#E"O$ %RO&ND DRA!NA%E.


1.0 P&RPOSE To establish & maintain a procedure for carrying out activities related to below ground drainage. 2.0 SCOPE This procedure shall be applicable to general purpose drainage works undertaken by the Company. 3.0 3.1 3.2 3.3 ,.0 ,.1 ,.2 ,.3 RE'ERENCES !"#0$0 !"#100 '( )000 * "art+1, DE'!N!T!ONS Company uality 1ngineer %iscipline 1ngineer ./0 2ominated uality 1ngineer at (ite. %ocument & %ata Control. &nspection & Testing. Code of "ractice for 'elow -round %rainage.

Company designated "lumbing 1ngineer as decided by the 3anagement and assigned with the responsibility of managing electrical part of the "ro4ect. 3aterial enclosing the pipe.

,.,

(urround

$.0

PROCED&RE

3 & 1 3(T+ 05,6 718 0

%!T1* 9anuary 25: 2001

Xyz COMPANY METHOD STATEMENT M & E NO.: M & E MST- 064/ REV 0 T!T"E: #E"O$ %RO&ND DRA!NA%E.

Page ( o 6

$.1

Responsibility The responsibility for carrying out this 3ethod (tatement shall be that of the %iscipline 1ngineer6 ;oremen: unless otherwise specifically mentioned in this procedure. The uality 1ngineer6 %iscipline 1ngineer6 ;oremen shall be responsible for inspection & testing.

$.2 $.2.1 $.2.2 $.2.3

Activity 1nsure personal protective e<uipment: till dawn lamps: material for barriers: warning signs and warning tape shall be available to barricade e=cavations. Check levels & positions of all e=isting services and tie in points. >hile setting out: mark out the following*

Centerline and 6 or width of drain trench: trench bottom level. &nspection chambers & manholes. 'ranch lines. ?ther underground services 6 crossing. 'ench marks.

$.3 $.3.1 $.3.2 $.3.3

Storage of Materials 1nsure pipes & 4ointing materials shall be received in good condition. 1nsure pipes shall not be pushed or thrown on to ground from the vehicle. "ipes shall be stored at site on plane ground without undulations: on timber sleepers placed in one level: or pipe racks etc. and the following shall be adhered to*

(tack height not more than 2 m. (ockets not resting on ground. @argest dia pipe at the bottom of stack. A"8C pipe stack protected from heat & sunlight Bby tarpaulin covering: if stored on openC.

$., $.,.1

Excavations 3ark all e=isting underground services during set out & obtain Work Permits before start of work: if contractually re<uired. Trial pits shall be taken to establish buried services. 1nsure e=isting structures shall not be affected due to e=cavations. %imension of trench shall be kept to a minimum possible. &n absence of the Customer (pecifications: width shall be 1.$ times pipe dia plus 2$0 mm or 500 mm whichever is greater.
%!T1* 9anuary 25: 2001

$.,.2 $.,.3

3 & 1 3(T+ 05,6 718 0

Xyz COMPANY METHOD STATEMENT M & E NO.: M & E MST- 064/ REV 0 T!T"E: #E"O$ %RO&ND DRA!NA%E.

Page ) o 6

$.,., $.,.$ $.,.5 $.$

!de<uate shorting 6 battering shall be provided for trenches in loose material. 1nsure completed trenches shall be clean: accurate to gradients: not contain sharp edges and uniform bearing is available throughout. 1=cavated material shall be stacked Bminimum 1 mC away from edges of trench and disposed of <uickly: if the same is not useful for backfilling. Bedding !ppropriate material shall be used for bedding and ensure the following*

'edding shall be provided for full width in narrow trench. 'edding for wide trench for fle=ible pipes shall be 3 times of the pipe dia and rigid pipes Bsteel: clay: cast iron etc.C shall be 2 time of the pipe dia. The depth of bedding shall be 100 mm minimum: for granular bedding. The depth shall be 100 mm minimum for granular & concrete bedding and encasing. &f the pipes shall have fle=ible 4oints: fle=cell sheet or as per Contract (pecifications shall be provided upstream of each socket to partition the pipe surround fully. !ll temporary supports shall be removed before or during encasing.

$.5 $.5.1

Jointing >hen 4ointing rigid pipes with fle=ible ring or gasket 4oint: ensure all the 4ointing material & lubricant or sealant shall be of approved make or original spare. 1nsure 4ointing faces are smooth: clean & free from soil or bedding particles. @ay the spigot s<uarely & push home with lever or mechanical means B4ackC. "ipe end shall be protected by timber block. Clay ware pipes shall be 4ointed by filling them first with rope yarn for centering and then with 1*3 cement sand mortar. 3ortar shall be filled beyond socket. Curing shall be done for five days or as agreed with client. (olvent welding shall be done as per the manufacturerDs instructions. "ipe shall not be tested unless 4oints are set. "ipe shall be laid down as per specified gradients. Manholes & Chambers "recast 3anholes 1nsure 4oints between precast items are properly sealed.

$.5.2 $.5.3 $.5.,

$.5.$

$.5.5 $.E $.E.1

3 & 1 3(T+ 05,6 718 0

%!T1* 9anuary 25: 2001

Xyz COMPANY METHOD STATEMENT M & E NO.: M & E MST- 064/ REV 0 T!T"E: #E"O$ %RO&ND DRA!NA%E.

Page 4 o 6

$.E.2

"8C 3anholes 1nsure that only appropriate sealant are used and concrete surrounds is as per drawing or specification.

$.E.3

(tep &rons 1nsure that the spacing between step irons shall be 230 mm to 300 mm. Top step shall not be more than E$0 mm below surface & bottom step not more than ,$0 mm above the benching. &nterval between steps shall be constant. (taggering shall be 300 mm distance between vertical rows.

$.E.,

Covers &nspect covers before placement & ensure the lid shall not be placed in to the cover when bed mortar is still plastic. 3ortar shall be of 1 cement to 3 sand proportion or as specified.

$.E.$

'enching 1nsure benching shall be formed from the channel upto the height of the soffit of outlet: the radius 2$ mm and rise to a slope of minimum 1*12. 'enching shall be completed before placing the manhole cover.

$.E.5

(ide 'ranches 1nsure during layout that reverse flow is not being caused by any branch. >hen branch meets at an angle F0G or more: vertical & sides of benching shall be shaped to contain the flow.

$.) $.).1

Backfilling !fter bedding: laying & testing the pipe shall be surrounded with blown 6 give sand fill to specified depth. 'ackfill material shall not contain large rocks particles & other deleterious materials.

$.).2 $.).3 $.).,

The side fill shall be placed evenly in 1$0 mm layers and temporary pegs are removed as work progresses. &f e=cavated material to be reused for backfilling: stones over ,0 mm siHe shall be removed. (urround shall be compacted by tamping until the pipeline is 1$0 mm cover. 3echanical rolling & compaction shall be done after filling ,$0 mm of surround material.

3 & 1 3(T+ 05,6 718 0

%!T1* 9anuary 25: 2001

Xyz COMPANY METHOD STATEMENT M & E NO.: M & E MST- 064/ REV 0 T!T"E: #E"O$ %RO&ND DRA!NA%E.

Page * o 6

$.).$

1nsure the following precautionary measures while laying of pipes*


(uitable fill material shall be used. "ipe shall be laid to specified line & elevation. &f laid on formation: the formation shall be properly compacted & inspected by the Customer: when contractually re<uired. (ockets shall be buried in bedding material such that pipe rests fully along the length of granular fill. >hen laying concrete bedding: socket portion shall be left open by providing polystyrene surround. ;le=ible 4oint near manholes: building entry etc. shall be kept as close to the structure Bma=imum 300 mmC as possible. The ne=t pipe shall be a small rocker piece of 500 mm length. >hen severe movement of pipe is anticipated: several rocker pipes shall be provided Be.g. at bends without anchorsC. esting

$.F

Anless directed otherwise: testing shall be carried out as follows*


;it plugs or bag stoppers at the lower end of the section of the pipeline & any other relevant branches under a test. ;it a plug or bag supporter with a tube leading to a water container at the highest end of the pipeline. ;ill & test to an internal pressure of 1.2 m above the invert of the pipe at the high end of the section pipeline and not more than 2., m head at the lower end. !llow the water level to stand for 2 hours: topping up the level: if necessary. !fter 2 hours: measure any loss of water by noting <uantity needed to maintain level in the container over a period of 30 minutes.

&f the rate of water loss is greater than given below: investigate the cause of loss: remedy the defect & retest. 7epeat the test until a satisfactory result is obtained* 2ominal "ipe %iameter ImmJ 100 1$0 22$ @itre @ost "er 3eter 7un of (ection of "ipeline 0.0$ 0.0) 0.12

5.0

DOC&MENTAT!ON / RECORDS
%!T1* 9anuary 25: 2001

3 & 1 3(T+ 05,6 718 0

Xyz COMPANY METHOD STATEMENT M & E NO.: M & E MST- 064/ REV 0 T!T"E: #E"O$ %RO&ND DRA!NA%E.

Page 6 o 6

5.1 5.2 5.3

"lumbing &nstallation BaC (ewer line &ncluding hook up+ &nspection report. 'elow -round drainage+ &nspection report. Kydrotest 6 @eak Test 7eport

3&1 3&1 3&1

C#;orm+ 05,a+016 718. 0. C#;orm+ 05,b+016 718. 0. C#;orm+ 053+026 718. 0.

3 & 1 3(T+ 05,6 718 0

%!T1* 9anuary 25: 2001