INDIGENISED FASTNERS 1250-2E GTG

SR6001D-320318

SR6001D-320319

SR6001D-321809

SR6001D-348507

SR6001D-97620

SR6001D-13463-77-

SR6001D-13463-77: 16-21

SR6001D-13463-77-8.21

INDIGENISATION BULLETIN
IMPORT SUBSTITUTION THROUGH REVERSE ENGINEERING
DAG ,CENTRE (C.No. 32)
Date : Aug 04
Issue No.NDB/IND/05/ENGG-DAG
INDIGENOUS DEVELOPMENT OF 1250 2E GAS TURBINE GENERATOR
TURBO COMPRESSOR FASTNERS
1.
In continued efforts to attain self-reliance by way of indigenisation, development
of spares for the 1250-2E Gas Turbine Generator Turbo Compressor (TC) are being
undertaken by the Diesel and Gas Turbine (DAG) department of ND (MB). A large
number of spares are required for undertaking 5K/10K routines on the TC and RG.
Routines on GTGs of a large number of ships have been deferred due to non- availability
of these spares. Most of the lock plates required have been manufactured through
indigenous source. The developed items will be taken up for fitment trial on receipt of
bulk items.
2.
The details of additional 08 fasteners for which bulk production clearance has
been accorded for carrying out 5,000 hourly routines on the TC are as follows:
SNO

ITEM CODE

DESC

PLATE
LOCKING
PLATE
SR6001D-320319
LOCKING
PLATE
SR6001D-321809
LOCKING
PLATE
SR6001D-348507
LOCKING
WASHER
SR6001D-97620
LOCK
WASHER TAB
SR6001D-13463-77-10.21 10.21
SR6001D-13463-77: 16-21- WASHER
08X22H6T
16.21.

SR6001D-13463-77-8.21

1
2
3
4
5
6

SR6001D-320318

WASHER 8-21

CLASS
OF SHIP

EQUIPMENT

MATERIAL
12X18H10T

SNF/DELHI

GTG 1250 2E

SNF/DELHI

GTG 1250 2E

SNF/DELHI

GTG 1250 2E

SNF/DELHI

GTG 1250 2E

SNF/DELHI

GTG 1250 2E

SNF/DELHI

GTG 1250 2E

SNF/DELHI

GTG 1250 2E

SNF/DELHI

GTG 1250 2E

12X18H10T
12X18H10T
12X18H10T
12X18H10T
12X18H10T
12X18H10T
12X18H10T

NATURE OF DEVELOPMENT

Import substitution of fasteners through indigenous sources.

The drawing and data regarding material specifications /mechanical properties


was collected keeping in mind the criticality of the items. Heat treatment schedule
was arrived from tests on the original samples
Material Specifications- 12X18H10T

C
0.12
max

Mn
2.00
max

Si
0.80
max

S
.020
max

P
.035
max

Ni
9-11

Cr
17-19

Ti
0.8 max(5%C to 0.8)

Fe
Base

Mechanical Properties
UTS:
Yield strength:
% Elongation:
Hardness:

515 MPa
205 Mpa
40 % min
140-170 BHN

Pilot samples have been manufactured prior to undertaking bulk production.

Approval for bulk production was accorded after dimensional compatibility


checks and verification of accompanying test reports from government approved
laboratories. The following were checked:
o Pilot sample inspection report
o Sample Drawing
o Chemical test report for material conformity
o Raw Material Procurement certificate

REMARKS

Items developed will be taken up for user trials on receipt of the remaining
fasteners.

The details of the firm through which the manufacturing of the fasteners has been
undertaken:
JS Precisions
#88 5th Cross , Ashoknagar
Bangalore- 560050
Tel: 080-26675649 Fax: 080-26616156
E-mail:
j_s_preci@satyam.net.in

On completion of user trials onboard, the final report will be compiled.


CONTACT DETAILS

Manager Diesel Engines and Gas Turbines


Naval Dockyard
Mumbai-23
Phone : 022-22687548 / 22687549

NAVAL DOCKYARD MUMBAI

INDIGENISATION BULLETIN
DATE OF ISSUE :

Aug 04

ISSUE NO.ND(MB)/IND/DAG-05
PREAMBLE

INDIGENISATION EFFORTS- NAVAL DOCKYARD (MB)


1.
Taking into consideration the difficulties experienced in undertaking the
routine on the 1250-2E Gas Turbine Generators, development of critical spares
has been undertaken by the yard to attain self-reliance by way of indigenisation.
08 such spares have been already developed through indigenous sources
through REVERSE ENGINEERING since the specifications and samples were
available for these spares. The salient features of the activities undertaken to
affect the process are as follows:
(a)
(b)
(c)
(d)
(e)

Preparation of manufacturing drawings.


Identification of material specifications /Composition.
Identification of mechanical properties and special heat treatment to
be undertaken.
Acceptance checks on pilot samples.
Acceptance trials/user trial followed by compilation of report for the
bulk items.

GM(R)
DISTRIBUTION
NHQ
HQWNC
HQENC
ND (V)
NSRY (KOCHI)
NSRY (PORTBLAIR)
INSMA (MB)
MS (MB)/MS (V)

ACOM (D&R), DFM, DME


CSO (TECH) / CRO
CSO (TECH) / CRO
ASD / GM(R) / AGM (PR)