Vous êtes sur la page 1sur 14

User Manual M900/M1800 Base Transceiver Station (BTS30)

Table of Contents

Table of Contents
Chapter 1 Routine Maintenance Instructions............................................................................. 1-1 1.1 Routine Maintenance Overview......................................................................................... 1-1 1.1.1 Purpose of Routine Maintenance............................................................................ 1-1 1.1.2 Routine Maintenance Classification ........................................................................ 1-1 1.1.3 BTS Routine Maintenance Record & Instructions................................................... 1-2 1.2 Weekly Maintenance Instructions ...................................................................................... 1-8 1.3 Monthly Maintenance Instructions ..................................................................................... 1-9 1.4 Quarterly Maintenance Instructions ................................................................................... 1-9 1.5 Yearly Maintenance Instructions...................................................................................... 1-10 1.6 Return Loss, VSWR and Reflection Coefficient .............................................................. 1-11

Huawei Technologies Proprietary i

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 1 Routine Maintenance Instructions

Chapter 1 Routine Maintenance Instructions


1.1 Routine Maintenance Overview
1.1.1 Purpose of Routine Maintenance
Reliable running of the BTS depends on effective routine maintenance. The aim of such maintenance is to detect and solve problems in time. This chapter describes the contents of routine maintenance and the correct operation procedures, thus providing the basic methods and reference basis of routine maintenance for users in deciding local office maintenance solutions.

1.1.2 Routine Maintenance Classification


I. Classification by Implementing Methods
1) Conventional maintenance

To observe, test and analyze the equipment performance and operating conditions by means of normal maintenance. 2) Unconventional maintenance

To check whether the equipment performance has degraded by observing, testing and analyzing it in artificially-created special conditions. For example, to avoid alarm system fault, the maintenance personnel can deliberately create some faults and check whether the alarm system can generate reports correctly.

II. Classification by Period Length


1) Unscheduled maintenance

Maintenance tasks incurred by equipment fault and network adjustment. For example, the maintenance operations required at the time of user complaint, equipment damage and line fault are unscheduled. In addition, problems found and recorded in routine maintenance are also one of the triggering factors of unscheduled maintenance operations. 2) Daily routine maintenance

Huawei Technologies Proprietary 1-1

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 1 Routine Maintenance Instructions

Maintenance operations conducted every day, which help the maintenance personnel keep track of equipment running conditions and solve problems in time. When a problem is found in daily maintenance, please record in detail the exact physical position where it occurs and describe it in detail, so that maintenance operations can be conducted in time to avoid bigger trouble. 3) Periodical routine maintenance

Maintenance operations conducted regularly, which help the maintenance personnel keep track of the long-time performance of the equipment. Periodical routine maintenance includes quarterly and yearly maintenance.

1.1.3 BTS Routine Maintenance Record & Instructions


BTS Weekly Maintenance Record Please note down in this record the operations actually conducted in BTS weekly maintenance. For methods of conducting weekly maintenance operations, please refer to BTS Weekly Maintenance Instructions. BTS Monthly Maintenance Record Please note down in this record the operations actually conducted in BTS monthly maintenance. For methods of conducting monthly maintenance operations, please refer to BTS Monthly Maintenance Instructions. BTS Quarterly Maintenance Record Please note down in this record the operations actually conducted in BTS quarterly maintenance. For methods of conducting quarterly maintenance operations, please refer to BTS Quarterly Maintenance Instructions. BTS Yearly Maintenance Record Please note down in this record the operations actually conducted in BTS yearly maintenance. For methods of conducting yearly maintenance operations, please refer to BTS Yearly Maintenance Instructions. BTS Unexpected Fault Handling Record Please note down in this record the operations actually conducted in clearing the unexpected faults that come up in BTS routine maintenance. This record serves as a basis for future reference in equipment maintenance. The maintenance personnel may modify the list of items in this record according to the actual conditions of the local office, and compile several sheets of records into a handbook on the clearing of unexpected faults.

Huawei Technologies Proprietary 1-2

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 1 Routine Maintenance Instructions

I. BTS Unexpected Fault Handling Record


Site name Time when faults occur Person on duty Fault type: Primary power supply Baseband frame Antenna and feeder system Sources of fault information Subscriber complaints Discovery in daily maintenance Fault description: Alarm system Other sources Secondary power supply TRX frame Others Home BSC Time when faults get solved Faults handled by

Handling methods and results:

Huawei Technologies Proprietary 1-3

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 1 Routine Maintenance Instructions

II. BTS Weekly Maintenance Record


Site name: Maintenance time: Maintenance item Environment condition Temperature condition Humidity condition Dust-proof condition Indoor air-conditioner running state Board running state Maintenance status Normal Normal Normal Normal Normal Normal Abnormal Abnormal Abnormal Abnormal Abnormal Abnormal Maintenance personnel: Remarks Maintenance personnel

Fault description and handling

Problems remained

Checked by shift leader

Huawei Technologies Proprietary 1-4

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 1 Routine Maintenance Instructions

III. BTS Monthly Maintenance Record


Site name: Maintenance time: Maintenance item Call test Check working status of battery set Check grounding, lightning arrester and power supply system Check running status of antenna and feeder Check running status of secondary power supply Maintenance personnel: Maintenance status Normal Abnormal Normal Abnormal Normal Abnormal Normal Abnormal Normal Abnormal Remarks Maintenance personnel

Fault description and handling

Problems remained

Checked by shift leader

Huawei Technologies Proprietary 1-5

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 1 Routine Maintenance Instructions

IV. BTS Quarterly Maintenance Record


Site name: Maintenance time: Maintenance item Check primary power supply Check running conditions of fan Road test VSWR test Check alarm collecting devices Maintenance status Normal Abnormal Normal Abnormal Normal Abnormal Normal Abnormal Normal Abnormal Maintenance personnel: Remarks Maintenance personnel

Fault description and the handling

Problems remained

Checked by shift leader

Huawei Technologies Proprietary 1-6

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 1 Routine Maintenance Instructions

V. BTS Yearly Maintenance Record


Site name: Maintenance time: Maintenance item Check running state of channel Cabinet cleanness Check base station power output Earth resistance test and grounding cable check Check the waterproof status of antenna and feeder connectors and lightning-proof grounding cards Check the firmness of antenna and tower-top amplifier and the tilting angle of directional antenna Maintenance status Normal Normal Normal Normal Abnormal Abnormal Abnormal Abnormal Maintenance personnel: Remarks Maintenance personnel

Normal

Abnormal

Normal

Abnormal

Fault description and handling

Problems remained

Checked by shift leader

Huawei Technologies Proprietary 1-7

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 1 Routine Maintenance Instructions

1.2 Weekly Maintenance Instructions


Maintenance item Operation instructions Check the machine room for any environment alarm including power supply, fire and smoke alarms. Check the anti-theft net, doors and windows, and other facilities in the equipment room. Reference standard Everything should be normal. No alarm appears. The facilities including anti-theft net, doors and windows ought to be intact.

Environment condition

Temperature condition Humidity condition

Observe the thermometer indication in Normal equipment room environmental the equipment room. temperature: 15 C~30 C. Observe the hygrometer indication in the equipment room. Normal equipment room environmental humidity: 40% ~ 65%.

Dust-proof condition

All items should be clean without any visible dust attaching. Then the Observe equipment housing, dust-proof condition is good. If any item equipment interior, floor and desktop. is not up to the standard, then the dust-proof condition is bad. Check whether it is normally running The indication of the thermometer is and whether the refrigeration function consistent with the temperature set and is good. the refrigeration system works. Observe whether indicators of all boards are normal.

Indoor air conditioner running status

Board running status

Huawei Technologies Proprietary 1-8

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 1 Routine Maintenance Instructions

1.3 Monthly Maintenance Instructions


Maintenance item Operation instructions Use the testor mobile station to perform call test with another one cooperating beside the BSC, and observe whether calls are normal over all channels. Check whether there is liquid leakage regarding the battery, or the connection is loose. Check whether the grounding system and lightning protection system are working normally, whether the connection is reliable, whether the power supply system is working normally and whether there is any scorch for the lightening arrester. Check whether there is standing wave alarm, whether there is deviation of antenna support, and whether the waterproofness of the feeder line is good. See whether they are operating normally Reference standard There should be no noises, interruptions or crosstalk.

Call Test

Check the running status of battery sets

Check the grounding, lightning arrester and power supply systems

Make sure the signal lightning arrester, power supply lightning arrester, antenna and feeder lightning arrester are in good condition.

Check the working status of antenna and feeder system

Check whether there is standing wave alarm from CDU.

Check the running conditions of secondary power supply boards

No alarm.

1.4 Quarterly Maintenance Instructions


Maintenance item Primary power check Operation instructions Measure the output voltage and the voltage of each battery, and check the aging of DC power cable. Check whether the fan runs normally or whether there are alarms Use the testor mobile station to test the switch-over function and the coverage. Check the CDU VSWR alarm indicator Humidity, temperature, fire alarm etc. Test whether the transmitting power is normal. Reference standard Output voltage <-43.5V Battery voltage error < 0.3V No alarm

Check running conditions of fan

Road test

VSWR test Check alarm collecting device

Huawei Technologies Proprietary 1-9

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 1 Routine Maintenance Instructions

1.5 Yearly Maintenance Instructions


Maintenance item Operation instructions Use the testor mobile station to test the communication conditions of respective channels. Observe whether there are call drop, call interruption, noise and single-sided communication, and make record for future reference. Tools: vacuum cleaner, alcohol, towel etc. Measure TRX transmitting power. 1. Measure earth resistance with an earth resistance meter. Earth resistance test and grounding cable check 2. Examine whether the connectors of respective grounding cables are loose and check their aging condition. Check the external part or untie the insulating tape to have a check 1. Screw up the nut again with a wrench. 2. Use an angle meter to check the titling angle. Reseal it with the same material! Set strict operation regulations to avoid mis-touching switch or power supply accidentally. Check whether it is consistent with the BSC setting. Reference standard

Check running conditions of channel

Cabinet cleanness

Check base station output power

Check the waterproof conditions of the connectors and lightning grounding clips Check the firmness of antenna and tower top amplifier and the tilting angle of the antenna

Do not apply too much force when screwing up the nut with the wrench.

Huawei Technologies Proprietary 1-10

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 1 Routine Maintenance Instructions

1.6 Return Loss, VSWR and Reflection Coefficient


Return loss (dB) 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 VSWR 4.41943 3.56977 3.00952 2.61457 2.32285 2.09988 1.92495 1.78489 1.6709 1.57689 1.49852 1.43258 1.37668 1.32898 1.28805 1.25276 1.22222 1.19569 1.17257 1.15238 1.13469 1.11917 1.10553 1.09351 1.08292 1.07357 1.06531 1.058 1.05153 1.0458 Reflection coefficient () 0.63096 0.56234 0.50119 0.44668 0.39811 0.35481 0.31623 0.28184 0.25119 0.22387 0.19953 0.17783 0.15849 0.14125 0.12589 0.1122 0.1 0.08913 0.07943 0.07079 0.0631 0.05623 0.05012 0.04467 0.03981 0.03548 0.03162 0.02818 0.02512 0.02239

Huawei Technologies Proprietary 1-11

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 1 Routine Maintenance Instructions

Return loss (dB) 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

VSWR 1.04072 1.03621 1.03221 1.02866 1.0255 1.0227 1.0202 1.01799 1.01601 1.01426 1.0127 1.01131 1.01007 1.00897 1.00799 1.00712 1.00634

Reflection coefficient () 0.01995 0.01778 0.01585 0.01413 0.01259 0.01122 0.01 0.00891 0.00794 0.00708 0.00631 0.00562 0.00501 0.00447 0.00398 0.00355 0.00316

Huawei Technologies Proprietary 1-12

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 1 Routine Maintenance Instructions

Formulas for calculating reflection coefficient , return Loss RL, and VSWR is displayed in the following table: Reflection coefficient
= Ureflected Uforward
1 R alog( 20 )
VSWR=

VSWR
Uforward+Ureflected UforwardUreflected

Return loss (RL) Z1=Z2=Z3


Uforward+Ureflected VSWR= UforwardUreflected

VSWR=

1+ 1
R alog( 20 )+1 R alog( 20 )

RL= 20log

VSWR1 VSWR+1

VSWR=

RL= 20log

VSWR+1 VSWR1

Huawei Technologies Proprietary 1-13

Vous aimerez peut-être aussi