Académique Documents
Professionnel Documents
Culture Documents
Page
CHAPTER 1 INTRODUCTION
1.1
1.2
1.3
1.4
2.2
2.3
2.3.2
2.3.3
2.3.4
2.4
2.5
3.2
3.3
3.4
3.5
3.4.1
3.4.2
3.4.3
4.2
4.3
5.2
5.3
5.4
5.5
5.3.1
5.3.2
5.4.2
5.4.3
5.4.4
Main Gate Operation Rule (Case 1: TLWL > High TWL) ............................ 5-5
5.4.5
Main Gate Operation Rule (Case 2: Low TWL < TLWL < High TWL) ....... 5-5
5.4.6
Main Gate Operation Rule (Case 3: WLWL < TLWL < Low TWL)............. 5-8
5.4.7
5.4.8
5.4.9
5.4.10
5.4.11
Basic Flow and Annual Schedule of Main Gate Operation ......................... 5-12
5.5.2
5.5.3
Observation.................................................................................................. 5-12
5.5.4
5.5.5
5.5.6
5.5.7
List of Tables
Table 5.3.1
Table 5.4.1
Table 5.4.2
ii
List of Figures
Fig. 2.2.1
Fig. 2.4.1
Fig. 4.1
Fig. 5.2.2
Rating Curve of Water Level and Volume of Tempe Lake, 2003 .......................F-4
Fig. 5.4.1
Tempe Outflow and Walanae Discharge (with and without Barrage) ................F-5
Fig. 5.4.2
Fig. 5.4.3
Relation among Required Discharge, Barrage Site Water Level and Gate
Opening Height ..................................................................................................F-7
Fig. 5.4.4
Fig. 5.4.5
Fig. 5.4.6
Fig. 5.4.7
Fig. 5.4.8
Fig. 5.5.1
Fig. 5.5.2
Fig. 5.5.3
Fig. 5.5.4
Fig. 5.5.5
Fig. 5.5.6
Fig. 5.5.7
Fig. 5.5.8
iii