Académique Documents
Professionnel Documents
Culture Documents
Vehicle Assly
DAILY CHECKING POINTS
SR. 2 3 4 5 6 DESCRIPTION 1 Fill Chassis tackle daily check sheet Check P& F operater control panel & lever Check Pneumatic pipe routine Tackle arm break working in condition Electrical control panel closed condition Electrical control panel button working condition
DATE :
FREQUENCY METHOD STANDRED Daily Daily Daily Daily Daily Daily Daily Daily Daily Manual Manual visual Manual visual Manual visual Manual Manual As per sheet No dust,durt Proper routine On/Off condition No open & W/o door As per application Working condition Working condition Working condition 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
7 Check drop lift cycle indecater lamp 8 Check drop lift dispatch sensor working 9 Check emergancy switch working
DATE :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
TO BE FILLED BY SEC.MANEGER
TARG DT STATUS REMARK
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Check electrical control panal 2 Check hydraulic system 3 4 5 6 7 Check hydraulic oil level Hydrolic & air hose pipe hroutine Check electrical control panel door Check M/C holding chain proper tightining Andon work in condition
DATE :
FREQUENCY METHOD STANDRED Daily Manual No dust Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Manual Visual Visual Manual Manual Visual Visual Manual Manual Manual Manual No oil leakage As per marking Proper routine No open Fully tight As per application as per use Clean & Hang properly Clean & Hang properly No material on floor No damage 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
8 Tube light work in condition 9 Bearing race stand condition 10 M/C display & its wire routine 11 Pick up fallen material 12 Check chassis position stopper bkt
DATE :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
ABNORMALITY OBSERVED
SR.NO 1 2 3 4 5 6 7 8 9 10 DESCRIPTION RESP.
TO BE FILLED BY SEC.MANEGER
TARG DT STATUS REMARK
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Check chassis lifting Zero gravity balancer 2 Locating hook condition 3 4 5 6 7 Check tackle rope condition Check Pneumatic pipe routine Check chassis stopper rubber coatted rod Check conveyor side plate Pick up fallen material
DATE :
FREQUENCY METHOD STANDRED Daily visual No wear Daily Daily Daily Daily Daily Daily visual visual visual visual visual Manual No wear No damage Proper routine No damage No loose No material on floor 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
DATE :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
TO BE FILLED BY SEC.MANEGER
TARG DT STATUS REMARK
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Clean paint bottle & paint bin 2 Check conver side bolt 3 4 5 6 7 Check mallet stand condition Andon work in condition Tube light work in condition Pick up fallen material Check mallet condition
DATE :
FREQUENCY METHOD STANDRED Daily manual No paint fallon Daily Daily Daily Daily Daily Daily Daily manual Visual Visual Visual Manual Visual Visual No loose No dust As per application as per use No material on floor No more damege No paint fallon 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
DATE :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
TO BE FILLED BY SEC.MANEGER
TARG DT STATUS REMARK
Bajaj Auto
Cell Name Conveyor " B " L-6 CDI Fitment
STAGE OWN
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Fixture openning tool condition 2 Pick up fallen material 3 4 5 6 7 8 9 10 Check conv. side bolt Tube light work in condition Normal function of fixture Andon work in condition
MONTH / YE
DATE :
FREQUENCY METHOD STANDRED Daily Manual No paint damege Daily Daily Daily Daily Daily Manual manual Visual Manual Visual No material on floor No loose as per use Easy openning As per application 1 2
DATE :
1 2
3 4 5 6 7 8 9 10
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
TO BE FILLED BY SEC.MANEGER
REMARK
27 28 29
30 31
27 28 29
30 31
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Check kit bin 2 Pick up fallen material 3 4 5 6 7 8 9 10 Check conv. side bolt Tube light work in condition Normal function of fixture Andon work in condition
DATE :
FREQUENCY METHOD STANDRED Daily Manual No damaged Daily Daily Daily Daily Daily Manual manual Visual Manual Visual No material on floor No loose as per use Easy openning As per application 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
DATE :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
TO BE FILLED BY SEC.MANEGER
REMARK
Bajaj Auto
Cell Name Conveyor " B " L-6 Battery Arrester Fitment
STAGE OWN
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Check kit bin condition 2 Pick up fallen material 3 4 5 6 7 8 9 10 Check conv. side bolt Tube light work in condition Normal function of fixture Andon work in condition Check Pneumatic pipe routine
MONTH / YE
DATE :
FREQUENCY METHOD STANDRED Daily Manual No damaged Daily Daily Daily Daily Daily Daily Manual manual Visual Manual Visual visual No material on floor No loose as per use Easy openning As per application Proper routine 1 2
DATE :
1 2
3 4 5 6 7 8 9 10
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
TO BE FILLED BY SEC.MANEGER
REMARK
27 28 29
30 31
27 28 29
30 31
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Check fastners trolley 2 Pick up fallen material 3 4 5 6 7 Check conver side cover bolt Andon work in condition Tube light work in condition Maximum & minimum inventory in secondary Work instruction display on stage
DATE :
FREQUENCY METHOD STANDRED Daily Manual No dust,durt Daily Daily Daily Daily Daily Daily Manual manual Visual Visual Visual Visual No material on floor No loose As per application as per use As per lay out Operation sequency 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
DATE :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
TO BE FILLED BY SEC.MANEGER
REMARK
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Check fastners trolley 2 Pick up fallen material 3 4 5 6 7 8 9 10 Check conv side bolt Andon work in condition Tube light work in condition Maximum & minimum inventory in secondary
DATE :
FREQUENCY METHOD STANDRED Daily Manual No dust,durt Daily Daily Daily Daily Daily Manual manual Visual Visual Visual No material on floor No loose As per application as per use As per lay out 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
DATE :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
TO BE FILLED BY SEC.MANEGER
REMARK
Bajaj Auto L
Cell Name Conveyor " B " L9 Engine bkt tightinig
STAGE OWN
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Pick up fallen material 2 Check conv side cover bolt 3 Andon work in condition 4 Tube light work in condition 5 Check Pneumatic pipe routine 6 7 8
MONTH / YE
DATE :
FREQUENCY METHOD STANDRED Daily Manual No material on floor Daily Daily Daily Daily manual Visual Visual visual No loose As per application as per use Proper routine 1 2
DATE :
1 2
1 2 3 4 5 6 7 8 9 10
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
TO BE FILLED BY SEC.MANEGER
REMARK
27 28 29 30
31
27 28 29 30
31
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Pick up fallen material 2 Check conver side cover bolt 3 Andon work in condition 4 Tube light work in condition 5 Check Pneumatic pipe routine 6 7 8
DATE :
FREQUENCY METHOD STANDRED Daily Manual No material on floor Daily Daily Daily Daily manual Visual Visual visual No loose As per application as per use Proper routine 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
DATE :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
TO BE FILLED BY SEC.MANEGER
REMARK
Bajaj Auto L
Cell Name Conveyor " B " L11 Chain routing
STAGE OWN
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Pick up fallen material 2 Check conver side cover bolt 3 4 5 6 7 8 9 Andon work in condition Tube light work in condition Display board acralyc condition Check Chain slakness tool Check Chain slakness tool nyllon pad
MONTH / YE
DATE :
FREQUENCY METHOD STANDRED Daily Manual No material on floor Daily Daily Daily Daily Daily Daily manual Visual Visual Visual Manual Manual No loose As per application as per use No damege No damege No wear,damege 1 2
DATE :
1 2
3 4 5 6 7 8 9 10
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
TO BE FILLED BY SEC.MANEGER
REMARK
27 28 29 30 31
27 28 29 30 31
Bajaj Auto L
Cell Name Conveyor " B " L12 Chain Case Fitment
STAGE OWN
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Check chain case trolley 2 Check chain case trolley 3 4 5 6 7 Maximum &minimum inventory in secondary Check Pneumatic pipe routine Pick up fallen material Check conver side cover bolt Andon work in condition
MONTH / YE
DATE :
FREQUENCY METHOD STANDRED Daily Manual No dust,durt Daily Daily Daily Daily Daily Daily Daily Manual Visual visual Manual manual Visual Visual Wheel freeness As per lay out Proper routine No material on floor No loose As per application as per use 1 2
DATE :
1 2
2 3 4 5 6 7 8 9 10
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
TO BE FILLED BY SEC.MANEGER
REMARK
27 28 29 30 31
27 28 29 30 31
Bajaj Auto L
Cell Name Conveyor " B " L13 GSL & RR Cover Fitment
STAGE OWN
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Check Pneumatic pipe routine 2 Pick up fallen material 3 Check conv side cover bolt 4 Andon work in condition 5 Tube light work in condition 6 7 8
MONTH / YE
DATE :
FREQUENCY METHOD STANDRED Daily visual Proper routine Daily Daily Daily Daily Manual manual Visual Visual No material on floor No loose As per application as per use 1 2
DATE :
1 2
2 3 4 5 6 7 8 9 10
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
TO BE FILLED BY SEC.MANEGER
REMARK
27 28 29 30 31
27 28 29 30 31
Bajaj Auto L
Cell Name Conveyor " B " L14 Carburattor Fitment
STAGE OWN
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Pick up fallen material 2 Check conver side cover bolt 3 4 5 6 Andon work in condition Tube light work in condition Display board acralyc condition Check tool condition
MONTH / YE
DATE :
FREQUENCY METHOD STANDRED Daily Manual No material on floor Daily Daily Daily Daily Daily manual Visual Visual Visual Visual No loose As per application as per use No damege No damege 1 2
DATE :
1 2
3 4 5 6 7 8 9 10
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
TO BE FILLED BY SEC.MANEGER
REMARK
27 28 29 30 31
27 28 29 30 31
Bajaj Auto L
Cell Name Conveyor " B " L15 SPM lower connection
STAGE OWN
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Check Pneumatic pipe routine 2 Pick up fallen material 3 4 5 6 7 8 Check conv side cover bolt Andon work in condition Tube light work in condition Check philips head bit condition
MONTH / YE
DATE :
FREQUENCY METHOD STANDRED Daily visual Proper routine Daily Daily Daily Daily Daily Manual manual Visual Visual Visual No material on floor No loose As per application as per use No wear or damaged 1 2
DATE :
1 2
2 3 4 5 6 7 8 9 10
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
TO BE FILLED BY SEC.MANEGER
REMARK
27 28 29 30 31
27 28 29 30 31
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Check gun balancer 2 Check gun socket 3 4 5 6 7 8 9 10 Pick up fallen material Check conver side cover bolt Andon work in condition Tube light work in condition
DATE :
FREQUENCY METHOD STANDRED Daily Manual Proper position Daily Daily Daily Daily Daily Manual Manual manual Visual Visual No wear out No material on floor No loose As per application as per use 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
DATE :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
TO BE FILLED BY SEC.MANEGER
REMARK
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Check handlebar trolley 2 check nyllon rod condition 3 4 5 6 7 check trolley side locking plate Check trolley wheel condition Maximum &minimum inventory in secondary Pick up fallen material Check conver side cover bolt
DATE :
FREQUENCY METHOD STANDRED Daily Manual No dust,durt Daily Daily Daily Daily Daily Daily Daily Daily Daily Visual Visual Manual Visual Manual manual Visual Visual Visual No loose & wear No loose & missing Freeness & damege As per lay out No material on floor No loose As per application as per use No damege 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
8 Andon work in condition 9 Tube light work in condition 10 Display board acralyc condition
DATE :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
TO BE FILLED BY SEC.MANEGER
REMARK
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Check Pneumatic pipe routine 2 Pick up fallen material 3 Check conveyor side cover bolt 4 Andon working condition 5 Tube light working condition 6
DATE :
FREQUENCY METHOD STANDRED Daily Manual No dust & durt Daily Daily Daily Daily Manual visual Manual manual No wear out Proper routine No material on floor No loose 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
DATE :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
TO BE FILLED BY SEC.MANEGER
REMARK
Bajaj Auto L
Cell Name Conveyor " B " L19 Choke conn.
STAGE OWN
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Check breather pipe clip plier condition 2 Tube light working condition 3 Check conveyor side plate 4 Andon working condition 5 Pick up fallen material 6 7
MONTH / YE
DATE :
FREQUENCY METHOD STANDRED Daily Manual No damege Daily Visual as per use Daily Daily Daily Visual Visual Manual No loose As per application No material on floor 1 2
DATE :
1 2
ABNORMALITY OBSERVED:-
SR.NO DESCRIPTION 1 2 3 4 5 6 7 8 9 10
RESP.
TARG DT
STATUS
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
TO BE FILLED BY SEC.MANEGER
REMARK
27 28 29 30 31
27 28 29 30 31
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Check spare seat cawl hanging fixture 2 Tube light working condition 3 4 5 6 7 Check Pneumatic pipe routine Pick up fallen material Check balancer rope condition Check conveyor side plate Andon working condition
DATE :
FREQUENCY METHOD STANDRED No dust ,durt Daily Manual Daily Visual as per use Daily Daily Daily Daily Daily Manual Manual Visual Visual Visual No dust & durt No material on floor No damege No loose As per application 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
DATE :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
TO BE FILLED BY SEC.MANEGER
REMARK
10
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Pick up fallen material 2 Check conver side cover bolt 3 Andon work in condition 4 Tube light work in condition 5 Display board acralyc condition
DATE :
FREQUENCY METHOD STANDRED Daily Manual No material on floor Daily Daily Daily Daily manual Visual Visual Visual No loose As per application as per use No damege 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
DATE :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
TO BE FILLED BY SEC.MANEGER
REMARK
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Jelly stand condition 2 Jelly application brush condition 3 4 5 6 7 Pick up fallen material Check conver side cover bolt Andon work in condition Tube light work in condition Check Pneumatic pipe routine
DATE :
FREQUENCY METHOD STANDRED Daily manual No dust ,durt Daily Daily Daily Daily Daily Daily Daily manual Manual manual Visual Visual Manual Visual No damege No material on floor No loose As per application as per use No dust & durt No damege 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
DATE :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
TO BE FILLED BY SEC.MANEGER
REMARK
Bajaj Auto L
Cell Name Conveyor " B " L23 Battery Connection
STAGE OWN
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Check Pneumatic pipe routine 2 Check balancer rope condition 3 4 5 6 7 Pick up fallen material Check conver side cover bolt Andon work in condition Tube light work in condition Check philips head bit condition
MONTH / YE
DATE :
FREQUENCY METHOD STANDRED Daily Manual No dust & durt Daily Daily Daily Daily Daily Daily Daily Visual Manual manual Visual Visual Visual Visual No damege No material on floor No loose As per application as per use No wear or damaged No damege 1 2
DATE :
1 2
3 4 5 6 7 8 9 10
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
TO BE FILLED BY SEC.MANEGER
REMARK
27 28 29 30 31
27 28 29 30 31
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Check trolley condition 2 Check trolley condition 3 4 5 6 7 Check trolley tank locating hanger Check trolley display board Pick up fallen material Check conver side cover bolt Andon work in condition
DATE :
FREQUENCY METHOD STANDRED Daily Manual No dust,durt Daily Daily Daily Daily Daily Daily Daily Manual Manual Manual Manual manual Visual Visual Rotaion in 360 degree No bend , broken No bend ,no dust No material on floor No loose As per application as per use 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
DATE :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
TO BE FILLED BY SEC.MANEGER
REMARK
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Check c.p.u condition 2 Check voltage stbilizer 3 4 5 6 7 Check scanner charger condition Check key board condition Check wire routing Check P.C screen Pick up fallen material
DATE :
FREQUENCY METHOD STANDRED Manual No dust,durt Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Manual Manual Manual Manual Manual Manual manual Visual Visual Manual Manual No dust,durt Woking condition No dust,durt Proper routing No dust,durt No material on floor No loose As per application as per use No dust, Proper location 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
8 Check conver side cover bolt 9 Andon work in condition 10 Tube light work in condition 11 Off line board condition 12 Check rubber pad lower side
DATE :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
TO BE FILLED BY SEC.MANEGER
REMARK
Bajaj Auto L
Cell Name Conveyor " B " L26 Fr. Br. Conn
STAGE OWN
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION 1 Check DC tool Display screen 2 Check DC tool balancer 3 4 5 6 Pick up fallen material Check conver side cover bolt Andon work in condition Tube light work in condition
MONTH / YE
DATE :
FREQUENCY METHOD STANDRED Daily Manual No dust,durt Daily Daily Daily Daily Daily Manual Manual manual Visual Visual proper No material on floor No loose As per application as per use 1 2
DATE :
1 2
2 3 4 5 6 7 8 9 10
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
DATE :
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
TO BE FILLED BY SEC.MANEGER
REMARK
27 28 29 30 31
27 28 29 30 31
Vehicle Assly
DAILY CHECKING POINTS
SR. DESCRIPTION
DATE :
FREQUENCY METHOD STANDRED 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
DATE :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
6 7 8 9 10