Ermchtigt und not ifiz iert g em A rti kel 1 0 de r Richtlinie des Rates vom 21. Dezember 1988 zur Angleichung der Rechts- und Verwaltung svorschriften d e r M i t g l i e ds t a a t e n b er B auprod ukte (89/106/EWG)
ETA-03/0032
Zulassungsinhaber
Holder of approval
Kraftkontrolliert spreizender Verbunddbel mit Ankerstange aus galvanisch verzinktem Stahl in den Gren M10/75, M12/95, M16/105, M16/125 und M20/170 zur Verankerung im Beton
Torque controlled bonded anchor with anchor rod made of galvanised steel of sizes M10/75, M12/95, M16/105, M16/125 und M20/170 for use in concrete
Geltungsdauer vom
Validity from
bis
to
Herstellwerk
Manufacturing plant
Diese europische technische Zulassung ersetzt ETA-03/0032 mit Geltungsdauer vom 01.10.2003 bis 01.10.2008. This European Technical Approval replaces ETA-03/0032 with validity from 01.10.2003 to 01.10.2008.
I
1
The Deutsches Institut fr Bautechnik is authorised to check whether the provisions of this European Technical Approval are met. Checking may take place in the manufacturing plant. Nevertheless, the responsibility for the conformity of the products to the European Technical Approval and for their fitness for the intended use remains with the holder of the European Technical Approval. This European Technical Approval is not to be transferred to manufacturers or agents of manufacturers other than those indicated on page 1, or manufacturing plants other than those indicated on page 1 of this European Technical Approval. This European Technical Approval may be withdrawn by the Deutsches Institut fr Bautechnik, in particular after information by the Commission on the basis of Article 5 (1) of Council Directive 89/106/EEC. Reproduction of this European Technical Approval including transmission by electronic means shall be in full. However, partial reproduction can be made with the written consent of the Deutsches Institut fr Bautechnik. In this case partial reproduction has to be designated as such. Texts and drawings of advertising brochures shall not contradict or misuse the European Technical Approval. The European Technical Approval is issued by the approval body in its official language. This version corresponds to the version circulated within EOTA. Translations into other languages have to be designated as such.
1 2 3 4
Official Journal of the European Communities N L 40, 11.02.1989, p. 12 Official Journal of the European Communities N L 220, 30.08.1993, p. 1 Bundesgesetzblatt I, p. 812, zuletzt gendert durch Gesetz ('last amended by law on') vom 15.12.2001, Bundesgesetzblatt I, p. 3762 Official Journal of the European Communities N L 17, 20.01.1994, p. 34
15538.04
II
1
1.1
1.2
2
2.1
The technical documentation of this European Technical Approval is deposited at the Deutsches Institut fr Bautechnik and, as far as relevant for the tasks of the approved bodies involved in the attestation of conformity procedure, is handed over to the approved bodies.
15538.04
The characteristic anchor values for the design of anchorages are given in Annexes 5 to 6. Each anchor rod shall be marked with the identifying mark of the producer, with the anchor size and with fixture thickness in accordance with Annex 3. Each foil capsule shall be marked with the identifying mark of the producer and with the trade name. The Anchor shall only be packaged and supplied as a complete unit, foil capsules being packed separately from anchor rods, nuts and washers. 2.2 Methods of verification The assessment of fitness of the anchor for the intended use in relation to the requirements for mechanical resistance and stability and safety in use in the sense of the Essential Requirements 1 and 4 has been made in accordance with the "Guideline for European Technical Approval of Metal Anchors for Use in Concrete", Part 1 "Anchors in general" and Part 5 "Bonded anchors" as well as the TR 018 "Torque-controlled bonded anchors", on the basis of Option 1. In addition to the specific clauses relating to dangerous substances contained in this European Technical Approval, there may be other requirements applicable to the products falling within its scope (e.g. transposed European legislation and national laws, regulations and administrative provisions). In order to meet the provisions of the EU Construction Products Directive, these requirements need also to be complied with, when and where they apply.
3
3.1
3.2 3.2.1
Responsibilities Tasks of the manufacturer; factory production control The manufacturer has a factory production control system in the plant and exercises permanent internal control of production. All the elements, requirements and provisions adopted by the manufacturer are documented in a systematic manner in the form of written policies and procedures. The production control system ensures that the product is in conformity with the European Technical Approval. The manufacturer shall only use raw materials supplied with the relevant inspection documents as laid down in the prescribed test plan6. The incoming raw materials shall be subject to controls and tests by the manufacturer before acceptance. Check of incoming materials such as anchor rods, nuts and washers as well as resin and hardener shall include control of the inspection documents presented by suppliers (comparison with nominal values) by verifying dimensions and determining material properties, e.g. tensile strength, hardness, surface finish.
The prescribed test plan has been deposited at the Deutsches Institut fr Bautechnik and is handed over only to the approved bodies involved in the conformity attestation procedure.
15538.04
The manufactured components of the anchor shall be subjected to the following tests: Dimensions of component parts: anchor rod (diameter, length, thread); hexagon nut (well running, wrench size across flats); washer (diameter, thickness); resin (fill quantity, fill weight); hardener (fill quantity, fill weight). Material properties: anchor rod (tensile strength, yield limit); hexagon nut (proof load); washer (hardness); mortar (condition, curing time, viscosity); hardener (condition, reactivity). Thickness of the zinc coating. Visual control of completeness of the anchor. The frequency of controls and tests conducted during production and on the assembled anchor is laid down in the prescribed test plan taking account of the automated manufacturing process of the anchor. The results of factory production control are recorded and evaluated. The records include at least the following information: designation of the product, basic material and components; type of control or testing; date of manufacture of the product and date of testing of the product or basic material and components; result of control and testing and, if appropriate, comparison with requirements; signature of person responsible for factory production control. The records shall be presented to the inspection body involved in the continuous surveillance. On request they shall be presented to the Deutsches Institut fr Bautechnik. Details of the extent, nature and frequency of testing and controls to be performed within the factory production control shall correspond to the prescribed test plan which is part of the technical documentation of this European Technical Approval. 3.2.2 Tasks of approved bodies 3.2.2.1 Initial type-testing of the product For initial type-testing the results of the tests performed as part of the assessment for the European Technical Approval shall be used unless there are changes in the production line or plant. In such cases the necessary initial type-testing has to be agreed between the Deutsches Institut fr Bautechnik and the approved bodies involved. 3.2.2.2 Initial inspection of factory and of factory production control The approved body shall ascertain that, in accordance with the prescribed test plan, the factory, in particular the staff and equipment, and the factory production control are suitable to ensure a continuous and orderly manufacturing of the anchor with the specifications mentioned in 2.1 as well as in the Annexes to the European Technical Approval, in accordance with the prescribed test plan. 3.2.2.3 Continuous surveillance The approved body shall visit the factory at least once a year for surveillance. It has to be verified that the system of factory production control and the specified automated manufacturing process are maintained taking account of the prescribed test plan. Continuous surveillance and assessment of factory production control have to be performed according to the prescribed test plan.
15538.04
The results of product certification and continuous surveillance shall be made available on demand by the certification body or inspection body, respectively, to the Deutsches Institut fr Bautechnik. In cases where the provisions of the European Technical Approval and the prescribed test plan are no longer fulfilled the conformity certificate shall be withdrawn. 3.3 CE marking The CE marking shall be affixed on each packaging of anchors. The symbol "CE" shall be accompanied by the following information: identification number of the certification body; name or identifying mark of producer and manufacturing plant; the last two digits of the year in which the CE marking was affixed; number of the EC certificate of conformity; number of the European Technical Approval; use category (ETAG 001-1 Option 1); size.
Assumptions under which the fitness of the product for the intended use was favourably assessed
Manufacturing The anchor is manufactured in accordance with the provisions of the European Technical Approval using the automated manufacturing process as identified in the inspection of the plant by the Deutsches Institut fr Bautechnik and the approved body and laid down in the technical documentation. Installation Design of anchorages The fitness of the anchor for the intended use is given under the following conditions: The anchorages are designed in accordance with the "Guideline for European Technical Approval of Metal Anchors for Use in Concrete", Annex C, Method A, under the responsibility of an engineer experienced in anchorages and concrete work. Verifiable calculation notes and drawings are prepared taking account of the loads to be anchored. The position of the anchor is indicated on the design drawings (e.g. position of the anchor relative to reinforcement or to supports, etc.). Installation of anchors The fitness for use of the anchor can only be assumed if the anchor is installed as follows: Anchor installation carried out by appropriately qualified personnel and under the supervision of the person responsible for technical matters of the site. Use of the anchor only as supplied by the manufacturer without exchanging the components of an anchor. Anchor installation in accordance with the manufacturers specifications and drawings using the tools indicated in the technical documentation of this European Technical Approval. Checks before placing the anchor to ensure that the strength class of the concrete in which the anchor is to be placed is in the range given and is not lower than that of the concrete to which the characteristic loads apply. Check of concrete being well compacted, e.g. without significant voids.
4.1
4.2 4.2.1
4.2.2
15538.04
4.2.3
The anchor must not be installed in flooded holes. Before installation of the anchor the hole shall be cleaned, and possibly existing water in the hole shall be completely removed. The hole shall be cleaned by at least blowing out twice with a hand pump. Keeping the effective anchorage depth. Keeping of the edge distance and spacing to the specified values without minus tolerances. Positioning of the drill holes without damaging the reinforcement. In case of aborted hole, the hole shall be filled with mortar. The foil capsule is set into the drilled hole. Connecting the anchor rod with the percussion drill by using a corresponding adapter. Driving the anchor rod into the foil capsule by simultaneous hammering and turning of the drill. If the anchorage depth is achieved the drill must stopped immediately by using some pressure. If the anchor is proper installed mortar must be visible at the member surface. The anchor component installation temperature shall be at least +5 C. During curing of the injection mortar the temperature of the concrete must not fall below 0 C. The curing time until the anchor may be loaded as given in Annex 2 has to be observed. For wet concrete the curing time according to Annex 2 must be doubled. After the curing time the member to be anchored shall be fixed by using the torque wrench by not exceeding the torque moment given in Annex 4. Responsibility of the manufacturer It is in the responsibility of the manufacturer to ensure that the information on the specific conditions according to 1 and 2 including Annexes referred to and 4.2.1 and 4.2.2 as well as 5.1 is given to those who are concerned. This information may be made by reproduction of the respective parts of the European Technical Approval. In addition all installation data shall be shown clearly on the package and/or on an enclosed instruction sheet, preferably using illustration(s). The minimum data required are: drill bit; hole depth; diameter of anchor rod; minimum effective anchorage depth; maximum thickness of the fixture; information on the installation procedure, including cleaning of the hole with the cleaning equipment, preferably by means of an illustration; anchor component installation temperature; ambient temperature of the concrete during installation of the anchor; curing time until the anchor may be loaded as a function of the ambient temperature in the concrete during installation; torque moment; identification of the manufacturing batch. All data shall be presented in a clear and explicit form.
15538.04
5
5.1
Beglaubigt A. Kummerow
15538.04
HVU-TZ M..
HVU-TZ M..
HVZ ...
Fixture Thickness
HVZ ...
Annex 1
of European Technical Approval
ETA-03/0032
dp
HVU-TZ M..
p
HVU-TZ M..
Table 1:
Materials
Marking HVU-TZ M .. Foil tube: Aggregate: Binder: Hardener: Material PP-PET-PE Composition foil Quartz sand Reaction resin Dibenzoylperoxid
Designation
Foil capsule
Table 2:
11 110 M10x75
[mm]
Table 3:
These data are valid for dry anchorage base only. In wet anchorage base the curing times must be doubled.
Annex 2
of European Technical Approval
ETA-03/0032
1
dk
3
HVZ...
Marking 2
hef
HVZ ...
HAS-E-TZ
Table 4:
1 2 3
1)
Part Designation
Anchor rod washer DIN 125 Hexagon nut DIN EN 24032
Table 5:
Anchor rod HAS-(E-)TZ
M12x95 / tfix
M12 / tfix 95 25 / 50 / 100 158 / 183 / 233 95 12 12,8
= 1500 mm
M16x105 / tfix
M16 / tfix 105 30 / 60 / 100 181 / 211 / 251 105 16
M16x125 / tfix
M16L / tfix 125 30 / 60 / 100 201 / 131 / 271 125
M20x170 / tfix
M20 / tfix 170 40 269 170 21 22,7
1)
hef = d dk
1)
16,8
Annex 3
of European Technical Approval
ETA-03/0032
d0
df
HVZ ...
hef = h1 hmin
1) 2) 3) 4)
1)
2) f
tfix
4)
3)
Effective anchorage depth hef see Annex 3 and 5 Effective length of anchor in shear loading f see Annex 6 Minimum thickness of concrete member hmin Fixture thickness tfix see Annex 1 and 3
Table 6:
Nominal diameter of drill bit Cutting diameter of drill bit Depth of drilled hole Diameter of clearance hole in the fixture Torque moment
HAS-(E-)TZ
Tinst [Nm]
Table 7:
Minimum thickness of concrete member, minimum spacing and minimum edge distance of anchors
HVZ with HAS-(E-)TZ M10x75 hmin [mm] smin [mm] cmin [mm] smin [mm] cmin [mm] 150 50 50 50 50 M12x95 190 60 60 60 70 M16x105 M16x125 210 70 70 70 85 250 M20x170 340 80 80 80 80
Min. thickness of concrete member Cracked concrete Minimum spacing Minimum edge distance Non-cracked concrete Minimum spacing Minimum edge distance
Hilti adhesive anchor HVZ Characteristic values of anchors and installation; Minimum thickness of concrete, minimum spacing and edge distances
Annex 4
of European Technical Approval
ETA-03/0032
Table 8:
Steel failure Characteristic resistance Partial safety factor Pullout failure Characteristic resistance in cracked concrete Characteristic resistance in non-cracked concrete Increasing factors for NRk,p for cracked and non-cracked concrete Partial safety factor NRk,p NRk,p [kN] [kN] C30/37
c
NRk,s
Ms
[kN] [-]
35
51 1,5
90
182
1)
1)
1)
1)
1)
1)
40
1)
1)
1)
C40/50 C50/60
Mp
[-]
Concrete cone failure and splitting failure Effective anchorage depth Spacing Edge distance Partial safety factor
1)
hef
[mm]
75
95
125
170
M,sp
[-]
2)
= 1,0 is included.
Table 9:
M16x105 M16x125 M20x170 24,6 0,3 1,0 30,8 0,2 1,2 30,8 0,3 1,1 36,9 0,2 1,2 58,4 0,3 1,2 70,7 0,2 1,2
[mm] [mm]
Hilti adhesive anchor HVZ Design method A, characteristic values of resistance to tension loads; displacements
Annex 5
of European Technical Approval
ETA-03/0032
Table 10: Characteristic values of resistance to shear loads for design method A
HVZ with HAS-(E-)TZ Steel failure without lever arm Characteristic resistance Partial safety factor Steel failure with lever arm Characteristic resistance Partial safety factor Concrete pryout failure Factor in equation (5.6) of ETAG Annex C, 5.2.3.3 Partial safety factor Concrete edge failure Effective length of anchor in shear loading Diameter of anchor Partial safety factor
1)
M10x75
M12x95
VRk,s
Ms
[kN] [-]
18
27 1,25
51
88
MRk,s [Nm]
Ms
48
86 1,25
227
519
[-]
k
Mcp
[-] [-]
2,0 1,8
1)
lf dnom
Mc
75 12
95 14
105 18 1,8
1)
125
170 25
= 1,0 is included.
Hilti adhesive anchor HVZ Design method A, characteristic values of resistance to shear loads; displacements
Annex 6
of European Technical Approval
ETA-03/0032