Vous êtes sur la page 1sur 43

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page: of:

1 43

CLIENT: PROJECTO:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

TECHNICAL SPECIFICATION

PAINT TECHNICAL SPECIFICATION


(This document is the English version of CTEB-101-INGE-R-ET-0026)

0 B A
REV

2013-03-27 For construction 2013-03-06 For approval 2012-12-21 For approval


DATE DESCRIPTION

NPC NPC NPC


ISSUED

MLR MLR
REVISED

JUJ JUJ
APPROVED

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page. 2 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
CLASSIFICATION It contains information for the design of structures, systems or components: Yes Design verification: REVISION CHECK Rev. Revisions N/A U.O chief./Supervisor Verificator level 1 No level 2

A B

N/A first issue Update of documents as per SENERs remarks. Revisions shall de marked with a line in the right margin. Subsections revised: 2:The subsection title is modified and the reference to the open cycle paint specification is added. 4: Addition: The paint manufacturer shall be considered for every product, although this specification shall be taken in consideration. No changes

PRELIMINARY OR PENDING INFORMATION Rev. Subsections Concept Status

DISTRIBUTION External Internal N copies/Support

UTE

MCQ, REA, AHA, MLY, NNA, JUJ, MLR, NPC, AGD

1/Correo electrnico

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page. 3 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION Index


1. PURPOSE ................................................................................................................... 5 1.1 1.2 2. 3. 4. PAINT AT FACTORY SCOPE ........................................................................ 6 PAINT AT SITE SCOPE ................................................................................. 9

REFERENCED DOCUMENTS.................................................................................... 9 CODES, REGULATIONS AND STANDARDS ............................................................ 9 GENERAL REQUIREMENTS ................................................................................... 10 4.1 4.2 RUST PREVENTION.................................................................................... 11 CATHODIC PROTECTION COMPATIBILITY .............................................. 11

5. 6.

PAINT SELECTION .................................................................................................. 11 SURFACE PREPARATION....................................................................................... 12 6.1 6.2 6.3 6.4 6.5 6.6 CARBON STEEL .......................................................................................... 12 PREVIOUSLY COATED STEEL SURFACES .............................................. 14 GALVANIZED STEEL................................................................................... 14 COLD-ROLLED STEEL ................................................................................ 15 STAINLESS STEEL AND SLIGHT ALLOYS ................................................ 15 CONCRETE AND CEMENT SURFACES .................................................... 16

7.

PAINT APPLICATION ............................................................................................... 16 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 7.10 GENERAL .................................................................................................... 16 SAFETY REGULATIONS ............................................................................. 18 FILM THICKNESS ........................................................................................ 18 REPAIRS ...................................................................................................... 18 INACCESSIBLE AREAS AFTER ASSEMBLY.............................................. 18 SURFACES TO BE WELDED AFTER PAINTING........................................ 18 INSULATED SURFACES ............................................................................. 19 GALVANIZED, STAINLESS STEEL OR ALUMINUM SURFACES .............. 19 SUPPORTS .................................................................................................. 19 CONCRETE ................................................................................................. 19

8.

PAINT SCHEMES ..................................................................................................... 20 8.1 COATING SYSTEM SELECTION ................................................................ 20

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page. 4 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
8.2 9. COMMERCIAL PAINTS ............................................................................... 26

COLORS ................................................................................................................... 32 9.1 9.2 EQUIPMENT AND STRUCTURE ................................................................. 32 PIPING AND VALVES .................................................................................. 33

10. IDENTIFICATION ...................................................................................................... 33 10.1 10.2 IDENTIFICATION BANDS ............................................................................ 33 EQUIPMENT IDENTIFICATION ................................................................... 34

11. INSPECTION ............................................................................................................ 34 11.1 11.2 11.3 11.4 11.5 11.6 11.7 11.8 GENERAL .................................................................................................... 34 INSPECTION DEVICES ............................................................................... 35 INSPECTION STAGES ................................................................................ 35 THICKNESS MEASUREMENT .................................................................... 36 ADHESION TESTING .................................................................................. 36 DETECTION OF DISCONTINUITIES ........................................................... 36 REJECTION ................................................................................................. 36 DOCUMENTATION ...................................................................................... 36

12. WARRANTY .............................................................................................................. 36 12.1 12.2 12.3 WARRANTY TERM ...................................................................................... 36 PAINT IN SITE OVER COATING APPLIED IN FACTORY .......................... 37 PAINT APPLIED IN FACTORY .................................................................... 37

13. HANDLING AND APPROVAL OF DOCUMENTS ..................................................... 37 13.1 13.2 WORKS IN FACTORY ................................................................................. 37 WORKS IN SITE........................................................................................... 37

ANNEX A FORMATS........................................................................................................ 39

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page. 5 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION

1.

PURPOSE

This specification aims at defining the technical requirements the paint applied on components and/or structures (from now on components) shall meet in the conversion to the Thermal Power Ensenada de Barragn combined cycle. The Ensenada de Barragn Thermal Power plant is located in the city of Ensenada, 19 km far from the city of La Plata, capital of the province of Buenos Aires, and 50 km from Ciudad Autnoma de Buenos Aires Argentina. This plant has a 413 MW combined cycle that uses natural gas as fuel. The unit can also work by burning diesel oil (distilled #2) as fuel and generating 385 MW. The unit is composed by one (1) dual gas turbine (Natural-distilled gas), one (1) heat recovery steam generator (HRSG), one (1) steam surface, one (1) surface condenser and the respective systems and auxiliary equipment. The requirements herein mentioned apply both to the work in factory and to the work in site. The person responsible for the job (from now on, the supplier) shall be the supplier of the component for the work in factory or the person who applies the paint in the site for the tasks to be performed during the construction of the plant. The scope of these tasks is defined below in this specification and in the component specification as well. The other tasks, if any, shall be responsibility of the person in charge of applying paint in the site. Paints shall protect surfaces against corrosion and erosion caused by the below mentioned environmental conditions. Besides, the paint shall resist the conditions derived from the operation of the different components. Barometric pressure: Temperature: Maximum Minimum Mean maximum Mean minimum Mean maximum Mean minimum 41,7 C - 5,1 33,4 3,3 C 87,8 % 56,7 % 1338,1 mm/year 1015 mbar

Relative humidity

Annual maximum rainfall

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page. 6 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
The supplier shall be responsible for the storage, inspection, material testing, surface preparation and paint in full compliance with the requirement herein stated. Services shall include, but not limited to, the supply and storage of materials and tools to be used, the surface preparation and the application of the necessary primers, intermediate coatings and finish coatings and final touches to the surfaces already painted as well as the performance of applicable inspections and testing, The supply of materials shall include the paints to apply defined in this document-, thinners, solvents or any other required additive, devices and tools necessary to prepare the surfaces, apply coatings, make checks and ensure the work quality and the staff safety. The following materials, unless otherwise stated, shall not be painted: stainless steel, plastics, tin, brass, copper, chromed metals, glass; special coatings such as rubber, ebonite, varnish, porcelain, etc.; switching mechanisms, commercial or industrial marks or tag plates; insulation, equipment inside parts, unless otherwise indicated; equipment machined parts; galvanized steel unless explicit indication on the contrary and ground connection areas in cabinets, panels, etc. Before painting, the supplier shall protect the tag plates, labels, holes, lights and other similar elements to avoid damage during the painting tasks. Standard components (see subsection 1.1) can be supplied with their usual protection provided that this process is adequate for the environment of the component in operation, and the manufacturer guarantees in writing the protection integrity during the term indicated in the purchasing documents (see technical conditions that apply to guarantee term in section 12 herein). The manufacturer shall submit all the information requested in this document. Likewise, the supplier shall quote as an alternative one of the paint schemes on subsection 8.1.

1.1

PAINT AT FACTORY SCOPE

The scope of the painting tasks in the factor shall include, but not limited to, the following: The components and equipment conditions (situation, insulation status, material and operation temperature) shall be included in all the technical specifications. The complete paint system, including the number of layers and thickness of each one, is describe in subsection 8.1 taking into consideration the following factors: Corrosion rate as per ISO 12944, Material to be coated Surface temperature Insulation Location and point where the generic products are going to be used

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page. 7 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
a) b) c) d) e) f) Surface preparation type Pumps and Compressors Fans Hoists Tank inside surfaces (if indicated in the Data Sheet) to be delivered in the site completely assembled Package equipment delivered in the site complete mounted on the frame Any other equipment or component if mentioned in the respective technical specification.

These systems shall apply for the following components:

The following equipment shall be delivered in the site, adequately prepared and painted, except for the finish coating and the zones that shall be welded afterwards, as indicated in subsection 7.6 of this specification: Tank exteriors Building structures Bridge or gantry crane beams Filtering systems Condenser Heaters and coolers without insulation Equipment benches In general, any component (except those expressly mentioned) to be welded in the site and so indicated in their technical specification. The electrical equipment and elements (terminal boxes, sealers, control elements, etc.) Electrical engines, control panels and electric transformers Check valves external surface

The following equipment shall be painted in accordance with the manufacturer standards:

Piping and valves shall be painted as follows:

451-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 8 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGN LPEZ THERMAL POWER PLANT

PAINT SPECIFICATION
Table 1: Paint system for pipes and valves
Location in plant: Known (at the moment of painting) paint as per subsection 8.1 Location in plant: unknown (at the moment of painting) follow below instructions: 1 STEP LOCATION OF THE ELEMENT IN THE PLANT PROCESS TO APPLY INSULATION 2 STEP (after knowing the site and always after the 1st step) TEMPERATURE UNDER NORMAL OPERATION LOCATION OF THE ELEMENT IN PLANT Inside buildings PROCESS TO APPLY

Unknown painting

when CS-HI system (general priming) (subsection 8.1)

NO

YES

System CS-LU-IC3, subsection 8.1. Priming for patch up, touch up and for finishing <93C Outdoors and System CS-LU-WC4 or CS-LU-WC4-ALT, partially protected subsection 8.1. Priming only for patching, intermediate coating and finish. between 93 and Indifferent System CS-HU subsection 8.1 (only for 400C upper coating) Irrelevant irrelevant None

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 9 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
Tank ferrules that shall be assembled in the site can be provided as follows: With no previous paint treatment so all the preparation and painting tasks are made in the site after the tank has been welded. In this case, it is important to consider that inaccessible areas, i.e. the exterior side of the bottoms, shall be dripped and primed before the assembly. With surface preparation and prime made in the factory and finishing paint system in the site. In this case, a 5-10-cm wide zone along the welding areas shall be left without prime and shall be protected with adhesive tape, peelable paint or welding prime compatible with the products to be applied after the assembly.

In the case of units that shall be thermally insulated, see subsection 7.7. The supplier of the unit shall send instructions for the final painting and /or the necessary finishing touches in the Site, after the erection. Machined interior surfaces shall be supplied with a layer of protective grease.

1.2

PAINT AT SITE SCOPE

The scope of the tasks in the site shall include, but not limited to the application of the complete paint systems as defined in chapter 8, all the components provided without paint and the application of intermediate or finish coatings and / or finishing touches until completing the paint systems defined in subsection 8.1, all the components that require paint, and in general all paint tasks defined in the Specifications Sheet. The scope shall also include the preparation and painting of the concrete surfaces in chemical environments that require specific chemical resistance characteristics, such as diked areas, neutralization basins or lab or battery room floor.

2.

REFERENCED DOCUMENTS

Open cycle: 10111-P-ET-148 (Rev.6).Paint specification (DSO)

This specification is compatible with the one mentioned in the open cycle. For conversion to combined cycle this specification shall be used.

3.

CODES, REGULATIONS AND STANDARDS

The following codes and standards shall be considered part of this specification. American Society for Testing and Materials (ASTM) Steel Structures Painting Council (SSPC) Register of Colors, RAL

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 10 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
International Organization of Standardization (ISO) Normativa Argentina (IRAM)

Besides those codes and standards herein mentioned, the supplier shall meet the requirements of all applicable local regulations in force at the date of execution of the contract. For the selection of paint systems, their corrosivity and durability categories shall be taken into consideration, as per ISO 12944-1 and ISO 12944-2 standards, respectively. The following categories shall apply to this specification: C3 C4: Exteriors: Outside industrial areas Im 1 = Fresh water. Components immersed in river, reservoir, pre-treated (nondrinking) water such as water inside tanks, mechanical components or equipment submersed parts of water intake structures. Im 3 = Buried elements. (buried tanks, piping or equipment). For water and soil, categories shall be as follows: Interiors: Inside industrial buildings

This specification describes paint systems for equipment or components affected by these conditions and others, such as high temperature, submersed locations or in occasional contact with chemicals or other specific requirements.

4.

GENERAL REQUIREMENTS

Surface preparation shall be made in accordance with the latest instructions issued by the manufacturer of the paints to be used and with this specification. The manufacturers indication about every product shall be considered. However, this specification shall be also taken into consideration. The necessary precautions shall be taken to ensure that the equipment internal surfaces, machined surfaces, mechanisms, etc shall not be contaminated with cleaning products, sand, etc. Metal structures or units that must be protected shall be designed as per ISO 12944-3, "Corrosion protection of steel structures by protective paint systems. Design considerations " Before starting with the cleaning tasks all mechanical defects shall be removed: exfoliations, weld bead, slots, etc.

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 11 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
The paints indicated in subsection 8.1 shall be used depending on the conditions they are going to undergo once applied. Any other paint shall be previously approved by the Purchaser. Paints, thinners, etc. shall be delivered in their original packages, closed, sealed and with no sign of damage. Paint and thinner packages shall clearly show the manufacturers brand, designation and expiry date. All products shall be submitted with their respective application and storage instructions. Transport and storage shall be made in compliance with the manufacturers instructions. As a general rule, the packages shall be stored indoors, in a ventilated place and protected against fire, at a temperature within 5C of the recommended range of temperature and least 2C over the condensation point. Lighting shall be anti-deflagrant. Equipment and structures painted in factory shall include a 10% extra for finishing touches in the site. Paint shall be prepared and applied in accordance with the manufacturers instructions and this specification. Paint to be used shall be that indicated in subsection 8.2 or the equivalent approved by the purchaser. Paint shall meet the environmental applicable regulations, including local ones. Forbidden components such as lead, chrome, etc are not allowed. Paint shall not be applied in surfaces in contact with fluids of process, unless otherwise stated.

4.1

RUST PREVENTION

Machined surfaces and other ferrous materials that are not going to be painted shall be protected with a corrosion inhibitor. The corrosion inhibitor shall not negatively affect the quality of the surface. Corrosion inhibitors applied to surfaces in contact with process fluids such as condensate, supply water, steam, etc. shall be soluble in water or VPI-inhibitor vapor phase type. Drainage resulting from the elimination of this product shall not contain any product that cannot be poured in the sewage system

4.2

CATHODIC PROTECTION COMPATIBILITY

All paint applied over submersed or buried surfaces shall be compatible with the cathodic protection.

5.

PAINT SELECTION

As far as possible, coatings shall meet the following:

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 12 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
Coating types shall be as few as possible to cover the highest range of applications. Only standard application products, available in the market, shall be selected. Brands to be used in paint shall be as few as possible. AKZO-INTERNATIONAL PPG/AMERON HEMPEL REVESTA CARBOLINE SHERWIN WILLIAMS

Recommended suppliers are:

6.

SURFACE PREPARATION

6.1
6.1.1

CARBON STEEL
GREASE REMOVAL

Surfaces shall be cleaned as per SSPC-SP-1 Specification "Solvent Cleaning". The following elements can be used: Cloth or brushes soaked in solvents. The final cleaning shall be made with clean cloth or brushed. Detergents, with subsequent wash. Thinner in vapor phase.

The use of hot detergent or halogenated solvents in vapor phase shall not be allowed in the Site, because they are difficult to handle and more dangerous. When solvents are used, the respective safety rules shall be observed, including goggles, ventilation equipment, gloves etc. Special precaution shall be taken to avoid contaminating stainless steel surfaces located near the place of work, especially is halogenated cleaning agents are being used. 6.1.2
CONTAMINATION DUE TO SALTS, ACIDS AND ALKALI

Chemicals residues shall be removed by washing with warm water or water-jetting (<700 bar). If necessary, neutral moistening agents can be added. The pH of clean wet surfaces shall be between 6 and 8.

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 13 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
6.1.3
RUST REMOVAL

Rust shall be removed from a surface when it can be painted within the 8 hours after the cleaning and in no case the clean surface shall be left overnight without painting. If rust appears again, the surface shall be blast-cleaned again. 6.1.3.1 Blast-cleaning

Rust removal shall be made by means of blast-cleaning procedure in accordance with SSPC-SP specification for the degree defined for the selected paint system. After the surface has been prepared, its aspect shall match the figure of ISO-8501 standard. Blast-cleaning shall not damage or distort the surface. The abrasive to be used shall be clean, dry and free from contaminants and soluble salts and shall meet the applicable SSPC-SP standards and the ISO 8501, ISO 8502 and ISO 8503. The blast-cleaning in areas in contact with demineralized water or condensate shall be made with crushed steel and not sand, to avoid the surface contamination with silica. The abrasive granulometry shall be within the range mentioned in the respective standards and shall allow that, after the cleaning, the roughness of the surface is the one recommended by the paint manufacture, between 25 y 50 m, depending on the thickness of the paint to apply. After the blast-cleaning, dust shall be removed with air blowing free of oil and water, vacuum and/or brushing. Surface preparation through abrasive blast-cleaning may be used in certain environments at the Purchasers discretion to give more protection against sparks, minimize atmospheric and surface pollution and prepare the surfaces with saline contamination that spend a lot of time under wet conditions. The manufacturer of the paint to be used on the surface shall confirm that the wet blast-cleaning is the best option. The compressors shall supply air free of oil and water with the necessary flow and at the required pressure in the nozzle. 6.1.3.2 Mechanical or manual brushing

This method is used in surfaces where the blast-cleaning cannot be performed and with the Purchasers approval, for repairs and touch-ups of small damaged areas. The final aspect of the surface shall be equivalent to the cleaning degree of ISO-8501 standard defined in every case. It will be also used to achieve the proper roughness in white steel plate surfaces (cold rolled steel).

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 14 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
6.1.3.3 Chemical cleaning

Rust removal using chemical cleaning (pickling bath, etc.) shall require the express Purchasers approval

6.2
6.2.1

PREVIOUSLY COATED STEEL SURFACES


DEFECTIVE SURFACES

If the defects to be repaired are small clearly identified areas, they will be brushed with a mechanical brush until reaching a firm paint coating or the bare metal and then, after cleaning the dust, the appropriate paint system shall be applied. If the defects to be repaired represent more than the 20% of the painted surface or are distributed all over the surface (notwithstanding the percentage), all the defective coatings shall be removed and the total surface shall be prepared and painted in accordance with this specification. 6.2.2
WELDED JOINTS AND SCREWED AREAS

All joints and weld beads shall be continuous as per 12944-3 and if this is not possible the spaces shall be sealed with polyester or acrylic repaintable filler in both sides of the joint. After welding, the surface shall be cleaned and brushed before paint. All welding residues shall be removed, such as burned paint, test residues, etc. The welded area shall be prepared to be painted with the same paint system as the rest of the component. In screwed joints, after tightening the joint, the entire perimeter shall be sealed with acrylic or polyester repaintable filler, compatible with other paint coatings. In this type of joints, plasticized paint that may be serve as lubricant is not allowed. 6.2.3
NON-DEFECTIVE SURFACES

If it is necessary to finish these surfaces, the painted surface shall be cleaned with solvents adequate for the type of paint with cloth or brushes. If the type of paint is unknown, tests shall be made in small areas with different solvents or detergents to find out the one that best cleans the surface without damaging the coating. If the surface is too smooth, it should be slightly sanded or brushed to achieve a slight roughness that facilitates the application of paint. The surface shall be clean and dry to apply the paint.

6.3
6.3.1

GALVANIZED STEEL
NEW GALVANIZED STEEL

These surfaces shall be cleaned with a suitable detergent and then rinsed with fresh water. Oil and grease shall be removed with solvents.

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 15 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
If the surface is too smooth, blast-cleaning or very slight brushing shall be performed to achieve a slight roughness. Afterwards, after approval, a well-known special adhesion epoxy primer shall be applied. 6.3.2
AGED GALVANIZED SURFACES

Zinc products and contaminants shall be cleaned with water and detergents. After cleaning and approval, a well-known special adhesion epoxy primer shall be applied. 6.3.3
SURFACE WITHOUT ZINC COATING IN SOME AREAS

These surfaces shall be locally cleaned by blast-cleaning process or slight brushing, carefully avoiding removing the zinc coating near the zones to be repaired. After cleaning, a well-know special adhesion zinc powder primer shall be applied, The rest of the surface shall be also painted with a well-known special adhesion primer to then apply the respective finish coating.

6.4

COLD-ROLLED STEEL

For thickness > 3 mm an abrasive blast-cleaning shall be performed, until achieving a Sa2 degree in accordance with ISO 8501 standard. For thickness 3 mm degreasing and phosphating shall be carried out an then, if necessary, cleaning shall be completed with a slight blast-cleaning to achieve the necessary roughness to apply paint..

6.5

STAINLESS STEEL AND SLIGHT ALLOYS

Only if it is specially required to paint these materials, the following steps will be followed: Degrease the surface with fresh water and mild detergent, brush with non-metal brushes, if necessary, to avoid any contamination. Afterwards, slight blast-cleaned preferably with corundum or glass sphere. If this is not possible, use dry, fine-coarse silica sand (it shall not be used on surfaces in contact with process fluids). After blasting, the surface shall be vacuumed to eliminate all residues. Medium roughness of the irregularities shall be within 15-30 m.

Stainless steel materials shall be kept in clean places and shall not be in contact with carbon steel, low alloy steels of low melting point metals. Piping, accessories and equipment made of this material shall be properly packed and after assembly they shall be protected against splash, dirt or dust caused by works made in carbon or low alloy steels in the surroundings.

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 16 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
6.6
6.6.1
CONCRETE AND CEMENT SURFACES

GENERAL

Cure new concrete and cement for at least thirty (30) days before painting. Before painting, it will be checked that there is no leak or moisture that may not allow a good adherence. If there is moisture or leak, the paint manufacturer shall provide a compatible sealing coating that may be applied before painting to cover the entire surface. The supplier shall ensure, before the application of paint, that both the paint and the formrelease products used are compatible. Before cleaning the surfaces, all burrs, rough edges, etc. shall be removed with a polishing machine, abrasive discs, etc. In vertical locations, walls, columns, etc, before applying the coating all defects (such as nest, mineral pockets) shall be removed, to achieve a smooth coating, free of pores and cracks. It is necessary to apply filler that covers the surface but do not sink so, after drying, it can be worked with a polisher. Concrete surfaces shall be prepared and coated always following the manufacturers instructions. 6.6.2
CLEANING

To clean cement and concrete a slight abrasive blasting shall be performed and afterwards dust will be vacuumed or air-pressure cleaned.

7.

PAINT APPLICATION

7.1

GENERAL

The surface, before the application of the coating, shall be perfectly prepared in accordance with the coating to be applied and the requirements of this specification as regards cleaning degree, rust and roughness removal degree. The coatings to be applied on the same surface (priming, intermediate and finish) shall be from the same manufacturer and compatible. This also applies to any touch-up and factory priming. Before the application of a paint coating, the previous one shall be clean and free from foreign matters and in proper curing conditions. The manufacturers recommendations as to painting intervals shall be followed and normally the absolute minimum shall be observed in order to avoid contamination between coatings. In case of contamination between coatings, it will be completely removed by cleaning with detergent and rinsing with fresh water.

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 17 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
During the performance of the tasks, all edges, corners, discontinuous surfaces, etc shall be carefully coated and the viscosity required by the application method used shall be met (paintbrush, spray gun, etc). In exterior corners and edges a previous coating shall be applied before painting the whole unit. Piping shall be painted overlapping a 50% of the new coating with the previous one to avoid less thick areas. As a general rule, primers shall be applied only with paintbrush or airless gun. Two or more layers of the same paint on the same surface shall be applied in both directions and each layer in a different tone, as to ensure a complete coating of the surface for every layer. The first primer coating shall have a color different from the steel where it is applied. Recommended temperature and humidity conditions given by the manufacturer shall be taken in consideration to apply the paint. As a general rule, paint shall not be applied in these cases:

Room temperature under 5C (for epoxy and polyurethane room temperature shall be >10C). If it is foreseen that temperature may fall below 0C before the paint is dry. When the metal temperature is < 5C over the air dew point Room temperature over 50C (for epoxy and polyurethane room temperature shall not be above 35C). Relative humidity above 85% Rain, ice, snow or mist. Wind speed above 20 Km/h Daylight exposure Presence of dust and gas

No paint shall be dried under conditions that may affect the substrate, the paint films and/or the adherence between them. Special precaution shall be taken to avoid damage or stain on the units interiors After all painting tasks are finished, all masking tapes shall be removed and it will be carefully checked that there are no instruments, tools, pieces of cloth, paper, screws, etc left inside the unit elbows, orifices, etc.

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 18 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
7.2
SAFETY REGULATIONS

During paint application, the respective safety rules shall be observed. The area shall be ventilated and NO SMOKING signs shall be visible. The devices use shall not emit sparks. Operators shall wear gloves, goggles or masks if necessary to avoid the inhalation or contact of the skin with toxic products The supplier shall be responsible for the safety of his staff, as well as for the observance of the safety legal requirements applicable both in the factory and in the site.

7.3

FILM THICKNESS

The paint film thickness indicated shall be strictly observed. Unless disposition on the contrary, they refer to dry film thickness. Thickness values are described in subsections 8.1 y 8.2.

7.4

REPAIRS

All defects on painted surfaces, such as insufficient adherence, mechanical damage, bubbles, inclusions, breaks, etc shall be removed so the finish coating shall meet the required specifications. All defective areas shall be completely cleaned, including those areas adjacent to the defect in about 100 mm. The surface shall be visually inspected before painting. If the defects to be repaired represent more than the 20% of the painted area or are distributed all over the surface (notwithstanding the percentage), all defective paint coatings shall be completely removed and the surface shall be prepared and painted as per this specification requirements.

7.5

INACCESSIBLE AREAS AFTER ASSEMBLY

Surfaces that will be inaccessible after the erection (welded beam faces, floor under equipment, exterior bottom or vertical tanks, etc) shall be painted with the complete selected paint system when they still are accessible either in the site before erection or in the factory if they become inaccessible when delivered in the site.. Steel parts embedded in concrete shall be only painted on the transition zone. Steel surfaces that shall be contact with a continuous weld bead (sealed) shall not be painted.

7.6

SURFACES TO BE WELDED AFTER PAINTING

In those surfaces that will be welded after painting, a 30-50 mm band (depending on the thickness of the plate to be welded) shall be left without paint and adjacent to the edge to be welded. This band shall be protected against corrosion with a zinc silicate shop-primer, 20-30-m thick, or with peelable varnish or adhesive paper until the moment of welding.

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 19 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
After welding, the band shall be prepared and painted, even the welded area, in accordance with the specification.

7.7

INSULATED SURFACES

Surfaces with a maximum operation temperature between 93C y 400C shall be prepared and painted with 70 m zinc inorganic silicate, ethyl-base, resistant to the components maximum operation temperature, (see subsection 8.1).

7.8

GALVANIZED, STAINLESS STEEL OR ALUMINUM SURFACES

These materials shall not be normally painted. They will only be coated with paint under these conditions: Exposure to chemicals or other environments if the material is not resistant to them. Signaling needs.

Before the application of the paint system, the surface shall be treated as indicated in subsection 6.3 in the case of galvanized steel or 6.5 if it is stainless steel or aluminum, cleaning and priming it with 35-40 m of epoxy primer followed by the respective paint system (interior or exterior) except for the primer. If these surfaces need to be painted to improve their corrosive properties, the CS-LU-IC3 system in subsection 8.1 shall be applied for components assembled in interiors and the CS-LU-WC4 or CS-LU-WC4-ALT shall apply for components located outdoors, except in the case of priming (application in accordance with the specifications of this subsection). If these surfaces need to be painted due to signaling requirements (visual requirements) only a 40 m coating of aliphatic polyurethane varnish shall be applied over the epoxy primer as indicated herein.

7.9

SUPPORTS

Support components can be hot-dip galvanized products when the maximum operation service is below 400C. They shall be painted if they met the conditions of 7.8. Those components provided already painted shall meet the conditions of subsection 1.1 for piping and valves.

7.10

CONCRETE

The scope of the concrete coatings under this specification only limits to those surfaces exposed to chemical attack, such as diked areas, chemical drain wells neutralization basins or lab or battery room floor. In general for the selection of the correct paint, it must be checked that it is resistant to the chemical reactive it may be exposed to in the location.

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 20 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
Application shall be made in accordance with the paint suppliers recommendations, especially as regards repairs, thickness and sealing coatings. In the case of coatings for diked areas and gutters, a sealing coating shall be applied to eliminate pores and it shall be compatible with the subsequent coating, as well as an epoxy coating, without solvent of a 300-micra thickness (theoretical performance of about 1 l/m2 depending on the paint). The need of coating the basins concrete surfaces (effluents and neutralization) shall be mentioned in the respective building drawings. The coatings shall depend on the concentration of the chemicals and their temperature in the basin. If the surface to be painted is a passable floor, the necessary loads indicated by the paint manufacturer shall be added to avoid slippery.

8.

PAINT SCHEMES

8.1

COATING SYSTEM SELECTION

Below there is a table with the complete paint system to apply, depending on the conditions and the material.

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 21 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
MATERIAL AND CONDITIONS CORROSIVITY (ISO 12944-2) C3 Medium EQUIPMENT Interiors: Applied on structures, piping, valves, tanks, equipment, etc located inside buildings. SYSTEM IDENT (1) PROCESS DRY THICKNESS m GENERIC PRODUCTS

Surface preparation Sa 2 CS-LU-IC3 Priming Finish coating. Total 70 100 170 Zinc-rich epoxy primer Polyamide epoxy varnish

CARBON STEEL WITH SERVICE TEMPERATURE OF <93 C NOT SUBMERSED

C4 high

Outdoors: Applied on structures, piping, valves, tanks, equipment, etc located outside CS-LU-WC4

Finish coating Sa 2 Priming Intermed. Finish coating. Total 70 90 40 200 Zinc-rich epoxy primer Polyamide epoxy Aliphatic polyurethane varnish

C4 high (3)

Outdoors: Applied on structures, piping, Finish coating Sa 2 valves, tanks, equipment, etc located Priming 200 outside. CS-LU-WC4-ALT Finish 60 coating. Total 260

Solid-rich epoxy Aliphatic polyurethane varnish

N/A

Outdoors/Interiors: Piping and vessels

INSULATED

CS-LI

Finish coating Sa 2 Priming Total 70 70 Zinc-rich epoxy primer

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 22 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
MATERIAL AND CONDITIONS CORROSIVITY (ISO 12944-2) SYSTEM IDENT (1) DRY THICKNESS m

EQUIPMENT > 93 C up to 400C (external surfaces of piping, valves chimney etc) > 93 C up to 205C INSULATED

PROCESS

GENERIC PRODUCTS

Finish coating Sa 2 CS-HI Priming Total 70 70 Finish coating Sa 2 Priming 70 40-50 110-120 General cleaning: transport temporary painting Finish coating Sa 2 Zinc silicate Acrylic silicone UNINSULATED CS-HU Zinc silicate

HIGH TEMPERATURE CARBON STEEL

N/A

(external surfaces of piping, valves chimney etc) > 400C up to 600C (external surfaces of piping, valves, etc) > 205C up to 600C (external surfaces of piping, valves, etc)

Finish coating. Total

INSULATED

CS-VI

UNINSULATED

CS-VU

Finish coating. Total

2 x 25 50

Aluminum silicone with a resistance up to 600C

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 23 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION

MATERIAL AND CONDITIONS

CORROSIVITY (ISO 12944-2)

EQUIPMENT

SYSTEM IDENT (1)

PROCESS

DRY THICKNESS m

GENERIC PRODUCTS

Finish coating Sa 2 Raw water (non drinkable) or buried elements (inside tanks, submersed areas of vertical pumps or equipment and buried pumps, etc) Priming (2) CS-LU-ImR Finish coating Total CARBON STEEL AT ROOM TEMPERATURE AND SUBMERSED (All these systems shall be compatible with cathodic protection) Im1/Im3 Priming (2) Drinkable or demineralized water (tank interiors, etc) CS-LU-ImP 40 3 x 120 360-400 Finish coating Sa 2 40 Polyamide epoxy primer 100% solid epoxy coating Certificate is necessary for water tank coating as well as Bresle test 2 (max. 2-3 g/cm , to verify with the product technical sheet) Polyamide epoxy primer Solid-rich immersion) epoxy (service

Finish coating

400 ( 2 x 200)

Total

400-440 Finish coating Sa 2

Priming (2) N/A Diesel oil (4) CS-LU-ImG Finish coating Total

40 2 x 150 300-340

Polyamide epoxy primer Amina or Phenolic epoxy

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 24 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
MATERIAL AND CONDITIONS CORROSIVITY (ISO 12944-2) N/A SYSTEM IDENT (1) LS-LU-I LS-LU- W DRY THICKNESS m

EQUIPMENT Cold-rolled steel (electric cabinets, panels, etc)

PROCESS

GENERIC PRODUCTS

Finish coating: see section 6.4 Surface coating Total > 80 >80 Finish coating: see section 6.3 Priming Interm. and/or surface coating Total 35-40 Polyamide epoxy primer for smooth surfaces Polister or epoxi, dried at high temperature

NON-BLASTING METAL SURFACES

N/A

Galvanized steel, aluminum, stainless steel surface

GS-LU-I GS-LU-W

See paragraph 7.8 of this specification

See paragraph 7.8 of this specification

CONCRETE SURFACE

N/A

Concrete with chemicals or water effluents (chemical tank dry basins, drain basins for chemical products, etc) (see paragraph 7.10)

CO-L-Im

Concrete conditions: hardened and dry, with no remains of oil or grease Finish coating: sanded and cleaned with vacuum machine and treated with diluted HCI if the surface is smooth. Sealed Epoxy or polyester sealing shall be applied to the concrete joins. Sealing shall be elastic and shall allow touch-ups 35 - 40 Dilute epoxy layer with a consumption between 0,2 and 0,3 kg/m2 (approx.) Epoxi coating 100% solids or similar approved for service

Priming

Surface coating

>300

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 25 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION

NOTES

(1) SYSTEM IDENTIFICATION: XX-YY-ZZZ, where, XX = Material; YY = Temperature of service or fire stability and ZZZ = Localization or service

Material to be coated CS LS Carbon steel Cold-rolled steel

Maximum surface temperature of service / insulation V H Very high High I U Insulated uninsulated I

Localization and/or services Interior (characters below refer corrosivity degree as per ISO 12944) to the

W Exterior and slightly protected (exposed to the open air) (characters below refer to the corrosivity degree as per ISO 12944) Im Immersion (raw salty water, drinkable or demineralized or (G) diesel oil)

GS CO

Galvanized steel, stainless steel, light aluminum L alloys Concrete

Low

(2)Primer to apply if the blasted surface shall be protected before the application of the surface coating. (3) Optional paint system to be used in equipment, structures or piping to be completely painted in the factory and safely transported to the site (avoiding blows that may damage the paint system applied). (4) Only the tank bottom shall be painted and a 500 mm high from this bottom..

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 26 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
8.2
COMMERCIAL PAINTS

The following tables show the commercial paints of suppliers identified in subsection 5 of this specification.
SPECIFICATED SYSTEMS
SYSTEM

MANUFACTURERS PAINT SYSTEMS AKZOINTERNATIONAL INTERZINC 52 INTERGARD 475HS PPG/ AMERON AMERCOAT 68 G AMERCOAT 385 HEMPEL HEMPADUR ZINC 17360/15360 HEMPADUR MASTIC 45880/1 SHERWIN WILLIAMS SUMAZINC 276 (***) REVESTA REVESTA 31 CARBOLINE CL 655 R CG 890 SG/CG 885

Coating Primer CS-LUIC3 Surface coating Total Primer

Thickness (dry) m 70

Generic paint Zinc-rich epoxy Polyamide epoxy

100 170 70

MACROPOXY 646 o REVESTA 340 SUMADUR FC

Zinc-rich epoxy Polyamide epoxy

INTERZINC 52 INTERGARD 475HS

AMERCOAT 68 G AMERCOAT 385

HEMPADUR ZINC 17360/15360 HEMPADUR MASTIC 45880/1 HEMPATHANE CAPA SUPERFICIAL 55210 HEMPATHANE HS 55610

SUMAZINC 276 (***)

REVSTA 31

CL 655 R

Intermed. CS-LUWC4 Surface layer Total

90

MACROPOXY 646 o REVESTA 340 SUMADUR FC SUMATANE 355

CG 893

40

Aliphatic polyurethane

INTERTHANE 990

AMERCOAT 450S

REVESTA 290 CTH 133 HB

200

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 27 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
SPECIFICATED SYSTEMS
SYSTEM

MANUFACTURERS PAINT SYSTEMS AKZOINTERNATIONAL INTERSEAL 211 HS PPG/ AMERON AMERLOCK 400 HEMPEL HEMPADUR MASTIC 45880/1 HEMPATHANE CAPA SUPERFICIAL 55210 HEMPATHANE HS 55610 SHERWIN WILLIAMS REVESTA CARBOLINE

Coating

Thickness (dry) m 200

Generic paint Solid-rich epoxi

Primer CS-LUWC4ALT (3)

MACROPOXY REVESTA 646 o 340/REVESTA SUMADUR FC 400 SUMATANE 355

CG 890

Surface coating Total

60

Aliphatic polyurethane

INTERTHANE 990

AMERCOAT 450S

REVESTA 290 CTH 133 HB

260 70 70 70 70 70 Zinc silicate Acrylic silicone (205 C) INTERZINC 22 INTERTHERM 875 DIMETCOTE 9 AMERCOAT 891 HEMPELS GALVOSIL 15700/15780 HEMPELS SILICONA ACRILICA 56940 ZINC CLAD 61 SUMATHERM HS 550 (8) REVESTA D 9FT REVESTA 67/2 CZ 11 FG Zinc silicate INTERZINC 22 DIMETCOTE 9 HEMPELS GALVOSIL 15700/15780 ZINC CLAD 61 REVESTA D 9FT CZ 11 FG Zinc-rich epoxy INTERZINC 52 AMERCOAT SUMAZINC 276 HEMPADUR ZINC 17360 68 G (***) REVESTA 31 CL 655 R

CS-LI

Primer Total

CS-HI

Primer Total Primer

CS-HU

Surface coating Total

40-50 110-120

---

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 28 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
SPECIFICATED SYSTEMS
SYSTEM

MANUFACTURERS PAINT SYSTEMS AKZOINTERNATIONAL INTERTHERM 50 PPG/ AMERON SILICOFER 600 HEMPEL HEMPELS 56910 ALUMINIO 19000 SHERWIN WILLIAMS SUMATHERM HS 550 (until 550 C) REVESTA CARBOLINE

Coating Surface coating Total

Thickness (dry) m 2 X 25

Generic paint Aluminum silicone (600 C)

CS-VU

REVESTA 650 THERMALINE HEAT 4700

50 MACROPOXY 646 o REVESTA 340 EURONAVY ES NF 301 MACROPOXY 646 o EURONAVY ES 301 REVESTA 400/118VI

Primer (2) CS-LUImR Surface coating Total Primer (2) CS-LUImP Surface coating Total

40

Polyamide epoxy

INTERGARD 291

AMERCOAT 71

HEMPADUR 15400/ HEMPADUR 85210

CG 888

3 X 120

Solid-rich epoxy

INTERSEAL 670 HS/ INTERZONE 954

AMERCOAT 385

HEMPADUR 15400/ HEMPADUR 85210

CG 891

360 - 400 40 400 Polyamide epoxy 100% solid epoxy INTERLINE 982 AMERCOAT 71 HEMPADUR 15590 EURONAVY ES REVESTA 340 301 NF REVESTA 118VI/400 CG 888

INTERLINE 910

HEMPADUR AMERCOAT EURONAVY ES MULTISTRENGH 35530/ 610 301 HEMPADUR 35560

PL 4500 S

400 - 440

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 29 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
SPECIFICATED SYSTEMS
SYSTEM

MANUFACTURERS PAINT SYSTEMS AKZOINTERNATIONAL INTERLINE 982 INTERLINE 850/ INTERLINE 975 PPG/ AMERON AMERCOAT 71 AMERCOAT 610 HEMPEL HEMPADUR 85210/ HEMPADUR 15400/ HEMPADUR 85210/ HEMPADUR 15400/ SHERWIN WILLIAMS REVESTA CARBOLINE PH 187 fdo.

Coating Primer (2) CS-LUImG (4) Surface coating Total

Thickness (dry) m 40

Generic paint Polyamide epoxy Amina or phenolic epoxy

PHENICON HS REVESTA 340 (***) NF PHENICON HS (***) REVESTA 118VI

2 x 150

PH 187 Ac.

300- 340 (Alternative with liquid paint) HEMPADUR 45880/1 (80/100 m) + HEMPATHANE TOPCOAT 55210/55610 (50-75 m) (**) (Alternative with liquid paint) 893 SG (80/100 m) + CTH 133 HB (40m)

LS-LU-I LS-LUW

Surface coating

>80

Polyester or epoxy powder

---

---

---

---

Total Primer GS-LU-I GS-LUW Surface coating Total

>80 35 - 40 Polyamide epoxy INTERGARD 291 AMERCOAT 71 HEMPADUR 15570 SUMADUR SP 530 --CG 888

Same as CS-LU-IC3 or CS-LU-WC4. Depending on the location in site (see section 6.9)

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 30 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
SPECIFICATED SYSTEMS
SYSTEM

MANUFACTURERS PAINT SYSTEMS AKZOINTERNATIONAL PPG/ AMERON --NUKLAD 105 --HEMPADUR 85210/ HEMPADUR 15400/ HEMPADUR 85671 (*) HEMPEL HEMPADUR SEALER 05990 (diluted with THINNER 08450) SHERWIN WILLIAMS SUMADUR JF (7) REVESTA CARBOLINE

Coating

Thickness (dry) m

Generic paint

Sealing

Polyester or INTERGARD 740 epoxy 35 - 40 Diluted epoxy 100% solid epoxy ---

---

CL 1340

CO-L-Im (5)

Primer Surface coating Total

SHER TILE REVESTA 400 CLEAR HS BR NOVA PLATE REVESTA 400 UHS (6) o COR (6) /204 COTE HCR

---

>300 335

INTERLINE 910

PL 4550 S

(*) (**) (***)

Three (3) 75-m thick each dry coatings shall be applied Total thickness dry 120 m In new steel degree Sa 3 blasting is required
NOTES (1) N/A. (2)Primer to apply if the blasted surface needs protection before the surface coating (3) Optional paint system to be used in equipment, structures or piping to be completely painted in the factory and safely transported to the site (avoiding blows that may damage the paint system applied). (4) Only the tank bottom shall be painted and a 500 mm high from this bottom.. (5) In each case, the manufacturer shall confirm if the paint is adequate for the chemical and temperature the surface shall be protected against.

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 31 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
(6) Only for water or neutral aqueous solutions. (7) Valid for horizontal surfaces. (8) Aluminum silicone, only available in color aluminum.

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 32 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION 9. COLORS


Finish colors shall be the following:

9.1

EQUIPMENT AND STRUCTURE


Components Color Code IRAM DEF D 10-54 Code RAL

Mechanical Pumps

Compressors

Supports Frames Uninsulated valves and piping and with a maximum service temperature of 93 C (except for PCI) PCI Equipment, piping and valves Piping and valves with temperature higher than 93 C uninsulated Ventilation equipment Tanks Pressure vessels Benches and structures in mechanical equipment Crane bridge Electric Electric elements and equipment (distribution boxes, sealers, control elements) Electric engines and motor panels Electric transformers Instrumentation Control and instrumentation devices Civil Metal structures Safety bars and stairs

Work fluid color (see subsection 9.2) or standard Work fluid color (see subsection 9.2) or standard Grey Grey Identifying color (6.12.2) Red Aluminum (*) Grey White White Grey Yellow Manufacturer standard Manufacturer standard Manufacturer standard Manufacturer standard Grey yellow

09-1-060 09-1-060 -

7046 7046 -

03-1-080 09-1-060 02-1-040 02-1-040 09-1-060 05-1-020 -

3001 7046 9010 9010 7046 1023 -

09-1-060 05-1-020

7046 1023

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 33 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
(*) See paint system CS-HU subsection 8.1

9.2

PIPING AND VALVES

In the case of valves (through base color) and uninsulated piping and with a maximum service temperature of 93C the following finish colors shall be applied (as per IRAM DEF D 10-54 standard) depending on the fluid carried. Fluid Service water Fire water Raw water Pre-treated water Drinkable water Demineralized water Instrumentation air Service air Nitrogen Electricity Gas vent Air vent Drain Fuel gas Fuel oil Lube oil Color Base Band Green Red Green Black Green Grey Green Green Yellow Blue Blue White Blue Orange Black Yellow Orange Blue White Ochre Yellow Yellow Dark brown Brown Code IRAM DEF D 10-54 01-1-120 03-1-080 01-1-180 11-1-070 01-1-180 09-1-060 01-1-120 01-1-120 05-1-020 08-1-070 08-1-070 02-1-040 08-1-070 02-1-020 11-1-070 05-1-020 02-1-020 08-1-070 02-1-040 06-1-020 05-1-020 05-1-020 07-1-120 07-1-120 Code RAL 6010 3001 6002 9005 6002 7046 6010 6010 1023 5009 5009 9010 5009 2009 9005 1023 2009 5009 9010 8001 1023 1023 8011 8002

10.

IDENTIFICATION

10.1

IDENTIFICATION BANDS

The previous band color codes shall be painted with a 6-meter distance between them, in the straight sections, on each side of the valves, connections, piping changes of direction, and next to floors, ceilings or walls the piping passes through, on the straight tubing, or on both sides of valves, tees, elbows and crossings of ceilings, floors or walls. Likewise, a 10 cm space shall be left between the connection or valves intake and the respective band, as well as the bands of the same group. The piping flow direction shall be identified, if, required, with an arrow that shall be painted or marked with a sticker over each side of the band and 100 mm far from the valve flange or equipment connection.

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 34 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
In piping supported by a wall, flow direction bands shall be painted on the side that shall be visible from the work place. The width of the band shall depend on the piping external diameter, as shown in this table: INSULATION OR PIPING EXTERNAL DIAMETER (mm) D 50 mm 50 < D 150 mm 150 < D 250 mm D > 250 m BAND WIDTH Base Color (mm) 200 300 600 800 Band color (mm) 100 150 250 350 ARROW Axis Length width (mm) (mm) 80 10 100 15 150 20 200 25

TYPE 1 2 3 4

The length of the arrow that shows the flow direction shall be also limited by the piping external diameter shown in the table. In insulated piping, two bands shall be painted with 100 mm distance between them. The main band shall be of the base color indicated in subsection 9.2 and the secondary band shall be of the band color indicated in subsection 9.2. If there is no band color only one main band shall be painted.

10.2

EQUIPMENT IDENTIFICATION

The proportions per type of letters and name to be used shall correspond to HELVETICA or SWISS 721 BT font that can be found in Windows programs and applications. Type 1 2 3 4 Letter and numbers shall be black. height (mm) 70 280 498 700 Width (mm) 40 160 280 400

11. INSPECTION
11.1 GENERAL

All surfaces that shall be painted must be inspected before and after the tasks. The suppliers Inspection Service shall have access at any time to the place where the tasks are performed, as well as to the records to inspect any work stage. The inspector shall inform the purchaser of any deviation to the paint manufacturers instructions or to this Specification to determine the measures to be taken.

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 35 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
11.2
INSPECTION DEVICES

The supplier shall have the necessary equipment and standards for the inspection and control of the tasks, such as humidity gauges, surface thermometers, cotton cloth to check the absence of water an oil in the compressors air, ISO 8501 visual standards, roughness gauges, dry and wet film thickness gauges etc.. Testing devices shall be calibrated as many times as necessary.

11.3

INSPECTION STAGES

The inspection of coatings both in factory and site shall include all stages that may affect the paint performance. The following shall, at least, be inspected: Storage, surface preparation, mixture, application and curation. It includes cleaning conditions and the suitability of all tools and devices to be used. Material reception. It includes the inspection of packages, documents attached to packages and storage conditions. Suitable environmental conditions both in preparation of surfaces and paint application as well. Substrate before and after the surface preparation. It shall be inspected as per ISO 8501, and the applicable SSPC, recording the surface status before and after preparation. Also, the roughness achieved shall be inspected. Preparation, mixture and application of every type of paint and coatings determined, in accordance with the paint manufacturers instructions. After painting the surface, a visual inspection shall be carried out, regarding: Bites Blisters and bubbles Color and gloss uniformity (only in finish coatings) Lack of drops Scratches Thickness of dry coating Continuity and uniformity Surface contamination Mechanical damage

No defects shall be accepted The thickness of dry film shall be measured, as per en 11.4.

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 36 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
11.4
THICKNESS MEASUREMENT

Thickness shall be measure with suitable devices (magnetic gauges), and in accordance with SSPC-PA-2 standard. No measurement in one point (three readings average) shall be lower to the 80 % of the defined thickness. Thickness per coating 1,3 higher than the one defined shall be only allowed with the manufacturers previous authorization in writing.

11.5

ADHESION TESTING

In the case of submersed surfaces, traction adherence tests shall be carried out as per ISO 4624 with a 2,5 MPa load.

11.6

DETECTION OF DISCONTINUITIES

Painted steel surface that will be immersed during operation shall be inspected with a high voltage detector to check the film continuity.

11.7

REJECTION

Those surfaces where the coating and /or application do not meet the requirements of this Specification, including the referenced standards where they are applicable and /or the purchasers requirements, shall be rejected.

11.8

DOCUMENTATION

Besides those requirements included in subsection 13 of this document, the purchaser shall not accept the paint if the documentation has not been specially approved for buildings or piping structures assembled in the site or very big components.

12.

WARRANTY

12.1

WARRANTY TERM

The warranty term of coatings as regards defects and /or compliance with the specified conditions shall be determined in the purchase documentation. The warranty term shall start from the acceptance of a component by the Purchasers Inspection Services. It will be considered that a coating has passed the warranty term when at the end the oxidation on the surface is not higher than degree R 10 (0% of surface with rust) of ISO 46288-3 Evaluation of degradation of paint coatings. If during the warranty term defects are found in the surface preparation, composition or application of paint systems, the supplier shall remove and repair the defective paint on his account. After these repairs, a new warranty term shall start for one (1) year, maximum, to run from the expiration date of the original term. Repairs shall not affect the schedule of the rest of the tasks.

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 37 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
12.2
PAINT IN SITE OVER COATING APPLIED IN FACTORY

Before painting in the site over a surface already painted in the factory, the supplier shall inspect the surface and the guarantee shall cover the complete paint system. If after the inspection the supplier rejects the guarantee, it shall inform the purchaser in writing about the reasons for the rejection.

12.3

PAINT APPLIED IN FACTORY

If defects are found in the surface preparation, composition or application of paint systems, the supplier shall remove and repair the defective paint on his account. All defects found within the warranty term shall be removed and the surface shall be repaired with no extra charge and without affecting the scheduled of the rest of the tasks.

13.

HANDLING AND APPROVAL OF DOCUMENTS

13.1
13.1.1

WORKS IN FACTORY
TENDER

The supplier shall include in his tender the procedures for Preparation and Painting of surfaces (as per format n 1 of Annex A of this specification), together with the information related to the method of paint and inspection within his scope. All exceptions to this Specification shall be listed. 13.1.2
AFTER AWARD

After the award, the supplier shall submit for approval the procedure as per format n 1 of Annex A. Likewise, records as per formats n 1, 2 y 3 of Annex A shall be left at the purchasers disposal, or his agents and /or authorized entities. One (1) procedure for Preparation and Painting or Surface (as per format) shall be submitted for every different paint system applied to a component The approval of the Procedures shall not release the supplier from the performance of inspections and keeping of necessary records during the performance of the tasks.

13.2
13.2.1

WORKS IN SITE
TENDER

The supplier shall submit the procedures for the preparation of surfaces for all types of surfaces and the procedures for painting for all types of paints he shall be using in the site, as well as the necessary touch-ups. The manufacturer included in the tenders shall be duly authorized, included in subsection 8.2.

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 38 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
13.2.2
AFTER AWARD

After selecting the paint manufacturer and the supplier, the latter shall be responsible for keeping a record with the required documentation. This documentation shall include: Surface preparation and painting (Format n 1 of annex A) Repairs (Format n 2 of Annex A) Paint acceptance (Format n 3 of Annex A) Daily record of tasks performed Record of inspections performed.

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 39 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION

ANNEX A FORMATS N 1: N 2: N 3: SURFACE PREPARATION AND PAINTING REPAIRS PAINT ACCEPTANCE

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 40 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
DATE: PROCEDURE N: FORMAT N 1 SURFACE PREPARATION AND PAINTING (To be filled in by the SUPPLIER) pages

(if filled in as a record, the actual date obtained during the tasks shall be recorded) Page 1 of 3 SUPPLIER 1.0 1.1 1.2. 1.3 1.4 2.0 2.1 2.2 2.3 2.4 3.0 3.1. 3.2 3.3 3.4 3.5 3.6 4.0 4.1 4.2 4.3 4.4 General Technical specification of unit n Unit identification Component Substrate (material) Surface preparation Blasting degree (ISO 8501): Abrasive type and size Surface roughness Other preparation method Priming (1er coating) Paint identification Product generic type Film thickness per coating (m) N of coatings Application method Color Intermediate (2 coating) Paint identification Product generic type Film thickness per coating (m) N of coatings

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 41 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
4.5 4.6 5.0 5.1 5.2 5.3 5.4 5.5 5.6 6.0 Application method Color Finish (3 coating) Paint identification Product generic type Film thickness per coating (m) N of coatings Application method Color Remarks

(to be filled in in case of record)


Signature

Signed: (Name and position) Attachments: (if the proposed paints are not among those mentioned in subsection 8.2, the respective technical data sheet, issued by the manufacturer, shall be attached)

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 42 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
Date: Page 1 of 1 FORMAT N 2 REPAIRS (To be filled in by the supplier) ( pages) SUPPLIER 1. 2. 3. 4. 5. 6. 7. 8. 9. 9.1 9.2 10. 10.1 10.2 11. 11.1 11.2 12. Date Equipment Component Paint procedure number (format N 1) Substrate condition % damage and repaired surface Surface preparation method Paint method Priming (1 coating) Name and type Coating thickness (m) Intermediate (2 coating) Name and type Coating thickness (m) finish (3 coating) Name and type Coating thickness (m) Remarks

Signature

Signed: (Name and position)

450-01-I-M-27700-R4

CTEB-101-INGE-R-ET-5026

Page 43 of 43 Rev: 0

CLIENT: PROJECT:

ENARSA ENSENADA DE BARRAGAN THERMAL POWER PLANT

PAINT SPECIFICATION
Page 1 of 2 FORMAT N 3 PAINTING ACCEPTANCE SUPPLIER 1. 2. 3. 4. 5. 6. 6.1 6.2 6.3 Name Dry film (m) 7. 8. Workplace Equipment Component Contract N Paint procedure N (format N 1) Description of the work Substrate (type of material) Surface preparation Paint: 1 COATING PRIMING thickness Coating final characteristics Color Total thickness (m) Paint aspect Qualification ACCEPTABLE 9. 10. Remarks: Repair procedure N (format N 2) ACCEPTABLE
Signature date: and

(consisting in

pages)

2 COATING INTERMEDIATE

3 COATING FINISH

NOT ACCEPTABLE

NOT ACCEPTABLE

Signed; (Name and position)

Vous aimerez peut-être aussi