NOTES

2,075 3,000 3,000 3,000 3,000

IPE 200 I-section D


305x165x40 UB
200 200

1.Foundations shall generally be taken down 1300 mm below existing ground level and all excavations to be approved first by the engineer before concrete blinding is laid. 2.Weak Pockets of bearing strata to be dug out and filled with 1:2 all in concrete mix.

2,800

C
200

305x165x40 UB

305x165x40 UB

IPE 200 I-section

IPE 200

1,000

1,200

1,200

IPE 200

IPE 200

IPE 200

IPE 200

m 100

olid s k hic t m

3,750

ith w p n to o ed c r info e r slab


200

305x165x40 UB

305x165x40 UB

305x165x40 UB

wire

f. N e r sh me

2w 5 2 o. A

ith

ver o c . min

2,875

2,875

mm 0 5 of

5,550

ts, e e sh IPE 200 I-section on r I ised n a ys alv 4 g othwa 2 ge c/c b a u G on 200mm d e t sea Y12@ b a l th lid s ed wi o s rc hick reinfo t mm 100

IPE 200 I-section

3. Concrete Mixes: a) Mass concrete to have a minimum works cube strength of 15N/mm2 at 28 days with 40 mm Maximum aggregate size. b)Reinforced concrete to have a minimum works cube strength of 25 N/mm2 at 28 days with 20 mm maximum Aggregate size. 4. Reinforcement a)Y....denotes High yeild bars to be square twisted cold formed bars to B.S.4461. b)R ...denotes Mild steel to be round bars to B.S.4449. c)Mesh requirements to comply with the requirements of B.S. 4483. 5. Minimum cover to all steel in foundations,ground beams and stub columns to be 40 mm unless shown otherwise. 6. Block Work: All load bearing block walls to be constructed from solid block of 5.0N/mm MIN.with B.S 5628 Part 1 Structural use of Unreinforced Masonry. Mortar to conform to Mortar designation (III) of Table 1 BS 5628 Part 1. 7. Joints: Movement joints to be amaximum 9.0m centres.joint positions as indicated onDrawings.Joint in slab to be carried through walls to underside of ring beam.

2,875

2,875

B IPE 200 I-section

200

200

A 1

IPE 200 I-section 1


3,000

GENERAL STAIR CASES' NOTES 2.Staircase Concrete is of Fcu 30N/Sq.MM. and Ring Beam of Fcu 35N/Sq.MM after 28 days.

2,075

3,000

3,000

1,000

2,000

6 TYPICAL MEZZANINE FLOOR LAYOUT

FOUNDATION LAYOUT

3.Site Engineer to Prepare Trial Mixes for Approval by Engineer. 4.All Structural Concrete to be Tested for Compressive Strength by Central Materials .Labaratory. 5.Concrete to recieve full time curing preferably surface curing or equal and approved by the Engineer. 6.Stairs are to comprise: 175mm Waist, 150mm Risers and 300mm Treads and/or inclined angle of 30.963 Degrees to the Horizontal. 6) All dimensions must be verified on site before cutting any reinforcement

Parapet Wall To Detail


3,100 3,100

7) All dimensions must be checked and verified on site before commencing any works. Descrepancies to be brought to the attention of the Engineer immediately. 8) Contractor must submit shop drawings to engineer for approval prior to fabrication of structural steelwork 9) All welds to be 6mm fillet welds 10)Structural steelwork to be grade 43 to B.S. 449 11) All steel surfaces shall be thoroughly power wire brushed and cleaned with approved solvent and coated of red oxide primer type 'A' to B.S. 2523. All scratches to be repainted

3,100

3,100

12) All dimensions to be checked and verified on site before fabrication commences 13) THE QUALITY OF ALL MATERIALS AND WORKMANSHIP SHALL COMPLY WITH THE REQUIREMENTS OF THE RELEVANT BRITISH STANDARDS AND CODES OF PRACTICE 14) Paint one shop coat of red oxide primer prior to dispatch, touch up on site (for any scratches); apply second coat of red oxide primer after erection and gloss paint as directed by Architect

3,100

200

100

3,100

LINK-A TECHNOLOGIES LTD


Architects, Civil/Structural engineers
P.O Box 24868 Kampala E-mail- tchnlgslnk@gmail.com Mobile- +256-772-846 511 + 256-702-098 979

3,100

Stong Room wall To Detail


Ground Level

3,100

Ground Level

Issue Type

CONSTRUCTION
Pad/footings to Detail
This Drawing is the copyright of Link-A Tech. Ltd and must not be reproduced without permission The moral right of the author is hereby asserted Copyright c 2013

SECTION A-A
Project Title

SECTION B-B
CLIENT DESCRIPTION

Scale 1:100,75,50 Architects:

Date Nov, 2013

Designed by M.E.N

Drawn by M.E.N Drawing NO. LINK-A 001

NOTES
250x250mmx16mm th. base plate with 6 holes 22mm diameter 25mm Grout

100 square x 25mm th. non-shrink sand/cement levelling pad provided at the same level by the civil contractor prior to erection of steel columns
50 25

IPE 200 I-section

1.Foundations shall generally be taken down 1300 mm below existing ground level and all excavations to be approved first by the engineer before concrete blinding is laid. 2.Weak Pockets of bearing strata to be dug out and filled with 1:2 all in concrete mix.

03

125

6/20 diameter H.D Bolts with nuts and flat round washers, 450mm long (STD/HD20/450)
300

3. Concrete Mixes: a) Mass concrete to have a minimum works cube strength of 15N/mm2 at 28 days with 40 mm Maximum aggregate size. b)Reinforced concrete to have a minimum works cube strength of 25 N/mm2 at 28 days with 20 mm maximum Aggregate size. 4. Reinforcement a)Y....denotes High yeild bars to be square twisted cold formed bars to B.S.4461. b)R ...denotes Mild steel to be round bars to B.S.4449. c)Mesh requirements to comply with the requirements of B.S. 4483. 5. Minimum cover to all steel in foundations,ground beams and stub columns to be 40 mm unless shown otherwise. 6. Block Work: All load bearing block walls to be constructed from solid block of 5.0N/mm MIN.with B.S 5628 Part 1 Structural use of Unreinforced Masonry. Mortar to conform to Mortar designation (III) of Table 1 BS 5628 Part 1.

75

124

50

03
26
450 369

50 25

124 300

124

50 25

50 O/D removable casting template

Plan
STUB COLUMN CONNECTION DETAIL(17Nos) SCALE 1:4
6 125 125 300

25MM GROUT

100x6mm th.,100mm long anchor plates

25

FFL

7. Joints: Movement joints to be amaximum 9.0m centres.joint positions as indicated onDrawings.Joint in slab to be carried through walls to underside of ring beam. GENERAL STAIR CASES' NOTES 2.Staircase Concrete is of Fcu 30N/Sq.MM. and Ring Beam of Fcu 35N/Sq.MM after 28 days. 3.Site Engineer to Prepare Trial Mixes for Approval by Engineer. 4.All Structural Concrete to be Tested for Compressive Strength by Central Materials .Labaratory. 5.Concrete to recieve full time curing preferably surface curing or equal and approved by the Engineer. 6.Stairs are to comprise: 175mm Waist, 150mm Risers and 300mm Treads and/or inclined angle of 30.963 Degrees to the Horizontal. 6) All dimensions must be verified on site before cutting any reinforcement 7) All dimensions must be checked and verified on site before commencing any works. Descrepancies to be brought to the attention of the Engineer immediately. 8) Contractor must submit shop drawings to engineer for approval prior to fabrication of structural steelwork 9) All welds to be 6mm fillet welds 10)Structural steelwork to be grade 43 to B.S. 449

Section 3 - 3

4Y12

9R8@150 9R8@150 6Y12@150 6Y12@150

DEPTH UP TO 1000mm

4Y16

11) All steel surfaces shall be thoroughly power wire brushed and cleaned with approved solvent and coated of red oxide primer type 'A' to B.S. 2523. All scratches to be repainted

12) All dimensions to be checked and verified on site before fabrication commences 13) THE QUALITY OF ALL MATERIALS AND WORKMANSHIP SHALL COMPLY WITH THE REQUIREMENTS OF THE RELEVANT BRITISH STANDARDS AND CODES OF PRACTICE 14) Paint one shop coat of red oxide primer prior to dispatch, touch up on site (for any scratches); apply second coat of red oxide primer after erection and gloss paint as directed by Architect

300

50

400 50mm CONCRETE BLINDING

1000

Y12@200MM C/C Bothways


1,400 1,400

COLUMN BASE F2 R.C DETAILS SCALE 1:25

LINK-A TECHNOLOGIES LTD


1,400

1,800

6Y12@150
Y12 Y16 Y12 Y16 Y12 Y16

IPE 200 I-SECTION BEAM GAUGE 24 PREPAINTED IRON SHEET DECK IPE 200 I-SECTION BEAM
TR US S
6,553

TRUSS T1

152

1P-200 BEAM

TR US S

T2

1000

100mm THICK SOLID SLAB

M14 BOLTS
S US TR T2
2,801

Architects, Civil/Structural engineers


P.O Box 24868 Kampala E-mail- tchnlgslnk@gmail.com Mobile- +256-772-846 511 + 256-702-098 979

Issue Type

TRUSS T1

CONSTRUCTION
This Drawing is the copyright of Link-A Tech. Ltd and must not be reproduced without permission
6,553

The moral right of the author is hereby asserted Copyright c 2013

1000

Y12 Y16

6Y12@150

TRUSS T1
1,800

Project Title CLIENT DESCRIPTION

TRUSS T1

S US TR

T2

TYPICAL FOOTING F2 PLAN DETAILS SCALE 1:25

SECTION A-A THROUGH MEZANINE FLOOR SLAB SCALE 1:4

1 98 , 1

1,401

T2

Scale 1:100,75,50 Architects:

Date Nov, 2013

Designed by M.E.N

Drawn by M.E.N Drawing NO. LINK-A 002

2,802