Procedure SITE SURVEY AND PLANNING PROCEDURE Doc. No. : HTS-RNO-QP-001 Rev ! o" No.

: 0 P#$e 1 o% &

REVISION CHANGE HISTORY Rev No. 0 Effective Date 31 Jul 2013 Affected Page All Change Descri tions New Issue Revie!ed "# A roved "#

$. PO%ICY Our policy is to find out and plan accurate site data at first time.

Procedure SITE SURVEY AND PLANNING PROCEDURE Doc. No. : HTS-RNO-QP-001 Rev ! o" No. : 0 P#$e ' o% &

&. P'RPOSE The purpose of this procedure is to provide comprehensive site survey data collection and plannin! procedure "as well as to collect accurate site data#. (. SCOPE This procedure is applica$le to %NO Transmission &ore 'ireless and Tower (epartments of the company. Other departments may also use such as Networ) *ection etc. ). RESPONSI*I%ITIES +.1. %NO (epartment or *ection ,ana!er is responsi$le for the !o ahead orders of site surveys as well as su$mission of site survey report"s# to respective departments. They are also responsi$le for proper preservation and filin! of all necessary records and data. +.2. T( ,ana!er is responsi$le for site survey approval. +.3. %NO -n!ineer"s# are responsi$le for performin! all %NO activities includin! site surveys. +. DE,INITIONS ..1. *ite means location of the e/uipment to $e installed. ..2. %NO %adio Networ) Optimi0ation (epartment ..3. %N1 means %adio Networ) 1lannin! ..+. T( means Technical (ivision .... &ell (ata is the cell parameters that will $e used to confi!ure the e/uipment. -. RE,ERENCES 2.1. I*O 300142005 2.2. &ompany %e/uirements

Procedure SITE SURVEY AND PLANNING PROCEDURE Doc. No. : HTS-RNO-QP-001 Rev ! o" No. : 0 P#$e ( o% &

.. THE PROCED'RE 6.1. *ite survey can $e performed if networ) initial plans are prepared or customers complaint or recommended $y %NO and approved $y T( mana!er. 6.2. 7pon the need of site survey trained or capa$le %NO -n!ineer"s# should visit the physical location of the area to confirm the need and collect necessary parameters usin! site preplan document. 6.2.1. If the site locates within the city ",o!adishu and its su$ur$s# the survey should not e8ceed to a period NOT more than two wor)in! days. 6.2.2. 9owever if the site locates rural areas *ite *urvey should not ta)e more than 10 wor)in! days. 6.3. After collectin! all necessary data %NO -n!ineer"s# must analy0e the data and produce site survey report that descri$ers site parameters. 6.+. %NO -n!ineer"s# should share the site survey report with the respective other departments within period not more than :I;- wor)in! days. NOTE: The timing of site survey report depends on the number of sites being surveyed and/or area of those sites. 6... Immediately after %NO (epartment su$mits the report respective department"s# will use such report to deploy re/uired e/uipment to the site. 6.2. (urin! deployment process %NO will report &ell (ata and su$mit it to the respective department"s# such as IN &ore and 'ireless within period not more than two wor)in! days. /. RECORDS 5.1. *ite *urvey :orm 5.2. *ite 1replan (ocument 5.3. *ite *urvey %eport 5.+. &ell (ata :orm

Procedure SITE SURVEY AND PLANNING PROCEDURE Doc. No. : HTS-RNO-QP-001 Rev ! o" No. : 0 P#$e & o% &

DOC'0ENTATION CHANGE ,%O1 CHART


*t a rt

*t e p 1 *t e p 2

*t e p 3

(e ci s ion
Yes

No

*t e p +

*t e p .

*t e p 2

*t e p N

-n d