Académique Documents
Professionnel Documents
Culture Documents
JM FLOCH JM DENOUAL
1
CST User Group Meeting 2010
Outline
The project The partnerships Goals CST simulation Measurements First results
2
CST User Group Meeting 2010
VIPERE Project
(Vision des PERsonnes Ensevelies)
Project financed by ANR beginning in 2007, end in august 2010 Goals : Detection of buried persons with RADAR techniques
3
CST User Group Meeting 2010
parternship
CEA for antenna test CISTEM / XLIM for radioelectric experimental and simulation data ETSA for Electronics IETR for antenna design MARTEC for leadership, integration and treatments
4
CST User Group Meeting 2010
Goals (1)
- Propagation in inhomogeneous structure High attenuation Multiple traject, diffraction - Detection of people with very low mobility - Doppler treatement - Imaging in 3D - Light and compact system
5
CST User Group Meeting 2010
Goals (2)
Radar scope 2 to 30 m Distance resolution 15 to 50 cm Maximum sensibility -150 to -165 dBm Respiration amplitude few mm to 2 cm Respiration frequency 0.1 to 0.5 Hz Radar UWB CW with phase coding Frequency repetition 100 Hz Code length 2*23 Treatement gain 69 dB
6
CST User Group Meeting 2010
Radar schematic
7
CST User Group Meeting 2010
8
CST User Group Meeting 2010
CST Simulation
10
CST User Group Meeting 2010
Exemples of simulation
simulation forme.ppt Simulation and optimisation of reflector and flare shape in oder to have - good reflection coefficient - good radiation pattern - good impulse response
11
CST User Group Meeting 2010
Antenna prototype
Size : 35 x 23 x 15 cm
CST User Group Meeting 2010
Weight : 1.1 Kg
12
VIPERE Antenna
13
CST User Group Meeting 2010
Reflection coefficient
14
CST User Group Meeting 2010
Radiation pattern
(measurement and simulation in H and V polarisation)
300 MHz
2 GHz
15
CST User Group Meeting 2010
Antenna Gain
16
CST User Group Meeting 2010
Polarization decoupling
17
CST User Group Meeting 2010
18
CST User Group Meeting 2010
19
CST User Group Meeting 2010
20
CST User Group Meeting 2010
21
CST User Group Meeting 2010
22
CST User Group Meeting 2010
23
24
25
CST User Group Meeting 2010
Horizotantal coupling
Vertical coupling
26
CST User Group Meeting 2010
Horizontal
Distance : 15 cm 30 cm 45 cm Vertical
27
CST User Group Meeting 2010
Radar Prototype
28
CST User Group Meeting 2010
Measurement exemple
Respiration measured spectra
29
CST User Group Meeting 2010
30
CST User Group Meeting 2010