Operational Excellence
Stated as a primary objective by many operating enterprises committed to achieving and sustaining best in field Great cachet at the highest executive levels What does it mean, how is it implemented, what are benefits?
An operating enterprise; one that utilizes some physical means to produce and / or deliver a product; comply with a mission. Applies to a broad range of industrial enterprises: Process, production, power generation and distribution, continuous and discrete manufacturing, mining, food processing, transportation, marine, etc. Equally applicable to service industries, public transportation, municipalities (fresh and waste water treatment), military, financial institutions, not for profits, schools and other types of organizations where mission effectiveness and customer satisfaction, rather than profit, may be the primary objective
Operational
Excellence
Objective that must be achieved and sustained for continuing success
2
Ensuring the safety and reliability of our operations is fundamental to our business success and a critical challenge that ExxonMobil takes on every day.
ExxonMobil 2008 Annual Report
an integrated management system that drives business productivity by applying proven practices and procedures in three foundation blocks:
Asset Productivity Capital Effectiveness Operations Risk Management
DuPont: Delivering Operational Excellence to the Global Market, 2005 3
Characteristics
Creates positive work culture, organization and human relationships Gains greatest results from proven procedures, practices and technologies
Opportunity driven
Value prioritized improvements based on history (data, information) and risk
Governing principles
of the improvement initiative communicated and advocated by a committed, engaged senior executive actively supporting the Operational Excellence program
Total understanding of requirements; commitment to excellence in all activities, continual improvement to performance and effectiveness
throughout the enterprise
Identifying and eliminating deficiencies is the only way to permanently improve performance reducing costs without eliminating the need for spending
results in inefficiency and ultimately increased costs to SHE / EHS (Safety Health Environment), mission, business, operating performance and efficiency; reduced cost Strong management and operating leadership enthusiastic, supportive, committed to success Ownership and empowerment at all levels of the organization Responsibility at the working level for identifying, valuing, developing, implementing improvement initiatives; accountability for success Linked, layered results metrics demonstrating value contribution to business / mission objectives Complete data and information accurate, secure, easily accessible and understood
The program
Extends definition of reliability across all activities and the entire organization Positive attitudes and behaviors are the key essentials to gaining success
Dr. Peter G. Martin, Vice President; Invensys
How implemented
Implemented at the working level by multi-function, high performance Improvement Action Teams
Empowered members Refine opportunities, develop and implement improvement action plans, identify, report and correct deficiencies, direct continuous improvement
8
Do these characteristics and requirements remind you of something that exists today in your organization?
9
Safety!
Program Highlights
Enterprise wide, value driven improvement initiative Equivalent to safety in terms of imperative and ownership for excellence; organizational and individual commitment
Demands initiative and accountability at all levels
Operational leadership preferably by production / operations Recommended implementation in a circular progression DIPICI
Similar to PDCA (Shewart Deming), DMAIC (Six Sigma), OODA (Boyd) Iterative process
Includes assessment, feedback, improvement and follow up mechanisms to assure compliance with objectives
Formal assessment process
Tangible rewards for successfully meeting objectives Produces real, sustainable value
12
Starts from where you are (not where you might think you are) Gets you where you need to go
Comprehensive commencement assessment utilized to identify:
Current conditions and strengths to build on Utilize institutional knowledge and ownership to greatest advantage Opportunities for improvement Weaknesses to strengthen; barriers to overcome Progress to success
Working level improvement action teams responsible for identifying and valuing opportunities; planning and driving results
Strategy, analysis, discovery all team developed
Value and risk driven solutions
Gains greatest value from proven best practices: Lean, Six Sigma, RCA, PM, CBM, TPM, RCM, etc.
Prioritized implementation
Lean optimize work flow, minimize waste Six Sigma rigorous process; statistics applied to reduce performance deviations; control phase to assure sustainability Reliability Centered Maintenance (RCM) establish maintenance requirements to address potential failure modes
Failure Modes and Effects (Criticality) Analysis FME(C)A
Asset Integrity expanded to require meeting all requirements for safe operation Root Cause Analysis (RCA) identification of failure cause for elimination Condition Monitoring (CM) define current performance and condition
vibration measurement and condition assessment operating performance fluid (lubricating oil) monitoring Thermography motor impedance, current analysis ultrasonic's; active and passive
Condition Based Maintenance (CBM) maintain on need Time Based Preventive Maintenance, PM maintain on time
Based on statistical and historical lifetime
Proactive Maintenance pre operation action to reduce failure Computerized Work Management Systems (CMMS)
Planning and Scheduling optimize work management Materials MRO stores, repair parts management
Definition: Probability that a system, equipment or product will perform its required functions in a safe, satisfactory manner for a given period of time when used under specified operating conditions.
Physical Asset Management Handbook
Achievement of predictable results with as little variation as specific David L. Stringer, Brig Gen USAF; Keynote at RCM / EAM 2006 circumstances permit.
Definition and requirements extend and apply to the entire organization and all activities:
Performance safely meet requirements, predictable, minimum variation Organization completely defined (RASCI or equivalent), consistent decision process, empowered employees Work Culture commitment to and ownership for excellence, highest quality work and continuous improvement Skills requirements totally defined, training provided, qualifications up to date Processes and practices fully defined, totally repeatable, high quality results Systems fully capable of meeting all operational demands Equipment safe, cost effective conformance to operational requirements Data accurate, secure, up to date and accessible
16
Efficiency:
Performing a given task well activity and task oriented.
Effectiveness:
Performing the correct task efficiently results oriented. Path to maximum effectiveness
Performing tasks well
Poor Prioritization:
Low value tasks performed well
Poor Quality:
17
Value defined for specific enterprise, business unit, facility, area / plant / unit
All unique
Sources of value
Improve Safety, Health, Environmental performance Achieve consistently greater business performance / mission compliance
Increase throughput, availability, utilization Improve qualityreduce rework, scrap (waste) Reduce variation, interruptions, penalties, loss of good will
Improve efficiency
Reduce operating cost
Safety, Health, Environment, Risk Management and Control Production Effectiveness Availability Reliability Production Rate Quality Production Planning Process Control Information Technology Purchasing Training Administration System & Operating Improvements O&M Cost Optimization Maintenance Management Spare Parts Management
19
Establishing value
Analytical methodology
Production Weibull Pareto
Riskthe future
Failure Modes and Effects Analysis (FMEA)
Business model
Accurate valuation of opportunities, results
20
History and Pareto look at the past; risk adds future threats Risk considers likelihood, vulnerability and impact probability times consequences
Probability (how likely is an event?)
Threat analysis to anticipate the future Historyhas it happened before Current condition (mechanical and operating performance) Means and likelihood of detection defect / fault identification
Minor
Consequences / Severity
Avoidance Imperative
Low Risk
22
Definitions:
Functional failure: The inability to deliver a defined standard of performance:
Full / partial Partial loss reduced performance, efficiency Observable / hidden Hidden failure not observable until a second failure occurs
Mode: Any potential occurrence (event) that could cause a functional failure Effect: What happens when a failure occurs Risk: How often a given failure occurs (probability); how serious if it does occur (consequences) Detection: How are the symptoms of a failure observed; time available to manage a failure
How recognized Interval from recognition to action required
Controls: Actions placed in effect to extend life, prevent / counter failure and / or identify a defect for mitigating corrective action prior to failure
23
FMEA Template
Chevron Shipping Modes and Effects Analysis (FMEA) Template FailureCompany Modes Failure and Effects Analysis Template
System: Sub-System: Equipment: Function:
Cargo Transfer Date Created: Vessel: Team Members: Pumping Date Revised: FMEA Facilitator Cargo Pump 1 Transfer cargo from tanks off the vessel at rated flow and pressure without leaks
Severity / Consequences Failure Mode RPN Classification Controls / Counter Actions Responsibility Prevention Detection Due Date
Occurrence / Probability
Detection
Failure Effect
Pump stopped
24
Dave Smith
Leak (controllable)
1. Gasket failed
24
2. Seal failing
24
Coupling fractured
1. Misalignment
10
2. Defective coupling
Shaft fractured
1. Defective shaft
None
Vibration monitoring
24
FMEA Template
Chevron Shipping Company Failure and Effects Analysis (FMEA) Template Failure Modes and Modes Effects Analysis Template
System: Sub-System: Equipment: Function: Date Created: Vessel: Team Members: Cargo Transfer Date Revised: FMEA Facilitator Pumping Cargo Pump 1 Transfer cargo from tanks off the vessel at rated flow and pressure without leaks RPN Classification Severity / Consequences Failure Mode Failure Component Cause Controls / Counter Actions Responsibility Prevention Detection Due Date
Occurrence / Probability
Detection
Failure Effect
Pump stopped
24
Dave Smith
Leak (controllable)
1. Gasket failed
24
2. Seal failing
24
Coupling fractured
1. Misalignment
10
2. Defective coupling
Shaft fractured
1. Defective shaft
None
Vibration monitoring
25
FMEA Template
Chevron Shipping Company Failure and Effects Analysis (FMEA) Template Failure Modes and Modes Effects Analysis Template
System: Sub-System: Equipment: Function: Date Created: Vessel: Team Members: Cargo Transfer Date Revised: FMEA Facilitator Pumping Cargo Pump 1 Transfer cargo from tanks off the vessel at rated flow and pressure without leaks RPN Classification Severity / Consequences Failure Mode Failure Controls / Counter Actions Responsibility Prevention Detection Due Date
Occurrence / Probability
Component
Pump stopped
Vessel Failing bearing; caused by: Date 1. Unbalance 2. Shaft misalignment FMEA Team System Leak (controllable) 1. Gasket failed Subsystem Equipment 2. Seal failing Function
Coupling fractured 1. Misalignment
Detection
Failure Effect
24
Dave Smith
24
24
10
2. Defective coupling
Shaft fractured
1. Defective shaft
None
Vibration monitoring
26
FMEA Template
Chevron Shipping Company Failure and Effects Analysis (FMEA) Template Failure Modes and Modes Effects Analysis Template
System: Sub-System: Equipment: Function: Date Created: Vessel: Team Members: Cargo Transfer Date Revised: FMEA Facilitator Pumping Cargo Pump 1 Transfer cargo from tanks off the vessel at rated flow and pressure without leaks RPN Classification Severity / Consequences Failure Mode Failure Component Cause Controls / Counter Actions Responsibility Prevention Detection Due Date
Occurrence / Probability
Detection
Failure Effect
Pump stopped
24
Description of system or Leak (controllable) 1. Gasket failed 3 equipment inability to deliver required performance 3 functional failure 2. Seal failing
Coupling fractured 1. Misalignment 2
Failure
Dave Smith
24
24
10
2. Defective coupling
Shaft fractured
1. Defective shaft
None
Vibration monitoring
27
FMEA Template
Chevron Shipping Company Failure and Effects Analysis (FMEA) Template Failure Modes and Modes Effects Analysis Template
System: Sub-System: Equipment: Function: Date Created: Vessel: Team Members: Cargo Transfer Date Revised: FMEA Facilitator Pumping Cargo Pump 1 Transfer cargo from tanks off the vessel at rated flow and pressure without leaks RPN Classification Severity / Consequences Failure Mode Failure Component Cause Controls / Counter Actions Responsibility Prevention Detection Due Date
Occurrence / Probability
Detection
Failure Effect
Pump stopped
24
Leak (controllable)
Any potential 1. Gasket failed 3 2 occurrence (event) that could cause a 2. Seal failing 3 2 functional failure.
1. Misalignment 2 1
Failure Mode
Dave Smith
24
24
Coupling fractured
10
2. Defective coupling
Shaft fractured
1. Defective shaft
None
Vibration monitoring
28
FMEA Template
Chevron Shipping Company Failure and Effects Analysis (FMEA) Template Failure Modes and Modes Effects Analysis Template
System: Sub-System: Equipment: Function: Date Created: Vessel: Team Members: Cargo Transfer Date Revised: FMEA Facilitator Pumping Cargo Pump 1 Transfer cargo from tanks off the vessel at rated flow and pressure without leaks RPN Classification Severity / Consequences Failure Mode Failure Component Cause Controls / Counter Actions Responsibility Prevention Detection Due Date
Occurrence / Probability
Detection
Failure Effect
Pump stopped
24
Leak (controllable)
1. Gasket failed
Weakness or defect the 3 2 Cargo transfer 4 24 1. Assure proper slowed consequence of which is a up at make reassembly Failure Mode. 2. Assure proper
3 2 4 24 assembly
Cause
Dave Smith
2. Seal failing
Coupling fractured
1. Misalignment
10
2. Defective coupling
Shaft fractured
1. Defective shaft
None
Vibration monitoring
29
FMEA Template
Chevron Shipping Company Failure and Effects Analysis (FMEA) Template Failure Modes and Modes Effects Analysis Template
System: Sub-System: Equipment: Function: Date Created: Vessel: Team Members: Cargo Transfer Date Revised: FMEA Facilitator Pumping Cargo Pump 1 Transfer cargo from tanks off the vessel at rated flow and pressure without leaks RPN Classification Severity / Consequences Failure Mode Failure Component Cause Controls / Counter Actions Responsibility Prevention Detection Due Date
Occurrence / Probability
Detection
Failure Effect
Pump stopped
24
Dave Smith
Leak (controllable)
1. Gasket failed
2. Seal failing
2 Cargo transfer 4 24 a 1. Assure proper Visual Probability that specific inspection; slowed make up at hourly while in Cause/Mechanism reassembly will occur; operation 2. Assure proper ranked 1 54 24 assembly 2
Likelihood / Probability
Coupling fractured
1. Misalignment
10
2. Defective coupling
Shaft fractured
1. Defective shaft
None
Vibration monitoring
30
FMEA Template
Chevron Shipping Company Failure and Effects Analysis (FMEA) Template Failure Modes and Modes Effects Analysis Template
System: Sub-System: Equipment: Function: Date Created: Vessel: Team Members: Cargo Transfer Date Revised: FMEA Facilitator Pumping Cargo Pump 1 Transfer cargo from tanks off the vessel at rated flow and pressure without leaks RPN Classification Severity / Consequences Failure Mode Failure Component Cause Controls / Counter Actions Responsibility Prevention Detection Due Date
Occurrence / Probability
Detection
Failure Effect
Pump stopped
24
Dave Smith
Leak (controllable)
1. Gasket failed
2. Seal failing
Cargo transfer 4 24 1. Assure proper Visual How the specific failure inspection; slowed make up at hourly while in reassembly mode is detected; operation 2. Assure proper assembly ranked 1 -4 5. 24
Detection
Coupling fractured
1. Misalignment
10
2. Defective coupling
Shaft fractured
1. Defective shaft
None
Vibration monitoring
31
FMEA Template
Chevron Shipping Company Failure and Effects Analysis (FMEA) Template Failure Modes and Modes Effects Analysis Template
System: Sub-System: Equipment: Function: Date Created: Vessel: Team Members: Cargo Transfer Date Revised: FMEA Facilitator Pumping Cargo Pump 1 Transfer cargo from tanks off the vessel at rated flow and pressure without leaks RPN Classification Severity / Consequences Failure Mode Failure Component Cause Controls / Counter Actions Responsibility Prevention Detection Due Date
Occurrence / Probability
Detection
Failure Effect
Pump stopped
24
Leak (controllable)
1. Gasket failed
Results of the Failure 4 24 1. Assure proper Visual inspection; Mode on the makefunction, up at hourly while in reassembly operation observed by the user 2. Assure proper
4 24 assembly
Failure Effect
Dave Smith
2. Seal failing
Coupling fractured
1. Misalignment
10
2. Defective coupling
Shaft fractured
1. Defective shaft
None
Vibration monitoring
32
FMEA Template
Chevron Shipping Company Failure and Effects Analysis (FMEA) Template Failure Modes and Modes Effects Analysis Template
System: Sub-System: Equipment: Function: Date Created: Vessel: Team Members: Cargo Transfer Date Revised: FMEA Facilitator Pumping Cargo Pump 1 Transfer cargo from tanks off the vessel at rated flow and pressure without leaks RPN Classification Severity / Consequences Failure Mode Failure Component Cause Controls / Counter Actions Responsibility Prevention Detection Due Date
Occurrence / Probability
Detection
Failure Effect
Pump stopped
24
Leak (controllable)
1. Gasket failed
2. Seal failing
inspection; make up at The impact of hourlythe while in reassembly operation specific Failure Effect, 2. Assure proper assembly 24 ranked 15
24
Severity / Consequences
1. Assure proper Visual
Dave Smith
Coupling fractured
1. Misalignment
10
2. Defective coupling
Shaft fractured
1. Defective shaft
None
Vibration monitoring
33
FMEA Template
Chevron Shipping Company Failure and Effects Analysis (FMEA) Template Failure Modes and Modes Effects Analysis Template
System: Sub-System: Equipment: Function: Date Created: Vessel: Team Members: Cargo Transfer Date Revised: FMEA Facilitator Pumping Cargo Pump 1 Transfer cargo from tanks off the vessel at rated flow and pressure without leaks RPN Classification Severity / Consequences Failure Mode Failure Component Cause Controls / Counter Actions Responsibility Prevention Detection Due Date
Occurrence / Probability
Detection
Failure Effect
Pump stopped
24
Dave Smith
Leak (controllable)
1. Gasket failed
24
2. Seal failing
24
Likelihood (1 5) times 1. Assure proper Visual inspection; make up at Detection (1 while 5) times hourly in reassembly operation 2. Assure proper (1 5) Severity assembly
1. Assure shaft alignment at assembly 2. Inspect coupling during assembly Vibration monitoring might identify crack precursors
RPN Classification
Coupling fractured
1. Misalignment
10
2. Defective coupling
Shaft fractured
1. Defective shaft
None
Vibration monitoring
34
FMEA Template
Chevron Shipping Company Failure and Effects Analysis (FMEA) Template Failure Modes and Modes Effects Analysis Template
System: Sub-System: Equipment: Function: Date Created: Vessel: Team Members: Cargo Transfer Date Revised: FMEA Facilitator Pumping Cargo Pump 1 Transfer cargo from tanks off the vessel at rated flow and pressure without leaks RPN Classification Severity / Consequences Failure Mode Failure Component Cause Controls / Counter Actions Responsibility Prevention Detection Due Date
Occurrence / Probability
Detection
Failure Effect
Pump stopped
24
Leak (controllable)
Improvements to 2operating, 1. Gasket failed 3 Cargo transfer 4 slowed preventive and/or repair procedures that prevent the 2. Seal failing 3 2 Cause/Mechanism or Failure 4 Mode/Effect from occurring, Coupling fractured 1. Misalignment 1 5 reduce the rate2 of occurrence and/or Severity 1 1 5 2. Defective
coupling
Controls Prevention
Dave Smith
24
24
10
Shaft fractured
1. Defective shaft
None
Vibration monitoring
35
FMEA Template
Chevron Shipping Company Failure and Effects Analysis (FMEA) Template Failure Modes and Modes Effects Analysis Template
System: Sub-System: Equipment: Function: Date Created: Vessel: Team Members: Cargo Transfer Date Revised: FMEA Facilitator Pumping Cargo Pump 1 Transfer cargo from tanks off the vessel at rated flow and pressure without leaks RPN Classification Severity / Consequences Failure Mode Failure Component Cause Controls / Counter Actions Responsibility Prevention Detection Due Date
Occurrence / Probability
Detection
Failure Effect
Pump stopped
24
Leak (controllable)
Coupling fractured
Improved physical 3 2 Cargo transfer 4 24 1. Assure proper up at surveillanceslowed or analytical make reassembly 2. Assure proper methods to detect the assembly 2. Seal failing 3 2 24 Cause/Mechanism or4 Failure Mode before a defect 1. Misalignment 1. Assure shaft 2 1 5 10 alignment at reaches a state where action assembly 2. Inspect must be taken (minimize 1 1 5 5 2. Defective coupling coupling during consequences). assembly
1. Gasket failed 1. Defective shaft 1 1 5 5 None
Controls Detection
Dave Smith
Shaft fractured
Vibration monitoring
36
FMEA Template
Chevron Shipping Company Failure and Effects Analysis (FMEA) Template Failure Modes and Modes Effects Analysis Template
System: Sub-System: Equipment: Function: Date Created: Vessel: Team Members: Cargo Transfer Date Revised: FMEA Facilitator Pumping Cargo Pump 1 Transfer cargo from tanks off the vessel at rated flow and pressure without leaks RPN Classification Severity / Consequences Failure Mode Failure Component Cause Controls / Counter Actions Responsibility Prevention Detection Due Date
Occurrence / Probability
Detection
Failure Effect
Pump stopped
24
Leak (controllable)
1. Gasket failed
2. Seal failing
Individual, by name, with 2 Cargo transfer 4 24 1. Assure proper Visual inspection; slowed responsibility for the / makecontrol up at hourly while in reassembly counter strategy for a proper operation 2. Assure assembly 3 specified 2 4 24 Mode Failure
3 2 1 5 10 1. Assure shaft alignment at assembly 2. Inspect coupling during assembly Vibration monitoring might identify crack precursors
Responsibility
Dave Smith
Coupling fractured
1. Misalignment
2. Defective coupling
Shaft fractured
1. Defective shaft
None
Vibration monitoring
37
Program Implementation
Brief description ImplementationDIPICI Organization Exploiting opportunities Matrix implementation Assuring results Assessment process Benefits
An essential concept
Gain the effectiveness and sustainable performance necessary to succeed in an intense operating environment
Emphasizes the human, work culture and organizational issues that are essential for success
Organization wide commitment to excellence, initiative, ownership, support and participation mandatory to gain real success
Deviations from performance objectives identified, prioritized and corrected based on business value and risk
Performance assessments, benchmarking, statistical and risk analysis utilized to identify and prioritize opportunities for improvement:
Safe, sustainable improvement Not a command but rather the result of doing the right things
39
Programin brief
Define mission / business and operating objectives Appoint leadership Establish the organizational and administrative systems
Consider facilitation during program development and implementation
Accelerate learning, gain results faster
Measure and monitor results; adjust plans as required Institutionalize and sustain results; continuously improve
If you dont know where you are going any road will do!
40
Boyd OODA
Observe opportunities Orient take advantage of opportunities Do take action to capitalize on opportunities Adjust corrective action if required
41
Definethe program
Business and program objectives Leadership, organizational and administrative requirements Governing policy and strategy, business plan Methodology for vital procedures such as risk assessment and business value model
42
Define
(need to do) Establish Business Requirements Collect Facts
Improve
Measure Results
Identify
(opportunities for improvement) Based on Value Potential
Check
(what you did)
Plan
(going to do) Increase Business Value Formulate Improvement Actions
Implement
(improvement action plans)
43
Define
(need to do) Establish ambitious, prioritized Establish Business Requirements objectives, develop mission statement, Collect Facts financial model, business plan
Improve
Manage results, conform to KPIs, assure meeting expectations and satisfaction, Measure Results add/modify organization and improvement initiatives, continue training
Identify
(opportunities for improvement) Expand leadership team, conduct FMEA Based on risk, value analysis, value prioritize Value Potential opportunities for improvement
Check
(what you did)
Plan
Deploy global best practices: technology, methodology and processes, continue Increase training, strengthen and support, Businessownership Value conduct RCA (going to do) Formulate opportunity Formulate based tactical action plan prioritized by potential return, commence Improvement Actions training, identify applicable best practices
44
Implement
(improvement action plans)
Executive champion
Provides compelling vision, necessity and benefits, business / mission objectives Visibly engaged, continuing support and drive
Program Leader
Operational leadership
Communications team
Define organization, management and administrative systems Validate procedures for risk assessment and business value
Establish business and risk models Value normalization
45
Program organization
Improvement Action Team Executive Champion Steering Team Operating Leadership Team Improvement Action Teams
Senior Corporate or Site Executive Plant and Business Managers, Site Production and Maintenance Superintendents Initiative Leader, Department Heads Initiative Leader, Production and Maintenance Managers, Technical Professionals, First Line Supervisors, Multi Function Crafts Improvement Champion, Technical Professionals, Multi-Function Working-Level Specialists as required
46
States compelling vision, business objectives Identifies necessity for improvement and benefits motivates participants Outlines overall program requirements Appoints respected operational leaders committed to success
Steering Team
Provides visible engagement and continuing drivefully committed to success Removes institutional and organizational barriers
47
Composed of senior business and operating executives and functional managers with ownership for the program and committed to success
Operations / Production, Maintenance, Engineering, Finance, HR, IT Preferably chaired by production executive Appoints program leaderchampion
Program leader a member
Involved in tactics only when reviewing results and acting to eliminate organizational barriers
48
Working level responsibility, authority and accountability for program development, objectives, plans, implementation and results including:
Assure that program strategy and plan are consistent with and contribute value to organizational policy, strategy and objectives Appoint members of Operating Leadership Team and subject matter experts; augment teams where necessary as improvement plans develop Direct and facilitate the process of identifying, value prioritizing and developing improvement initiatives Identify resource requirements Assure that improvement plans are consistent and supportive with other organizational activities; resolve inconsistencies Monitor progress and results, compliance with strategy and objectives; assure sustainability
49
Established for each site / facility business unit, area, plant Appointed by Program Leader with agreement of Steering Team Multi level, function, discipline
Highly respected top people with direct knowledge and experience in areas of potential improvement
Engineering, Operations, Maintenance augmented by IT, finance, safety as required Technical professionals, working level supervisors, technicians, crafts and operators
Commence with introductory, kick off workshop Initial task: review and validate / modify program mission, principles, policy, strategy and business plan
Essential for full commitment and ownership
Identify and develop potential opportunities for improvement Augmented as initiatives are identified and refined Spin off Improvement Action Teams
Opportunity discovery process, developing and implementing improvement initiatives are essentials to gain the ownership, commitment and responsibility necessary for sustainable success
50
Delivered to Operating Leadership Teams Detail program objectives, organization, function and process to participants Three to four days duration in two phases:
Program description and process
Mission, strategy, principles, policy and business plan Improvement discovery, prioritization and implementing process
Identify opportunity for improvement Describe future state; objectives Define the value gained Describe the step by step process to achieve the improvement; action plan Identify strengths to build on; challenges and barriers to overcome Define activity and results metrics to measure progress and success with objective time lines List resources, people and funding required Define potential risks that might impede the plans success
Highly beneficial for Executive Champion and Steering Team to participate in final presentations
51
52
80
= 552.5
50
20
10
= 24.4
18.410 M Units per Year
= 11.89
100
1000
54
55
56
57
PlanImprovements
59
Directed toward quick results create visibility, gain enthusiasm, support and momentum
Short action horizon 3 to 6 months from formation through implementation Divide large populations into improved and unimproved
Track and publicize gains create visibility, gain support and momentum
60
PlanImprovements II
Select four to six initiatives totaling approximately 125% of overall objective for submission to Steering Team Finalize and submit action plans obtain approval Publish improvement plan
Employee led leadership teams do unbelievably good strategic and tactical planning if you give them the opportunity. Most important, they gain total buy-in for the plan, Fortune 250 company CEO its implementation and results.
61
Matrix Implementation
Vivid Vision Communicated; High Level Agreement on the Need For Improvement; Commitment to Successful Implementation of OE Program
Designate Executive Champion, Appoint Corporate and Site Leadership, Steering Team, Program Leader Translate Corporate Business Objectives Into Overall OE Vision and Objectives, Business Drivers and Value Opportunities Develop OE Business and Mission Objectives; Compliance (SHE), Operating Effectiveness (Production Availability, Cost, LOE) Establish Business Aligned Overall Measures of Performance; Metrics, KPI's Develop the Site Overall Policy and Strategy Develop Business Model Form Communications Team; Develop Communications Strategy Initiate Consensus Development Within the Organization; Publicize Necessity for Improvement Design the Planning, Implementation and Sustainability Process Select OE Champions, Establish Improvement Action Team, Commence the OE Improvement Process Validate the OE Program Mission Statement
Risk Rank Systems and Equipment Categorize Areas for Improvement Establish Current Conditions Benchmark to Refine OE Objectives Highest Priority Value Opportunities History Culture, Values Strengths Results Expected Results / Value Probability Organization Weaknesses Value Potential Time Consequences Processes / Procedures Barriers Probability of Success Risk Future Material Opportunities Metrics Responsibility
Define
Organize
Identify
Analyze Prioritize
Identify Gaps to OE Performance Objectives; Value Prioritize Opportunities for Improvement Based on Value, Probability of Success Develop Value and Risk Prioritized OE Tactical Improvement Action Plans; Establish Measures of Performance; Control / Sustainability Plans Build and Train Organization; Expand Action Teams; Select OE Implementing Practices, Systems and Technology Practice Systems Methodology Technology Develop Competencies Deploy Risk / Value Prioritized OE Improvement Action Plans
Values, Culture, Relationships Basic Documentation Foundation Processes Organization and Administration Information and Data Management Risk Management and Mitigation Systems Reliability Improvement / Optimization Maintenance Optimization Integrity Assurance Incident, Test and Inspection Management Quality Assurance Reporting Programs Skills Management -- Training Communicate and Promote Results Measure and Manage Results Implement Continuous Improvement Review Program Assumptions, Envelope Emphasis on Continuous Improvement Reliability Culture P&ID'S Risk / Value Prioritization Champions Integrity Risk Determination Process IT Infrastructure Performance Based RCM / FMEA SIS Lifecycle Management Calibration Management Skills Management -- Training Automated Calculation Safety Wins Actual Results Production / Maintenance Partnership Asset Register Asset Hierarchy Work Management Materials Management Leadership Organizational Alignment Accuracy Availability / Security Reviewed and Validated High Risk Mitigation Process CMMS Recommendation Management Defect Based -- RCA Design Improvements Time Based PM Condition Based Electrical Distribution Integrity Thickness Measurement PRV Test Records RBI / Inspection Management Work Quality Reviews Configuration / Document Control Posted Published Team Professional / Craft Lessons People Metrics Gap Technology Risk Publicize Change Management Equipment History Lubrication RASCI Revision Control
Plan
Implement
Measure, Monitor and Review Results Adjust and Improve Action Plans; Improve and Maintain the OE Program Evergreen
Process Practice Operating Raw Materials Extend Ownership; Institutionalize and Sustain Success Control Plan Communicate
Check Improve
Sustain
Safely Achieve Optimized Business and Market Value Return From Operations
62
ImplementImprovement plans
Conduct training
Awareness; program necessity, principles, values, objectives Details; technology, systems, processes and best practices
64
Communicatewidely
Report progress and success to Steering Team; executive and business management
Financial results demonstrating contribution to business / mission objectives Compliance with timeline
65
Improvecontinuously
Strategy
Validate all factors that influence the business / mission objectives, strategy and successful implementation of the program
Program
Producing continuing contribution to business / mission objectives Employ financially based measurements wherever possible Assure plans to reduce risk, gain optimum sustainable effectiveness and value remain effective and consistent with the strategy and objectives Identify and value prioritize continuing improvement opportunities
Changing business / mission conditions elevate requirements for enterprise performance and effectiveness
Continuing pressure on performance (mission effectiveness, profit margins) results in corresponding pressure to reduce cost Operational Excellence must conclusively demonstrate greater benefits from improved effectiveness Provide continuing assurance that expenditures are being allocated correctly at the right time to gain optimum effectiveness
Infuse business / mission objectives into day to day management decisions
Make certain the 2nd and 3rd order effects (unintended consequences) associated with a change are fully identified and understood
67
Sustain gains
Everyone thoroughly understands the personal and organizational benefits of increased efficiency and objective performance
72 Hours:
Risk identification, assessment and control process documented and in place; governs application and implementation of asset integrity, Little or no knowledge or use of risk analysis reliability optimization, equipment management and surveillance programs; improvement and repair priorities or optimization Strategic, proactive reliability plan documented, fully utilized, periodically reviewed and updated; unexpected events "surprises", deviations from strategic plan, expectations rare All statutory, regulatory and site requirements for tests and inspections fully identified and documented; compliance assured by automated reporting variations from normal, out of limit measurements and test intervals Predictive (condition based: operating performance, mechanical condition) preventive and proactive programs fully documented including application, implementation, reporting and follow up requirements to assure effectiveness Robust Failure Analysis (RCA), tracking and prevention program fully defined, in place and effective; failures treated as a learning experience, opportunity to improve, eliminate recurrence Work and stores managed and conducted effectively in accordance with written, understood and utilized procedures; activities primarily determined by strategic plan; minimal ad hoc response to unexpected events required Continuous improvement program documented, in place and functioning effectively; capital replacement process documented and followed; Change Management process established, in-place and functioning Robust data and information infrastructure and management system; fast, accessible network, solid graduated security procedures; ready access; simplified, effective reporting Document and skills management system; written procedure in place, fully functional, easy to use and access including configuration control of all documentation, drawings, manuals, plans, etc; skills matrix in place with training, certification and succession plans Formalized program for organizational improvement and transformation documented. Individual appointed to lead and develop support for change throughout the organization, identifying opinion leaders, and establishing ambassador network. Periodic assessments conducted to evaluate performance, effectiveness and results to objectives. Assessment reports include recommendations for improvements No formal evaluations Little or no strategy; activities largely ad hoc response to events Statutory and regulatory requirements not fully defined; no reliable reporting system Support programs uncoordinated, little or no assurance of consistency or effectiveness Failure analysis accomplished inconsistently or not at all; ineffective follow up Work and stores management system non existent or ineffective No formal program for improvement; change management Poor IT infrastructure, data and information inconsistent, ineffective controls Inconsistent training; little or no document and skills management system in place
Scoring
1. Performance, Results, Effectiveness: HSE Compliance, Asset Effectiveness
Compliance Safety Health Environmental (HSE) objectives and requirements Full compliance with all legislative and statutory requirements for a safe, environmentally benign operation meeting all local expectations for good corporate citizenship. Clear objectives established, understood and reinforced.
Safety: OSHA Recordables or equivalent - Sites OSHA recordable rate over the last year; Five years. Objectives posted and stressed. Environmental incidents and/or local limits exceeded over the last year. Five years .
3.5 - 4.0
2.1 - 3.4
0.5 - 2.0
0 - 0.5
Focus on eliminating / minimizing potential event sources. Minimizing probability and / or consequences of events by continuing, comprehensive risk analysis and mitigation.
Continuing emphasis on learning and avoidance action from "near misses." Cultural commitment to HSE compliance.
Emphasis on HSE compliance; safety message and lessons learned discussed at every employee meeting. Performance to HSE metrics publicized and prominently displayed.
Low cultural commitment to HSE compliance. Compliance by directive; inconsistent adherence Environmental or safety incidents with significant consequences have occurred.
TRR <.8
TRR >2.5
No significant incidents.
Minor incidents have occurred, without significant release of any kind. Action taken to prevent recurrence
Large-scale release event or fire have occurred resulting in property damage and / or injury.
71
Overall results
ASSET OPTIMIZATION PERFORMANCE EVAULATION
RESULTS, EFFECTIVENESS
10.00
72
Creates maximum value Promotes effectiveness in all activities Extends reliability Minimizes risk
Clear vision stated, understood and accepted Solid values established, communicated and adopted by all in the organization
Initiative, ownership, commitment to excellence, responsibility and proactive continuous improvement throughout the organization
Effective operational leadership and organization; constructive work culture Ambitious, optimistic, and achievable operational objectives
Full compliance with business, mission and organizational objectives Established and owned by implementation action teams
Optimally applied; value driven risk and reliability optimizing strategy and programs Energized, empowered and motivated champions
Real ownership, initiative, responsibility and accountability by all program participants
74
Financial system in place to accurately assess real costs and value produced Effective training
Initiated at launch, and continued throughout Skills matrix established and maintained current
Robust, accurate and accessible support programs, practices and procedures, technology
Deployed to address specific requirements
Effective management of change, personnel skills and certification Full commitment to continuous review, improvement and sustainability
Identification of additional opportunities for improvement Results institutionalized
Periodic assessments to measure performance; identify additional opportunities for improvement Tangible rewards for results and value created
75
Major benefits
76
Major benefits
Sustaining
77
A few quotes
From the Physical Asset Management Handbook Employee knowledge of the business environment, its ramifications for company success and job preservation through participation in the improvement process has promoted ownership and a desire to maximize opportunities. Ownership and commitment is essential to successful change and takes time and effort to gain. Employees resist change. They will typically ride out management directed changes because experience indicates the change will be forgotten in six months or the change itself will be changed. Employee involvement and ownership must be part of the overall strategy. Employees must know and believe why they must change and improve. A clear strategy paves the way to the necessity for changes. When a manager inquired why no one had ever mentioned the huge waste and inefficiencies within the old system, workers replied: You never asked!
78
Thank You!
Questions, comments?