Académique Documents
Professionnel Documents
Culture Documents
RGO:
OBRA:
LOCAL:
PREFEITURA MUNICIPAL DE
QUADRA POLIESPORTIVA
SEDE DO MUNICIPIO
DATA: AGOSTO/2013
TOTAL GERAL
QUADRA POLIESPORTIVA
Item
Unid.
Qtde
MOVIMENTAO TERRA:
Escavao / aterro mecanica p/ acerto terreno
Acerto e nivelamento do terreno
m3
m2
400.00
1,200.00
5.50
2.30
4,960.00
2,200.00
2,760.00
2
2.1
2.2
2.3
2.4
PISO QUADRA
Espalhamento de colcho de brita 0 esp=5cm
Forma de fundao de madeira de lei, contorno quadra
Malha de ao Bitola 5 mm, corte e dobra
Concreto 15 MPa de e= 10 cm
m3
m2
kg
m3
30.00
10.00
1,016.00
60.00
85.00
32.00
5.90
290.00
26,264.40
2,550.00
320.00
5,994.40
17,400.00
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
3.15
4
4.1
4.2
4.3
4.4
4.5
Unit.
85,938.10
1
1.1
1.2
Descrio
R$
Total
15,068.80
un
1.00
1,300.00
1,300.00
un
4.00
185.00
740.00
un
12.00
285.00
3,420.00
un
4.00
155.00
620.00
un
12.00
90.00
1,080.00
un
4.00
1,430.00
5,720.00
un
12.00
4.65
55.80
un
12.00
2.50
30.00
m
m
300.00
38.00
4.70
6.00
1,410.00
228.00
un
8.00
27.00
216.00
un
un
un
un
2.00
4.00
2.00
1.00
7.00
38.00
38.00
7.00
14.00
152.00
76.00
7.00
m2
220.00
75.00
16,500.00
1.00
560.00
560.00
1.00
1,300.00
1,300.00
1.00
370.00
370.00
300.00
3.50
1,050.00
19,780.00
cj
cj
cj
m
5
5.1
5.2
5.3
m
m
m
4.00
60.00
8.00
18.50
32.00
325.00
4,594.00
74.00
1,920.00
2,600.00
6
6.1
6.2
6.3
ARQUIBANCADA
MOVIMENTAO TERRA:
Escavao de vala em solo seco at 150 cm manual
Nivelamento e compactao fundo de vala
Aterro
m3
m2
m3
13.00
36.00
43.00
13.20
3.80
12.50
845.90
171.60
136.80
537.50
7
7.1
INFRA-ESTRUTURA:
Concreto ciclpico 150kg/m3 com 30% de pedra de mo
m3
13.00
253.00
3,289.00
3,289.00
8
8.1
SUPER-ESTRUTURAS:
Alvenarias de blocos de concreto 20x20x40 vazado
m2
120.00
66.00
7,920.00
7,920.00
9
9.1
9.2
PISOS E REVESTIMENTOS:
Piso cimentado com nata de cimento
Reboco Paulista
m2
m2
72.00
96.00
TOTAL
3,216.00
2,016.00
1,200.00
85,938.10
28.00
12.50
CREA