Vous êtes sur la page 1sur 4

Certification Questions10

1.) What is the kind of testing used to check the behavior and performance of each tier? Ans) Performance Testing .) What is the performance test ob!ective "hich checks "hether a ne" version of the soft"are Adverse#$ affect response time? Ans) %enchmark Performance Testing& based 'benchmarked) on previous version (.) What is the performance test ob!ective "hich checks "hether the s$stem is stab#e enough to go into production? Ans) )etect a## the bott#enecks *.) The #oad generator shou#d have connectivit$ to "hich components?se#ect t"o? a.) "eb server b.) vugen c.) contro##er d.) ana#$sis Ans) 'a)&'c) +.) Which component emu#ate the steps of rea# users using the app#ication? a.) vugen b.)Contro##er c.)#oad generator d.) ana#$sis Ans) a) ,.) What is the component used to monitor app#ication infrastructure components "hich provide metrics for s$stem tuning? Ans) Contro##er -.) What u "i## do after doing a debug run? a.) re.run the scenario b.) tune the s$stem c.) go to fu## #oad test and sca#abi#it$ test d.) inform the pro!ect manager that s$stem peformance is good and stop the #oad testing Ans) c /.) Which statement is an e0amp#e of a conceptua# goa#?

The #ogin transaction shou#d respond "ithin * seconds or #ess during heav$ usage. Ans) )) 2.) What is the 3oad4unner term used to define a co##ection of 5users "ithin a scenario?

A. %. C. ).

The update transaction shou#d function during heav$ usage. The 1pdate transaction must attain 00 concurrent users during peak time. The search transaction shou#d respond "ithin + seconds during norma# usage.

A. %. C. ).
%)

6et 7roup Profi#e


6c

enario Ans)

10.)A set of actions or user steps performed "ithin an app#ication to accomp#ish a business goa# is ca##ed as a.) business process
b.) transaction c.) concurrenc$ d.) check point Ans) b)

11.) An e0amp#e of stress testing 8 a.) Purchasing at an e.commerce site b.)6earches at a search engine site c.)1pdated content disp#a$ at a ne"s site

d.))o"n#oading received orders or updating order status at a C#ient 9 6erver s$stem. Ans) a) 1 .) :aster )ata comes from 8 a.) App#ication data b.)user input
c.) 6$stem "i## generate d.) from scripts

Ans) a) 1(.) An e0amp#e of user generated data a.) e.mai# address b.) session id c.) confirmation number d.) userid and pass"ord Ans) d) 1*.) de#a$ bet"een t"o different iterations can be done b$ using "hich run time settings? Ans) Pacing 1+.) ;terations can be set under "hich option in run time settings dia#og bo0? Ans) 4un3ogic 1,.) What is the t$pe of concurrenc$ happening "hen user "as in the process of bu$ing tickets? Ans) <. 1-.) What is the t$pe of business process happening "hen mu#tip#e users "ere bu$ing tickets? Ans)<= 1/.) >o" man$ transactions "i## need to be run per minute if a #oad test has to be run for four hours "ith 000 users& assuming an average #ength of ten minutes? Ans) 00 transactions 12.) "hat is the process to va#idate that there is enough test hard"are avai#ab#e in the test environment&benchmark the business processes against the testing hard"are? Ans) 6moke Test 0.) vugen shou#d have connectivit$ to "hich component to record vuser script? a.) A1T'app#ication under test)
b.) ana#$sis c.) contro##er

d.) #oad generator Ans a) 1.) u r tr$ing to change the server samp#ing rate and u cou#dn?t do it "hat u shou#d u do to make the process the successfu#? a.) disconnect #oad generator and tr$ again b.) c#ose #oadrunner and open again c.) shut do"n the corresponding server and tr$ again d.) u cou#dn?t do that because u cannot change server samp#ing rate .) When u c#ick start scenario option8
a.) #oad generator "i## automatica##$ go to read$ state and do the necessar$ operation b.) 1 need to manua##$ c#ick the connect button in #oad generator "indo"

c.) start "#run.e0e d.) ping the contro##er Ans) a) (.) %efore the vusers are e0ecuted& first the$ are a.) initia#i@ed b.) the$ "i## e0ecute the scripts direct#$ in A1T from #oad generator c.) paused and then "i## do the intended operation d.) vusers "i## go to rende@vous state Ans) a)

*.) Aption "here vusers and groups "i## be automatica##$ schedu#ed is a.) :anua# scenario
b.) 7oa# oriented scenario c.) rea# #ife schedu#e

d.) 4un unti# comp#etion Ans) d) +.) What is the scenario out#ine for the condition update shou#d successfu##$ happen for 1000 concurrent users a.) script shou#d define update and 1000 concurrent users shou#d run the script b.) script shou#d define update and 1000 users shou#d run the script c.) update transaction "ith manua# scenario d.) update transaction "ith goa# oriented scenario Ans) d)

,.) the t$pe of fi#e to be choosed in scenario groups is a.) .#rr fi#e
b.) .#ra fi#e c.) .usr fi#e d.) .#rs fi#e Ans) d)

-.) What is the minimum va#ue for transaction monitor freBuenc$ for sma## scenarios? Ans) 1 minute /.) What is the minimum va#ue for transaction monitor freBuenc$ for #arge scenarios? Ans) 1 minute 2.) if in initia# stages of scenario e0ecution during ramp up& if u fee# that response time is increasing& "hat u "i## do to run the scenario "ith current users? a.) stop the scenario and decrease the no of vusers b.) press the pause button in interactive schedu#e graph to continue "ith current no of users c.) pause the users in run tab d.) design a different scenario Ans) a) (0.) "hat is the common run time settings for a## protoco#s? Ans) 7enera#

Vous aimerez peut-être aussi