BILL OF MATERIALS

ELECTRICAL
Loads S1 5 7 6 7 6 1 1 1 1 1 8 11 6 6 6 4 1 1 2 SWITCHES S2

CIRCUIT C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13

S3

Summary of Materials: DESCRIPTION 1. Switch 2. 50 W Bulb 3. Convenience Outlet 2 gang 4. Electrical Wire No. 12 THHN (roll) 5. Aircon QUANTITY 20 30 21 2 3

COST OF MATERIALS

ELECTRICAL
UNIT PRICE 150 210 410 3150 22200 COST 3000 6300 8610 6300 66600 66600

DESCRIPTION QUANTITY 1. Switch 20 2. 50 W Bulb 30 3. Convenience Outlet 21 2 gang 4. Electrical Wire 2 No. 12 THHN 5. Aircon 3 TOTAL COST:

Total Cost of Materials: Labor Cost (40%) Contractor (12%) Tax (4%) Additional Expenses: Total Project Cost:

66600 26640 7992 2664 37296 103896