HAZOP STUDY WO

Node E-501 Dwg No:

Event No
1

DEVIATION More Flow

No
1

CAUSES

No
1.1

Inlet valve malfunction fully open Inlet valve malfunction close

No Flow Reverse Flow More Pressure Less Pressure / Vacuum More Temperature

1.1

No additional significant issues of concerns identified. No additional significant issues of concerns identified. No additional significant issues of concerns identified. 1 Inlet valve malfunction close
1

1.1

Less Temperature Composition Change

Inlet valve malfunction fully open No additional significant issues of concerns identified. No additional significant issues of concerns identified. No additional significant issues of concerns identified. No additional significant issues of concerns identified. No additional significant issues of concerns identified. No additional significant issues of concerns identified. No additional significant issues of concerns identified. No additional significant issues of concerns identified. No additional significant issues of concerns identified. No additional significant issues of concerns identified.

1.1

Contamination

10

Relief System and Piping Class Instrumentation

11

12

High level.

13

Low level. Corrosion/erosion Sampling

14

15

16

Drain/Vent Maintenance

17

18

Static Electricity Startup Shutdown Safety

19

20

21

No additional significant issues of concerns identified 1 No additional significant issues of concerns identified 1 No additional significant issues of concerns identified 1 No additional significant issues of concerns identified

HAZOP STUDY WORKSHEET


Intention of lines:

CONSEQUENCES

No
1.1.1

SAFEGUARDS

Act No

Potential less temperature benzene No heating for benzene

Temperature Alarm Low

1.1.1

Temperature Alarm High

No heating for benzene Potential less temperature benzene

1.1.1

Temperature Alarm High Temperature Alarm Low

1.1.1

RECOMMENDATION

CONCERN

HAZOP STUDY W
Node No

Event No
232

DEVIATION More Flow

No
1

CAUSES

No
1.1

24-LV-265 malfunction open

233

No Flow

24-LV-265 malfunction close

1.1

1.2

234

Reverse Flow

No additional significant issues of concerns identified See No Flow : 24-LV-265 malfunction close No additional significant issues of concerns identified No additional significant issues of concerns identified No additional significant issues of concerns identified No additional significant issues of concerns identified No additional significant issues of concerns identified

235

More Pressure

236

Less Pressure / Vacuum More Temperature

237

238

Less Temperature

239

Composition Change

240

Contamination

241

Relief System and Piping Class Instrumentation

No additional significant issues of concerns identified No additional significant issues of concerns identified See No Flow : 24-LV-265 malfunction close See More Flow : 24-LV-265 malfunction open No additional significant issues of concerns identified. No additional significant issues of concerns identified. No additional significant issues of concerns identified. No additional significant issues of concerns identified No additional significant issues of concerns identified No additional significant issues of concerns identified No additional significant issues of concerns identified No additional significant issues of concerns identified

242

243

High level.

244

Low level.

245

Corrosion/erosion

246

Sampling

247

Drain/Vent

248

Maintenance

249

Static Electricity

250

Startup

251

Shutdown

252

Safety

HAZOP STUDY WORKSHEET


Intention of lines: Boiler: Blow Down from Deaerator and Boiler

CONSEQUENCES

No
1.1.1

SAFEGUARDS

Act No
45

Low level Continuous Blow down Flash Tank 24-V-265, steam blow by to Blow down Cooler 24-E-265

24-LAL-265, Operate bypass valve

46

High level Continuous Blow down Flash Tank 24-V-265 High pressure Continuous Blow down Flash Tank 24-V-265

1.1.1

24-LAH-265, Operate bypass valve 24-PSV-265

1.2.1

RECOMMENDATION

CONCERN

Review piping material specification Safety and equipments downstream of Continuous Blow down Flash Tank 24-V-265 if it is stand to high pressure and high temperature Need to study if using by pass line Safety operation Boiler still consider safe