ANALISIS DE COSTOS

PROPUESTA DE RENDIMIENTOS DE MANO DE OBRA


CONCEPTO UNIDAD MINIMO CIMBRAS Y ANDAMIOS RENDIMIENTO MEDIO MAXIMO GRUPO

ANDAMIO DE CABALLETE h=1.10 25 USOS LONG=2.50 m 10 USOS LONG=2.50 m CIMBRA DALA DESPLANTE 15x20 CON DUELA CIMBRA DALA DE LIGA 15x20 CON DUELA CIMBRA CASTILLO 2-C 15x20 CON DUELA TARIMA PARA CIMBRA 50x100 CON DUELA TARIMA TRIPLAY 1.22X2.44X0.016 PLATAFORMA 1.50X1.00 PARA ELEV MAT CIMBRA DALA DESPLANTE 15x20 CON TRIPLAY CIMBRA CASTILLO 2-C 15x15 CON TRIPLAY CIMBRA DALA DE LIGA 15x20 CON TRIPLAY CIMBRA CASTILLO 2-C 15x20 CON TRIPLAY CIMBRA CASTILLO 2-C 15x30 CON TABLA
FABRICACION DE CONCRETO

PZA PZA M2 M2 M2 PZA PZA HR ML ML M2 ML M2 M3 M3 M3 M3 M3 M2 M2 M2 M2 M2 M2 M2 M2 M2 M3 M2 M2

4.00 11.00 13.00 13.00 13.00 18.00 10.00 1.00 13.00 45.00 13.00 13.00 12.00 13.00 1.50 0.50 2.00 4.75 18.00 5.75 23.00 7.75 22.00 11.00 33.00 23.00 25.00 0.55 22.00 16.00

5.00 12.00 14.00 14.00 14.00 20.00 11.00 2.00 14.00 50.00 14.00 14.00 13.00 15.00 1.75 0.60 2.25 5.50 20.00 6.75 25.00 9.00 25.00 13.00 39.00 27.00 27.00 0.65 26.00 19.00

6.00 13.00 15.00 15.00 15.00 21.00 12.00 3.00 15.00 53.00 15.00 15.00 14.00 16.00 2.00 0.65 2.50 6.00 21.00 7.25 26.00 9.75 26.00 15.00 42.00 29.00 28.00 0.70 28.00 21.00

16 16 16 16 16 16 16 16 9 16 16 16 16 5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

FABRICADO DE CONCRETO C/REVOLVEDORA 1 SACO


DEMOLICIONES (A MANO Y SIN INCLUIR ACARREOS)

DEMOLICION DE CIMIENTOS DE MAMPOSTERIA DEMOLICION DE CIMIENTOS DE CONCRETO ARMADO DEMOLICION DE MUROS DE MAMPOSTERIA DEMOLICON DE MURO DE ADOBE Y TEPETATE DEMOLICION MURO DE TABIQUE E=28 cm DEMOLICION MURO DE TABIQUE E=28 cm C/RECUPER. DEMOLICION MURO DE TABIQUE O BLOCK E=21 cm DEMOLICION MURO DE TABIQUE O BLOCK E=21 cm C/R DEMOLICION MURO DE TABIQUE O BLOCK E=14 cm DEMOLICION MURO DE TABIQUE O BLOCK E=14 cm C/R DEMOLICION MURO DE TABIQUE O BLOCK E=7 cm DEMOLICION MURO DE TABIQUE O BLOCK E=7 cm C/R DEMOLICION CELOSIAS E=10 A 15 cm DEMOLICION ESTRUCTURA CONCRETO ARMADO DEMOLICION PISO CONCRETO SIMPLE E=8 A 10 cm DEMOLICION DE LOSETA DE BARRO C/MORTERO

DEMOLICION DE ZOCLO DE LOSETA C/MORTERO DESMONTAJE DE PISO DE DUELA C/BASTIDOR Y BASES DESPEGAR PISO DE LOSETA VINILICA DEMOLICION DE LAMBRIN DE AZULEJO C/MORTERO DEMOLICION DE APLANADOS,.YESO O PASTAS DEMOLICION DE FALSO PLAFOND DE YESO C/BASTIDOR DESMONTAJE DE CANCELERIA METALICA LEVANTAR TAPIZ PLASTICO DESMONTAJE DE PUERTAS DE MADERA C/MARCO DESMONTAJE DE CANCELERIA DE MADERA DESMONTAJE DE VIDRIOS DESMONTAJE DE MUEBLES SANITARIOS DESMONTAJE DE TUBERIA HID. COBRE O GALV. DESMONTAJE DE LAMPARAS SOBREPONER 60x60 DESMONTAJE DE TUBERIA STEEL O PVC C/CONEXIONES DEMOLICION DE GUARNICION DE CONCRETO SIMPLE DEMOLICION DE BANQUETA CONCRETO SIMPLE E=10 cm DEMOLICION CARPETA ASFALTICA E=5 A7 cm DEMOLICION DE PAVIMENTO CONCRETO SIMPLE DEMOLICION DE PAVIMENTO CONCRETO ARMADO DESMONTAJE MUEBLE TIPO MOSTRADOR S/SECCIONADO DESMONTAJE MUEBLE TIPO MOSTRADOR C/SECCIONADO TALA DE ARBOL DIAM=10 A 30 cm C/DESENRICE TALA DE ARBOL DIAM=31 A 60 cm C/DESENRICE TALA DE ARBOL DIAM=61 A 100 cm C/DESENRICE TALA DE ARBOL DIAM=101 A 120 cm C/DESENRICE DEMOLICION C/POLVO EXPLOSIVO C/BARRENACION
LIMPIEZA Y TRAZO

ML M2 M2 M2 M2 M2 M2 M2 PZA M2 M2 PZA ML PZA ML ML M2 M2 M3 M3 ML ML PZA PZA PZA PZA M3 M2 M2 M2 M2 M2 M2 M2 M3 M3 M3 M3 M3 M3

63.00 17.00 41.00 17.00 21.00 21.00 14.00 90.00 8.00 14.00 24.00 5.00 77.00 8.50 18.00 18.00 21.00 17.00 0.90 0.38 6.00 3.75 3.50 1.00 0.35 0.34 9.00 49.00 90.00 65.00 70.00 200.00 250.00 340.00 4.00 2.25 1.00 2.25 1.50 0.85

74.00 20.00 48.00 20.00 25.00 24.00 16.00 100.00 10.00 16.00 28.00 6.00 90.00 10.00 21.00 20.00 24.00 25.00 1.05 0.45 7.00 4.50 4.00 1.25 0.50 0.40 10.00 57.00 100.00 75.00 80.00 240.00 300.00 400.00 4.75 2.75 1.25 2.50 18.50 1.75 18.50 1.00

80.00 22.00 52.00 22.00 27.00 26.00 17.00 105.00 11.00 17.00 30.00 6.50 97.00 11.00 23.00 21.00 26.00 26.00 1.15 0.49 7.50 4.75 4.50 1.35 0.65 0.43 11.00 62.00 105.00 85.00 87.00 260.00 325.00 430.00 5.25 3.00 1.35 2.75 2.00 1.10

1 16 1 1 1 1 22 1 17 17 28 30 30 32 32 1 1 1 1 1 17 17 1 1 1 1 9 1 1 1 1 10 10 10 1 1 1 1 16 1 16 1

LIMPIEZA Y DESENRAICE A MANO H=1.00 m LIMPIEZA A MANO HASTA 8 cm ESPESOR PARA TRAZO LIMPIEZA Y DESENRAICE A MANO H=0.10 A 0.50 m LIMPIEZA GRUESA CON PALA SIN BARRER, POSRETIRO ESCOMBRO TRAZO Y NIVELACION SUP. MENOR A 300 M2 TRAZO Y NIVELACION SUP. DE A 300 A 900 M2 TRAZO Y NIVELACION SUP. MAYOR A 900 M2
EXCAVACIONES

EXCAVACION A MANO EN CEPAS PROF<2.00 TIPO I CON AFINE EXCAVACION A MANO EN CEPAS PROF<2.00 TIPO II CON AFINE EXCAVACION A MANO EN CEPAS PROF<2.00 TIPO II-A CON AFINE EXCAVACION A MANO EN CEPAS PROF 2.00 A 4.00 TIPO I CON AFINE Y TARIMA PARA EXCAVACION EXCAVACION A MANO EN CEPAS PROF 2.00 A 4.00 TIPO II CON AFINE Y TARIMA PARA EXCAVACION EXCAVACION A MANO EN CEPAS PROF 2.00 A 4.00 TIPO II-A CON AFINE

Y TARIMA PARA EXCAVACION EXCAVACION A MANO A CIELO ABIERTO PROF<2.00 TIPO I CON AFINE EXCAVACION A MANO A CIELO ABIERTO PROF<2.00 TIPO II CON AFINE EXCAVACION A MANO A CIELO ABIERTO PROF<2.00 TIPO II-A CON AFINE EXCAVACION A MANO A CIELO ABIERTO PROF<2.00 TIPO III (ROCA)
RELLENOS

M3 M3 M3 M3 M3 M3 ML M2 M2 M2 M2 M2 M2 M2 M2 M3 M2 M2

4.00 3.00 1.25 0.90 5.00 6.50 10.00 16.00 43.00 10.00 8.50 27.00 24.00 17.00 30.00 2.25 10.75 9.75

18.50 4.50 3.60 1.50 1.10 5.75 7.50 12.00 20.00 50.00 12.00 10.00 32.00 28.00 20.00 35.00 2.75 12.50 50.00 11.50 30.00 9.50 26.28 9.00 23.00 7.00 18.76 12.00 19.53 10.50 28.13 10.00 24.61 10.25 41.00 10.50 42.00 12.50 50.00

4.75 3.90 1.65 1.20 6.25 8.15 13.00 24.00 54.00 13.00 11.00 35.00 30.00 22.00 37.00 3.00 13.50 12.50

16 1 1 1 1 1 1 9 1 1 1 1 9 9 9 1 9 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16

RELLENO COMPACTADO CON PISON EN CAPAS DE 20 cm RELLENO DE CEPAS COMPACTADO AL 90% CON BAILARINA DREN 30x30 CON GRAVA, INC.: EXC., RELL, TUBO JUNTEADO C/MORTERO CAMA FILTRANTE DE GRAVA 3/4" DE 20 cm DE ESPESOR
PLANTILLAS

CONSOLIDACION DE FONDO DE CEPAS CON PISON PLANTILLA DE PEDACERIA DE TABIQUE H=10 cm PLANTILLA DE PEDACERIA DE TABIQUE H=15 cm PLANTILLA DE CONCRETO H=5, NO INCLUYE FABRICADO DE CONCRETO PLANTILLA DE CONCRETO H=8, NO INCLUYE FABRICADO DE CONCRETO PLANTILLA DE CONCRETO H=10, NO INCLUYE FABRICADO DE CONCRETO PLANTILLA DE ARENA H=5 cm
CIMIENTOS DE MAMPOSTERIA

CIMIENTO DE MAMPOSTERIA DE PIEDRA BRAZA ASENTADO C/MORTERO


CIMBRA EN CIMENTACION

CIMBRA ZAPATA CORRIDA Y AISLADA H=10 A 15 cm INCL. DESCIMBRADO CIMBRA CONTRATRABES DE 20x80 A 25x100 cm INCL. DESCIMBRADO
CIMBRA EN ESTRUCTURA

CIMBRA EN COLUMNAS CON DUELA DE 30x30 cm A 50x50 cm, H=3.00 m INCL. DESCIMBRADO CIMBRA EN COLUMNAS CON TRIPLAY DE 30x30 cm A 50x50 cm, H=3.00 m INCL. DESCIMBRADO CIMBRA EN COLUMNA CIRCULAR CON DUELA DIAM 40 cm, H=3.00 m INCL. DESCIMBRADO CIMBRA EN COLUMNA CIRCULAR CON SONOTUBO DIAM 40 cm, H=3.00 m INCL. DESCIMBRADO CIMBRA EN TRABES CON DUELA DE 25x40 A 40x60 cm INCL. DESCIMBRADO CIMBRA EN TRABES CON TRIPLAY DE 25x40 A 40x60 cm INCL. DESCIMBRADO CIMBRA EN LOSAS CON DUELA DE 10 A 15 cm DE PERALTE INCL. DESCIMBRADO CIMBRA EN LOSAS CON TRIPLAY DE 10 A 15 cm DE PERALTE INCL. DESCIMBRADO CIMBRA EN LOSAS CON TARIMA DE 10 A 20 cm DE PERALTE INCL. DESCIMBRADO

M2 M2 M2 M2 M2 M2 M2 M2 M2

8.00 7.75 6.00 10.25 9.00 8.50 8.75 9.00 10.75

10.25 9.75 7.50 13.00 11.50 10.75 11.00 11.25 13.50

CIMBRA EN MUROS DE 20 cm DE ESPESOR INCL. DESCIMBRADO CIMBRA EN RAMPAS DE ESCALERA DE 15 cm DE PERALTE INCL. DESCIMBRADO ACERO DE REFUERZO EN CIMENTACION #2 ACERO DE REFUERZO EN CIMENTACION #2.5 ACERO DE REFUERZO EN CIMENTACION #3 ACERO DE REFUERZO EN CIMENTACION #4 ACERO DE REFUERZO EN CIMENTACION #5 ACERO DE REFUERZO EN CIMENTACION #6, #8, #10 Y #12 ACERO DE REFUERZO EN ESTRUCTURA #2 ACERO DE REFUERZO EN ESTRUCTURA #2.5 ACERO DE REFUERZO EN ESTRUCTURA #3 ACERO DE REFUERZO EN ESTRUCTURA #4 ACERO DE REFUERZO EN ESTRUCTURA #5 ACERO DE REFUERZO EN ESTRUCTURA #6, #8, #10 Y #12 MALLA ELECTROSOLDADA EN PISOS 6x6-4/4 Y 6x6-6/6 MALLA ELECTROSOLDADA EN PISOS 6x6-8/8 MALLA ELECTROSOLDADA EN PISOS 6x6-10/10 MALLA ELECTROSOLDADA EN MUROS 6x6-4/4 MALLA ELECTROSOLDADA EN MUROS 6x6-6/6 Y 6x6-8/8 MALLA ELECTROSOLDADA EN MUROS 6x6-10/10
CONCRETO EN CIMENTACION (COLOCACION, VIBRADO, CURADO) (NO INCLUYE FABRICACION)

M2 M2

8.50 7.25

10.00 27.22 8.50 34.00 0.14 0.17 0.23 0.30 0.30 0.35 0.13 0.16 0.20 0.27 0.30 0.30 82.00 84.00 98.00 69.00 71.00 82.00 9.50 3.03 24.00 3.03 15.00 6.00 1.60 8.00 2.14 7.00 2.50 15.00 1.60 22.00 2.14 20.00 2.50

10.75 9.25

16 16 16 16 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 13 1 13 1 13 13 1 13 1 13 1 13 1 13 1 13 1

ACERO DE REFUERZO EN CIMENTACION (HABILITADO Y ARMADO) (SIN GANCHOS, TRASLAPES NI ANCLAJES)

TON TON TON TON TON TON TON TON TON TON TON TON M2 M2 M2 M2 M2 M2 M3 M3 M3 M3 M3 M3 M3 M3 M3

0.13 0.15 0.21 0.27 0.25 0.30 0.12 0.15 0.18 0.23 0.25 0.25 67.00 68.00 80.00 56.00 58.00 67.00 8.00 21.00 13.00 5.00 6.75 6.00 13.00 19.00 17.00

0.16 0.18 0.24 0.32 0.35 0.40 0.14 0.17 0.21 0.30 0.35 0.35 92.00 94.00 110.00 77.00 80.00 92.00 10.25 26.00 16.00 6.50 8.75 7.50 16.00 24.00 22.00

ACERO DE REFUERZO EN ESTRUCTURA (HABILITADO Y ARMADO) (SIN GANCHOS, TRASLAPES NI ANCLAJES)

CONCRETO EN CIMENTACION VACIADO CON CARRETILLA Y BOTES CONCRETO EN CIMENTACION VACIADO CON BOMBA CONCRETO CICLOPEO EN CIMENTACION
CONCRETO EN ESTRUCTURA (COLOCACION, VIBRADO, CURADO) (NO INCLUYE FABRICACION)

CONCRETO EN COLUMNAS Y MUROS VACIADO CON CARRETILLA Y BOTES CONCRETO EN TRABES Y LOSAS VACIADO CON CARRETILLA Y BOTES CONCRETO EN TRABES RETICULARES VACIADO CON CARRETILLA Y BOTES CONCRETO EN COLUMNAS Y MUROS VACIADO CON BOMBA CONCRETO EN TRABES Y LOSAS VACIADO CON BOMBA CONCRETO EN TRABES RETICULARES VACIADO CON BOMBA
DALAS DE DESPLANTE

15x15, 4 #3, E #2 @ 30 15x20, 4 #3, E #2 @ 30 15x25, 4 #3, E #2 @ 30 15x30, 4 #3, E #2 @ 30


DALAS DE LIGA, TRABES Y CASTILLOS

ML ML ML ML

8.75 8.25 8.00 7.00

10.25 71.42 9.75 53.70 9.25 43.02 8.25 35.71 10.00 71.42 9.50 53.70 9.00 43.02 8.00 35.71 7.00 26.75 25.50 17.00 2.00 7.00 12.00 64.00 10.50 55.00 7.75 43.00 6.00 50.00 10.25 9.75 80.00 30.50 26.45 24.00 26.45 23.00 26.45 47.50 30.00

11.00 10.50 10.00 9.00

9 1 9 1 9 1 9 1 9 1 9 1 9 1 9 1 9 1 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 1 9 1 9 1 9 9

15x15, 4 #3, E #2 @ 25 15x20, 4 #3, E #2 @ 15 A 25 15x25, 4 #3, E #2 @ 25 15x30 Y 20x25, 4 #3, E #2 @ 25 20x30, 4 #3, E #2 @ 25
CASTILLO AHOGADO 1 HUECO DE BLOCK DE 15 cm CON 1 #3 CASTILLO AHOGADO 2 HUECOS DE BLOCK DE 15 cm CON 2 #3 MUROS

ML ML ML ML ML ML ML M3 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 SIN ACABADO M2 SIN ACABADO M2 M2 M2

8.50 8.00 7.75 6.75 6.00 22.00 14.50 1.75 6.00 10.25 55.00 9.00 46.00 6.50 37.00 5.40 43.00 9.00 8.50 69.00 26.00 20.50 19.50 40.50 25.50

10.75 10.25 9.75 8.75 7.50 27.50 18.50 2.25 7.50 13.00 69.00 11.50 59.00 8.25 46.00 6.30 54.00 11.00 10.50 86.00 33.00 26.00 25.00 51.00 32.50

MURO DE MAMPOSTERIA DE 30 A 40 cm DE ESPESOR SOBREPRECIO POR CARA ACABADO APARENTE MURO MAMPOSTERIA MURO DE TABIQUE E=7 SOBREPRECIO POR CARA ACABADO APARENTE MURO TABIQUE E=7 MURO DE TABIQUE E=14 SOBREPRECIO POR CARA ACABADO APARENTE MURO TABIQUE E=14 MURO DE TABIQUE E=21 SOBREPRECIO POR CARA ACABADO APARENTE MURO TABIQUE E=21 MURO DE TABIQUE E=28 SOBREPRECIO POR CARA ACABADO APARENTE MURO TABIQUE E=28 MURO DE BLOCK 15x20x40, E=15 MURO DE BLOCK 20x20x40, E=20 SOBREPRECIO POR CARA ACABADO APARENTE MURO DE BLOCK
FIRMES Y PISOS (NO INCLUYE FABRICADO DE CONCRETO)

FIRME DE CONCRETO E=5 cm FIRME DE CONCRETO E=8 cm FIRME DE CONCRETO E=10 cm SIN ACABADO ACABADO ESCOBILLADO INTEGRAL SOBRE CONCRETO FRESCO ACABADO PULIDO INTEGRAL SOBRE CONCRETO FRESCO

FIRME DE CONCRETO E=8 cm CON MALLA ELECTROSOLDADA SIN ACABADO FIRME DE CONCRETO E=10 cm CON MALLA ELECTROSOLDADA SIN ACABADO FIRME DE CONCRETO E=8 cm CON FIBRA PLASTICA SIN ACABADO FIRME DE CONCRETO E=10 cm CON FIBRA PLASTICA SIN ACABADO SOBREPISO DE MORTERO E=3 cm SIN ACABADO PISO DE AZULEJO 11x11 cm PISO DE LOSETA 10x20 cm PISO DE LOSETA 15x15 cm PISO DE LOSETA 15x30 cm PISO DE LOSETA 20x20 cm PISO DE LOSETA 20x30 cm PISO DE LOSETA 30x30 cm PISO DE LOSETA 30x40 cm ZOCLO DE AZULEJO 11x11 cm, H=11 cm ZOCLO DE LOSETA 10x20 cm, H=10 cm ZOCLO DE LOSETA 15x15 cm, H=15 cm PISO DE DUELA MACHIMBRADA DE 1/2" BARNIZADA PISO DE PARQUET DE MADERA DE 6 mm PISO DE LOSETA VINILICA ZOCLO VINILICO SARDINEL DE AZULEJO 11X11 cm
PLAFONES Y MUROS DIVISORIOS

M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 ML ML ML M2 M2 M2 ML ML M2 M2 M2 M2 M2 M2 M2 M2 M2 ML

15.00 14.50 20.50 19.50 26.00 6.25 5.00 5.50 8.00 7.25 8.50 10.25 10.25 16.00 20.50 20.50 10.00 10.00 30.50 67.00 4.20 14.00 12.50 11.00 18.50 13.50 12.00 8.75 10.50 7.75 22.50

17.50 26.45 17.00 26.45 24.00 26.45 23.00 26.45 30.50 71.42 7.25 5.75 6.50 9.25 8.50 10.00 12.00 12.00 18.00 24.00 24.00 12.00 12.00 35.50 75.00 5.00 15.00 13.50 12.00 21.50 79.37 16.00 71.43 14.00 79.37 10.25 71.43 12.50 79.37 9.00 71.43 26.50

19.00 18.50 26.00 25.00 33.00 7.75 6.25 7.00 10.00 9.25 11.00 13.00 13.00 19.00 26.00 26.00 13.00 13.00 38.50 79.00 5.40 20.00 16.30 12.60 23.00 17.50 15.00 11.00 13.50 9.75 28.50

9 1 9 1 9 1 9 1 9 1 15 15 15 15 15 15 15 15 8 15 15 17 17 15 15 8 63 63 63 9 1 9 1 9 1 9 1 9 1 9 1 9

MURO DE TABLAROCA 1/2" C/POSTE @ 61 cm MURO DE TABLAROCA 1/2" C/POSTE @ 41 cm MURO DE TABLAROCA 1/2" C/POSTE @ 30.5 cm
APLANADOS EN MUROS Y PLAFONES

REPELLADO EN MUROS CON MORTERO CEMENTO-ARENA, e=2 cm REPELLADO EN PLAFONES CON MORTERO CEMENTO-ARENA, e=2 cm APLANADO EN MUROS PULIDO A PLANA CON MORTERO C-A, e=2.5 cm APLANADO EN PLAFONES PULIDO A PLANA CON MORTERO C-A, e=2.5 cm APLANADO EN MUROS PULIDO A LLANA CON MORTERO C-A, e=2.5 cm APLANADO EN PLAFONES PULIDO A LLANA CON MORTERO C-A, e=2.5 cm PERFILADO DE ARISTAS EN REPELLADO DE 6 cm CON MORTERO C-A

PERFILADO DE ARISTAS EN APLANADO PULIDO A PLANA DE 6 cm CON MORTERO C-A PERFILADO DE ARISTAS EN APLANADO PULIDO A LLANA DE 6 cm CON MORTERO C-A RASTREADO DE YESO PARA RECIBIR TIROL EN MUROS Y PLAFONES
RECUBRIMIENTOS EN MUROS

ML ML M2 M2 ML M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 LOTE PZA

18.00 16.00 31.02 10.25 15.50 8.50 5.25 5.50 5.50 5.50

714.29 21.00 714.29 18.50 714.29 33.00 12.00 79.37 18.00 714.29 10.50 6.00 6.00 6.00 6.00

22.50 20.00 34.65 13.00 19.50 11.50 6.50 6.30 6.30 6.30

1 9 1 9 1 20 9 1 9 1 15 15 15 15 15

RECUBRIMIENTO DE PASTA ACABADO RAYADO O PICADO PERFILADO DE ARISTA CON PASTA ACABADO RAYADO O PICADO DE 6 cm RECUBRIMIENTO TEXTURIZADO CON PASTA COREV RECUBRIMIENTO DE AZULEJO 11x11 cm RECUBRIMIENTO CON LOSETA 10x20 cm RECUBRIMIENTO CON LOSETA 15x15 cm RECUBRIMIENTO CON LOSETA 15x20 cm RECUBRIMIENTO CON LOSETA 20x20 cm RECUBRIMIENTO CON LOSETA 15x15 cm RECUBRIMIENTO DE ARISTA CON AZULEJO 11x11 cm DE 8 cm RECUBRIMIENTO DE ARISTA CON LOSETA 10x20 cm DE 8 cm RECUBRIMIENTO DE ARISTA CON LOSETA 15x15 cm DE 8 cm
COLOCACIONES Y AMACIZADOS

12.00 13.50 7.75 2.00 2.50

14.00 16.00 8.75 2.50 2.75

15.00 17.50 9.25 2.75 3.00

15 15 9 15 9

COL. DE HERRERIA AMACIZADA CON MORTERO CEMENTO-ARENA COL. DE JUEGO DE 6 PIEZAS DE ACCESORIOS DE BAO DE EMPOTRAR COL. DE LAVADERO DE CONCRETO AMACIZADO CON MORTERO C-A
IMPERMEABILIZACIONES

IMPERMEABILIZACION DE DALAS DE DESPLANTE O CHAROLAS DE BAO CON 1 DE IMPERPRIN SL, 2 DE FIBRACOAT Y RIEGO DE ARENA CON 1 DE HIDRO PRIMER, 2 DE VAPORTITE 550, 1 FESTER FELT Y ARENA CON 1 DE PRIMER, 2 EMULSION ASFALTICA, 1 FIELTRO #15 Y ARENA IMPERMEABILIZACION DE AZOTEA CON 1 IMPERPRIN SSL, 3 FIBRACOAT S-40, 1 VITROCOAT Y RIEGO DE ARENA 1 HIDRO PRIMER, 2 ROOF COATING, 1 FESTER FLEX Y ARENA 1 PRIMER, 3 EMULSION ASFALTICA, 2 FIELTRO Y PINTURA REFLEJANTE PRIMER, EMULSION ASFALTICA, ASFALTO OXIDADO Y CARTON ARENADO IMPERMEABILIZACION SOBRE DESPLANTE DE MUROS CON 1 ASFALTO OXIDADO Y FIELTRO ASFALTICO
AZOTEAS

M2 M2 M2

48.50 36.50 45.00

56.00 42.50 53.00 97.47 51.00 63.50 45.00 222.22 54.90 3333.33 180.00 1333.33 27.00 33.00

61.00 46.00 57.00

64 64 64 1 64 64 64 1 9 9 9 9 9 9

M2 M2 M2 M2

43.50 54.50 40.00 51.60

55.00 68.50 49.00 57.64

ML

164.00

189.00

ENTORTADO DE 3 cnm DE ESPESOR CON MORTERO CEMENTO-ARENA CHAFLAN 10x10 cm CON CONCRETO

M2 ML

23.00 30.00

29.00 35.00

ALBAALES, DRENES Y REGISTROS

REGISTRO 40x60 Y PROF. DE 0.80 m REGISTRO 40x60 Y PROF. DE 1.00 A 1.20 m REGISTRO 40x60 Y PROF. DE 1.40 m
YESERIA

PZA PZA PZA M2 M2 M2 M2 M2 M2 ML M2 M2 M2 M2 M2 M2 M2 KG

1.50 1.25 1.00 25.50 21.00 16.00 24.50 19.00 16.00 19.00 5.25 6.00 20.50 16.50 19.00 15.50 5.75 18.80

1.75 1.50 1.25 30.00 24.50 19.00 28.50 22.00 18.50 22.00 6.00 7.00 24.00 19.50 22.50 18.00 6.75 20.00 101.01 2000.00 4.00 12.23 42.80 1.80 1.70 1.60 1.00 0.95 0.90 8.00 7.00 7.00 5.00 4.20 5.50 3.75 3.50 25.00 20.00

2.00 1.75 1.50 32.50 26.50 20.50 31.00 24.00 20.00 24.00 6.50 7.50 26.00 21.00 24.50 19.50 7.25 21.00

9 9 9 20 20 20 20 20 20 20 20 20 20 20 20 20 20 22 9 1 22 9 1 17 17 17 17 17 17 17 17 17 17 17 21 17 21 21 21

APLANADO EN MUROS CON YESO-AGUA A TALOCHA APLANADO EN MUROS CON YESO-AGUA C/MAESTRAS A REVENTON APLANADO EN MUROS CON YESO-AGUA C/MAESTRAS A PLOMO Y REGLA APLANADO EN PLAFOND CON YESO-AGUA A TALOCHA APLANADO EN PLAFOND CON YESO-AGUA C/MAESTRAS A REVENTON APLANADO EN PLAFOND CON YESO-AGUA C/MAESTRAS A PLOMO Y REGLA PERFILADO DE ARISTAS CON YESO DE 6 cm DE ANCHO YESO EN COLUMNAS RECTANGULARES C/MAESTRAS A PLOMO Y REGLA YESO EN TRABES C/MAESTRAS A PLOMO, NIVEL Y REGLA TIROL EN MUROS ACABADO RUSTICO TIROL EN MUROS ACABADO PLANCHADO TIROL EN PLAFONES ACABADO RUSTICO TIROL EN PLAFONES ACABADO PLANCHADO FALSO PLAFOND DE YESO CON METAL DESPLEGADO
HERRERIA

REJILLA PLUVIAL DE ANGULO Y SOLERA, FABRICACION Y COLOCACION

REGISTRO CON TAPA METALICA DE 80x80 cm CON LAMINA NEGRA CAL. 18, CON PORTACANDADO, BISAGRAS, MARCO DE ANGULO, PINTURA ANTICORROSIVA.
CARPINTERIA

PZA

3.50

4.50

PUERTA C/BASTIDOR DE MADERA Y TRIPLAY DE 0.70x2.10 m PUERTA C/BASTIDOR DE MADERA Y TRIPLAY DE 0.80x2.10 m PUERTA C/BASTIDOR DE MADERA Y TRIPLAY DE 0.90x2.10 m PUERTA C/BASTIDOR DE MADERA FORRADA C/FORMAICA DE 0.70x2.10 m PUERTA C/BASTIDOR DE MADERA FORRADA C/FORMAICA DE 0.80x2.10 m PUERTA C/BASTIDOR DE MADERA FORRADA C/FORMAICA DE 0.90x2.10 m CHAMBRANA P/PUERTA CON BATIENTE SOBREPUESTO CERRADURA COLOCADA EN PUERTA DE MADERA BISAGRA DE DOBLE ACCION COLOCADA EN PUERTA DE MADERA LAMBRIN DE DUELA DE " SOBRE BASTIDOR @ 45 cm A.S. LAMBRIN DE DUELA DE " SOBRE BASTIDOR @ 60 cm A.S. C/BARNIZ FALSO PLAFON DE DUELA CACBADO CON BARNIZ
PINTURA

PZA PZA PZA PZA PZA PZA PZA PZA PZA M2 M2 M2

1.60 1.60 1.45 0.95 0.90 0.85 7.30 6.00 6.00 4.25 3.85 3.45

1.90 1.80 1.70 1.05 1.00 0.95 8.40 7.50 7.50 5.50 4.45 3.95

PINTURA VINILICA EN MUROS Y PLAFONES DE YESO, 1S + 2M + PREP. SUP. PINTURA VINILICA EN MUROS Y PLAFONES DE MEZCLA, 1S + 2M + PREP. SUP.

M2 M2

23.00 18.00

26.00 21.00

PINTURA VINILICA EN MUROS Y PLAFONES CONCRETO, 1S + 2M + PREP. SUP. PINTURA ESMALTE, MUROS Y PLAFONES DE YESO, 1S + 2M + PREP. SUP. PINTURA ESMALTE, MUROS Y PLAFONES CONCRETO, 1S + 2M + PREP. SUP. PINTURA ESMALTE SOBRE SUP. METALICAS, 1P +2M +PREP. SUP. PINTURA ESMALTE EN VENTANERIA METALICA, 1P + 2M + PREP.SUP. BARNIZ NATURAL C/BROCHA S/MADERA, 1S + 2M + PREP.SUP. BARNIZ MARINO C/MUECA S/MADERA, 1S + 2M + PREP.SUP. PINTURA ESMALTE EN CHAMBRANAS, TUBERIAS, PERF. METALICOS, ETC PINTURA ESMALTE EN VENTANAS, BARANDALES, REJAS Y ESCALERAS PINTURA ESMALTE EN PUERTAS Y SUP. DE MADERA, 2M + PREP.SUP. PINTURA ESMALTE EN PLAFONES DE MEZCLA, 1S + 2M + PREP. SUP.
JARDINERIA

M2 M2 M2 M2 M2 M2 M2 ML M2 M2 M2 M2 M3 M3 M2 M2 M2 PZA M2 M2 M2 PZA PZA PZA PZA PZA PZA PZA PZA PZA JGO ML ML ML PZA ML ML ML ML

23.00 20.00 20.00 23.00 17.00 13.25 6.30 52.00 17.00 17.00 17.00 83.00 10.00 10.00 39.00 45.50 74.00 7.00 25.50 51.00 45.00 3.25 1.00 3.25 2.25 3.25 3.25 3.25 3.25 1.30 5.00

25.00 22.00 22.00 25.00 20.00 15.00 7.00 60.00 20.00 20.00 20.00 90.00 11.00 11.00 45.50 53.00 87.00 8.00 30.00 60.00 50.00 3.75 1.35 3.75 2.75 3.75 3.75 3.75 3.75 1.50 5.75 400.00 340.00 290.00 6.00 8.00 60.00 60.00 42.00 32.00

26.00 23.00 23.00 26.00 21.50 16.00 7.35 64.00 21.00 21.00 21.00 95.00 11.60 12.00 49.00 57.00 94.00 9.00 32.50 65.00 53.00 4.00 1.50 4.00 3.00 4.00 4.00 4.00 4.00 1.80 6.25

21 21 21 21 21 21 21 21 21 21 21 9 1 1 1 1 1 1 1 1 1 30 5-INST 30 5-INST 30 30 30 30 5-INST 30 5-INS 5-INS 5-INS 3-INS 1-INST 5-INS 5-INS 5-INS 5-INS

SIEMBRA DE PASTO EN ROLLO COLOCACION DE TIERRA VEGETAL PARA JARDINERIA COLOCACION DE TIERRA LAMA PARA JARDINERIA
LIMPIEZA

LIMPIEZA DE AZULEJO EN MUROS C/ACIDO, JABON EN POLVO Y AGUA LIMPIEZA DE AZULEJO EN PISOS C/ACIDO, JABON EN POLVO Y AGUA LIMPIEZA DE LOSETA VINILICA EN PISOS CON AGUA Y JABON LIMPIEZA DE MUEBLES SANITARIOS CON ACIDO, AGUA Y JABON. LIMPIEZA DE VIDRIOS AMBAS CARAS CON AGUA Y JABON LIMPIEZA DE ESPEJOS CON AGUA Y JABON LIMPIEZA GRUESA GENERAL DE OBRA C/ACOPIO Y ACARREO HOR. A 20m
INSTALACION DE MUEBLES SANITARIOS Y ACCESORIOS

LAVABO COMPLETO CON ACCESORIOS (REINSTALACION) LAVABO COMPLETO CON ACCESORIOS W.C. TANQUE BAJO COMPLETO CON ACCESORIOS (REINSTALACION) W.C. TANQUE BAJO COMPLETO CON ACCESORIOS W.C. C/FLUXOMETRO COMPLETO CON ACCESORIOS MINGITORIO C/FLUX. COMPLETO CON ACCESORIOS FREGADERO ACERO INOX. 2 ESCURR. COMPLETO CON ACCESORIOS CALENTADOR O REGADERA (REINSTALACION) CALENTADOR LLAVE DE NARIZ PARA LAVADERO
INSTALACION ELECTRICA

ALAMBRE TW CAL. 12 ALAMBRE TW CAL. 10 ALAMBRE TW CAL. 8 CENTRO DE CARGA TUBO STEEL P/GRUESA 13 TUBO STEEL P/GRUESA 19 TUBO STEEL P/GRUESA 25 TUBO STEEL P/GRUESA 38

4.50

7.00

TUBO STEEL P/GRUESA 50 TUBO STEEL P/DELGADA 13 TUBO PVC 25 SALIDA DE ALUMBRADO O CONTACTOS SALIDA DE TELEFONO O TELEVISION

ML ML ML SAL SAL

0.15 2.25

24.00 90.00 63.00 0.20 2.50

0.22 2.75

5-INS 5-INS 5-INS 32 32

Investigacin de rendimientos de mano de obra


Concepto Grupo de trabajo Preliminares y cimentacion Plantillas entre 0.07 y 0.01 m. m 2 Castillo centro de Block 1 (3/8") 9.5 mm. m 5 Castillos y Cadenas 1515 con 4(3/8")9.5 m 5 Castillos y Cadenas 1520 con 4(3/8")9.5 m 5 Castillos y Cadenas 1530 con 4(3/8")9.5 m 5 Concepto Grupo de trabajo Preliminares y cimentacion m 2 m 1 Unidad Unidad Rendimiento Fuente de Consulta Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Fuente de Consulta Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar

14m/jor 30m/jor 10m/jor 9.5m/jor 8m/jor Rendimiento

Limpia y trazo 50 m/jor Excavacion en tierra hasta 4 m/jor 2 m de profundidad Excavacion en tepetate blando m 1 2 m/jor hasta 2 m de profundidad Traspaleado hasta 2m m 1 18 m/jor Acarredo con carrtilla a 20.00m. Mximo m 1 5 m/jor Rellenos por capas compactadas con m 1 7 m/jor piston a mano Compactacin de Cepas con m 1 35m/jor Piston de mano Plantillas entre 0.07 y 0.01 m. m 2 14m/jor Cimientos de Piedra Braza m 5 3m/jor Habilitado y Armado De Fierro de Refuerzo. En Cimentacin TON 0.17TON/jor en Estructura TON 4 0.16TON/jor Habilitado y Armado de Alambrn de 1/4 y 5/16" TON 4 0.13TON/jor Cimbrar y Descimbrar, Acabado No Aparente En Cimientos m 3 9.5m/jor En Columnas Rectangulares m 3 7.5m/jor En Columnas Circulares m 3 6m/jor En Trabes m 3 8.5m/jor En Losas m 3 9 m/jor Hechura de Cimbra En Cimientos m 3 17m/jor En Columnas Rectangulares m 3 8.5m/jor En Columnas Circulares m 3 4m/jor En Trabes m 3 10m/jor En Losas m 3 10m/jor Cimbrar y Descimbrar con Sonotubo m 3 15m/jor Losas Reticulares Colocacin de Block Hasta 20x40x40cm caja 2 100c/jor Colocacin De BlockHAsta 35x60x60cm caja 2 40c/jor Entrepiso Reticular celulado lnea menor caja 2 40c/jor Entrepiso Reticular celulado lnea mayor caja 2 40c/jor Colados (No Incluyendo la Fabricacin de Concreto) En Cimientos m 2 1.50m/jor

Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar

En Columnas y Muros m 2 0.85m/jor En Trabes y Losas m 2 0.95m/jor En Losas Reticulares m 2 0.80m/jor Curado de Concreto con Agua en m 1 10m/jor Superficies Horizontales Cuarado de Concreto Con Agua m 1 300m/jor En Superficies Verticales Muros De Tabique Comn o Ligero No Aparente. De 0.17m de espesor m 5 11m/jor De 0.14m de espesor m 5 10m/jor DE 0.21m de espesor m 5 8m/jor De 0.28m de espesor m 5 6m/jor Sobre Presio para Cara Aparente m 5 40m/jor Concepto Unidad Grupo de Rendimiento trabajo Muros de Block Tipo Piramide De 0.10m de espesor m 5 10m/jor De 0.12m de espesor m 5 9.5m/jor De 0.15m de espesor m 5 9m/jor De 0.20m de espesor m 5 8.5m/jor Sobre Presio para Cara Aparente m 5 80m/jor Muro de Block Extruido De 5x10x15 en 10cm de espesor m 6 4.5m/jor De 6x10x20 en 10 cm de espesor m 6 5.0m/jor De 10x10x20 en 10 cm de espesor m 6 5.5m/jor De 10x15x20 en 15 cm de espesor m 6 5.5m/jor Sobreprecio para Cara Aparente m 6 55m/jor Castillos Y Cadenas Castillo centro de Block 1 (3/8") 9.5 mm. m 5 30m/jor Castillos y Cadenas 1515 con 4(3/8")9.5 m 5 10m/jor Castillos y Cadenas 1520 con 4(3/8")9.5 m 5 9.5m/jor Castillos y Cadenas 1530 con 4(3/8")9.5 m 5 8m/jor Sobreprecio cara aparente castilos-cadenas m 5 25m/jor Recubrimientos Repellados de Mezcla m 5 19m/jor Aplanados de Mezcla (Rostreados) m 5 14m/jor Aplanados Fionos de Mezcla m 5 11m/jor Aplanados finos de cemento a llana m 5 10m/jor Recubrimiento de Ceramica o Mosaico m 6 4m/jor Veneciano, incle repellado Recubrniento Cintilla 5.5 22 1.0 a m 6 4.5m/jor 6.0 1.0 cm. Recubrimiento fachaleta 10 20 1 a m 6 5m/jor 11 22 1 cm. Recubrimiento Azulejo m 6 5.5m/jor Recubrimiento Tipo Vitricota 62018cm m 6 4.5m/jor Recubrimiento Tipo Vitricota 10201.8cm m 6 5m/jor Recubriento Mosaico 20202.0 cm m 5 9m/jor Boquilla Incluyendo cortes a 450 6 16m/jor Material Verificados Pisos Firmes de Concreto para Pisos, m 2 10m/jor

Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar

Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Fuente de Consulta Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar

Suarez Salazar

espesor de 8 a 10 cm. Acabado escobillado integral sobre firmes Fino no Integral acabado pulido Armado con Malla en Pisos Pisos creamica sin firme Pisos loseta 15151.0 cm a 2 cm Pisos loseta 10201.0 a 2.0 cm Pisos loseta 30302.5 cm Pisos Mosaico 20202 cm Pisos mosaico terraza sin junta metlica 50502.5 cm Zoclo mosaico 10202.0 cm Zoclo loseta 101530 a 40 cm Materlinado fino sobre pisos Materlinado fino sobre muros Materlinado fino sobre trabes y losas Concepto

m m m m m m m m m

5 5 4 6 6 6 6 6 6

35m/jor 18m/jor 50m/jor 5m/jor 7m/jor 7m/jor 13m/jor 11m/jor 9.5

Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar

Rellenos de Tezontle en Azoteas esntornado sobre casco Enladrillado y Escobillado Enladrillado aparente Chaflanes de pedacera Hechura Tarimas 50100cm Muro Block vidrio 102020cm Incluyendo refuerzo en juntas Registros de 4060 cm con profundidad promedio de 1.25m Tapa de registro de 4060 cm Impermiabilizacin de cimientos Albaales 15 cm. tendido y junteo Colocacin de Herrreria Impermiabilizacin azotea por capa. Colado firme 5cm Colado firme 10cm Pulido fino con llana Repellado mort. 1:1:8 piso azulejo cermica pasta 2020 Yeso Plafn reventon Yeso muros Limpieza gruesa Obra Acero columnas 1/4" Acero columnas 5/16" Acero columnas 3/8" Acero columnas 1/2" Acero coumnas 5/8" Acero columnas 3/4" Acero columnas 1"

m 6 m 6 Materlinados m 1 m 1 m 4 Unidad Grupo de trabajo Azoteas m 1 m 5 m 5 m 5 5 Varios pza 3 m 6 pza pza m m m m m m m m m m m m m kg kg kg kg kg kg kg 5 5 2 5 5 2 5 5 5 5 6 6 5 5 1 4 4 4 4 4 4 4

18m/jor Suarez Salazar 18m/jor Suarez Salazar 4m/jor Suarez Salazar 3m/jor Suarez Salazar 2m/jor Suarez Salazar Rendimiento Fuente de Consulta 2m/jor 20m/jor 11m/jor 7m/jor 24m/jor Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar

19pza/jor Suarez Salazar 3.5m/jor Suarez Salazar 2pza/jor Suarez Salazar 6pza/jor 35m/jor 26m/jor 7.5m/jor 30m/jor 21.90m/jor 19.92m/jor 12m/jor 9m/jor 4m/jor 7.50m/jor 20m/jor 18.50m/jor 50m/jor 75kg/jor 68.32kg/jor 120kg/jor 140kg/jor 150kg/jor 163.98kg/jor 200kg/jor Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Suarez Salazar Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh.

Cimb. Y Des. Trabes Cimb. Y Des. Rampa esc Cimb. Desc.Losas Relleno tepetate chaflan pulido pedac. inst.tubo drenaje 20cm viv. Relleno y comp. Albaal registro pref. 40 60 t. Ciega plantilla prm.100 y 5cm pasos albaal en cimiento Mamp. Piedra braza mort, 1:5 Zap. Y contr. Hab. Acero 1/4 Zap. Y contr. Hab. Acero 5/16 Zap. Y contr. Hab. Acero 3/8 Zap. Y contr. Hab. Acero 1/2 Zap. Y contr. Hab. Acero 5/8 Zap. Y contr. Hab. Acero 1 Colado conc.inc.vibr.cimient Cimb.y desim. Zap. y contra. Relleno prod. Excav. Capas 20cm Arm cim vac dalas 15 15 1n Concepto Arm cim vac dalas 15 15 2n tab. rojo comn 14c mort 1:5 bar 1n tab. rojo comn 14c muro 1n tab. rojo comn 14c muro 2n cimb. Y desc. Col.1n cimb. Y desc. Col niv sub. fab. Conc. 100 - 300 kg /cm sum. Col. Malla 6 6 - 6/6 sum. Col. Malla 6 6 - 10/10 armex cualquier dimencin limpieza de terreno a mano limpieza de terreno accidentado trazo nivelacin a mano excav, a mano T1 0 al .50 excav. A mano T2 0 al .50 excav. A mano T3 0 al .50 afine de terraseria a mano excav. Albaal vivienda ceja de tabique rojo en muros de 14 cm ceja de tabique Sta. Julia en sentido vertical ceja de tabique rojo,muros 14 cm, pulido ceja ladrillo comprimido frente 20x2.5 cm ceja tabique comprimido frente 5x10cm Arenero de 40x40x60 cm de profundidad, de tabique comun, pulido con mortero cemento arena 1:5 tabique asentado con c-a 1:5 Registro de albaal de 40x60x1.00m prof.

m m m m ml ml m pza m pza m kg kg kg kg kg kg m m m ml Unidad ml m m m m m m m m ml m m m m m m m m m ml ml ml ml ml Registros m

3 3 3 5 5 5 1 5 5 5 5 5 5 5 5 5 5 2 5 5 5 Grupo de trabajo 5 5 5 5 5 5 5 5 5 5 1 1 5 5 1 1 1 1 1 5 5 5 5 5 5

4.25m/jor 30m/jor 6.91m/jor 2.07m/jor 15ml/jor 20ml/jor 2.85m/jor 6pza/jor 21.90/jor 5.50pza/jor 2.05m/jor 75kg/jor 100kg/jor 120kg/jor 140kg/jor 150kg/jor 200kg/jor 8.51m/jor 6m/jor 2.85m/jor 7.37ml/jor Rendimiento 6.71ml/jor 3.60m/jor 7.50m/jor 6.82m/jor 4.25m/jor 3.87m/jor 17.28m/jor 120m/jor 158.75m/jor 100.85ml/jor 150m/jor 75m/jor 250m/jor 250m/jor 4m/jor 2.24m/jor 1.50m/jor 22.50m/jor 2.24m/jor 28.57ml/jor 6.67 ml/jor 10.53 ml/jor 14.29ml/jor 6.67ml/jor 2.42

Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Fuente de Consulta Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Inv. de campo Teh. Plazola Plazola Plazola Plazola Plazola Plazola

1.342

Plazola

pulido mortero c-a 1:5, tabique asentado con mortero c-a 1:6 Registro de albaal de 40x60x1.50m prof. pulido mortero c-a 1:5, tabique asentado con mortero c-a 1:6 Registro de albaal de 60x60x1.00m prof. pulido mortero c-a 1:5, tabique asentado con mortero c-a 1:6 Registro de albaal de 60x60x1.50m prof. pulido mortero c-a 1:5, tabique asentado con mortero c-a 1:6 Registro de albaal de 60x60x2.00m prof. pulido mortero c-a 1:5, tabique asentado con mortero c-a 1:6 Registro de albaal de 60x90x1.00m prof. pulido mortero c-a 1:5, tabique asentado con mortero c-a 1:6 Registro de albaal de 60x90x1.50m prof. pulido mortero c-a 1:5, tabique asentado con mortero c-a 1:6 Registro de albaal de 60x90x2.00m prof. pulido mortero c-a 1:5, tabique asentado con mortero c-a 1:6

0.887

Plazola

1.106

Plazola

0.735

Plazola

0.565

Plazola

0.875

Plazola

0.615

Plazola

0.453

Plazola

Concepto

Grupo de trabajo Tapas de registro Tapa de registro de albaal de 40x40x5 cm pza 5 concreto f'c=140 armado con alambron 1/4" marco y contramarco de angulo 1"x1"x1/8" Tapa de registro de albaal de 40x60x8 cm pza 5 concreto f'c=140 armado con alambron 1/4" Tapa de registro de albaal de 60x60x8 cm pza 5 concreto f'c=140 armado con varilla 3/8" Tapa de registro de albaal de 90x90x8 cm pza 5 concreto f'c=140 armado con varilla 3/8" Tapa de registro de albaal de 40x60x5 cm pza 5 concreto f'c=140 armado con alambron 1/4" marco y contramarco de angulo 1"x1"x1/8" Tapa de registro de albaal de 50x60x5 cm pza 5 concreto f'c=140 armado con alambron 1/4" marco y contramarco de angulo 1"x1"x1/8" Tapa de registro de albaal de 60x60x5 cm pza 5 concreto f'c=140 armado con alambron 1/4" marco y contramarco de angulo 1"x1"x1/8" Tapa de registro de albaal de 60x90x6 cm pza 5 concreto f'c=140 armado con alambron 1/4" marco y contramarco de angulo 1"x1"x1/8" Tapa de registro de albaal de 90x90x8 cm pza 5 concreto f'c=140 armado con varilla 3/8" marco y contramarco de angulo 1"x1"x1/8"

Unidad

Rendimiento

Fuente de Consulta Plazola

6.13

28.57 19.23 10 14

Plazola Plazola Plazola Plazola

12.5

Plazola

11

Plazola

8.2

Plazola

5.29

Plazola

conexin para bombas paso de agua fierro galvanizado ced. 40 instalacin para tinaco con tuberia galv. instalacin para calentador tipo A instalacin para calentador tipo B instalacin para calentador tipo C instalacin regaderas con tuberia galv. instalacin de fregadero sin considerar mueble, material fierro galvanizado alimentacion y desague de lavabos instalacin para WC con llave de resorte sin considerar mueble, material fierro galv Acabado con Voltedor Cimbra metalica en ambas caras

Instalaciones unid unid unid unid unid unid unid unid unid unid m

6 6 6 6 6 6 6 6 6

1.25 1 1 2 2.5 2.5 1 1 0.286 0.87 92.00

Plazola Plazola Plazola Plazola Plazola Plazola Plazola Plazola Plazola Plazola

6 of albail

Fuentes de consulta 1.- Costo y Tiempo en edificacion Suarez Salazar 2.-Normas y costos en construccin Plazola 3.-Investigacion de campo en la regin de Tehuacan

Grupos de trabajo: Actividades Excavaciones, acarreos, rellenos Plantillas, firmes, vaciado de concreto Cimbra de cimentacion, columnas, etc. Acero en cimentacion, columnas, trabes Cimentacion de piedra, dalas, muros, etc. Pisos, terrazo, azulejo, ceramica, etc. Gpo 1 2 3 4 5 6 Integrantes 1/10 cabo + 1 peon 1/4 of. Albail + 1 peon 1 of. Carpintero + 1 peon 1/2 of. Fierrero + 1 peon 1 of. Albail + 1 peon 1 of. Especialista + 1 peon

dimensiones de tabique: a= b= c= z= 6 26 14 1.6 cm cm cm cm

6x

14 x

26

No. De Pzas.=

1/ [(b+z)(a+z)]

Se le agrega un 10% de desperdicio

No. De Pzas.= 47.67 pzas/ m2 No. De Pzas. + 10%= 52.44 pzas/ m2 Mortero m3/pza= m3/m2= mortero= zc (b+z+a) 0.039 0.051 m3/m2 CONCRETO losa de concreto de fc=200 kg/cm2 Area= 1.498 espesor= 0.15 m3/pza= 0.0007526 mas 30% de desperdicio

DIMENSIONES DE LA CAJA No. V: A= 1.30 SUPERF I= B= 0.90 SUPERF II= H= 1.75 e= 0.14 SUPEFICIE TOTAL=

4.55 M2 3.15 M2 7.7 M2

PZA TOTALES DE TABIQUE: TOTAL DE MORTERO:

403.79 0.3951

pzas m2

Volumen=

0.247 m3

CONCRETO DIMENSIONES DE LA CAJA No. I: A= 0.70 SUPERF I= B= 0.70 SUPERF II= H= 0.85 e= 0.14 SUPEFICIE TOTAL= 1.19 M2 1.19 M2 2.38 M2 Area= espesor= 0.706 0.15

PZA TOTALES DE TABIQUE: TOTAL DE MORTERO:

124.81 0.1221

pzas m2

Volumen=

0.116 m3

CONCRETO DIMENSIONES DE LA CAJA No. II: A= 1.00 SUPERF I= B= 0.90 SUPERF II= H= 0.25 e= 0.14 SUPEFICIE TOTAL= 0.5 M2 0.45 M2 0.95 M2 Area= espesor= 1.186 0.15

PZA TOTALES DE TABIQUE: TOTAL DE MORTERO:

49.819 0.0487

pzas m2

Volumen=

0.196 m3

ACERO varilla 3/8" @20 cm en piso num de Var: 7.2 x num de Var: 5.2 x varilla 3/8" @10 cm en losa tapa num de Var: 14.4 x num de Var: 10.4 x 1.30 = 0.90 = 1.30 = 0.90 = 9.36 x 4.68 x 18.72 x 9.36 x peso 3/8= 0.56 = 0.56 = 0.56 = 0.56 = 5.242 2.621 10.48 5.242 25.95 kg

peso total de varilla

ACERO varilla 3/8" @20 cm en piso num de Var: 4.2 x num de Var: 4.2 x varilla 3/8" @10 cm en losa tapa num de Var: 8.4 x num de Var: 8.4 x 0.70 = 0.70 = 0.70 = 0.70 = 2.94 x 2.94 x 5.88 x 5.88 x peso 3/8= 0.56 = 0.56 = 0.56 = 0.56 = 1.646 1.646 3.293 3.293 10.87 kg

peso total de varilla

ACERO varilla 3/8" @20 cm en piso num de Var: 5.7 x num de Var: 5.2 x varilla 3/8" @10 cm en losa tapa num de Var: 11.4 x num de Var: 10.4 x 1.00 = 0.90 = 1.00 = 0.90 = 5.7 x 4.68 x 11.4 x 9.36 x peso 3/8= 0.56 = 0.56 = 0.56 = 0.56 = 3.192 2.621 6.384 5.242 19.18 kg

peso total de varilla

Tabla de 1"x10"x8 1/4 CIMBRA Tabla ancho 0.254 m Num pzas= 3.543 1 10 8 1/4

Pt=

12.6 pt Tabla de 1"x10"x8 1/4 1 10 8 1/4

CIMBRA Tabla ancho 0.254 m Num pzas= 2.756

Pt=

5.275 pt Tabla de 1"x10"x8 1/4

CIMBRA Tabla ancho 0.254 m Num pzas= 0.984

10 8 1/4

Pt=

2.422 pt

Cuadrilla No 2: ( 1.00 Pon + 1/10 cabo ). Cuadrilla No 3 (1 Carpintero + 1 Ayudante general) Cuadrilla No 27 (1 Albail + 5 Peones) Cuadrilla 40: (1.00 Of. Albanil) Motoniveladora marca Caterpillar modelo 12G, motor diesel de 140 hp hoja de 3.66 m*0.61, vel. 1a 3.8 Km/h, 2a. 4.8 Km/h Motoniveladora marca Caterpillar modelo 12G, motor diesel de 140 hp hoja de 3.66 m*0.61, vel. 1a 3.8 Km/h, 2a. 4.8 Km/h Motoniveladora marca Caterpillar modelo 12G, motor diesel de 140 hp hoja de 3.66 m*0.61, vel. 1a 3.8 Km/h, 2a. 4.8 Km/h Compactador de suelos de tambor liso vibratorio marca AMMANN modelo AC 110 de 121 hp y 10.90 ton de peso de operacion y 2.29 m de ancho del tambor, vel. max. trabajo 8 kph Camion pipa de 10000 lts sobre Chasis cabina MercedezBenz L-1417/52 STD 170 HP

REND. 5 9 7.5 34 60

210

47

80

RELLENO COMPACTADO DE TIERRA LIMPIA CIMBRA PARA CIMENTACION CONCRETO HECHO EN OBRA ACABADO ESCOBILLADO

M3 M2 M3 M2

EXCAVACION EN CAJA

M2

ESCARIFICADO O RASTREO

M3

OPERACIN DE TENDIDO, CONFORMACION Y AFINAMIENTO PARA EL ACABADO SUPERFICIAL. M3

COMPACTACION DE TERRENO NATURAL

limpieza general del terreno

50 m2/j