Académique Documents
Professionnel Documents
Culture Documents
Content and form: Although the project log book will be reviewed by your supervisor from time to time, it is addressed to yourself and your own needs and should be a true reflection of your work. At each progress review, your project log book will be assessed by the examination panel as a component in the course grade. Therefore please bring this project log book to each assessment. The following items will be used by your supervisor and the examination panel in assessing your progress in the project. (Only the applicable items to your project are considered.)
Actions Progress Problem definition Literature review Problem formulation Proposing a solution technique Develop a mathematical model Design a solution algorithm Writing a computer code Debugging the computer code Running the computer code Designing hardware Fabricating hardware Testing hardware Design a test rig for experiments Design a test program Building up the test rig Carrying out the experiments Getting results Result presentations Result analysis Drawing conclusions Future improvements A: Excellent B: Very Good Status [ ]D [ ]D [ ]D [ ]D [ ]D [ ]D [ ]D [ ]D [ ]D [ ]D [ ]D [ ]D [ ]D [ ]D [ ]D [ ]D [ ]D [ ]D [ ]D [ ]D [ ]D
[ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [
]A ]A ]A ]A ]A ]A ]A ]A ]A ]A ]A ]A ]A ]A ]A ]A ]A ]A ]A ]A ]A
[ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [
]B ]B ]B ]B ]B ]B ]B ]B ]B ]B ]B ]B ]B ]B ]B ]B ]B ]B ]B ]B ]B
[ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [
]C ]C ]C ]C ]C ]C ]C ]C ]C ]C ]C ]C ]C ]C ]C ]C ]C ]C ]C ]C ]C
[ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [
]F ]F ]F ]F ]F ]F ]F ]F ]F ]F ]F ]F ]F ]F ]F ]F ]F ]F ]F ]F ]F
[ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [
] NA ] NA ] NA ] NA ] NA ] NA ] NA ] NA ] NA ] NA ] NA ] NA ] NA ] NA ] NA ] NA ] NA ] NA ] NA ] NA ] NA
C: Good
D: AcceptedF: Poor
ECY6595/ECY6496/ECY6197/ECY6498
Supervisor(s): any):
1. 2.
Team
1. 2.
members
(if
STUDENTS NOTES
(To be filled by the student.) Please enter any study, action, results, conclusions made. etc. related to your project.
Date :
1. PERFORMANCE DETAILS : Actions % work achieved Comments & conclusions Justification, Explanation and things learned
2. SUGGESTIONS AND DISCUSSED ITEMS WITH YOUR SUPERVISOR: (i) (ii) (iii)
3. ACTION ITEMS FOR THE NEXT MONTH (note responsibility for each). Actions Starting date Ending date Comments
< 40 F
40 49 50 59 60 69 70 84 D C B A
85 A+
Comments:
Supervisors Signature:
Date: