PROYECTO
ENTIDAD
CONTRATISTA
INSPECTOR
UBICACIN
CONCEPTO
MONTOS
RECALCULADOS
MONTOS
PAGADOS
S/.
S/.
711,529.08
42,755.55
56,535.13
810,819.76
708,102.00
42,755.55
56,535.13
807,392.68
45,021.30
1,957.50
2,834.58
53,540.20
3,755.95
648.83
TOTAL REAJUSTES
49,813.38
57,944.97
147,058.82
-147,058.82
147,058.82
-147,058.82
0.00
0.00
0.00
0.00
-73,711.36
-7,366.53
0.00
-81,077.89
138.25
205.04
0.00
0.00
343.29
0.00
16,904.46
0.00
16,904.46
0.00
877,537.60
784,259.76
166,732.14
149,009.36
( C) ADELANTOS OTORGADOS
Adelanto directo
Amortizacion adelanto directo
TOTAL ADELANTOS
( E) DEDUCCION POR GARANTIA DE FIEL CUMPLIMIENTO
Del contrato principal
(G)
MAYORES
GASTOS
GENERALES
POR
AMPLIACION DE
PLAZO
1,044,269.74
933,269.12
BRA
SALDO A FAVOR
DEL
CONTRATISTA
S/.
3,427.08
0.00
0.00
3,427.08
-8,518.90
-1,798.45
2,185.75
-8,131.59
0.00
0.00
0.00
73,711.36
7,366.53
81,077.89
138.25
205.04
343.29
16,904.46
16,904.46
93,277.83
17,722.79
111,000.62
ENTIDAD
CONTRATISTA
INSPECTOR
UBICACIN
VAL
DE
VALORIZAC
ION
ADELANTO
02
03
04
05
05
TOTAL
PAGO Y/O
FECHA
IMPORTE
EMISION
PARCIAL
FACTURA N
F-000001
DIRECTO
01
COMPROBANTE DE
AL
31.07.2008
AL
31.08.2008
AL
30.09.2008
AL
31.10.2008
AL
30.11.2008
AL
31.12.2008
ACUMULADO
175,000.00
175,000.00
F-000003
05.08.2008
73189.62
248,189.62
F-000005
05.09.2008
113,769.64
361,959.26
F-000006
07.10.2008
134,055.66
496,014.92
F-000007
05.11.2008
69,239.75
565,254.67
F-000014
05.12.2008
123,253.57
688,508.24
F-000015
24.02.2009
130129.45
818,637.69
818,637.69
ENTIDAD
CONTRATISTA
INSPECTOR
UBICACIN
VAL
DE
VALORIZAC
ION
COMPROBANTE DE
PAGO Y/O FACTURA
FECHA
IMPORTE
EMISION
PARCIAL
ACUMULADO
ADICIONAL DE
OBRA N O1
01
AL
30.10.2008
2008-01571
46,582.52
46,582.52
2008-01571
32,313.00
78,895.52
2008-01571
35,735.91
114,631.43
ADICIONAL DE
OBRA N O2
01
02
TOTAL
AL
30.10.2008
AL
31.12.2008
114,631.43
1 Y 02
PROYECTO
CONTRATO DE OBRA
: N 143-ALC-MDN 2008
OBRA
VALOR REFERENCIAL
: S/. 974,627.98
ENTIDAD
VALOR OFERTADO
: S/. 877,165.19
CONTRATISTA
PLAZO DE EJECUCION
INSPECTOR
UBICACIN
FECHA PRESUPUESTO
: ABRIL DE 2008
VALORIZACION
PERIODO
MONTO BRUTO
REINTEGRO
REINTEGRO
VALORIZADO
VAL. ACTUAL
ACTUAL
ACTUALIZACIN
VALORIZACION
AMORTIZACION
VALORIZACION
I.G.V.
BRUTA
ADEL. EFECTIVO
NETA
19%
(d)=(a+b+c)
(e)
(f)=(d-e)
(g)=19%(f)
DEDUCCION
POR
GARANTIA
FIEL
CUMPLIMIEN
TO
VAL. ANTERIOR
(a)
01
02
03
04
05
06
AL 31.07.08
AL 31.08.08
AL 30.09.08
AL 31.10.08
AL 30.11.08
AL 30.12.08
TOTAL ACUMULADO
NOTA:
73491.09
122,177.10
196,763.12
65,323.04
176,415.96
73,931.68
(b)
(b)
0
0.00
708,102.00 S/.
APROBACIONES
2674.73
10,579.06
14,193.59
4,024.98
10,833.59
7,479.62
53,540.20
0.00
1,885.61
0.00
1,869.00
0.00
0.00
76,165.82
134,641.78
210,956.71
71,217.02
187,249.55
81,411.30
761,642.19
14,661.94
39,037.04
24,593.54
13,032.36
83,675.12
-27,941.18
147058.82
61,503.88
95,604.74
186,363.17
58,184.66
103,574.43
109,352.48
614,583.37
(-10%)
11685.74
18,164.90
35,409.00
11,055.09
19,679.14
20,776.97
0.00
0.00
-87,716.52
0.00
0.00
0.00
116770.84
-87716.52
ALC-MDN 2008
,627.98
7,165.19
AS NATURALES
DE 2008
NETO A
PAGAR
(i)=(f+g-h)
73,189.62
113,769.64
134,055.65
69,239.75
123,253.57
130,129.45
643,637.69
VALORIZACION N 01
(LIQUIDACION FINAL)
PROYECTO
CONTRATO DE OBRA
: N 143-ALC-MDN 2008
OBRA
VALOR REFERENCIAL
: S/. 974,627.98
ENTIDAD
VALOR OFERTADO
: S/. 877,165.19
CONTRATISTA
PLAZO DE EJECUCION
INSPECTOR
UBICACIN
FECHA PRESUPUESTO
: ABRIL DE 2008
UND.
PARTIDA N
METRADO
COSTO
UNITARIO
COSTO
PARCIAL
SALDOS
AVANCES
ANTERIOR
METRADO
01.00.00
01.01.00
01.02.00
01.03.00
ACTUAL
COSTO
METRADO
ACUMULADO
COSTO
METRADO
COSTO
METRADO
OBRAS PROVICIONALES
CARTEL DE OBRA
ALMACEN DE OBRA
CERCO PROVICIONAL
UND
MES
M
1.00
4.00
54.00
800.00
200.00
54.34
800.00
800.00
2,934.36
0.00
0.00
0.00
1.00
800.00
100.00
1.00
800.00
100.00
0.00
0.00
0.00
0.00
4.00
800.00
100.00
4.00
800.00
100.00
0.00
0.00
0.00
0.00
54.00
2,934.36
100.00
54.00
2,934.36
100.00
0.00
M2
M2
875.43
875.43
0.36
0.74
315.15
647.82
0.00
0.00
0.00
875.43
315.15
100.00
875.43
315.15
100.00
0.00
0.00
0.00
0.00
875.43
647.82
100.00
875.43
647.82
100.00
0.00
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
MOVIMIENTO DE TIERRAS
M2
M3
M3
M3
875.43
142.10
33.73
219.79
2.54
13.73
12.01
10.27
2,223.59
1,951.03
405.10
2,257.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
875.43
0.00
0.00
0.00
142.10
1,951.03
100.00
142.10
1,951.03
100.00
0.00
0.00
0.00
0.00
33.73
405.10
100.00
33.73
405.10
100.00
0.00
0.00
0.00
0.00
219.79
2,257.24
100.00
219.79
2,257.24
100.00
0.00
04.00.00
04.01.00
04.02.00
04.03.00
04.04.00
04.05.00
CONCRETO SIMPLE
M3
M2
M2
M3
M2
13.72
98.00
809.17
18.83
165.67
108.40
26.08
16.42
138.32
18.26
1,487.25
2,555.84
13,286.57
2,604.57
3,025.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13.72
0.00
0.00
0.00
98.00
2,555.84
100.00
98.00
2,555.84
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
809.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
165.67
05.00.00
05.01.00
05.02.01
05.01.02
CONCRETO ARMADO
M3
KG
39.20
855.89
233.55
3.96
9,155.16
3,389.32
0.00
0.00
0.00
39.20
9,155.16
100.00
39.20
9,155.16
100.00
0.00
0.00
0.00
0.00
855.89
3,389.32
100.00
855.89
3,389.32
100.00
0.00
05.02.00
05.02.01
05.02.02
05.02.03
VIGAS DE CIMENTACION
M3
M2
KG
24.09
192.71
3,337.50
250.45
24.23
3.96
6,033.34
4,669.36
13,216.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
192.71
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,337.50
05.03.00
05.03.01
05.03.02
05.03.03
COLUMNAS
M3
M2
KG
18.52
198.36
2,488.20
290.92
24.23
3.96
5,387.84
4,806.26
9,853.27
0.00
0.00
0.00
4.34
1,262.59
23.43
4.34
1,262.59
23.43
14.18
0.00
0.00
0.00
59.62
1,444.59
30.06
59.62
1,444.59
30.06
138.74
0.00
0.00
0.00
2,488.20
9,853.27
100.00
2,488.20
9,853.27
100.00
0.00
05.04.00
05.04.01
05.04.02
05.02.03
VIGAS
M3
M2
KG
42.70
430.94
6,369.43
290.92
24.23
3.96
12,422.28
10,441.68
25,222.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
42.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
430.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6,369.43
05.05.00
05.05.01
05.05.02
05,05,03
LOSAS ALIGERADAS
M3
M2
KG
46.46
545.35
3,058.33
260.63
18.31
4.11
12,108.87
9,985.36
12,569.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
46.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
545.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,058.33
ZAPATAS
CONCRETO EN ZAPATAS F C=175KG/CM2
ACERO Fy =4200Kg/cm2
CONCRETO FC =175KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
CONCRETO FC=210KG/CM2
ENCONFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
CONCRETO FC=210KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
UND
4,908.17
2.28
11,190.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05.06.00
05.06.01
05.06.02
05.06.03
ESCALERAS
M3
M2
KG
7.91
46.88
634.53
267.68
33.26
4.07
2,117.35
1,559.23
2,582.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
46.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
634.53
05.07.00
05.07.01
05.07.02
05.07.03
LAVADERO Y URINARIOS
M3
M2
KG
1.75
11.05
75.62
250.45
24.23
3.96
438.29
267.74
299.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75.62
06.00.00
06.01.00
06.01.01
06.01.02
M2
M2
630.51
169.65
29.03
29.03
18,303.71
4,924.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
630.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
169.65
07.00.00
07.01.00
07.02.00
07.03.00
07.04.00
07.05.00
M2
M2
M2
M2
M
120.31
1,600.32
133.11
263.62
317.96
8.99
11.20
15.67
18.46
7.89
1,081.59
17,923.58
2,085.83
4,866.43
2,508.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,600.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
133.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
263.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
317.96
08.00.00 CIELORRASOS
08.01.00 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA
M2
545.35
23.17
12,635.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
545.35
M2
1,517.26
11.70
17,751.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,517.26
09.02.00 PISOS
09.02.01 PISO DE LOCETA CERAMICO 30X300CM. EN AMBIENTES
M2
708.09
37.19
26,333.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
708.09
M2
M
101.08
33.58
74.70
10.32
7,550.68
346.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
101.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
33.58
09.04.00 SARDINELES
09.04.01 CONCRETO SIMPLE EN SARDINEL Fc =140KG/CM2
M3
4.24
176.00
746.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.24
M2
120.31
34.66
4,169.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120.31
10.02.00 CONTRAZOCALOS
10.02.01 CONTRAZOCALO DE LOZETA CERAMICO DE 10X30 CM.
436.40
19.73
8,610.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
436.40
11.00.00
11.01.00
11.02.00
11.03.00
M2
UND
M2
60.13
3.00
147.25
142.89
217.79
60.00
8,591.98
653.37
8,835.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
147.25
12.00.00 CERRAJERIA
12.01.00 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2"
12.02.00 CERRADURA PARA PUERTA PRINCIPAL PESADA
PZA
PZA
70.00
35.00
9.30
73.90
651.00
2,586.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
35.00
P2
P2
900.66
77.00
22.41
30.71
20,183.79
2,364.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
900.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
77.00
CONCRETO FC=175KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
4,908.17
CARPINTERIA DE MADERA
PUERTA CONTRAPLACADA DE 45 MM TRIPLAY 4 MM INCLUIDO PINTADO
CLOSET DE MADERA INCLUYE COLOCADO Y PINTADO
VENTANA METALICA INCLUYE PINTADO
14.00.00 PINTURA
14.01.00 PUINTURA LATEX EN CIELORRASOS
14.02.00 PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES
M2
M2
15.00.00 VARIOS
15.01.00 LIMPIEZA PERMANENTE DE OBRA
16.00.00
16.00.00
16.00.00
16.00.00
17.00.00
17.01.00
17.02.00
17.03.00
17.05.01
17.05.02
17.05.03
17.06.01
17.06.02
17.06.03
17.06.04
17.06.05
17.06.06
17.06.07
17.06.08
17.07.01
17.07.02
17.07.03
17.08.01
INSTALACIONES SANITARIAS
18.00.00
18.01.00
18.02.01
18.02.02
18.03.01
18.03.02
18.03.03
18.03.04
18.03.05
18.03.06
18.04.01
18.04.02
18.05.01
INSTALACIONES DE AGUA
19.00.00
19.01.00
19.02.00
19.03.00
19.04.00
INSTALACIONES ELECTRICAS
545.35
2,556.99
4.98
4.42
2,715.84
11,301.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
545.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,556.99
GLB
1.00
500.00
500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
UND
UND
UND
19.00
3.00
6.00
208.22
178.80
10.08
3,956.18
536.40
60.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
PTO
PTO
PTO
M
M
M
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
UND
PZA
UND
PZA
4.00
14.00
20.00
16.51
20.25
103.98
27.00
5.00
8.00
1.00
8.00
2.00
10.00
12.00
11.00
4.00
20.00
6.00
33.97
33.61
40.74
10.37
10.05
12.85
7.96
11.37
11.37
7.13
10.57
6.97
10.82
10.77
21.22
18.80
5.04
110.40
135.88
470.54
814.80
171.21
203.51
1,336.14
214.92
56.85
90.96
7.13
84.56
13.94
108.20
129.24
233.42
75.20
100.80
662.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
103.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
PTO
M
M
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
32.00
66.78
61.45
10.00
3.00
34.00
4.00
23.00
6.00
10.00
4.00
1.00
28.11
5.33
24.16
4.58
4.58
4.58
4.58
4.58
4.58
30.41
21.04
23.60
899.52
355.94
1,484.63
45.80
13.74
155.72
18.32
105.34
27.48
304.10
84.16
23.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
66.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
61.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
34.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
23.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
PTO
PTO
PTO
PTO
75.00
1.00
54.00
24.00
43.28
40.73
38.43
38.43
3,246.00
40.73
2,075.22
922.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
54.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.00
611.00
4.71
2,877.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
611.00
21.00.00
21.01.00
21.02.00
21.03.00
M
M
M
100.00
852.00
370.00
2.38
1.36
1.31
238.00
1,158.72
484.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
852.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
370.00
PZA
2.00
35.96
71.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
UND
GLB
1.00
1.00
507.52
436.64
507.52
436.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
UND
75.00
48.59
3,644.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75.00
409,919.73
0.00
37,771.47
1.37%
5,615.90
0.00
517.47
517.47
6.63%
27,177.68
0.00
2,504.25
2,504.25
UTILIDAD
7.00%
MONTO VALORIZADO
FACTOR DE RELACION
28,694.38
0.00
2,644.00
2,644.00
471,407.69
0.00
43,437.19
43,437.19
424,266.92
0.00
39,093.47
39,093.47
80,610.71
0.00
7,427.76
7,427.76
504,877.63
0.00
46,521.23
46,521.23
0.00%
9.21%
9.21%
0.900
37,771.47
19.00%
-MDN 2008
ATURALES
COSTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,223.59
100.00
0.00
0.00
0.00
0.00
0.00
0.00
1,487.25
100.00
0.00
0.00
13,286.57
100.00
2,604.57
100.00
3,025.13
100.00
0.00
0.00
0.00
0.00
6,033.34
100.00
4,669.36
100.00
13,216.50
100.00
4,125.25
76.57
3,361.67
69.94
0.00
0.00
12,422.28
100.00
10,441.68
100.00
25,222.94
100.00
12,108.87
100.00
9,985.36
100.00
12,569.74
100.00
11,190.63
100.00
2,117.35
100.00
1,559.23
100.00
2,582.54
100.00
438.29
100.00
267.74
100.00
299.46
100.00
18,303.71
100.00
4,924.94
100.00
1,081.59
100.00
17,923.58
100.00
2,085.83
100.00
4,866.43
100.00
2,508.70
100.00
12,635.76
100.00
17,751.94
100.00
26,333.87
100.00
7,550.68
100.00
346.55
100.00
746.24
100.00
4,169.94
100.00
8,610.17
100.00
8,591.98
100.00
653.37
100.00
8,835.00
100.00
651.00
100.00
2,586.50
100.00
20,183.79
100.00
2,364.67
100.00
2,715.84
100.00
11,301.90
100.00
500.00
100.00
3,956.18
100.00
536.40
100.00
60.48
100.00
135.88
100.00
470.54
100.00
814.80
100.00
171.21
100.00
203.51
100.00
1,336.14
100.00
214.92
100.00
56.85
100.00
90.96
100.00
7.13
100.00
84.56
100.00
13.94
100.00
108.20
100.00
129.24
100.00
233.42
100.00
75.20
100.00
100.80
100.00
662.40
100.00
899.52
100.00
355.94
100.00
1,484.63
100.00
45.80
100.00
13.74
100.00
155.72
100.00
18.32
100.00
105.34
100.00
27.48
100.00
304.10
100.00
84.16
100.00
23.60
100.00
3,246.00
100.00
40.73
100.00
2,075.22
100.00
922.32
100.00
2,877.81
100.00
238.00
100.00
1,158.72
100.00
484.70
100.00
71.92
100.00
507.52
100.00
436.64
100.00
3,644.25
100.00
372,148.26
5,098.43
24,673.43
26,050.38
427,970.50
385,173.45
73,182.96
458,356.41
90.79%
VALORIZACION N 01
(LIQUIDACION FINAL)
PROYECTO
CONTRATO DE OBRA
: N 143-ALC-MDN 2008
OBRA
VALOR REFERENCIAL
: S/. 974,627.98
ENTIDAD
VALOR OFERTADO
: S/. 877,165.19
CONTRATISTA
PLAZO DE EJECUCION
INSPECTOR
UBICACIN
FECHA PRESUPUESTO
: ABRIL DE 2008
PARTIDA N
DESCRIPCION
UND.
METRADO
COSTO
UNITARIO
COSTO
PARCIAL
SALDOS
AVANCES
ANTERIOR
METRADO
ACTUAL
COSTO
METRADO
ACUMULADO
COSTO
METRADO
COSTO
METRADO
M2
M2
192.40
192.40
0.36
0.74
69.26
142.38
0.00
0.00
0.00
192.40
69.26
100.00
192.40
69.26
100.00
0.00
0.00
0.00
0.00
192.40
142.38
100.00
192.40
142.38
100.00
0.00
M2
M3
M3
M3
192.40
58.24
6.22
80.58
2.54
13.73
12.01
10.27
488.70
799.64
74.70
827.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
192.40
0.00
0.00
0.00
58.24
799.64
100.00
58.24
799.64
100.00
0.00
0.00
0.00
0.00
6.22
74.70
100.00
6.22
74.70
100.00
0.00
0.00
0.00
0.00
80.58
827.56
100.00
80.58
827.56
100.00
0.00
M3
M2
M2
M3
M2
4.88
33.28
183.25
4.87
38.95
108.40
26.08
16.42
138.32
18.26
528.99
867.94
3,008.97
673.62
711.23
0.00
0.00
0.00
4.88
528.99
100.00
4.88
528.99
100.00
0.00
0.00
0.00
0.00
33.28
867.94
100.00
33.28
867.94
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
183.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
38.95
M3
KG
41.39
289.44
233.55
3.96
9,666.63
1,146.18
0.00
0.00
0.00
41.39
9,666.63
100.00
41.39
9,666.63
100.00
0.00
0.00
0.00
0.00
289.44
1,146.18
100.00
289.44
1,146.18
100.00
0.00
M3
M2
KG
5.83
56.22
584.69
250.45
24.23
3.96
1,460.12
1,362.21
2,315.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
56.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
584.69
M3
M2
KG
12.58
124.62
1,790.97
290.92
24.23
3.96
3,659.77
3,019.54
7,092.24
0.00
0.00
0.00
1.44
418.92
11.45
1.44
418.92
11.45
11.14
0.00
0.00
0.00
18.72
453.59
15.02
18.72
453.59
15.02
105.90
0.00
0.00
0.00
1,790.97
7,092.24
100.00
1,790.97
7,092.24
100.00
0.00
M3
M2
KG
11.53
130.10
1,550.52
290.92
24.23
3.96
3,354.31
3,152.32
6,140.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.53
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
130.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,550.52
2.11
30.48
211.98
274.32
260.63
18.31
4.11
2.28
549.93
558.09
871.24
625.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
211.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
274.32
04.03.00 COLUMNAS
04.03.01 CONCRETO FC=210KG/CM2
04.03.02 ENCONFRADO Y DESENCOFRADO NORMAL
04.03.03 ACERO FY =4200Kg/cm2
04.04.00 VIGAS
04.04.01 CONCRETO FC=210KG/CM2
04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL
04.04.03 ACERO FY =4200Kg/cm2
M3
M2
KG
UND
UND
M
UND
5.00
8.00
12.00
390.34
61.77
34.59
1,951.70
494.16
415.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
M2
204.00
59.34
12,105.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
204.00
M2
87.96
29.03
2,553.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
87.96
M2
M2
M2
M2
M
39.72
358.68
127.83
117.30
168.92
8.99
11.20
15.67
18.46
7.89
357.08
4,017.22
2,003.10
2,165.36
1,332.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
358.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
127.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
117.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
168.92
M2
30.48
23.17
706.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.48
M2
183.25
11.70
2,144.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
183.25
M2
192.01
37.19
7,140.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
192.01
M2
39.72
34.66
1,376.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39.72
140.40
19.73
2,770.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
140.40
M2
M2
24.18
21.19
142.89
60.00
3,455.08
1,271.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.19
PZA
PZA
26.00
13.00
9.30
73.90
241.80
960.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
26.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13.00
P2
P2
233.12
26.40
22.41
30.71
5,224.22
810.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
233.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
26.40
M2
M2
30.48
646.04
4.98
4.42
151.79
2,855.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
646.04
GLB
1.00
500.00
500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
UND
4.00
208.22
832.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
5.00
05.02.00 COBERTURAS
05.02.01 COBERTURA DE CALAMINA DE ALUMINIO TRAPEZOIDAL
08.00.00 CIELORRASOS
08.01.00 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA
09.02.00 PISOS
09.02.01 PISO DE LOCETA CERAMICO 30X30 CM. EN AMBIENTES
10.02.00 CONTRAZOCALOS
10.02.01 CONTRAZOCALO DE LOSETA CERAMICO DE 10X30 CM.
12.00.00 CERRAJERIA
12.01.00 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2"
12.02.00 CERRADURA PARA PUERTA PRINCIPAL PESADA
14.00.00 PINTURA
14.01.00 PINTURA LATEX EN CIELORRASOS
14.02.00 PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES
15.00.00 VARIOS
15.01.00 LIMPIEZA PERMANENTE DE OBRA
UND
PZA
UND
3.00
2.00
2.00
178.80
118.64
10.08
536.40
237.28
20.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
PTO
PTO
PTO
M
M
M
PZA
PZA
PZA
PZA
PZA
PZA
PZA
UND
PZA
UND
1.00
7.00
5.00
3.72
9.12
13.91
19.00
4.00
2.00
2.00
2.00
2.00
3.00
2.00
2.00
4.00
33.97
33.61
40.74
10.37
10.05
12.85
7.96
11.37
7.13
10.57
6.97
10.82
10.77
21.22
18.80
5.04
33.97
235.27
203.70
38.58
91.66
178.74
151.24
45.48
14.26
21.14
13.94
21.64
32.31
42.44
37.60
20.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
PTO
M
PZA
PZA
PZA
11.00
34.42
19.00
11.00
2.00
28.11
24.16
4.58
4.58
21.04
309.21
831.59
87.02
50.38
42.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
34.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
PTO
PTO
PTO
24.00
12.00
7.00
43.20
40.65
38.35
1,036.80
487.80
268.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
120.00
4.71
565.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120.00
M
M
M
70.00
250.00
70.00
2.32
1.30
1.25
162.40
325.00
87.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
250.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70.00
PZA
1.00
35.96
35.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
UND
UND
12.00
12.00
48.53
31.22
582.36
374.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
118,226.13
0.00
22,088.03
1.37%
1,619.70
0.00
302.61
302.61
6.63%
7,838.39
0.00
1,464.44
1,464.44
UTILIDAD
7.00%
MONTO VALORIZADO
FACTOR DE RELACION
8,275.83
0.00
1,546.16
1,546.16
135,960.05
0.00
25,401.24
25,401.24
122,364.05
0.00
22,861.12
22,861.12
23,249.17
0.00
4,343.61
4,343.61
145,613.22
0.00
27,204.73
27,204.73
0.900
22,088.03
19.00%
AVANCE
0.00%
18.68%
18.68%
COSTO
0.00
0.00
0.00
0.00
488.70
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,008.97
100.00
673.62
100.00
711.23
100.00
0.00
0.00
0.00
0.00
1,460.12
100.00
1,362.21
100.00
2,315.37
100.00
3,240.85
88.55
2,565.95
84.98
0.00
0.00
3,354.31
100.00
3,152.32
100.00
6,140.06
100.00
549.93
100.00
558.09
100.00
871.24
100.00
625.45
100.00
1,951.70
100.00
494.16
100.00
415.08
100.00
12,105.36
100.00
2,553.48
100.00
357.08
100.00
4,017.22
100.00
2,003.10
100.00
2,165.36
100.00
1,332.78
100.00
706.22
100.00
2,144.03
100.00
7,140.85
100.00
1,376.70
100.00
2,770.09
100.00
3,455.08
100.00
1,271.40
100.00
241.80
100.00
960.70
100.00
5,224.22
100.00
810.74
100.00
151.79
100.00
2,855.50
100.00
500.00
100.00
832.88
100.00
536.40
100.00
237.28
100.00
20.16
100.00
33.97
100.00
235.27
100.00
203.70
100.00
38.58
100.00
91.66
100.00
178.74
100.00
151.24
100.00
45.48
100.00
14.26
100.00
21.14
100.00
13.94
100.00
21.64
100.00
32.31
100.00
42.44
100.00
37.60
100.00
20.16
100.00
309.21
100.00
831.59
100.00
87.02
100.00
50.38
100.00
42.08
100.00
1,036.80
100.00
487.80
100.00
268.45
100.00
565.20
100.00
162.40
100.00
325.00
100.00
87.50
100.00
35.96
100.00
582.36
100.00
374.64
100.00
96,138.10
1,317.09
6,373.96
6,729.67
110,558.82
99,502.94
18,905.56
118,408.50
81.32%
VALORIZACION N 01
(LIQUIDACION FINAL)
PROYECTO
CONTRATO DE OBRA
: N 143-ALC-MDN 2008
OBRA
VALOR REFERENCIAL
: S/. 974,627.98
ENTIDAD
VALOR OFERTADO
: S/. 877,165.19
PLAZO DE EJECUCION
FECHA PRESUPUESTO
: ABRIL DE 2008
UBICACIN
DESCRIPCION
PARTIDA N
UND.
METRADO
COSTO
UNITARIO
COSTO
PARCIAL
SALDOS
AVANCES
ANTERIOR
METRADO
01.00.00
01.01.00
01.02.00
OBRAS PRELIMINARES
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
MOVIMIENTO DE TIERRAS
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
CONCRETO SIMPLE
04.00.00
04.01.00
04.01.01
04.01.02
CONCRETO ARMADO
04.02.00
04.02.01
04.02.02
04.02.03
COLUMNAS
04.03.00
04.03.01
04.03.02
04.03.03
VIGAS
05.00.00
05.01.00
05.01.01
06.00.00
06.01.00
06.02.00
06.03.00
06.04.00
07.00.00
07.01.00
PISOS Y PAVIMENTOS
ACTUAL
COSTO
METRADO
ACUMULADO
COSTO
METRADO
COSTO
METRADO
M2
M2
242.95
242.95
0.36
0.74
87.46
179.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
242.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
242.95
M2
M3
M3
M3
97.18
53.65
17.60
89.06
2.54
13.73
12.01
10.27
246.84
736.61
211.38
914.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
97.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
53.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
89.06
M3
M2
M2
M3
M2
41.62
75.00
544.38
21.46
332.28
108.40
26.08
16.42
138.32
18.26
4,511.61
1,956.00
8,938.72
2,968.35
6,067.43
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
41.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
544.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
332.28
M3
KG
30.00
803.40
233.55
3.96
7,006.50
3,181.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
803.40
M3
M2
KG
17.34
206.25
1,864.76
290.92
24.23
3.96
5,044.55
4,997.44
7,384.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
206.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,864.76
M3
M2
KG
10.63
62.50
813.75
290.92
24.23
3.96
3,092.48
1,514.38
3,222.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
62.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
813.75
M2
289.08
29.03
8,391.99
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
289.08
M2
M2
M2
M
753.19
123.75
168.75
27.16
11.20
15.67
18.46
7.89
8,435.73
1,939.16
3,115.13
214.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
753.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
123.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
168.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.16
ZAPATAS
CONCRETO EN ZAPATAS F C=175KG/CM2
ACERO Fy =4200Kg/cm2
CONCRETO FC=210KG/CM2
ENCONFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
CONCRETO FC=210KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
CONTRAPISOS
07.01.01
CONTRAPISO DE 38 MM.
07.02.00
07.02.01
VEREDAS DE CONCRETO
07.03.00
07.03.01
SARDINELES
08.00.00
08.01.00
ZOCALOS Y CONTRAZOCALOS
09.00.00
09.01.00
09.02.00
CARPINTERIA METALICA
10.00.00
10.01.00
10.02.00
CERRAJERIA
11.00.00
11.01.00
PINTURA
12.00.00
12.01.00
12.02.00
JARDINERIA
13.00.00
13.01.00
VARIOS
VEREDA F C=140 KG/CM2 E=8.5 CM. + ACABADO COLOREADO Y BRUADO 1:2 (1.5cm.) E= 4"
M2
544.38
11.70
6,369.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
544.38
M2
462.79
74.70
34,570.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
462.79
M3
7.99
176.00
1,406.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.99
105.12
10.17
1,069.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
105.12
M2
M
25.38
102.96
126.05
67.22
3,199.15
6,920.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
102.96
6.00
3.00
9.30
73.90
55.80
221.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
1,052.48
4.42
4,651.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,052.48
UND
M2
50.00
999.60
17.26
2.40
863.00
2,399.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
999.60
GLB
1.00
500.00
500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
PZA
PZA
M2
146,585.43
0.00
0.00
0.00
1.37%
2,008.22
0.00
0.00
0.00
6.63%
9,718.61
0.00
0.00
0.00
UTILIDAD
7.00%
10,260.98
0.00
0.00
0.00
168,573.24
0.00
0.00
0.00
151,715.92
0.00
0.00
0.00
28,826.02
0.00
0.00
0.00
180,541.94
0.00
0.00
0.00
0.00%
0.00%
0.00%
MONTO VALORIZADO
FACTOR DE RELACION
0.900
19.00%
MDN 2008
TURALES
COSTO
87.46
100.00
179.78
100.00
246.84
100.00
736.61
100.00
211.38
100.00
914.65
100.00
4,511.61
100.00
1,956.00
100.00
8,938.72
100.00
2,968.35
100.00
6,067.43
100.00
7,006.50
100.00
3,181.46
100.00
5,044.55
100.00
4,997.44
100.00
7,384.45
100.00
3,092.48
100.00
1,514.38
100.00
3,222.45
100.00
8,391.99
100.00
8,435.73
100.00
1,939.16
100.00
3,115.13
100.00
214.29
100.00
6,369.25
100.00
34,570.41
100.00
1,406.24
100.00
1,069.07
100.00
3,199.15
100.00
6,920.97
100.00
55.80
100.00
221.70
100.00
4,651.96
100.00
863.00
100.00
2,399.04
100.00
500.00
100.00
146,585.43
2,008.22
9,718.61
10,260.98
168,573.24
151,715.92
28,826.02
180,541.94
100.00%
VALORIZACION N 01
(LIQUIDACION FINAL)
PROYECTO
CONTRATO DE OBRA
: N 143-ALC-MDN 2008
OBRA
VALOR REFERENCIAL
: S/. 974,627.98
ENTIDAD
VALOR OFERTADO
: S/. 877,165.19
PLAZO DE EJECUCION
FECHA PRESUPUESTO
: ABRIL DE 2008
UBICACIN
PARTIDA N
DESCRIPCION
UND. METRADO
COSTO
UNITARIO
COSTO
PARCIAL
SALDOS
AVANCES
ANTERIOR
METRADO
01.00.00
01.01.00
OBRAS PRELIMINARES
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
02.05.00
MOVIMIENTO DE TIERRAS
03.00.00
03.01.00
03.02.00
03.03.00
CONCRETO SIMPLE
04.00.00
04.01.00
04.02.00
EQUIPAMIENTO Y ACCESORIOS
05.00.00
05.01.00
PINTURA
06.00.00
06.01.00
FLETE
FLETE
ACTUAL
COSTO
METRADO
ACUMULADO
COSTO
METRADO
COSTO
METRADO
COSTO
M2
720.00
0.74
532.80
0.00
0.00
0.00
720.00
532.80
100.00
720.00
532.80
100.00
0.00
0.00
M3
M3
M2
M2
M3
144.00
6.72
720.00
720.00
195.94
13.73
12.01
2.48
4.33
10.27
1,977.12
80.71
1,785.60
3,117.60
2,012.30
0.00
0.00
0.00
144.00
1,977.12
100.00
144.00
1,977.12
100.00
0.00
0.00
0.00
0.00
0.00
6.72
80.71
100.00
6.72
80.71
100.00
0.00
0.00
0.00
0.00
0.00
720.00
1,785.60
100.00
720.00
1,785.60
100.00
0.00
0.00
0.00
0.00
0.00
720.00
3,117.60
100.00
720.00
3,117.60
100.00
0.00
0.00
0.00
0.00
0.00
195.94
2,012.30
100.00
195.94
2,012.30
100.00
0.00
0.00
M3
M2
M
76.48
54.40
208.00
250.45 19,154.42
24.23 1,318.11
10.32 2,146.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
76.48
19,154.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
54.40
1,318.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
208.00
2,146.56
UND
GLB
2.00
1.00
1,800.00
360.00
3,600.00
360.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
3,600.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
360.00
GLB
1.00
370.55
370.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
370.55
GLB
1.00
1,000.00
1,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1,000.00
37,455.77
0.00
9,506.13
9,506.13
1.37%
513.14
0.00
130.23
130.23
382.91
6.63%
2,483.32
0.00
630.26
630.26
1,853.06
UTILIDAD
7.00%
MONTO VALORIZADO
FACTOR DE RELACION
2,621.90
0.00
665.43
665.43
1,956.47
43,074.13
0.00
10,932.05
10,932.05
32,142.08
38,766.72
0.00
9,838.85
9,838.85
28,927.87
7,365.68
0.00
1,869.38
1,869.38
5,496.30
46,132.40
0.00
11,708.23
11,708.23
34,424.17
0.00%
25.38%
25.38%
74.62%
0.900
27,949.64
19.00%
%
0.00
0.00
0.00
0.00
0.00
0.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
VALORIZACION N 02
(LIQUIDACION FINAL)
PROYECTO
CONTRATO DE OBRA
: N 143-ALC-MDN 2008
OBRA
VALOR REFERENCIAL
: S/. 974,627.98
ENTIDAD
VALOR OFERTADO
: S/. 877,165.19
PLAZO DE EJECUCION
FECHA PRESUPUESTO
: ABRIL DE 2008
UBICACIN
UND.
PARTIDA N
COSTO
METRADO
UNITARIO
COSTO
PARCIAL
SALDOS
AVANCES
ANTERIOR
METRADO
01.00.00
01.01.00
01.02.00
01.03.00
OBRAS PROVICIONALES
02.00.00
07.01.00
07.02.00
OBRAS PRELIMINARES
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
MOVIMIENTO DE TIERRAS
04.00.00
04.01.00
04.02.00
04.03.00
04.04.00
04.05.00
CONCRETO SIMPLE
05.00.00
05.01.00
05.02.01
05.01.02
CONCRETO ARMADO
05.02.00
05.02.01
05.02.02
05.02.03
VIGAS DE CIMENTACION
05.03.00
05.03.01
05.03.02
05.03.03
COLUMNAS
05.04.00
05.04.01
05.04.02
05.02.03
VIGAS
05.05.00
05.05.01
05.05.02
05,05,03
LOSAS ALIGERADAS
CARTEL DE OBRA
ALMACEN DE OBRA
CERCO PROVICIONAL
UND
MES
M
1.00
4.00
54.00
800.00
200.00
54.34
800.00
800.00
2,934.36
M2
M2
875.43
875.43
0.36
0.74
315.15
647.82
M2
M3
M3
M3
875.43
142.10
33.73
219.79
2.54
13.73
12.01
10.27
2,223.59
1,951.03
405.10
2,257.24
M3
M2
M2
M3
M2
13.72
98.00
809.17
18.83
165.67
108.40
26.08
16.42
138.32
18.26
1,487.25
2,555.84
13,286.57
2,604.57
3,025.13
M3
KG
39.20
855.89
233.55
3.96
9,155.16
3,389.32
M3
M2
KG
24.09
192.71
3,337.50
250.45
24.23
3.96
6,033.34
4,669.36
13,216.50
M3
M2
KG
18.52
198.36
2,488.20
290.92
24.23
3.96
5,387.84
4,806.26
9,853.27
M3
M2
KG
42.70
430.94
6,369.43
290.92
24.23
3.96
M3
M2
KG
46.46
545.35
3,058.33
260.63
18.31
4.11
ACTUAL
COSTO
METRADO
ACUMULADO
COSTO
METRADO
COSTO
METRADO
1.00
800.00
100.00
0.00
0.00
0.00
1.00
800.00
100.00
0.00
4.00
800.00
100.00
0.00
0.00
0.00
4.00
800.00
100.00
0.00
54.00
2,934.36
100.00
0.00
0.00
0.00
54.00
2,934.36
100.00
0.00
875.43
315.15
100.00
0.00
0.00
0.00
875.43
315.15
100.00
0.00
875.43
647.82
100.00
0.00
0.00
0.00
875.43
647.82
100.00
0.00
2,223.59 100.00
0.00
0.00
0.00
875.43
875.43
2,223.59
100.00
0.00
142.10
1,951.03
100.00
0.00
0.00
0.00
142.10
1,951.03
100.00
0.00
33.73
405.10
100.00
0.00
0.00
0.00
33.73
405.10
100.00
0.00
219.79
2,257.24
100.00
0.00
0.00
0.00
219.79
2,257.24
100.00
0.00
1,487.25 100.00
0.00
0.00
0.00
13.72
98.00
2,555.84
100.00
0.00
13.72
1,487.25
100.00
0.00
0.00
98.00
2,555.84
100.00
0.00
0.00
0.00
0.00
809.17
13,286.57 100.00
809.17
13,286.57
100.00
0.00
0.00
0.00
0.00
18.83
2,604.57 100.00
18.83
2,604.57
100.00
0.00
0.00
0.00
0.00
165.67
3,025.13 100.00
165.67
3,025.13
100.00
0.00
0.00
ZAPATAS
CONCRETO EN ZAPATAS F C=175KG/CM2
ACERO Fy =4200Kg/cm2
CONCRETO FC =175KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
CONCRETO FC=210KG/CM2
ENCONFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
CONCRETO FC=210KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
39.20
9,155.16
100.00
0.00
0.00
0.00
39.20
9,155.16
100.00
0.00
855.89
3,389.32
100.00
0.00
0.00
0.00
855.89
3,389.32
100.00
0.00
0.00
0.00
0.00
24.09
6,033.34 100.00
24.09
6,033.34
100.00
0.00
0.00
0.00
0.00
192.71
4,669.36 100.00
192.71
4,669.36
100.00
0.00
0.00
0.00
0.00
3,337.50
13,216.50 100.00
3,337.50
13,216.50
100.00
0.00
4.34
1,262.59
23.43
14.18
4,125.25
76.57
18.52
5,387.84
100.00
0.00
59.62
1,444.59
30.06
138.74
3,361.67
69.94
198.36
4,806.26
100.00
0.00
2,488.20
9,853.27
100.00
0.00
0.00
0.00
2,488.20
9,853.27
100.00
0.00
12,422.28
10,441.68
25,222.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
42.70
0.00
0.00
0.00
44.25
1,072.18
10.27
44.25
1,072.18
10.27
386.69
0.00
0.00
0.00
4,500.00
17,820.00
70.65
4,500.00
17,820.00
70.65
1,869.43
12,108.87
9,985.36
12,569.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
46.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
545.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,058.33
05.05.04
05.06.00
05.06.01
05.06.02
05.06.03
ESCALERAS
05.07.00
05.07.01
05.07.02
05.07.03
LAVADERO Y URINARIOS
06.00.00
06.01.00
06.01.01
06.01.02
07.00.00
07.01.00
07.02.00
07.03.00
07.04.00
07.05.00
08.00.00
08.01.00
CIELORRASOS
09.00.00
09.01.00
09.01.01
PISOS Y PAVIMENTOS
09.02.00
09.02.01
PISOS
09.03.00
09.03.01
09.03.02
VEREDAS DE CONCRETO
09.04.00
09.04.01
SARDINELES
10.00.00
10.01.00
10.01.01
ZOCALOS Y CONTRAZOCALOS
10.02.00
10.02.01
CONCRETO FC=175KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
UND
4,908.17
2.28
11,190.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
KG
7.91
46.88
634.53
267.68
33.26
4.07
2,117.35
1,559.23
2,582.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
46.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
634.53
M3
M2
KG
1.75
11.05
75.62
250.45
24.23
3.96
438.29
267.74
299.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75.62
M2
M2
630.51
169.65
29.03
29.03
18,303.71
4,924.94
0.00
0.00
0.00
568.59
16,506.17
90.18
568.59
16,506.17
90.18
61.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
169.65
M2
M2
M2
M2
M
120.31
1,600.32
133.11
263.62
317.96
8.99
11.20
15.67
18.46
7.89
1,081.59
17,923.58
2,085.83
4,866.43
2,508.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,600.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
133.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
263.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
317.96
M2
545.35
23.17
12,635.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
545.35
M2
1,517.26
11.70
17,751.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,517.26
M2
708.09
37.19
26,333.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
708.09
M2
M
101.08
33.58
74.70
10.32
7,550.68
346.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
101.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
33.58
M3
4.24
176.00
746.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.24
M2
120.31
34.66
4,169.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120.31
436.40
19.73
8,610.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
436.40
M2
UND
M2
60.13
3.00
147.25
142.89
217.79
60.00
8,591.98
653.37
8,835.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
147.25
PZA
PZA
70.00
35.00
9.30
73.90
651.00
2,586.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
35.00
4,908.17
CONTRAPISOS
CONTRAPISO DE 38 MM.
VEREDA F C=140 KG/CM2 E=8.5 CM. + ACABADO COLOREADO Y BRUADO 1:2 (1.5cm.) E= 4"
JUNTAS DE DILATACION EN VEREDAS E= 1" Y FALSO PISO
ZOCALOS
ZOCALO DE LOZETA DE 0.30X0.30M. EN SS.HH. H=1.20m.
CONTRAZOCALOS
CONTRAZOCALO DE LOZETA CERAMICO DE 10X30 CM.
11.00.00
11.01.00
11.02.00
11.03.00
CARPINTERIA DE MADERA
12.00.00
12.01.00
12.02.00
CERRAJERIA
13.00.00
13.01.00
13.02.00
14.00.00
14.01.00
14.02.00
PINTURA
15.00.00
15.01.00
VARIOS
16.00.00
16.00.00
16.00.00
16.00.00
17.00.00
17.01.00
17.02.00
17.03.00
17.05.01
17.05.02
17.05.03
17.06.01
17.06.02
17.06.03
17.06.04
17.06.05
17.06.06
17.06.07
17.06.08
17.07.01
17.07.02
17.07.03
17.08.01
INSTALACIONES SANITARIAS
18.00.00
18.01.00
18.02.01
18.02.02
18.03.01
18.03.02
18.03.03
18.03.04
18.03.05
18.03.06
18.04.01
18.04.02
18.05.01
INSTALACIONES DE AGUA
19.00.00
19.01.00
19.02.00
19.03.00
19.04.00
INSTALACIONES ELECTRICAS
20.00.00
20.01.00
P2
P2
900.66
77.00
22.41
30.71
20,183.79
2,364.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
900.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
77.00
M2
M2
545.35
2,556.99
4.98
4.42
2,715.84
11,301.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
545.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,556.99
GLB
1.00
500.00
500.00
0.00
0.00
0.00
0.40
200.00
40.00
0.40
200.00
40.00
0.60
UND
UND
UND
19.00
3.00
6.00
208.22
178.80
10.08
3,956.18
536.40
60.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
PTO
PTO
PTO
M
M
M
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
UND
PZA
UND
PZA
4.00
14.00
20.00
16.51
20.25
103.98
27.00
5.00
8.00
1.00
8.00
2.00
10.00
12.00
11.00
4.00
20.00
6.00
33.97
33.61
40.74
10.37
10.05
12.85
7.96
11.37
11.37
7.13
10.57
6.97
10.82
10.77
21.22
18.80
5.04
110.40
135.88
470.54
814.80
171.21
203.51
1,336.14
214.92
56.85
90.96
7.13
84.56
13.94
108.20
129.24
233.42
75.20
100.80
662.40
0.00
0.00
0.00
4.00
135.88 100.00
4.00
135.88
100.00
0.00
0.00
0.00
0.00
14.00
470.54 100.00
14.00
470.54
100.00
0.00
0.00
0.00
0.00
20.00
814.80 100.00
20.00
814.80
100.00
0.00
0.00
0.00
0.00
16.51
171.21 100.00
16.51
171.21
100.00
0.00
0.00
0.00
0.00
20.25
203.51 100.00
20.25
203.51
100.00
0.00
0.00
0.00
0.00
30.00
385.50
28.85
30.00
385.50
28.85
73.98
0.00
0.00
0.00
27.00
214.92 100.00
27.00
214.92
100.00
0.00
0.00
0.00
0.00
5.00
56.85 100.00
5.00
56.85
100.00
0.00
0.00
0.00
0.00
8.00
90.96 100.00
8.00
90.96
100.00
0.00
0.00
0.00
0.00
1.00
7.13 100.00
1.00
7.13
100.00
0.00
0.00
0.00
0.00
8.00
84.56 100.00
8.00
84.56
100.00
0.00
0.00
0.00
0.00
2.00
13.94 100.00
2.00
13.94
100.00
0.00
0.00
0.00
0.00
10.00
108.20 100.00
10.00
108.20
100.00
0.00
0.00
0.00
0.00
12.00
129.24 100.00
12.00
129.24
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.00
0.00
0.00
0.00
0.00
0.00
PTO
M
M
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
32.00
66.78
61.45
10.00
3.00
34.00
4.00
23.00
6.00
10.00
4.00
1.00
28.11
5.33
24.16
4.58
4.58
4.58
4.58
4.58
4.58
30.41
21.04
23.60
899.52
355.94
1,484.63
45.80
13.74
155.72
18.32
105.34
27.48
304.10
84.16
23.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PTO
PTO
PTO
PTO
75.00
1.00
54.00
24.00
43.28
40.73
38.43
38.43
611.00
4.71
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
100.80 100.00
20.00
100.80
100.00
0.00
0.00
0.00
0.00
0.00
6.00
0.00
0.00
0.00
0.00
0.00
32.00
0.00
0.00
0.00
0.00
0.00
66.78
0.00
0.00
0.00
0.00
0.00
0.00
61.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
34.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
23.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
3,246.00
40.73
2,075.22
922.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
54.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.00
2,877.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
611.00
21.00.00
21.01.00
21.02.00
21.03.00
22.00.00
22.01.00
TABLEROS Y CUCHILLAS
23.00.00
23.01.00
23.02.00
24.00.00
24.01.00
ARTEFACTOS ELECTRICOS
TABLERO DE DISTRIBUCION
M
M
M
100.00
852.00
370.00
2.38
1.36
1.31
238.00
1,158.72
484.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
852.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
370.00
PZA
2.00
35.96
71.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
UND
GLB
1.00
1.00
507.52
436.64
507.52
436.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
UND
75.00
48.59
3,644.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75.00
409,919.73
37,771.47
92,619.62
130,391.09
1.37%
5,615.90
517.47
1,268.89
1,786.36
6.63%
27,177.68
2,504.25
6,140.68
8,644.93
UTILIDAD
7.00%
28,694.38
2,644.00
6,483.37
9,127.38
471,407.69
43,437.19
106,512.56
149,949.76
424,266.92
39,093.47
95,861.30
134,954.78
80,610.71
7,427.76
18,213.65
25,641.41
504,877.63
46,521.23
114,074.95
160,596.19
9.21%
22.59%
31.81%
MONTO VALORIZADO
FACTOR DE RELACION
0.900
19.00%
DN 2008
TURALES
COSTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12,422.28
100.00
9,369.50
89.73
7,402.94
29.35
12,108.87
100.00
9,985.36
100.00
12,569.74
100.00
11,190.63
100.00
2,117.35
100.00
1,559.23
100.00
2,582.54
100.00
438.29
100.00
267.74
100.00
299.46
100.00
1,797.54
9.82
4,924.94
100.00
1,081.59
100.00
17,923.58
100.00
2,085.83
100.00
4,866.43
100.00
2,508.70
100.00
12,635.76
100.00
17,751.94
100.00
26,333.87
100.00
7,550.68
100.00
346.55
100.00
746.24
100.00
4,169.94
100.00
8,610.17
100.00
8,591.98
100.00
653.37
100.00
8,835.00
100.00
651.00
100.00
2,586.50
100.00
20,183.79
100.00
2,364.67
100.00
2,715.84
100.00
11,301.90
100.00
300.00
60.00
3,956.18
100.00
536.40
100.00
60.48
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
950.64
71.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
233.42
100.00
75.20
100.00
0.00
0.00
662.40
100.00
899.52
100.00
355.94
100.00
1,484.63
100.00
45.80
100.00
13.74
100.00
155.72
100.00
18.32
100.00
105.34
100.00
27.48
100.00
304.10
100.00
84.16
100.00
23.60
100.00
3,246.00
100.00
40.73
100.00
2,075.22
100.00
922.32
100.00
2,877.81
100.00
238.00
100.00
1,158.72
100.00
484.70
100.00
71.92
100.00
507.52
100.00
436.64
100.00
3,644.25
100.00
279,528.64
3,829.54
18,532.75
19,567.00
321,457.93
289,312.14
54,969.31
344,281.45
68.19%
VALORIZACION N 02
(LIQUIDACION FINAL)
PROYECTO
CONTRATO DE OBRA
: N 143-ALC-MDN 2008
OBRA
30.2535597
VALOR REFERENCIAL
: S/. 974,627.98
ENTIDAD
VALOR OFERTADO
: S/. 877,165.19
PLAZO DE EJECUCION
FECHA PRESUPUESTO
: ABRIL DE 2008
UBICACIN
PARTIDA N
DESCRIPCION
UND. METRADO
COSTO
UNITARIO
COSTO
PARCIAL
SALDOS
AVANCES
ANTERIOR
METRADO
01.00.00
01.01.00
01.02.00
OBRAS PRELIMINARES
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
MOVIMIENTO DE TIERRAS
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
CONCRETO SIMPLE
04.00.00
04.01.00
04.01.01
04.01.02
CONCRETO ARMADO
04.02.00
04.02.01
04.02.02
04.02.03
VIGAS DE CIMENTACION
04.03.00
04.03.01
04.03.02
04.03.03
COLUMNAS
04.04.00
04.04.01
04.04.02
04.04.03
VIGAS
04.05.00
04.05.01
04.05.02
04.05.03
04.05.04
LOSAS ALIGERADAS
M2
M2
192.40
192.40
0.36
0.74
69.26
142.38
192.40
58.24
6.22
80.58
2.54
13.73
12.01
10.27
488.70
799.64
74.70
827.56
M3
M2
M2
M3
M2
4.88
33.28
183.25
4.87
38.95
108.40
26.08
16.42
138.32
18.26
528.99
867.94
3,008.97
673.62
711.23
M3
KG
41.39
289.44
233.55
3.96
9,666.63
1,146.18
M3
M2
KG
5.83
56.22
584.69
250.45
24.23
3.96
1,460.13
1,362.21
2,315.37
M3
M2
KG
12.58
124.62
1,790.97
290.92
24.23
3.96
3,659.77
3,019.55
7,092.24
M3
M2
KG
11.53
130.10
1,550.52
290.92
24.23
3.96
2.11
30.48
211.98
274.32
260.63
18.31
4.11
2.28
M2
M3
EXCAVACION PARA CIMIENTOS, VIGA DE CIMENTACION H=1.00m TERRENO NATURAL
M3
ELIMINACION DE MATERIAL EXEDENTE CON VOLQUETE
M3
NIVELACION Y APIZONADO INTERIOR E=0.20 CON EQUIPO
EXCAVACION DE ZANJA PARA ZAPATAS H=1.90 m
ACTUAL
COSTO
METRADO
ACUMULADO
COSTO
METRADO
COSTO
METRADO
COSTO
192.40
69.26
100.00
0.00
0.00
0.00
192.40
69.26
100.00
0.00
0.00
192.40
142.38
100.00
0.00
0.00
0.00
192.40
142.38
100.00
0.00
0.00
0.00
0.00
0.00
192.40
488.70
100.00
192.40
488.70
100.00
0.00
0.00
58.24
799.64
100.00
0.00
0.00
0.00
58.24
799.64
100.00
0.00
0.00
6.22
74.70
100.00
0.00
0.00
0.00
6.22
74.70
100.00
0.00
0.00
80.58
827.56
100.00
0.00
0.00
0.00
80.58
827.56
100.00
0.00
0.00
4.88
528.99
100.00
0.00
0.00
0.00
4.88
528.99
100.00
0.00
0.00
33.28
867.94
100.00
0.00
0.00
0.00
33.28
867.94
100.00
0.00
0.00
0.00
0.00
0.00
183.25
3,008.97
100.00
183.25
3,008.97
100.00
0.00
0.00
0.00
0.00
0.00
1.09
150.77
22.38
1.09
150.77
22.38
3.78
522.85
0.00
0.00
0.00
8.70
158.80
22.33
8.70
158.80
22.33
30.25
552.43
ZAPATAS
CONCRETO EN ZAPATAS F C=175KG/CM2
ACERO Fy =4200Kg/cm2
CONCRETO FC =175KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
CONCRETO FC=210KG/CM2
ENCONFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
CONCRETO FC=210KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
M3
M2
KG
UND
41.39
9,666.63
100.00
0.00
0.00
0.00
41.39
9,666.63
100.00
0.00
0.00
289.44
1,146.18
100.00
0.00
0.00
0.00
289.44
1,146.18
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.83
1,460.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
56.22
1,362.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
584.69
2,315.37
1.44
418.92
11.45
11.14
3,240.85
88.55
12.58
3,659.77
100.00
0.00
0.00
18.72
453.59
15.02
105.90
2,565.96
84.98
124.62
3,019.55
100.00
0.00
0.00
1,790.97
7,092.24
100.00
0.00
0.00
0.00
1,790.97
7,092.24
100.00
0.00
0.00
3,354.31
3,152.32
6,140.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.53
3,354.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
130.10
3,152.32
0.00
0.00
0.00
1,242.60
4,920.70
80.14
1,242.60
4,920.70
80.14
307.92
1,219.36
549.93
558.09
871.24
625.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.11
549.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.48
558.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
211.98
871.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
274.32
625.45
05.00.00
05.01.00
05.01.01
05.01.02
05.01.03
05.02.00
05.02.01
COBERTURAS
06.00.00
06.01.00
06.01.01
07.00.00
07.01.00
07.02.00
07.03.00
07.04.00
07.05.00
08.00.00
08.01.00
CIELORRASOS
09.00.00
09.01.00
09.01.01
PISOS Y PAVIMENTOS
09.02.00
09.02.01
PISOS
10.00.00
10.01.00
10.01.01
ZOCALOS Y CONTRAZOCALOS
10.02.00
10.02.01
ESTRUCTURAS
TIJERAL METALICO N 1
VIGUETAS DE FIERRO CORRUGADO
CORREAS METALICAS
UND
M
UND
5.00
8.00
12.00
390.34
61.77
34.59
1,951.70
494.16
415.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.00
1,951.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
494.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
415.08
M2
204.00
59.34
12,105.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
204.00
12,105.36
M2
87.96
29.03
2,553.48
0.00
0.00
0.00
87.96
2,553.48
100.00
87.96
2,553.48
100.00
0.00
0.00
M2
M2
M2
M2
M
39.72
358.68
127.83
117.30
168.92
8.99
11.20
15.67
18.46
7.89
357.08
4,017.22
2,003.10
2,165.36
1,332.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39.72
357.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
358.68
4,017.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
127.83
2,003.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
117.30
2,165.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
168.92
1,332.78
M2
30.48
23.17
706.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.48
706.22
M2
183.25
11.70
2,144.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
183.25
2,144.03
M2
192.01
37.19
7,140.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
192.01
7,140.85
M2
39.72
34.66
1,376.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39.72
1,376.70
140.40
19.73
2,770.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
140.40
2,770.09
M2
M2
24.18
21.19
142.89
60.00
3,455.08
1,271.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.18
3,455.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.19
1,271.40
PZA
PZA
26.00
13.00
9.30
73.90
241.80
960.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
26.00
241.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13.00
960.70
P2
P2
233.12
26.40
22.41
30.71
5,224.22
810.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
233.12
5,224.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
26.40
810.74
M2
M2
30.48
646.04
4.98
4.42
151.79
2,855.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.48
151.79
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
646.04
2,855.50
1.00
500.00
500.00
0.00
0.00
0.00
0.40
200.00
40.00
0.40
200.00
40.00
0.60
300.00
CONTRAPISOS
CONTRAPISO DE 38 MM.
ZOCALOS
ZOCALO DE LOSETA DE 0.30X0.30M. EN SS.HH. H=1.20m.
CONTRAZOCALOS
CONTRAZOCALO DE LOSETA CERAMICO DE 10X30 CM.
11.00.00
11.01.00
11.02.00
CARPINTERIA DE MADERA
12.00.00
12.01.00
12.02.00
CERRAJERIA
13.00.00
13.01.00
13.02.00
14.00.00
14.01.00
14.02.00
PINTURA
15.00.00
15.01.00
VARIOS
16.00.00
GLB
16.01.01
16.02.01
16.02.02
16.02.03
17.00.00
17.01.00
17.02.00
17.03.00
17.05.01
17.05.02
17.05.03
17.06.01
17.06.03
17.06.04
17.06.05
17.06.06
17.06.07
17.06.08
17.07.01
17.07.02
17.07.03
INSTALACIONES SANITARIAS
18.00.00
18.01.00
18.02.02
18.03.03
18.03.05
18.04.02
INSTALACIONES DE AGUA
19.00.00
19.00.01
19.00.02
19.00.03
INSTALACIONES ELECTRICAS
19.01.00
19.01.01
19.02.00
19.02.01
19.02.02
19.02.03
19.03.00
19.03.01
TABLEROS Y CUCHILLAS
19.04.00
19.04.01
19.04.02
ARTEFACTOS ELECTRICOS
TABLERO DE DISTRIBUCION
UND
UND
PZA
UND
4.00
3.00
2.00
2.00
208.22
178.80
118.64
10.08
832.88
536.40
237.28
20.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
832.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
536.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
237.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
20.16
PTO
PTO
PTO
M
M
M
PZA
PZA
PZA
PZA
PZA
PZA
PZA
UND
PZA
UND
1.00
7.00
5.00
3.72
9.12
13.91
19.00
4.00
2.00
2.00
2.00
2.00
3.00
2.00
2.00
4.00
33.97
33.61
40.74
10.37
10.05
12.85
7.96
11.37
7.13
10.57
6.97
10.82
10.77
21.22
18.80
5.04
33.97
235.27
203.70
38.58
91.66
178.74
151.24
45.48
14.26
21.14
13.94
21.64
32.31
42.44
37.60
20.16
0.00
0.00
0.00
1.00
33.97
100.00
1.00
33.97
100.00
0.00
0.00
0.00
0.00
0.00
7.00
235.27
100.00
7.00
235.27
100.00
0.00
0.00
0.00
0.00
0.00
5.00
203.70
100.00
5.00
203.70
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.72
38.58
0.00
0.00
0.00
9.12
91.66
100.00
9.12
91.66
100.00
0.00
0.00
0.00
0.00
0.00
6.00
77.10
43.14
6.00
77.10
43.14
7.91
101.64
0.00
0.00
0.00
19.00
151.24
100.00
19.00
151.24
100.00
0.00
0.00
0.00
0.00
0.00
4.00
45.48
100.00
4.00
45.48
100.00
0.00
0.00
0.00
0.00
0.00
2.00
14.26
100.00
2.00
14.26
100.00
0.00
0.00
0.00
0.00
0.00
2.00
21.14
100.00
2.00
21.14
100.00
0.00
0.00
0.00
0.00
0.00
2.00
13.94
100.00
2.00
13.94
100.00
0.00
0.00
0.00
0.00
0.00
2.00
21.64
100.00
2.00
21.64
100.00
0.00
0.00
0.00
0.00
0.00
3.00
32.31
100.00
3.00
32.31
100.00
0.00
0.00
0.00
0.00
0.00
2.00
42.44
100.00
2.00
42.44
100.00
0.00
0.00
0.00
0.00
0.00
2.00
37.60
100.00
2.00
37.60
100.00
0.00
0.00
0.00
0.00
0.00
4.00
20.16
100.00
4.00
20.16
100.00
0.00
0.00
PTO
M
PZA
PZA
PZA
11.00
34.42
19.00
11.00
2.00
28.11
24.16
4.58
4.58
21.04
309.21
831.59
87.02
50.38
42.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.00
309.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
34.42
831.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.00
87.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.00
50.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
42.08
PTO
PTO
PTO
24.00
12.00
7.00
43.20
40.65
38.35
1,036.80
487.80
268.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.00
1,036.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
487.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
268.45
120.00
4.71
565.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120.00
565.20
M
M
M
70.00
250.00
70.00
2.32
1.30
1.25
162.40
325.00
87.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70.00
162.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
250.00
325.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70.00
87.50
PZA
1.00
35.96
35.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
35.96
UND
UND
12.00
12.00
48.53
31.22
582.36
374.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
582.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
374.64
118,226.15
22,088.03
18,330.14
40,418.17
77,807.98
1.37%
1,619.70
302.61
251.12
553.73
1,065.97
6.63%
7,838.39
1,464.44
1,215.29
2,679.72
5,158.67
UTILIDAD
7.00%
8,275.83
1,546.16
1,283.11
2,829.27
5,446.56
135,960.07
25,401.24
21,079.66
46,480.89
89,479.18
MONTO VALORIZADO
FACTOR DE RELACION
0.900
19.00%
122,364.06
22,861.12
18,971.69
41,832.80
80,531.26
23,249.17
4,343.61
3,604.62
7,948.23
15,300.94
145,613.23
27,204.73
22,576.31
49,781.03
95,832.20
18.68%
15.50%
34.19%
65.81%
%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
77.62
77.67
0.00
0.00
100.00
100.00
100.00
0.00
0.00
0.00
100.00
100.00
19.86
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
0.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
60.00
100.00
100.00
100.00
100.00
0.00
0.00
0.00
100.00
0.00
56.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
VALORIZACION N 02
(LIQUIDACION FINAL)
PROYECTO
CONTRATO DE OBRA
: N 143-ALC-MDN 2008
OBRA
VALOR REFERENCIAL
: S/. 974,627.98
ENTIDAD
VALOR OFERTADO
: S/. 877,165.19
CONTRATISTA
PLAZO DE EJECUCION
INSPECTOR
UBICACIN
FECHA PRESUPUESTO
: ABRIL DE 2008
PARTIDA N
DESCRIPCION
UND. METRADO
COSTO
UNITARIO
COSTO
PARCIAL
SALDOS
AVANCES
ANTERIOR
METRADO
01.00.00
01.01.00
01.02.00
OBRAS PRELIMINARES
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
MOVIMIENTO DE TIERRAS
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
CONCRETO SIMPLE
04.00.00
04.01.00
04.01.01
04.01.02
CONCRETO ARMADO
04.02.00
04.02.01
04.02.02
04.02.03
COLUMNAS
04.03.00
04.03.01
04.03.02
04.03.03
VIGAS
05.00.00
05.01.00
05.01.01
06.00.00
06.01.00
06.02.00
06.03.00
06.04.00
ACTUAL
COSTO
METRADO
ACUMULADO
COSTO
METRADO
COSTO
METRADO
M2
M2
242.95
242.95
0.36
0.74
87.46
179.78
0.00
0.00
0.00
242.95
87.46
100.00
242.95
87.46 100.00
0.00
0.00
0.00
0.00
242.95
179.78
100.00
242.95
179.78 100.00
0.00
M2
M3
M3
M3
97.18
53.65
17.60
89.06
2.54
13.73
12.01
10.27
246.84
736.61
211.38
914.65
0.00
0.00
0.00
97.18
246.84
100.00
97.18
246.84 100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17.60
211.38
100.00
17.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
89.06
M3
M2
M2
M3
M2
41.62
75.00
544.38
21.46
332.28
108.40
26.08
16.42
138.32
18.26
4,511.61
1,956.00
8,938.72
2,968.35
6,067.43
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
41.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
544.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
332.28
M3
KG
30.00
803.40
233.55
3.96
7,006.50
3,181.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
803.40
M3
M2
KG
17.34
206.25
1,864.76
290.92
24.23
3.96
5,044.55
4,997.44
7,384.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
206.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,864.76
M3
M2
KG
10.63
62.50
813.75
290.92
24.23
3.96
3,092.48
1,514.38
3,222.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
62.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
813.75
M2
289.08
29.03
8,391.99
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
289.08
M2
M2
M2
M
753.19
123.75
168.75
27.16
11.20
15.67
18.46
7.89
8,435.73
1,939.16
3,115.13
214.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
753.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
123.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
168.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.16
0.00
0.00
211.38 100.00
0.00
53.65
0.00
ZAPATAS
CONCRETO EN ZAPATAS F C=175KG/CM2
ACERO Fy =4200Kg/cm2
CONCRETO FC=210KG/CM2
ENCONFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
CONCRETO FC=210KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
07.00.00
07.01.00
07.01.01
PISOS Y PAVIMENTOS
07.02.00
07.02.01
VEREDAS DE CONCRETO
07.03.00
07.03.01
SARDINELES
08.00.00
08.01.00
ZOCALOS Y CONTRAZOCALOS
09.00.00
09.01.00
09.02.00
CARPINTERIA METALICA
10.00.00
10.01.00
10.02.00
CERRAJERIA
11.00.00
11.01.00
PINTURA
12.00.00
12.01.00
12.02.00
JARDINERIA
13.00.00
13.01.00
VARIOS
CONTRAPISOS
CONTRAPISO DE 38 MM.
VEREDA F C=140 KG/CM2 E=8.5 CM. + ACABADO COLOREADO Y BRUADO 1:2 (1.5cm.) E= 4"
M2
544.38
11.70
6,369.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
544.38
M2
462.79
74.70
34,570.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
462.79
M3
7.99
176.00
1,406.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.99
105.12
10.17
1,069.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
105.12
M2
M
25.38
102.96
126.05
67.22
3,199.15
6,920.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
102.96
6.00
3.00
9.30
73.90
55.80
221.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
1,052.48
4.42
4,651.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,052.48
UND
M2
50.00
999.60
17.26
2.40
863.00
2,399.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
999.60
GLB
1.00
500.00
500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
PZA
PZA
M2
146,585.43
0.00
725.46
1.37%
2,008.22
0.00
9.94
9.94
6.63%
9,718.61
0.00
48.10
48.10
UTILIDAD
7.00%
MONTO VALORIZADO
FACTOR DE RELACION
10,260.98
0.00
50.78
50.78
168,573.24
0.00
834.28
834.28
151,715.92
0.00
750.85
750.85
28,826.02
0.00
142.66
142.66
180,541.94
0.00
893.51
893.51
0.00%
0.49%
0.49%
0.900
725.46
19.00%
MDN 2008
TURALES
COSTO
0.00
0.00
0.00
0.00
0.00
0.00
736.61
100.00
0.00
0.00
914.65
100.00
4,511.61
100.00
1,956.00
100.00
8,938.72
100.00
2,968.35
100.00
6,067.43
100.00
7,006.50
100.00
3,181.46
100.00
5,044.55
100.00
4,997.44
100.00
7,384.45
100.00
3,092.48
100.00
1,514.38
100.00
3,222.45
100.00
8,391.99
100.00
8,435.73
100.00
1,939.16
100.00
3,115.13
100.00
214.29
100.00
6,369.25
100.00
34,570.41
100.00
1,406.24
100.00
1,069.07
100.00
3,199.15
100.00
6,920.97
100.00
55.80
100.00
221.70
100.00
4,651.96
100.00
863.00
100.00
2,399.04
100.00
500.00
100.00
145,859.97
1,998.28
9,670.52
10,210.20
167,738.97
150,965.07
28,683.36
179,648.43
99.51%
VALORIZACION N 02
(LIQUIDACION FINAL)
PROYECTO
CONTRATO DE OBRA
: N 143-ALC-MDN 2008
OBRA
VALOR REFERENCIAL
: S/. 974,627.98
ENTIDAD
VALOR OFERTADO
: S/. 877,165.19
PLAZO DE EJECUCION
FECHA PRESUPUESTO
: ABRIL DE 2008
UBICACIN
DESCRIPCION
PARTIDA N
UND. METRADO
COSTO
UNITARIO
COSTO
PARCIAL
SALDOS
AVANCES
ANTERIOR
METRADO
ACTUAL
COSTO
METRADO
ACUMULADO
COSTO
METRADO
COSTO
METRADO
M2
720.00
0.74
532.80
720.00
532.80
100.00
0.00
0.00
0.00
720.00
532.80
100.00
0.00
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
02.05.00
MOVIMIENTO DE TIERRAS
M3
M3
M2
M2
M3
144.00
6.72
720.00
720.00
195.94
13.73
12.01
2.48
4.33
10.27
1,977.12
80.71
1,785.60
3,117.60
2,012.30
144.00
1,977.12
100.00
0.00
0.00
0.00
144.00
1,977.12
100.00
0.00
6.72
80.71
100.00
0.00
0.00
0.00
6.72
80.71
100.00
0.00
720.00
1,785.60
100.00
0.00
0.00
0.00
720.00
1,785.60
100.00
0.00
720.00
3,117.60
100.00
0.00
0.00
0.00
720.00
3,117.60
100.00
0.00
195.94
2,012.30
100.00
0.00
0.00
0.00
195.94
2,012.30
100.00
0.00
03.00.00
03.01.00
03.02.00
03.03.00
CONCRETO SIMPLE
M3
M2
M
76.48
54.40
208.00
250.45 19,154.42
24.23 1,318.11
10.32 2,146.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
76.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
54.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
208.00
UND
GLB
2.00
1.00
1,800.00
360.00
3,600.00
360.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
05.00.00 PINTURA
05.01.00 PINTADO Y DEMARCACION DE LOSA MULTIDEPORTIVA
GLB
1.00
370.55
370.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
06.00.00 FLETE
06.01.00 FLETE
GLB
1.00
1,000.00
1,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
37,455.77
9,506.13
0.00
9,506.13
1.37%
513.14
130.23
0.00
130.23
6.63%
2,483.32
630.26
0.00
630.26
UTILIDAD
7.00%
2,621.90
665.43
0.00
665.43
43,074.13
10,932.05
0.00
10,932.05
38,766.72
9,838.85
0.00
9,838.85
7,365.68
1,869.38
0.00
1,869.38
46,132.40
11,708.23
0.00
11,708.23
25.38%
0.00%
25.38%
MONTO VALORIZADO
FACTOR DE RELACION
0.900
19.00%
COSTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19,154.42
100.00
1,318.11
100.00
2,146.56
100.00
3,600.00
100.00
360.00
100.00
370.55
100.00
1,000.00
100.00
27,949.64
382.91
1,853.06
1,956.47
32,142.08
28,927.87
5,496.30
34,424.17
74.62%
VALORIZACION N 03
(LIQUIDACION FINAL)
PROYECTO
CONTRATO DE OBRA
: N 143-ALC-MDN 2008
OBRA
VALOR REFERENCIAL
: S/. 974,627.98
ENTIDAD
VALOR OFERTADO
: S/. 877,165.19
PLAZO DE EJECUCION
FECHA PRESUPUESTO
: ABRIL DE 2008
UBICACIN
UND.
PARTIDA N
METRADO
COSTO
UNITARIO
COSTO
PARCIAL
SALDOS
AVANCES
ANTERIOR
METRADO
01.00.00
01.01.00
01.02.00
01.03.00
OBRAS PROVICIONALES
02.00.00
07.01.00
07.02.00
OBRAS PRELIMINARES
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
MOVIMIENTO DE TIERRAS
04.00.00
04.01.00
04.02.00
04.03.00
04.04.00
04.05.00
CONCRETO SIMPLE
05.00.00
05.01.00
05.02.01
05.01.02
CONCRETO ARMADO
05.02.00
05.02.01
05.02.02
05.02.03
VIGAS DE CIMENTACION
05.03.00
05.03.01
05.03.02
05.03.03
COLUMNAS
05.04.00
05.04.01
05.04.02
05.02.03
VIGAS
CARTEL DE OBRA
ALMACEN DE OBRA
CERCO PROVICIONAL
UND
MES
M
1.00
4.00
54.00
800.00
200.00
54.34
800.00
800.00
2,934.36
M2
M2
875.43
875.43
0.36
0.74
M2
M3
M3
M3
875.43
142.10
33.73
219.79
M3
M2
M2
M3
M2
ACTUAL
COSTO
METRADO
ACUMULADO
COSTO
METRADO
COSTO
METRADO
COSTO
1.00
800.00
100.00
0.00
0.00
0.00
1.00
800.00
100.00
0.00
0.00
4.00
800.00
100.00
0.00
0.00
0.00
4.00
800.00
100.00
0.00
0.00
54.00
2,934.36
100.00
0.00
0.00
0.00
54.00
2,934.36
100.00
0.00
0.00
315.15
647.82
875.43
315.15
100.00
0.00
0.00
0.00
875.43
315.15
100.00
0.00
0.00
875.43
647.82
100.00
0.00
0.00
0.00
875.43
647.82
100.00
0.00
0.00
2.54
13.73
12.01
10.27
2,223.59
1,951.03
405.10
2,257.24
875.43
2,223.59
100.00
0.00
0.00
0.00
875.43
2,223.59
100.00
0.00
0.00
142.10
1,951.03
100.00
0.00
0.00
0.00
142.10
1,951.03
100.00
0.00
0.00
33.73
405.10
100.00
0.00
0.00
0.00
33.73
405.10
100.00
0.00
0.00
219.79
2,257.24
100.00
0.00
0.00
0.00
219.79
2,257.24
100.00
0.00
0.00
13.72
98.00
809.17
18.83
165.67
108.40
26.08
16.42
138.32
18.26
1,487.25
2,555.84
13,286.57
2,604.57
3,025.13
13.72
1,487.25
100.00
0.00
0.00
0.00
13.72
1,487.25
100.00
0.00
0.00
98.00
2,555.84
100.00
0.00
0.00
0.00
98.00
2,555.84
100.00
0.00
0.00
809.17
13,286.57
100.00
0.00
0.00
0.00
809.17
13,286.57
100.00
0.00
0.00
18.83
2,604.57
100.00
0.00
0.00
0.00
18.83
2,604.57
100.00
0.00
0.00
165.67
3,025.13
100.00
0.00
0.00
0.00
165.67
3,025.13
100.00
0.00
0.00
M3
KG
39.20
855.89
233.55
3.96
9,155.16
3,389.32
M3
M2
KG
24.09
192.71
3,337.50
250.45
24.23
3.96
6,033.34
4,669.36
13,216.50
M3
M2
KG
18.52
198.36
2,488.20
290.92
24.23
3.96
5,387.84
4,806.26
9,853.27
M3
M2
KG
42.70
430.94
6,369.43
290.92
24.23
3.96
12,422.28
10,441.68
25,222.94
ZAPATAS
CONCRETO EN ZAPATAS F C=175KG/CM2
ACERO Fy =4200Kg/cm2
CONCRETO FC =175KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
CONCRETO FC=210KG/CM2
ENCONFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
CONCRETO FC=210KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
39.20
9,155.16
100.00
0.00
0.00
0.00
39.20
9,155.16
100.00
0.00
0.00
855.89
3,389.32
100.00
0.00
0.00
0.00
855.89
3,389.32
100.00
0.00
0.00
24.09
6,033.34
100.00
0.00
0.00
0.00
24.09
6,033.34
100.00
0.00
0.00
192.71
4,669.36
100.00
0.00
0.00
0.00
192.71
4,669.36
100.00
0.00
0.00
3,337.50
13,216.50
100.00
0.00
0.00
0.00
3,337.50
13,216.50
100.00
0.00
0.00
18.52
5,387.84
100.00
0.00
0.00
0.00
18.52
5,387.84
100.00
0.00
0.00
198.36
4,806.26
100.00
0.00
0.00
0.00
198.36
4,806.26
100.00
0.00
0.00
2,488.20
9,853.27
100.00
0.00
0.00
0.00
2,488.20
9,853.27
100.00
0.00
0.00
0.00
0.00
0.00
42.70
12,422.28
100.00
42.70
12,422.28
100.00
0.00
0.00
44.25
1,072.18
10.27
386.69
9,369.50
89.73
430.94
10,441.68
100.00
0.00
0.00
4,500.00
17,820.00
70.65
1,869.43
7,402.94
29.35
6,369.43
25,222.94
100.00
0.00
0.00
05.05.00
05.05.01
05.05.02
05,05,03
05.05.04
LOSAS ALIGERADAS
05.06.00
05.06.01
05.06.02
05.06.03
ESCALERAS
05.07.00
05.07.01
05.07.02
05.07.03
LAVADERO Y URINARIOS
06.00.00
06.01.00
06.01.01
06.01.02
07.00.00
07.01.00
07.02.00
07.03.00
07.04.00
07.05.00
08.00.00
08.01.00
CIELORRASOS
09.00.00
09.01.00
09.01.01
PISOS Y PAVIMENTOS
09.02.00
09.02.01
PISOS
09.03.00
09.03.01
09.03.02
VEREDAS DE CONCRETO
09.04.00
09.04.01
SARDINELES
10.00.00
10.01.00
10.01.01
ZOCALOS Y CONTRAZOCALOS
10.02.00
10.02.01
11.00.00
11.01.00
CONCRETO FC=175KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
M3
M2
KG
UND
46.46
545.35
3,058.33
4,908.17
260.63
18.31
4.11
2.28
12,108.87
9,985.36
12,569.74
11,190.63
0.00
0.00
0.00
46.46
12,108.87
100.00
46.46
12,108.87
100.00
0.00
0.00
0.00
0.00
0.00
545.35
9,985.36
100.00
545.35
9,985.36
100.00
0.00
0.00
0.00
0.00
0.00
3,058.33
12,569.74
100.00
3,058.33
12,569.74
100.00
0.00
0.00
0.00
0.00
0.00
4,908.17
11,190.63
100.00
4,908.17
11,190.63
100.00
0.00
0.00
M3
M2
KG
7.91
46.88
634.53
267.68
33.26
4.07
2,117.35
1,559.23
2,582.54
0.00
0.00
0.00
7.91
2,117.35
100.00
7.91
2,117.35
100.00
0.00
0.00
0.00
0.00
0.00
46.88
1,559.23
100.00
46.88
1,559.23
100.00
0.00
0.00
0.00
0.00
0.00
634.53
2,582.54
100.00
634.53
2,582.54
100.00
0.00
0.00
M3
M2
KG
1.75
11.05
75.62
250.45
24.23
3.96
438.29
267.74
299.46
0.00
0.00
0.00
1.75
438.29
100.00
1.75
438.29
100.00
0.00
0.00
0.00
0.00
0.00
11.05
267.74
100.00
11.05
267.74
100.00
0.00
0.00
0.00
0.00
0.00
75.62
299.46
100.00
75.62
299.46
100.00
0.00
0.00
M2
M2
630.51
169.65
29.03
29.03
18,303.71
4,924.94
568.59
16,506.17
90.18
0.00
0.00
0.00
568.59
16,506.17
90.18
61.92
1,797.54
0.00
0.00
0.00
169.65
4,924.94
100.00
169.65
4,924.94
100.00
0.00
0.00
M2
M2
M2
M2
M
120.31
1,600.32
133.11
263.62
317.96
8.99
11.20
15.67
18.46
7.89
1,081.59
17,923.58
2,085.83
4,866.43
2,508.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120.31
1,081.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,600.32
17,923.58
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
133.11
2,085.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
263.62
4,866.43
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
317.96
2,508.70
M2
545.35
23.17
12,635.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
545.35
12,635.76
M2
1,517.26
11.70
17,751.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,517.26
17,751.94
M2
708.09
37.19
26,333.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
708.09
26,333.87
M2
M
101.08
33.58
74.70
10.32
7,550.68
346.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
101.08
7,550.68
0.00
0.00
0.00
33.58
346.55
100.00
33.58
346.55
100.00
0.00
0.00
M3
4.24
176.00
746.24
0.00
0.00
0.00
4.24
746.24
100.00
4.24
746.24
100.00
0.00
0.00
M2
120.31
34.66
4,169.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120.31
4,169.94
436.40
19.73
8,610.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
436.40
8,610.17
M2
60.13
142.89
8,591.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60.13
8,591.98
CONTRAPISOS
CONTRAPISO DE 38 MM.
VEREDA F C=140 KG/CM2 E=8.5 CM. + ACABADO COLOREADO Y BRUADO 1:2 (1.5cm.) E= 4"
JUNTAS DE DILATACION EN VEREDAS E= 1" Y FALSO PISO
ZOCALOS
ZOCALO DE LOZETA DE 0.30X0.30M. EN SS.HH. H=1.20m.
CONTRAZOCALOS
CONTRAZOCALO DE LOZETA CERAMICO DE 10X30 CM.
CARPINTERIA DE MADERA
PUERTA CONTRAPLACADA DE 45 MM TRIPLAY 4 MM INCLUIDO PINTADO
11.02.00
11.03.00
12.00.00
12.01.00
12.02.00
CERRAJERIA
13.00.00
13.01.00
13.02.00
14.00.00
14.01.00
14.02.00
PINTURA
15.00.00
15.01.00
VARIOS
16.00.00
16.00.00
16.00.00
16.00.00
17.00.00
17.01.00
17.02.00
17.03.00
17.05.01
17.05.02
17.05.03
17.06.01
17.06.02
17.06.03
17.06.04
17.06.05
17.06.06
17.06.07
17.06.08
17.07.01
17.07.02
17.07.03
17.08.01
INSTALACIONES SANITARIAS
18.00.00
18.01.00
18.02.01
18.02.02
18.03.01
18.03.02
18.03.03
18.03.04
18.03.05
18.03.06
18.04.01
18.04.02
INSTALACIONES DE AGUA
UND
M2
3.00
147.25
217.79
60.00
653.37
8,835.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
653.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
147.25
8,835.00
PZA
PZA
70.00
35.00
9.30
73.90
651.00
2,586.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70.00
651.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
35.00
2,586.50
P2
P2
900.66
77.00
22.41
30.71
20,183.79
2,364.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
900.66
20,183.79
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
77.00
2,364.67
M2
M2
545.35
2,556.99
4.98
4.42
2,715.84
11,301.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
545.35
2,715.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,556.99
11,301.90
GLB
1.00
500.00
500.00
0.40
200.00
40.00
0.30
150.00
30.00
0.70
350.00
70.00
0.30
150.00
UND
UND
UND
19.00
3.00
6.00
208.22
178.80
10.08
3,956.18
536.40
60.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.00
3,956.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
536.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
60.48
PTO
PTO
PTO
M
M
M
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
UND
PZA
UND
PZA
4.00
14.00
20.00
16.51
20.25
103.98
27.00
5.00
8.00
1.00
8.00
2.00
10.00
12.00
11.00
4.00
20.00
6.00
33.97
33.61
40.74
10.37
10.05
12.85
7.96
11.37
11.37
7.13
10.57
6.97
10.82
10.77
21.22
18.80
5.04
110.40
135.88
470.54
814.80
171.21
203.51
1,336.14
214.92
56.85
90.96
7.13
84.56
13.94
108.20
129.24
233.42
75.20
100.80
662.40
PTO
M
M
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
32.00
66.78
61.45
10.00
3.00
34.00
4.00
23.00
6.00
10.00
4.00
28.11
5.33
24.16
4.58
4.58
4.58
4.58
4.58
4.58
30.41
21.04
899.52
355.94
1,484.63
45.80
13.74
155.72
18.32
105.34
27.48
304.10
84.16
4.00
135.88
100.00
0.00
0.00
0.00
4.00
135.88
100.00
0.00
0.00
14.00
470.54
100.00
0.00
0.00
0.00
14.00
470.54
100.00
0.00
0.00
20.00
814.80
100.00
0.00
0.00
0.00
20.00
814.80
100.00
0.00
0.00
16.51
171.21
100.00
0.00
0.00
0.00
16.51
171.21
100.00
0.00
0.00
20.25
203.51
100.00
0.00
0.00
0.00
20.25
203.51
100.00
0.00
0.00
30.00
385.50
28.85
73.98
950.64
71.15
103.98
1,336.14
100.00
0.00
0.00
27.00
214.92
100.00
0.00
0.00
0.00
27.00
214.92
100.00
0.00
0.00
5.00
56.85
100.00
0.00
0.00
0.00
5.00
56.85
100.00
0.00
0.00
8.00
90.96
100.00
0.00
0.00
0.00
8.00
90.96
100.00
0.00
0.00
1.00
7.13
100.00
0.00
0.00
0.00
1.00
7.13
100.00
0.00
0.00
8.00
84.56
100.00
0.00
0.00
0.00
8.00
84.56
100.00
0.00
0.00
2.00
13.94
100.00
0.00
0.00
0.00
2.00
13.94
100.00
0.00
0.00
10.00
108.20
100.00
0.00
0.00
0.00
10.00
108.20
100.00
0.00
0.00
12.00
129.24
100.00
0.00
0.00
0.00
12.00
129.24
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.00
233.42
75.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
20.00
100.80
100.00
0.00
0.00
0.00
20.00
100.80
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
662.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.00
899.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
66.78
355.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
61.45
1,484.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
45.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
13.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
34.00
155.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
18.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
23.00
105.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
27.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
304.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
84.16
18.05.01
19.00.00
19.01.00
19.02.00
19.03.00
19.04.00
INSTALACIONES ELECTRICAS
20.00.00
20.01.00
21.00.00
21.01.00
21.02.00
21.03.00
22.00.00
22.01.00
TABLEROS Y CUCHILLAS
23.00.00
23.01.00
23.02.00
24.00.00
24.01.00
ARTEFACTOS ELECTRICOS
TABLERO DE DISTRIBUCION
PZA
1.00
23.60
23.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
23.60
PTO
PTO
PTO
PTO
75.00
1.00
54.00
24.00
43.28
40.73
38.43
38.43
3,246.00
40.73
2,075.22
922.32
0.00
0.00
0.00
75.00
3,246.00
100.00
75.00
3,246.00
100.00
0.00
0.00
0.00
0.00
0.00
1.00
40.73
100.00
1.00
40.73
100.00
0.00
0.00
0.00
0.00
0.00
54.00
2,075.22
100.00
54.00
2,075.22
100.00
0.00
0.00
0.00
0.00
0.00
24.00
922.32
100.00
24.00
922.32
100.00
0.00
0.00
611.00
4.71
2,877.81
0.00
0.00
0.00
480.00
2,260.80
78.56
480.00
2,260.80
78.56
131.00
617.01
M
M
M
100.00
852.00
370.00
2.38
1.36
1.31
238.00
1,158.72
484.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00
238.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
852.00
1,158.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
370.00
484.70
PZA
2.00
35.96
71.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
71.92
UND
GLB
1.00
1.00
507.52
436.64
507.52
436.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
507.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
436.64
UND
75.00
48.59
3,644.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75.00
3,644.25
409,919.73
130,391.09
97,977.37
228,368.46
1.37%
5,615.90
1,786.36
1,342.29
3,128.65
2,487.25
6.63%
27,177.68
8,644.93
6,495.90
15,140.83
12,036.85
UTILIDAD
7.00%
MONTO VALORIZADO
FACTOR DE RELACION
28,694.38
9,127.38
6,858.42
15,985.79
12,708.59
471,407.69
149,949.76
112,673.98
262,623.73
208,783.96
424,266.92
134,954.78
101,406.58
236,361.36
187,905.56
80,610.71
25,641.41
19,267.25
44,908.66
35,702.06
504,877.63
160,596.19
120,673.83
281,270.02
223,607.62
31.81%
23.90%
55.71%
44.29%
0.900
181,551.27
19.00%
%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.82
0.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
0.00
0.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
30.00
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00
100.00
0.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
0.00
0.00
0.00
0.00
21.44
100.00
100.00
100.00
100.00
100.00
100.00
100.00
VALORIZACION N 03
(LIQUIDACION FINAL)
PROYECTO
CONTRATO DE OBRA
: N 143-ALC-MDN 2008
OBRA
VALOR REFERENCIAL
: S/. 974,627.98
ENTIDAD
VALOR OFERTADO
: S/. 877,165.19
CONTRATISTA
PLAZO DE EJECUCION
INSPECTOR
UBICACIN
FECHA PRESUPUESTO
: ABRIL DE 2008
PARTIDA N
DESCRIPCION
UND.
METRADO
COSTO
UNITARIO
COSTO
PARCIAL
SALDOS
AVANCES
ANTERIOR
METRADO
01.00.00
01.01.00
01.02.00
OBRAS PRELIMINARES
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
MOVIMIENTO DE TIERRAS
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
CONCRETO SIMPLE
04.00.00
04.01.00
04.01.01
04.01.02
CONCRETO ARMADO
04.02.00
04.02.01
04.02.02
04.02.03
VIGAS DE CIMENTACION
04.03.00
04.03.01
04.03.02
04.03.03
COLUMNAS
04.04.00
04.04.01
04.04.02
04.04.03
VIGAS
04.05.00
04.05.01
04.05.02
04.05.03
04.05.04
LOSAS ALIGERADAS
ACTUAL
COSTO
METRADO
ACUMULADO
COSTO
METRADO
COSTO
METRADO
M2
M2
192.40
192.40
0.36
0.74
69.26
142.38
192.40
69.26 100.00
0.00
0.00
0.00
192.40
69.26
100.00
0.00
192.40
142.38 100.00
0.00
0.00
0.00
192.40
142.38
100.00
0.00
M2
M3
M3
M3
192.40
58.24
6.22
80.58
2.54
13.73
12.01
10.27
488.70
799.64
74.70
827.56
192.40
488.70 100.00
0.00
0.00
0.00
192.40
488.70
100.00
0.00
58.24
799.64 100.00
0.00
0.00
0.00
58.24
799.64
100.00
0.00
6.22
74.70 100.00
0.00
0.00
0.00
6.22
74.70
100.00
0.00
80.58
827.56 100.00
0.00
0.00
0.00
80.58
827.56
100.00
0.00
M3
M2
M2
M3
M2
4.88
33.28
183.25
4.87
38.95
108.40
26.08
16.42
138.32
18.26
528.99
867.94
3,008.97
673.62
711.23
M3
KG
41.39
289.44
233.55
3.96
9,666.63
1,146.18
M3
M2
KG
5.83
56.22
584.69
250.45
24.23
3.96
1,460.13
1,362.21
2,315.37
M3
M2
KG
12.58
124.62
1,790.97
290.92
24.23
3.96
3,659.77
3,019.55
7,092.24
M3
M2
KG
11.53
130.10
1,550.52
290.92
24.23
3.96
3,354.31
3,152.32
6,140.06
2.11
30.48
211.98
274.32
260.63
18.31
4.11
2.28
549.93
558.09
871.24
625.45
4.88
528.99 100.00
0.00
0.00
0.00
4.88
528.99
100.00
0.00
33.28
867.94 100.00
0.00
0.00
0.00
33.28
867.94
100.00
0.00
183.25
3,008.97 100.00
0.00
0.00
0.00
183.25
3,008.97
100.00
0.00
1.09
150.77
22.38
0.00
0.00
0.00
1.09
150.77
22.38
3.78
8.70
158.80
22.33
0.00
0.00
0.00
8.70
158.80
22.33
30.25
41.39
9,666.63 100.00
0.00
0.00
0.00
41.39
9,666.63
100.00
0.00
289.44
1,146.18 100.00
0.00
0.00
0.00
289.44
1,146.18
100.00
0.00
ZAPATAS
CONCRETO EN ZAPATAS F C=175KG/CM2
ACERO Fy =4200Kg/cm2
CONCRETO FC =175KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
CONCRETO FC=210KG/CM2
ENCONFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
CONCRETO FC=210KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY =4200Kg/cm2
M3
M2
KG
UND
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
56.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
584.69
12.58
3,659.77 100.00
0.00
0.00
0.00
12.58
3,659.77
100.00
0.00
124.62
3,019.54 100.00
0.00
0.00
0.00
124.62
3,019.54
100.00
0.00
1,790.97
7,092.24 100.00
0.00
0.00
0.00
1,790.97
7,092.24
100.00
0.00
0.00
0.00
0.00
11.53
3,354.31
100.00
11.53
3,354.31
100.00
0.00
0.00
0.00
0.00
130.10
3,152.32
100.00
130.10
3,152.32
100.00
0.00
1,242.60
4,920.70
80.14
307.92
1,219.36
19.86
1,550.52
6,140.06
100.00
0.00
0.00
0.00
0.00
2.11
549.93
100.00
2.11
549.93
100.00
0.00
0.00
0.00
0.00
30.48
558.09
100.00
30.48
558.09
100.00
0.00
0.00
0.00
0.00
211.98
871.24
100.00
211.98
871.24
100.00
0.00
0.00
0.00
0.00
274.32
625.45
100.00
274.32
625.45
100.00
0.00
05.00.00
05.01.00
05.01.01
05.01.02
05.01.03
05.02.00
05.02.01
COBERTURAS
06.00.00
06.01.00
06.01.01
07.00.00
07.01.00
07.02.00
07.03.00
07.04.00
07.05.00
08.00.00
08.01.00
CIELORRASOS
09.00.00
09.01.00
09.01.01
PISOS Y PAVIMENTOS
09.02.00
09.02.01
PISOS
10.00.00
10.01.00
10.01.01
ZOCALOS Y CONTRAZOCALOS
10.02.00
10.02.01
ESTRUCTURAS
TIJERAL METALICO N 1
VIGUETAS DE FIERRO CORRUGADO
CORREAS METALICAS
UND
M
UND
5.00
8.00
12.00
390.34
61.77
34.59
1,951.70
494.16
415.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
M2
204.00
59.34
12,105.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
204.00
M2
87.96
29.03
2,553.48
87.96
2,553.48 100.00
0.00
0.00
0.00
87.96
2,553.48
100.00
0.00
M2
M2
M2
M2
M
39.72
358.68
127.83
117.30
168.92
8.99
11.20
15.67
18.46
7.89
357.08
4,017.22
2,003.10
2,165.36
1,332.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
358.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
127.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
117.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
168.92
M2
30.48
23.17
706.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.48
M2
183.25
11.70
2,144.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
183.25
M2
192.01
37.19
7,140.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
192.01
M2
39.72
34.66
1,376.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39.72
140.40
19.73
2,770.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
140.40
M2
M2
24.18
21.19
142.89
60.00
3,455.08
1,271.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.19
PZA
PZA
26.00
13.00
9.30
73.90
241.80
960.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
26.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13.00
P2
P2
233.12
26.40
22.41
30.71
5,224.22
810.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
233.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
26.40
M2
M2
30.48
646.04
4.98
4.42
151.79
2,855.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
646.04
GLB
1.00
500.00
500.00
0.40
200.00
40.00
0.30
150.00
30.00
0.70
350.00
70.00
0.30
UND
4.00
208.22
832.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
5.00
CONTRAPISOS
CONTRAPISO DE 38 MM.
ZOCALOS
ZOCALO DE LOSETA DE 0.30X0.30M. EN SS.HH. H=1.20m.
CONTRAZOCALOS
CONTRAZOCALO DE LOSETA CERAMICO DE 10X30 CM.
11.00.00
11.01.00
11.02.00
CARPINTERIA DE MADERA
12.00.00
12.01.00
12.02.00
CERRAJERIA
13.00.00
13.01.00
13.02.00
14.00.00
14.01.00
14.02.00
PINTURA
15.00.00
15.01.00
VARIOS
16.00.00
16.01.01
16.02.01
16.02.02
16.02.03
17.00.00
17.01.00
17.02.00
17.03.00
17.05.01
17.05.02
17.05.03
17.06.01
17.06.03
17.06.04
17.06.05
17.06.06
17.06.07
17.06.08
17.07.01
17.07.02
17.07.03
INSTALACIONES SANITARIAS
18.00.00
18.01.00
18.02.02
18.03.03
18.03.05
18.04.02
INSTALACIONES DE AGUA
19.00.00
19.00.01
19.00.02
19.00.03
INSTALACIONES ELECTRICAS
19.01.00
19.01.01
19.02.00
19.02.01
19.02.02
19.02.03
19.03.00
19.03.01
TABLEROS Y CUCHILLAS
19.04.00
19.04.01
19.04.02
ARTEFACTOS ELECTRICOS
URINARIO DE LOSA
ESPEJOS DE 0.30X0.40 m
TABLERO DE DISTRIBUCION
UND
PZA
UND
3.00
2.00
2.00
178.80
118.64
10.08
536.40
237.28
20.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
PTO
PTO
PTO
M
M
M
PZA
PZA
PZA
PZA
PZA
PZA
PZA
UND
PZA
UND
1.00
7.00
5.00
3.72
9.12
13.91
19.00
4.00
2.00
2.00
2.00
2.00
3.00
2.00
2.00
4.00
33.97
33.61
40.74
10.37
10.05
12.85
7.96
11.37
7.13
10.57
6.97
10.82
10.77
21.22
18.80
5.04
33.97
235.27
203.70
38.58
91.66
178.74
151.24
45.48
14.26
21.14
13.94
21.64
32.31
42.44
37.60
20.16
1.00
33.97 100.00
0.00
0.00
0.00
1.00
33.97
100.00
0.00
7.00
235.27 100.00
0.00
0.00
0.00
7.00
235.27
100.00
0.00
5.00
203.70 100.00
0.00
0.00
0.00
5.00
203.70
100.00
0.00
0.00
3.72
38.58
100.00
3.72
38.58
100.00
0.00
9.12
91.66 100.00
0.00
0.00
0.00
9.12
91.66
100.00
0.00
6.00
77.10
43.14
7.91
101.64
56.86
13.91
178.74
100.00
0.00
19.00
151.24 100.00
0.00
0.00
0.00
19.00
151.24
100.00
0.00
4.00
45.48 100.00
0.00
0.00
0.00
4.00
45.48
100.00
0.00
2.00
14.26 100.00
0.00
0.00
0.00
2.00
14.26
100.00
0.00
2.00
21.14 100.00
0.00
0.00
0.00
2.00
21.14
100.00
0.00
2.00
13.94 100.00
0.00
0.00
0.00
2.00
13.94
100.00
0.00
2.00
21.64 100.00
0.00
0.00
0.00
2.00
21.64
100.00
0.00
3.00
32.31 100.00
0.00
0.00
0.00
3.00
32.31
100.00
0.00
2.00
42.44 100.00
0.00
0.00
0.00
2.00
42.44
100.00
0.00
2.00
37.60 100.00
0.00
0.00
0.00
2.00
37.60
100.00
0.00
4.00
20.16 100.00
0.00
0.00
0.00
4.00
20.16
100.00
0.00
PTO
M
PZA
PZA
PZA
11.00
34.42
19.00
11.00
2.00
28.11
24.16
4.58
4.58
21.04
309.21
831.59
87.02
50.38
42.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
34.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
PTO
PTO
PTO
24.00
12.00
7.00
43.20
40.65
38.35
1,036.80
487.80
268.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
0.00
0.00
0.00
7.00
268.45
100.00
7.00
268.45
100.00
0.00
120.00
4.71
565.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120.00
M
M
M
70.00
250.00
70.00
2.32
1.30
1.25
162.40
325.00
87.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
250.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70.00
PZA
1.00
35.96
35.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
UND
UND
12.00
12.00
48.53
31.22
582.36
374.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
0.00
0.00
118,226.15
40,418.16
10,889.37
1.37%
1,619.70
553.73
149.18
702.91
6.63%
7,838.39
2,679.72
721.97
3,401.69
UTILIDAD
7.00%
MONTO VALORIZADO
FACTOR DE RELACION
0.900
51,307.53
8,275.83
2,829.27
762.26
3,591.53
135,960.07
46,480.88
12,522.78
59,003.66
19.00%
122,364.06
41,832.79
11,270.50
53,103.29
23,249.17
7,948.23
2,141.40
10,089.63
145,613.23
49,781.02
13,411.90
63,192.92
34.19%
9.21%
43.40%
COSTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
522.85
77.62
552.43
77.67
0.00
0.00
0.00
0.00
1,460.13
100.00
1,362.21
100.00
2,315.37
100.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,951.70
100.00
494.16
100.00
415.08
100.00
12,105.36
100.00
0.00
0.00
357.08
100.00
4,017.22
100.00
2,003.10
100.00
2,165.36
100.00
1,332.78
100.00
706.22
100.00
2,144.03
100.00
7,140.85
100.00
1,376.70
100.00
2,770.09
100.00
3,455.08
100.00
1,271.40
100.00
241.80
100.00
960.70
100.00
5,224.22
100.00
810.74
100.00
151.79
100.00
2,855.50
100.00
150.00
30.00
832.88
100.00
536.40
100.00
237.28
100.00
20.16
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
309.21
100.00
831.59
100.00
87.02
100.00
50.38
100.00
42.08
100.00
1,036.80
100.00
487.80
100.00
0.00
0.00
565.20
100.00
162.40
100.00
325.00
100.00
87.50
100.00
35.96
100.00
582.36
100.00
374.64
100.00
66,918.62
916.79
4,436.70
4,684.30
76,956.41
69,260.77
13,159.55
82,420.32
56.60%
VALORIZACION N 03
(LIQUIDACION FINAL)
PROYECTO
CONTRATO DE OBRA
: N 143-ALC-MDN 2008
OBRA
VALOR REFERENCIAL
: S/. 974,627.98
ENTIDAD
VALOR OFERTADO
: S/. 877,165.19
PLAZO DE EJECUCION
FECHA PRESUPUESTO
: ABRIL DE 2008
UBICACIN
DESCRIPCION
PARTIDA N
UND. METRADO
COSTO
UNITARIO
COSTO
PARCIAL
SALDOS
AVANCES
ANTERIOR
METRADO
01.00.00
01.01.00
01.02.00
OBRAS PRELIMINARES
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
MOVIMIENTO DE TIERRAS
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
CONCRETO SIMPLE
04.00.00
04.01.00
04.01.01
04.01.02
CONCRETO ARMADO
04.02.00
04.02.01
04.02.02
04.02.03
COLUMNAS
04.03.00
04.03.01
04.03.02
04.03.03
VIGAS
05.00.00
05.01.00
05.01.01
06.00.00
06.01.00
06.02.00
06.03.00
06.04.00
M2
M2
M2
M3
M3
M3
M3
M2
M2
M3
M2
ACTUAL
COSTO
METRADO
ACUMULADO
COSTO
METRADO
COSTO
METRADO
COSTO
242.95
242.95
0.36
0.74
87.46
179.78
242.95
87.46
100.00
0.00
0.00
0.00
242.95
87.46
100.00
0.00
0.00
242.95
179.78
100.00
0.00
0.00
0.00
242.95
179.78
100.00
0.00
0.00
97.18
53.65
17.60
89.06
2.54
13.73
12.01
10.27
246.84
736.61
211.38
914.65
97.18
246.84
100.00
0.00
0.00
0.00
97.18
246.84
100.00
0.00
0.00
0.00
0.00
0.00
53.65
736.61
100.00
53.65
736.61
100.00
0.00
0.00
17.60
211.38
100.00
0.00
0.00
0.00
17.60
211.38
100.00
0.00
0.00
0.00
0.00
0.00
89.06
914.65
100.00
89.06
914.65
100.00
0.00
0.00
41.62
75.00
544.38
21.46
332.28
108.40
26.08
16.42
138.32
18.26
4,511.61
1,956.00
8,938.72
2,968.35
6,067.43
0.00
0.00
0.00
41.62
4,511.61
100.00
41.62
4,511.61
100.00
0.00
0.00
0.00
0.00
0.00
75.00
1,956.00
100.00
75.00
1,956.00
100.00
0.00
0.00
0.00
0.00
0.00
544.38
8,938.72
100.00
544.38
8,938.72
100.00
0.00
0.00
0.00
0.00
0.00
21.46
2,968.35
100.00
21.46
2,968.35
100.00
0.00
0.00
0.00
0.00
0.00
332.28
6,067.43
100.00
332.28
6,067.43
100.00
0.00
0.00
30.00
803.40
233.55
3.96
7,006.50
3,181.46
0.00
0.00
0.00
30.00
7,006.50
100.00
30.00
7,006.50
100.00
0.00
0.00
0.00
0.00
0.00
803.40
3,181.46
100.00
803.40
3,181.46
100.00
0.00
0.00
17.34
206.25
1,864.76
290.92
24.23
3.96
5,044.55
4,997.44
7,384.45
0.00
0.00
0.00
17.34
5,044.55
100.00
17.34
5,044.55
100.00
0.00
0.00
0.00
0.00
0.00
206.25
4,997.44
100.00
206.25
4,997.44
100.00
0.00
0.00
0.00
0.00
0.00
1,864.76
7,384.45
100.00
1,864.76
7,384.45
100.00
0.00
0.00
290.92
24.23
3.96
3,092.48
1,514.38
3,222.45
0.00
0.00
0.00
10.63
3,092.48
100.00
10.63
3,092.48
100.00
0.00
0.00
0.00
0.00
0.00
62.50
1,514.38
100.00
62.50
1,514.38
100.00
0.00
0.00
0.00
0.00
0.00
813.75
3,222.45
100.00
813.75
3,222.45
100.00
0.00
0.00
0.00
0.00
ZAPATAS
CONCRETO EN ZAPATAS F C=175KG/CM2
M3
ACERO Fy =4200Kg/cm2
KG
CONCRETO FC=210KG/CM2
M3
M2
ACERO FY =4200Kg/cm2
KG
CONCRETO FC=210KG/CM2
M3
M2
ACERO FY =4200Kg/cm2
KG
10.63
62.50
813.75
M2
289.08
29.03
8,391.99
0.00
0.00
0.00
289.08
8,391.99
100.00
289.08
8,391.99
100.00
M2
0.00
753.19
8,435.73
100.00
753.19
8,435.73
100.00
0.00
0.00
0.00
0.00
63.19
990.19
51.06
63.19
990.19
51.06
60.56
948.97
M2
0.00
0.00
0.00
86.00
1,587.56
50.96
86.00
1,587.56
50.96
82.75
1,527.57
8,435.73
1,939.16
3,115.13
214.29
0.00
11.20
15.67
18.46
7.89
0.00
M2
753.19
123.75
168.75
27.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.16
214.29
07.00.00
07.01.00
07.01.01
PISOS Y PAVIMENTOS
07.02.00
07.02.01
VEREDAS DE CONCRETO
07.03.00
07.03.01
SARDINELES
08.00.00
08.01.00
ZOCALOS Y CONTRAZOCALOS
09.00.00
09.01.00
09.02.00
CARPINTERIA METALICA
10.00.00
10.01.00
10.02.00
CERRAJERIA
11.00.00
11.01.00
PINTURA
12.00.00
12.01.00
12.02.00
JARDINERIA
13.00.00
13.01.00
VARIOS
CONTRAPISOS
M2
544.38
11.70
6,369.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
544.38
6,369.25
M2
462.79
74.70
34,570.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
462.79
34,570.41
M3
7.99
176.00
1,406.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.99
1,406.24
105.12
10.17
1,069.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
105.12
1,069.07
M2
126.05
67.22
3,199.15
6,920.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.38
3,199.15
25.38
102.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
102.96
6,920.97
6.00
3.00
9.30
73.90
55.80
221.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
55.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
221.70
1,052.48
4.42
4,651.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,052.48
4,651.96
50.00
999.60
17.26
2.40
863.00
2,399.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50.00
863.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
999.60
2,399.04
1.00
500.00
500.00
0.00
0.00
0.00
0.60
300.00
60.00
0.60
300.00
60.00
0.40
200.00
CONTRAPISO DE 38 MM.
VEREDA F C=140 KG/CM2 E=8.5 CM. + ACABADO COLOREADO Y BRUADO 1:2 (1.5cm.) E= 4"
PZA
PZA
M2
UND
M2
GLB
146,585.43
725.46
81,242.55
81,968.01
1.37%
2,008.22
9.94
1,113.02
1,122.96
885.26
6.63%
9,718.61
48.10
5,386.38
5,434.48
4,284.13
UTILIDAD
7.00%
MONTO VALORIZADO
FACTOR DE RELACION
10,260.98
50.78
5,686.98
5,737.76
4,523.22
168,573.24
834.28
93,428.93
94,263.21
74,310.03
151,715.92
750.85
84,086.04
84,836.89
66,879.03
28,826.02
142.66
15,976.35
16,119.01
12,707.02
180,541.94
893.51
100,062.39
100,955.90
79,586.05
0.49%
55.42%
55.92%
44.08%
0.900
64,617.42
19.00%
%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48.94
49.04
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
40.00
VALORIZACION N 03
(LIQUIDACION FINAL)
PROYECTO
CONTRATO DE OBRA
: N 143-ALC-MDN 2008
OBRA
VALOR REFERENCIAL
: S/. 974,627.98
ENTIDAD
VALOR OFERTADO
: S/. 877,165.19
PLAZO DE EJECUCION
FECHA PRESUPUESTO
: ABRIL DE 2008
UBICACIN
PARTIDA N
DESCRIPCION
UND. METRADO
COSTO
UNITARIO
COSTO
PARCIAL
SALDOS
AVANCES
ANTERIOR
METRADO
01.00.00
01.01.00
OBRAS PRELIMINARES
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
02.05.00
MOVIMIENTO DE TIERRAS
03.00.00
03.01.00
03.02.00
03.03.00
CONCRETO SIMPLE
04.00.00
04.01.00
04.02.00
EQUIPAMIENTO Y ACCESORIOS
05.00.00
05.01.00
PINTURA
06.00.00
06.01.00
FLETE
ACTUAL
COSTO
METRADO
ACUMULADO
COSTO
METRADO
COSTO
METRADO
COSTO
M2
720.00
0.74
532.80
720.00
532.80
100.00
0.00
0.00
0.00
720.00
532.80
100.00
0.00
0.00
M3
100.00
0.00
0.00
0.00
144.00
1,977.12
100.00
0.00
0.00
80.71
100.00
0.00
0.00
0.00
6.72
80.71
100.00
0.00
0.00
M2
720.00
1,785.60
100.00
0.00
0.00
0.00
720.00
1,785.60
100.00
0.00
0.00
M2
720.00
3,117.60
100.00
0.00
0.00
0.00
720.00
3,117.60
100.00
0.00
0.00
M3
1,977.12
80.71
1,785.60
3,117.60
2,012.30
6.72
13.73
12.01
2.48
4.33
10.27
1,977.12
M3
144.00
6.72
720.00
720.00
195.94
144.00
195.94
2,012.30
100.00
0.00
0.00
0.00
195.94
2,012.30
100.00
0.00
0.00
250.45 19,154.42
24.23 1,318.11
10.32 2,146.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
76.48
19,154.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
54.40
1,318.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
208.00
2,146.56
M3
M2
76.48
54.40
208.00
UND
1,800.00
360.00
3,600.00
360.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
3,600.00
GLB
2.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
360.00
GLB
1.00
370.55
370.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
370.55
GLB
1.00
1,000.00
1,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1,000.00
FLETE
37,455.77
9,506.13
0.00
9,506.13
1.37%
513.14
130.23
0.00
130.23
382.91
6.63%
2,483.32
630.26
0.00
630.26
1,853.06
UTILIDAD
7.00%
MONTO VALORIZADO
FACTOR DE RELACION
2,621.90
665.43
0.00
665.43
1,956.47
43,074.13
10,932.05
0.00
10,932.05
32,142.08
38,766.72
9,838.85
0.00
9,838.85
28,927.87
7,365.68
1,869.38
0.00
1,869.38
5,496.30
46,132.40
11,708.23
0.00
11,708.23
34,424.17
25.38%
0.00%
25.38%
74.62%
0.900
27,949.64
19.00%
%
0.00
0.00
0.00
0.00
0.00
0.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
VALORIZACION N 04
(LIQUIDACION FINAL)
PROYECTO
CONTRATO DE OBRA
: N 143-ALC-MDN 2008
OBRA
VALOR REFERENCIAL
: S/. 974,627.98
ENTIDAD
VALOR OFERTADO
: S/. 877,165.19
PLAZO DE EJECUCION
FECHA PRESUPUESTO
: ABRIL DE 2008
UBICACIN
UND. METRADO
PARTIDA N
COSTO
UNITARIO
COSTO
PARCIAL
SALDOS
AVANCES
ANTERIOR
METRADO
01.00.00
01.01.00
01.02.00
01.03.00
OBRAS PROVICIONALES
02.00.00
07.01.00
07.02.00
OBRAS PRELIMINARES
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
MOVIMIENTO DE TIERRAS
04.00.00
04.01.00
04.02.00
04.03.00
04.04.00
04.05.00
CONCRETO SIMPLE
05.00.00
05.01.00
05.02.01
05.01.02
CONCRETO ARMADO
05.02.00
05.02.01
05.02.02
05.02.03
VIGAS DE CIMENTACION
05.03.00
05.03.01
05.03.02
05.03.03
COLUMNAS
05.04.00
05.04.01
05.04.02
05.02.03
VIGAS
CARTEL DE OBRA
UND
ALMACEN DE OBRA
MES
CERCO PROVICIONAL
M2
M2
M2
M3
M3
M3
M3
M2
M2
M3
M2
1.00
4.00
54.00
800.00
200.00
54.34
800.00
800.00
2,934.36
875.43
875.43
0.36
0.74
875.43
142.10
33.73
219.79
ACTUAL
COSTO
METRADO
ACUMULADO
COSTO
METRADO
COSTO
METRADO
COSTO
1.00
800.00
100.00
0.00
0.00
0.00
1.00
800.00
100.00
0.00
0.00
4.00
800.00
100.00
0.00
0.00
0.00
4.00
800.00
100.00
0.00
0.00
54.00
2,934.36
100.00
0.00
0.00
0.00
54.00
2,934.36
100.00
0.00
0.00
315.15
647.82
875.43
315.15
100.00
0.00
0.00
0.00
875.43
315.15
100.00
0.00
0.00
875.43
647.82
100.00
0.00
0.00
0.00
875.43
647.82
100.00
0.00
0.00
2.54
13.73
12.01
10.27
2,223.59
1,951.03
405.10
2,257.24
875.43
2,223.59
100.00
0.00
0.00
0.00
875.43
2,223.59
100.00
0.00
0.00
142.10
1,951.03
100.00
0.00
0.00
0.00
142.10
1,951.03
100.00
0.00
0.00
33.73
405.10
100.00
0.00
0.00
0.00
33.73
405.10
100.00
0.00
0.00
219.79
2,257.24
100.00
0.00
0.00
0.00
219.79
2,257.24
100.00
0.00
0.00
13.72
98.00
809.17
18.83
165.67
108.40
26.08
16.42
138.32
18.26
1,487.25
2,555.84
13,286.57
2,604.57
3,025.13
13.72
1,487.25
100.00
0.00
0.00
0.00
13.72
1,487.25
100.00
0.00
0.00
98.00
2,555.84
100.00
0.00
0.00
0.00
98.00
2,555.84
100.00
0.00
0.00
809.17
13,286.57
100.00
0.00
0.00
0.00
809.17
13,286.57
100.00
0.00
0.00
18.83
2,604.57
100.00
0.00
0.00
0.00
18.83
2,604.57
100.00
0.00
0.00
165.67
3,025.13
100.00
0.00
0.00
0.00
165.67
3,025.13
100.00
0.00
0.00
39.20
855.89
233.55
3.96
9,155.16
3,389.32
24.09
192.71
3,337.50
250.45
24.23
3.96
6,033.34
4,669.36
13,216.50
18.52
198.36
2,488.20
290.92
24.23
3.96
5,387.84
4,806.26
9,853.27
42.70
430.94
6,369.43
290.92
24.23
3.96
12,422.28
10,441.68
25,222.94
ZAPATAS
CONCRETO EN ZAPATAS F C=175KG/CM2
M3
ACERO Fy =4200Kg/cm2
KG
CONCRETO FC =175KG/CM2
M3
M2
ACERO FY =4200Kg/cm2
KG
CONCRETO FC=210KG/CM2
M3
M2
ACERO FY =4200Kg/cm2
KG
CONCRETO FC=210KG/CM2
M3
M2
ACERO FY =4200Kg/cm2
KG
39.20
9,155.16
100.00
0.00
0.00
0.00
39.20
9,155.16
100.00
0.00
0.00
855.89
3,389.32
100.00
0.00
0.00
0.00
855.89
3,389.32
100.00
0.00
0.00
24.09
6,033.34
100.00
0.00
0.00
0.00
24.09
6,033.34
100.00
0.00
0.00
192.71
4,669.36
100.00
0.00
0.00
0.00
192.71
4,669.36
100.00
0.00
0.00
3,337.50
13,216.50
100.00
0.00
0.00
0.00
3,337.50
13,216.50
100.00
0.00
0.00
18.52
5,387.84
100.00
0.00
0.00
0.00
18.52
5,387.84
100.00
0.00
0.00
198.36
4,806.26
100.00
0.00
0.00
0.00
198.36
4,806.26
100.00
0.00
0.00
2,488.20
9,853.27
100.00
0.00
0.00
0.00
2,488.20
9,853.27
100.00
0.00
0.00
42.70
12,422.28
100.00
0.00
0.00
0.00
42.70
12,422.28
100.00
0.00
0.00
430.94
10,441.68
100.00
0.00
0.00
0.00
430.94
10,441.68
100.00
0.00
0.00
6,369.43
25,222.94
100.00
0.00
0.00
0.00
6,369.43
25,222.94
100.00
0.00
0.00
05.05.00
05.05.01
05.05.02
05,05,03
05.05.04
LOSAS ALIGERADAS
05.06.00
05.06.01
05.06.02
05.06.03
ESCALERAS
05.07.00
05.07.01
05.07.02
05.07.03
LAVADERO Y URINARIOS
06.00.00
06.01.00
06.01.01
06.01.02
07.00.00
07.01.00
07.02.00
07.03.00
07.04.00
07.05.00
08.00.00
08.01.00
CIELORRASOS
09.00.00
09.01.00
09.01.01
PISOS Y PAVIMENTOS
09.02.00
09.02.01
PISOS
09.03.00
09.03.01
09.03.02
VEREDAS DE CONCRETO
09.04.00
09.04.01
SARDINELES
10.00.00
10.01.00
10.01.01
ZOCALOS Y CONTRAZOCALOS
10.02.00
10.02.01
11.00.00
11.01.00
46.46
545.35
3,058.33
4,908.17
260.63
18.31
4.11
2.28
12,108.87
9,985.36
12,569.74
11,190.63
7.91
46.88
634.53
267.68
33.26
4.07
2,117.35
1,559.23
2,582.54
1.75
11.05
75.62
250.45
24.23
3.96
438.29
267.74
299.46
630.51
169.65
29.03
29.03
120.31
1,600.32
133.11
263.62
317.96
M2
M3
M2
KG
UND
M3
M2
KG
46.46
12,108.87
100.00
0.00
0.00
0.00
46.46
12,108.87
100.00
0.00
0.00
545.35
9,985.36
100.00
0.00
0.00
0.00
545.35
9,985.36
100.00
0.00
0.00
3,058.33
12,569.74
100.00
0.00
0.00
0.00
3,058.33
12,569.74
100.00
0.00
0.00
4,908.17
11,190.63
100.00
0.00
0.00
0.00
4,908.17
11,190.63
100.00
0.00
0.00
7.91
2,117.35
100.00
0.00
0.00
0.00
7.91
2,117.35
100.00
0.00
0.00
46.88
1,559.23
100.00
0.00
0.00
0.00
46.88
1,559.23
100.00
0.00
0.00
634.53
2,582.54
100.00
0.00
0.00
0.00
634.53
2,582.54
100.00
0.00
0.00
1.75
438.29
100.00
0.00
0.00
0.00
1.75
438.29
100.00
0.00
0.00
11.05
267.74
100.00
0.00
0.00
0.00
11.05
267.74
100.00
0.00
0.00
75.62
299.46
100.00
0.00
0.00
0.00
75.62
299.46
100.00
0.00
0.00
18,303.71
4,924.94
568.59
16,506.17
90.18
0.00
0.00
0.00
568.59
16,506.17
90.18
61.92
1,797.54
169.65
4,924.94
100.00
0.00
0.00
0.00
169.65
4,924.94
100.00
0.00
0.00
8.99
11.20
15.67
18.46
7.89
1,081.59
17,923.58
2,085.83
4,866.43
2,508.70
0.00
0.00
0.00
120.31
1,081.59
100.00
120.31
1,081.59
100.00
0.00
0.00
0.00
0.00
0.00
1,414.56
15,843.07
88.39
1,414.56
15,843.07
88.39
185.76
2,080.51
0.00
0.00
0.00
133.11
2,085.83
100.00
133.11
2,085.83
100.00
0.00
0.00
0.00
0.00
0.00
263.62
4,866.43
100.00
263.62
4,866.43
100.00
0.00
0.00
0.00
0.00
0.00
317.96
2,508.70
100.00
317.96
2,508.70
100.00
0.00
0.00
545.35
23.17
12,635.76
0.00
0.00
0.00
545.35
12,635.76
100.00
545.35
12,635.76
100.00
0.00
0.00
M2
1,517.26
11.70
17,751.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,517.26
17,751.94
M2
708.09
37.19
26,333.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
708.09
26,333.87
VEREDA F C=140 KG/CM2 E=8.5 CM. + ACABADO COLOREADO Y BRUADO 1:2 (1.5cm.) E= 4"
M2
74.70
10.32
7,550.68
346.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
101.08
7,550.68
101.08
33.58
0.00
33.58
346.55
100.00
0.00
0.00
0.00
33.58
346.55
100.00
0.00
0.00
M3
4.24
176.00
746.24
4.24
746.24
100.00
0.00
0.00
0.00
4.24
746.24
100.00
0.00
0.00
M2
120.31
34.66
4,169.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120.31
4,169.94
436.40
19.73
8,610.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
436.40
8,610.17
60.13
142.89
8,591.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60.13
8,591.98
CONCRETO FC=175KG/CM2
M3
M2
ACERO FY =4200Kg/cm2
KG
M2
M2
M2
M2
M2
M2
CONTRAPISOS
CONTRAPISO DE 38 MM.
ZOCALOS
ZOCALO DE LOZETA DE 0.30X0.30M. EN SS.HH. H=1.20m.
CONTRAZOCALOS
CONTRAZOCALO DE LOZETA CERAMICO DE 10X30 CM.
CARPINTERIA DE MADERA
PUERTA CONTRAPLACADA DE 45 MM TRIPLAY 4 MM INCLUIDO PINTADO
M2
11.02.00
11.03.00
UND
M2
3.00
147.25
217.79
60.00
653.37
8,835.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
653.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
147.25
8,835.00
12.00.00
12.01.00
12.02.00
CERRAJERIA
70.00
35.00
9.30
73.90
651.00
2,586.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70.00
651.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
35.00
2,586.50
13.00.00
13.01.00
13.02.00
900.66
77.00
22.41
30.71
20,183.79
2,364.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
900.66
20,183.79
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
77.00
2,364.67
14.00.00
14.01.00
14.02.00
PINTURA
545.35
2,556.99
4.98
4.42
2,715.84
11,301.90
0.00
0.00
0.00
265.00
1,319.70
48.59
265.00
1,319.70
48.59
280.35
1,396.14
0.00
0.00
0.00
451.99
1,997.80
17.68
451.99
1,997.80
17.68
2,105.00
9,304.10
15.00.00
15.01.00
VARIOS
GLB
1.00
500.00
500.00
0.70
350.00
70.00
0.20
100.00
20.00
0.90
450.00
90.00
0.10
50.00
16.00.00
16.00.00
16.00.00
16.00.00
UND
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.00
3,956.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
536.40
UND
3,956.18
536.40
60.48
0.00
ESPEJOS DE 0.30X0.40 m
208.22
178.80
10.08
0.00
UND
19.00
3.00
6.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
60.48
17.00.00
17.01.00
17.02.00
17.03.00
17.05.01
17.05.02
17.05.03
17.06.01
17.06.02
17.06.03
17.06.04
17.06.05
17.06.06
17.06.07
17.06.08
17.07.01
17.07.02
17.07.03
17.08.01
INSTALACIONES SANITARIAS
4.00
14.00
20.00
16.51
20.25
103.98
27.00
5.00
8.00
1.00
8.00
2.00
10.00
12.00
11.00
4.00
20.00
6.00
33.97
33.61
40.74
10.37
10.05
12.85
7.96
11.37
11.37
7.13
10.57
6.97
10.82
10.77
21.22
18.80
5.04
110.40
135.88
470.54
814.80
171.21
203.51
1,336.14
214.92
56.85
90.96
7.13
84.56
13.94
108.20
129.24
233.42
75.20
100.80
662.40
18.00.00
18.01.00
18.02.01
18.02.02
18.03.01
18.03.02
18.03.03
18.03.04
18.03.05
18.03.06
18.04.01
18.04.02
INSTALACIONES DE AGUA
32.00
66.78
61.45
10.00
3.00
34.00
4.00
23.00
6.00
10.00
4.00
28.11
5.33
24.16
4.58
4.58
4.58
4.58
4.58
4.58
30.41
21.04
899.52
355.94
1,484.63
45.80
13.74
155.72
18.32
105.34
27.48
304.10
84.16
PZA
PZA
P2
P2
M2
M2
PTO
PTO
PTO
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
UND
PZA
UND
PZA
PTO
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
4.00
135.88
100.00
0.00
0.00
0.00
4.00
135.88
100.00
0.00
0.00
14.00
470.54
100.00
0.00
0.00
0.00
14.00
470.54
100.00
0.00
0.00
20.00
814.80
100.00
0.00
0.00
0.00
20.00
814.80
100.00
0.00
0.00
16.51
171.21
100.00
0.00
0.00
0.00
16.51
171.21
100.00
0.00
0.00
20.25
203.51
100.00
0.00
0.00
0.00
20.25
203.51
100.00
0.00
0.00
103.98
1,336.14
100.00
0.00
0.00
0.00
103.98
1,336.14
100.00
0.00
0.00
27.00
214.92
100.00
0.00
0.00
0.00
27.00
214.92
100.00
0.00
0.00
5.00
56.85
100.00
0.00
0.00
0.00
5.00
56.85
100.00
0.00
0.00
8.00
90.96
100.00
0.00
0.00
0.00
8.00
90.96
100.00
0.00
0.00
1.00
7.13
100.00
0.00
0.00
0.00
1.00
7.13
100.00
0.00
0.00
8.00
84.56
100.00
0.00
0.00
0.00
8.00
84.56
100.00
0.00
0.00
2.00
13.94
100.00
0.00
0.00
0.00
2.00
13.94
100.00
0.00
0.00
10.00
108.20
100.00
0.00
0.00
0.00
10.00
108.20
100.00
0.00
0.00
12.00
129.24
100.00
0.00
0.00
0.00
12.00
129.24
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.00
233.42
75.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
20.00
100.80
100.00
0.00
0.00
0.00
20.00
100.80
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
662.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.00
899.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
66.78
355.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
61.45
1,484.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
45.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
13.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
34.00
155.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
18.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
23.00
105.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
27.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
304.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
84.16
18.05.01
PZA
1.00
23.60
23.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
23.60
19.00.00
19.01.00
19.02.00
19.03.00
19.04.00
INSTALACIONES ELECTRICAS
SALIDA DE TECHO CENTRO DE LUZ
PTO
100.00
0.00
0.00
0.00
75.00
3,246.00
100.00
0.00
0.00
40.73
100.00
0.00
0.00
0.00
1.00
40.73
100.00
0.00
0.00
PTO
54.00
2,075.22
100.00
0.00
0.00
0.00
54.00
2,075.22
100.00
0.00
0.00
PTO
3,246.00
40.73
2,075.22
922.32
1.00
43.28
40.73
38.43
38.43
3,246.00
PTO
75.00
1.00
54.00
24.00
75.00
24.00
922.32
100.00
0.00
0.00
0.00
24.00
922.32
100.00
0.00
0.00
20.00.00
20.01.00
611.00
4.71
2,877.81
480.00
2,260.80
78.56
131.00
617.01
21.44
611.00
2,877.81
100.00
0.00
0.00
21.00.00
21.01.00
21.02.00
21.03.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00
238.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
852.00
1,158.72
238.00
1,158.72
484.70
0.00
2.38
1.36
1.31
0.00
100.00
852.00
370.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
370.00
484.70
22.00.00
22.01.00
TABLEROS Y CUCHILLAS
PZA
2.00
35.96
71.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
71.92
23.00.00
23.01.00
23.02.00
UND
507.52
436.64
507.52
436.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
507.52
GLB
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
436.64
24.00.00
24.01.00
ARTEFACTOS ELECTRICOS
UND
75.00
48.59
3,644.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75.00
3,644.25
TABLERO DE DISTRIBUCION
409,919.73
228,368.46
43,055.89
271,424.35
138,495.38
1.37%
5,615.90
3,128.65
589.87
3,718.51
1,897.39
6.63%
27,177.68
15,140.83
2,854.61
17,995.43
9,182.24
UTILIDAD
7.00%
28,694.38
15,985.79
3,013.91
18,999.70
9,694.68
471,407.69
262,623.73
49,514.28
312,137.99
159,269.69
424,266.92
236,361.36
44,562.85
280,924.19
143,342.72
80,610.71
44,908.66
8,466.94
53,375.60
27,235.12
504,877.63
281,270.02
53,029.79
334,299.79
170,577.84
55.71%
10.50%
66.21%
33.79%
MONTO VALORIZADO
FACTOR DE RELACION
0.900
19.00%
%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.82
0.00
0.00
11.61
0.00
0.00
0.00
0.00
100.00
100.00
100.00
0.00
0.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
51.41
82.32
10.00
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00
100.00
0.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
VALORIZACION N 04
(LIQUIDACION FINAL)
PROYECTO
CONTRATO DE OBRA
: N 143-ALC-MDN 2008
OBRA
VALOR REFERENCIAL
: S/. 974,627.98
ENTIDAD
VALOR OFERTADO
: S/. 877,165.19
PLAZO DE EJECUCION
FECHA PRESUPUESTO
: ABRIL DE 2008
UBICACIN
PARTIDA N
DESCRIPCION
UND. METRADO
COSTO
UNITARIO
COSTO
PARCIAL
SALDOS
AVANCES
ANTERIOR
METRADO
01.00.00
01.01.00
01.02.00
OBRAS PRELIMINARES
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
MOVIMIENTO DE TIERRAS
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
CONCRETO SIMPLE
04.00.00
04.01.00
04.01.01
04.01.02
CONCRETO ARMADO
04.02.00
04.02.01
04.02.02
04.02.03
VIGAS DE CIMENTACION
04.03.00
04.03.01
04.03.02
04.03.03
COLUMNAS
04.04.00
04.04.01
04.04.02
04.04.03
VIGAS
04.05.00
04.05.01
04.05.02
04.05.03
LOSAS ALIGERADAS
M2
M2
M2
M3
M3
M3
M3
M2
M2
M3
M2
ACTUAL
COSTO
METRADO
ACUMULADO
COSTO
METRADO
COSTO
METRADO
192.40
192.40
0.36
0.74
69.26
142.38
192.40
69.26
100.00
0.00
0.00
0.00
192.40
69.26
100.00
0.00
192.40
142.38
100.00
0.00
0.00
0.00
192.40
142.38
100.00
0.00
192.40
58.24
6.22
80.58
2.54
13.73
12.01
10.27
488.70
799.64
74.70
827.56
192.40
488.70
100.00
0.00
0.00
0.00
192.40
488.70
100.00
0.00
58.24
799.64
100.00
0.00
0.00
0.00
58.24
799.64
100.00
0.00
6.22
74.70
100.00
0.00
0.00
0.00
6.22
74.70
100.00
0.00
80.58
827.56
100.00
0.00
0.00
0.00
80.58
827.56
100.00
0.00
4.88
33.28
183.25
4.87
38.95
108.40
26.08
16.42
138.32
18.26
528.99
867.94
3,008.97
673.62
711.23
41.39
289.44
233.55
3.96
9,666.63
1,146.18
5.83
56.22
584.69
250.45
24.23
3.96
1,460.13
1,362.21
2,315.37
12.58
124.62
1,790.97
290.92
24.23
3.96
3,659.77
3,019.55
7,092.24
11.53
130.10
1,550.52
290.92
24.23
3.96
3,354.31
3,152.32
6,140.06
2.11
30.48
211.98
260.63
18.31
4.11
549.93
558.09
871.24
4.88
528.99
100.00
0.00
0.00
0.00
4.88
528.99
100.00
0.00
33.28
867.94
100.00
0.00
0.00
0.00
33.28
867.94
100.00
0.00
183.25
3,008.97
100.00
0.00
0.00
0.00
183.25
3,008.97
100.00
0.00
1.09
150.77
22.38
0.00
0.00
0.00
1.09
150.77
22.38
3.78
8.70
158.80
22.33
0.00
0.00
0.00
8.70
158.80
22.33
30.25
ZAPATAS
CONCRETO EN ZAPATAS F C=175KG/CM2
M3
ACERO Fy =4200Kg/cm2
KG
CONCRETO FC =175KG/CM2
M3
M2
ACERO FY =4200Kg/cm2
KG
CONCRETO FC=210KG/CM2
M3
M2
ACERO FY =4200Kg/cm2
KG
CONCRETO FC=210KG/CM2
M3
M2
ACERO FY =4200Kg/cm2
KG
M3
M2
KG
41.39
9,666.63
100.00
0.00
0.00
0.00
41.39
9,666.63
100.00
0.00
289.44
1,146.18
100.00
0.00
0.00
0.00
289.44
1,146.18
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
56.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
584.69
12.58
3,659.77
100.00
0.00
0.00
0.00
12.58
3,659.77
100.00
0.00
124.62
3,019.54
100.00
0.00
0.00
0.00
124.62
3,019.54
100.00
0.00
1,790.97
7,092.24
100.00
0.00
0.00
0.00
1,790.97
7,092.24
100.00
0.00
11.53
3,354.31
100.00
0.00
0.00
0.00
11.53
3,354.31
100.00
0.00
130.10
3,152.32
100.00
0.00
0.00
0.00
130.10
3,152.32
100.00
0.00
1,550.52
6,140.06
100.00
0.00
0.00
0.00
1,550.52
6,140.06
100.00
0.00
2.11
549.93
100.00
0.00
0.00
0.00
2.11
549.93
100.00
0.00
30.48
558.09
100.00
0.00
0.00
0.00
30.48
558.09
100.00
0.00
211.98
871.24
100.00
0.00
0.00
0.00
211.98
871.24
100.00
0.00
04.05.04
05.00.00
05.01.00
05.01.01
05.01.02
05.01.03
05.02.00
05.02.01
COBERTURAS
06.00.00
06.01.00
06.01.01
07.00.00
07.01.00
07.02.00
07.03.00
07.04.00
07.05.00
08.00.00
08.01.00
CIELORRASOS
09.00.00
09.01.00
09.01.01
PISOS Y PAVIMENTOS
09.02.00
09.02.01
PISOS
10.00.00
10.01.00
10.01.01
ZOCALOS Y CONTRAZOCALOS
10.02.00
10.02.01
UND
274.32
2.28
625.45
274.32
625.45
100.00
0.00
0.00
0.00
274.32
625.45
100.00
0.00
TIJERAL METALICO N 1
UND
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
UND
1,951.70
494.16
415.08
0.00
CORREAS METALICAS
390.34
61.77
34.59
0.00
5.00
8.00
12.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
M2
204.00
59.34
12,105.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
204.00
M2
87.96
29.03
2,553.48
87.96
2,553.48
100.00
0.00
0.00
0.00
87.96
2,553.48
100.00
0.00
M2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39.72
0.00
0.00
290.00
3,248.00
80.85
290.00
3,248.00
80.85
68.68
M2
0.00
0.00
0.00
60.00
940.20
46.94
60.00
940.20
46.94
67.83
M2
0.00
0.00
0.00
58.00
1,070.68
49.45
58.00
1,070.68
49.45
59.30
357.08
4,017.22
2,003.10
2,165.36
1,332.78
0.00
8.99
11.20
15.67
18.46
7.89
0.00
M2
39.72
358.68
127.83
117.30
168.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
168.92
M2
30.48
23.17
706.22
0.00
0.00
0.00
30.48
706.22
100.00
30.48
706.22
100.00
0.00
M2
183.25
11.70
2,144.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
183.25
M2
192.01
37.19
7,140.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
192.01
M2
39.72
34.66
1,376.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39.72
140.40
19.73
2,770.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
140.40
24.18
21.19
142.89
60.00
3,455.08
1,271.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.19
26.00
13.00
9.30
73.90
241.80
960.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
26.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13.00
233.12
26.40
22.41
30.71
5,224.22
810.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
233.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
26.40
30.48
646.04
4.98
4.42
151.79
2,855.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
646.04
ESTRUCTURAS
CONTRAPISOS
CONTRAPISO DE 38 MM.
ZOCALOS
ZOCALO DE LOSETA DE 0.30X0.30M. EN SS.HH. H=1.20m.
CONTRAZOCALOS
CONTRAZOCALO DE LOSETA CERAMICO DE 10X30 CM.
11.00.00
11.01.00
11.02.00
CARPINTERIA DE MADERA
12.00.00
12.01.00
12.02.00
CERRAJERIA
13.00.00
13.01.00
13.02.00
14.00.00
14.01.00
14.02.00
PINTURA
M2
M2
PZA
PZA
P2
P2
M2
M2
15.00.00
15.01.00
VARIOS
16.00.00
16.01.01
16.02.01
16.02.02
16.02.03
17.00.00
17.01.00
17.02.00
17.03.00
17.05.01
17.05.02
17.05.03
17.06.01
17.06.03
17.06.04
17.06.05
17.06.06
17.06.07
17.06.08
17.07.01
17.07.02
17.07.03
INSTALACIONES SANITARIAS
18.00.00
18.01.00
18.02.02
18.03.03
18.03.05
18.04.02
INSTALACIONES DE AGUA
19.00.00
19.00.01
19.00.02
19.00.03
INSTALACIONES ELECTRICAS
19.01.00
19.01.01
19.02.00
19.02.01
19.02.02
19.02.03
19.03.00
19.03.01
TABLEROS Y CUCHILLAS
19.04.00
19.04.01
19.04.02
ARTEFACTOS ELECTRICOS
GLB
1.00
500.00
500.00
0.70
350.00
70.00
0.10
50.00
10.00
0.80
400.00
80.00
0.20
UND
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
PZA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
ESPEJOS DE 0.30X0.40 m
UND
832.88
536.40
237.28
20.16
0.00
URINARIO DE LOSA
208.22
178.80
118.64
10.08
0.00
UND
4.00
3.00
2.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
1.00
7.00
5.00
3.72
9.12
13.91
19.00
4.00
2.00
2.00
2.00
2.00
3.00
2.00
2.00
4.00
33.97
33.61
40.74
10.37
10.05
12.85
7.96
11.37
7.13
10.57
6.97
10.82
10.77
21.22
18.80
5.04
33.97
235.27
203.70
38.58
91.66
178.74
151.24
45.48
14.26
21.14
13.94
21.64
32.31
42.44
37.60
20.16
1.00
33.97
100.00
0.00
0.00
0.00
1.00
33.97
100.00
0.00
7.00
235.27
100.00
0.00
0.00
0.00
7.00
235.27
100.00
0.00
5.00
203.70
100.00
0.00
0.00
0.00
5.00
203.70
100.00
0.00
3.72
38.58
100.00
0.00
0.00
0.00
3.72
38.58
100.00
0.00
9.12
91.66
100.00
0.00
0.00
0.00
9.12
91.66
100.00
0.00
13.91
178.74
100.00
0.00
0.00
0.00
13.91
178.74
100.00
0.00
19.00
151.24
100.00
0.00
0.00
0.00
19.00
151.24
100.00
0.00
4.00
45.48
100.00
0.00
0.00
0.00
4.00
45.48
100.00
0.00
2.00
14.26
100.00
0.00
0.00
0.00
2.00
14.26
100.00
0.00
2.00
21.14
100.00
0.00
0.00
0.00
2.00
21.14
100.00
0.00
2.00
13.94
100.00
0.00
0.00
0.00
2.00
13.94
100.00
0.00
2.00
21.64
100.00
0.00
0.00
0.00
2.00
21.64
100.00
0.00
3.00
32.31
100.00
0.00
0.00
0.00
3.00
32.31
100.00
0.00
2.00
42.44
100.00
0.00
0.00
0.00
2.00
42.44
100.00
0.00
2.00
37.60
100.00
0.00
0.00
0.00
2.00
37.60
100.00
0.00
4.00
20.16
100.00
0.00
0.00
0.00
4.00
20.16
100.00
0.00
11.00
34.42
19.00
11.00
2.00
28.11
24.16
4.58
4.58
21.04
309.21
831.59
87.02
50.38
42.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
34.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
24.00
12.00
7.00
43.20
40.65
38.35
1,036.80
487.80
268.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
7.00
268.45
100.00
0.00
0.00
0.00
7.00
268.45
100.00
0.00
120.00
4.71
565.20
0.00
0.00
0.00
120.00
565.20
100.00
120.00
565.20
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
250.00
162.40
325.00
87.50
0.00
2.32
1.30
1.25
0.00
70.00
250.00
70.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70.00
PZA
1.00
35.96
35.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
UND
48.53
31.22
582.36
374.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
UND
12.00
12.00
0.00
SPOT LIGHT
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
PTO
PTO
PTO
PZA
PZA
PZA
PZA
PZA
PZA
PZA
UND
PZA
UND
PTO
PZA
PZA
PZA
PTO
PTO
PTO
TABLERO DE DISTRIBUCION
118,226.15
51,307.53
6,580.30
1.37%
1,619.70
702.91
90.15
793.06
6.63%
7,838.39
3,401.69
436.27
3,837.96
UTILIDAD
7.00%
MONTO VALORIZADO
57,887.83
8,275.83
3,591.53
460.62
4,052.15
135,960.07
59,003.66
7,567.34
66,571.00
FACTOR DE RELACION
0.900
19.00%
122,364.06
53,103.29
6,810.61
59,913.90
23,249.17
10,089.63
1,294.02
11,383.64
145,613.23
63,192.92
8,104.63
71,297.54
43.40%
5.57%
48.96%
COSTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
522.85
77.62
552.43
77.67
0.00
0.00
0.00
0.00
1,460.13
100.00
1,362.21
100.00
2,315.37
100.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,951.70
100.00
494.16
100.00
415.08
100.00
12,105.36
100.00
0.00
0.00
357.08
100.00
769.22
19.15
1,062.90
53.06
1,094.68
50.55
1,332.78
100.00
0.00
0.00
2,144.03
100.00
7,140.85
100.00
1,376.70
100.00
2,770.09
100.00
3,455.08
100.00
1,271.40
100.00
241.80
100.00
960.70
100.00
5,224.22
100.00
810.74
100.00
151.79
100.00
2,855.50
100.00
100.00
20.00
832.88
100.00
536.40
100.00
237.28
100.00
20.16
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
309.21
100.00
831.59
100.00
87.02
100.00
50.38
100.00
42.08
100.00
1,036.80
100.00
487.80
100.00
0.00
0.00
0.00
0.00
162.40
100.00
325.00
100.00
87.50
100.00
35.96
100.00
582.36
100.00
374.64
100.00
60,338.32
826.63
4,000.43
4,223.68
69,389.06
62,450.15
11,865.53
74,315.68
51.04%
VALORIZACION N 04
(LIQUIDACION FINAL)
PROYECTO
CONTRATO DE OBRA
: N 143-ALC-MDN 2008
OBRA
VALOR REFERENCIAL
: S/. 974,627.98
ENTIDAD
VALOR OFERTADO
: S/. 877,165.19
PLAZO DE EJECUCION
FECHA PRESUPUESTO
: ABRIL DE 2008
UBICACIN
DESCRIPCION
PARTIDA N
UND. METRADO
COSTO
UNITARIO
COSTO
PARCIAL
SALDOS
AVANCES
ANTERIOR
METRADO
01.00.00
01.01.00
01.02.00
OBRAS PRELIMINARES
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
MOVIMIENTO DE TIERRAS
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
CONCRETO SIMPLE
04.00.00
04.01.00
04.01.01
04.01.02
CONCRETO ARMADO
04.02.00
04.02.01
04.02.02
04.02.03
COLUMNAS
04.03.00
04.03.01
04.03.02
04.03.03
VIGAS
05.00.00
05.01.00
05.01.01
06.00.00
06.01.00
06.02.00
06.03.00
06.04.00
M2
M2
M2
M3
M3
M3
M3
M2
M2
M3
M2
ACTUAL
COSTO
METRADO
ACUMULADO
COSTO
METRADO
COSTO
METRADO
COSTO
242.95
242.95
0.36
0.74
87.46
179.78
242.95
87.46
100.00
0.00
0.00
0.00
242.95
87.46
100.00
0.00
0.00
242.95
179.78
100.00
0.00
0.00
0.00
242.95
179.78
100.00
0.00
0.00
97.18
53.65
17.60
89.06
2.54
13.73
12.01
10.27
246.84
736.61
211.38
914.65
97.18
246.84
100.00
0.00
0.00
0.00
97.18
246.84
100.00
0.00
0.00
53.65
736.61
100.00
0.00
0.00
0.00
53.65
736.61
100.00
0.00
0.00
17.60
211.38
100.00
0.00
0.00
0.00
17.60
211.38
100.00
0.00
0.00
89.06
914.65
100.00
0.00
0.00
0.00
89.06
914.65
100.00
0.00
0.00
41.62
75.00
544.38
21.46
332.28
108.40
26.08
16.42
138.32
18.26
4,511.61
1,956.00
8,938.72
2,968.35
6,067.43
41.62
4,511.61
100.00
0.00
0.00
0.00
41.62
4,511.61
100.00
0.00
0.00
75.00
1,956.00
100.00
0.00
0.00
0.00
75.00
1,956.00
100.00
0.00
0.00
544.38
8,938.72
100.00
0.00
0.00
0.00
544.38
8,938.72
100.00
0.00
0.00
21.46
2,968.35
100.00
0.00
0.00
0.00
21.46
2,968.35
100.00
0.00
0.00
332.28
6,067.43
100.00
0.00
0.00
0.00
332.28
6,067.43
100.00
0.00
0.00
30.00
803.40
233.55
3.96
7,006.50
3,181.46
17.34
206.25
1,864.76
290.92
24.23
3.96
5,044.55
4,997.44
7,384.45
290.92
24.23
3.96
3,092.48
1,514.38
3,222.45
ZAPATAS
CONCRETO EN ZAPATAS F C=175KG/CM2
M3
ACERO Fy =4200Kg/cm2
KG
CONCRETO FC=210KG/CM2
M3
M2
ACERO FY =4200Kg/cm2
KG
30.00
7,006.50
100.00
0.00
0.00
0.00
30.00
7,006.50
100.00
0.00
0.00
803.40
3,181.46
100.00
0.00
0.00
0.00
803.40
3,181.46
100.00
0.00
0.00
17.34
5,044.55
100.00
0.00
0.00
0.00
17.34
5,044.55
100.00
0.00
0.00
206.25
4,997.44
100.00
0.00
0.00
0.00
206.25
4,997.44
100.00
0.00
0.00
1,864.76
7,384.45
100.00
0.00
0.00
0.00
1,864.76
7,384.45
100.00
0.00
0.00
10.63
3,092.48
100.00
0.00
0.00
0.00
10.63
3,092.48
100.00
0.00
0.00
62.50
1,514.38
100.00
0.00
0.00
0.00
62.50
1,514.38
100.00
0.00
0.00
813.75
3,222.45
100.00
0.00
0.00
0.00
813.75
3,222.45
100.00
0.00
0.00
0.00
0.00
CONCRETO FC=210KG/CM2
M3
M2
ACERO FY =4200Kg/cm2
KG
10.63
62.50
813.75
M2
289.08
29.03
8,391.99
289.08
8,391.99
100.00
0.00
0.00
0.00
289.08
8,391.99
100.00
M2
100.00
0.00
0.00
0.00
753.19
8,435.73
100.00
0.00
0.00
990.19
51.06
0.00
0.00
0.00
63.19
990.19
51.06
60.56
948.97
M2
86.00
1,587.56
50.96
0.00
0.00
0.00
86.00
1,587.56
50.96
82.75
1,527.57
8,435.73
1,939.16
3,115.13
214.29
63.19
11.20
15.67
18.46
7.89
8,435.73
M2
753.19
123.75
168.75
27.16
753.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.16
214.29
07.00.00
07.01.00
07.01.01
PISOS Y PAVIMENTOS
07.02.00
07.02.01
VEREDAS DE CONCRETO
07.03.00
07.03.01
SARDINELES
08.00.00
08.01.00
ZOCALOS Y CONTRAZOCALOS
09.00.00
09.01.00
09.02.00
CARPINTERIA METALICA
10.00.00
10.01.00
10.02.00
CERRAJERIA
11.00.00
11.01.00
PINTURA
12.00.00
12.01.00
12.02.00
JARDINERIA
13.00.00
13.01.00
VARIOS
CONTRAPISOS
M2
544.38
11.70
6,369.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
544.38
6,369.25
M2
462.79
74.70
34,570.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
462.79
34,570.41
M3
7.99
176.00
1,406.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.99
1,406.24
105.12
10.17
1,069.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
105.12
1,069.07
M2
126.05
67.22
3,199.15
6,920.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.38
3,199.15
25.38
102.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
102.96
6,920.97
6.00
3.00
9.30
73.90
55.80
221.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
55.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
221.70
1,052.48
4.42
4,651.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,052.48
4,651.96
50.00
999.60
17.26
2.40
863.00
2,399.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50.00
863.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
999.60
2,399.04
1.00
500.00
500.00
0.60
300.00
60.00
0.20
100.00
20.00
0.80
400.00
80.00
0.20
100.00
CONTRAPISO DE 38 MM.
VEREDA F C=140 KG/CM2 E=8.5 CM. + ACABADO COLOREADO Y BRUADO 1:2 (1.5cm.) E= 4"
PZA
PZA
M2
UND
M2
GLB
146,585.43
81,968.01
100.00
82,068.01
1.37%
2,008.22
1,122.96
1.37
1,124.33
883.89
6.63%
9,718.61
5,434.48
6.63
5,441.11
4,277.50
UTILIDAD
7.00%
MONTO VALORIZADO
FACTOR DE RELACION
10,260.98
5,737.76
7.00
5,744.76
4,516.22
168,573.24
94,263.21
115.00
94,378.21
74,195.03
151,715.92
84,836.89
103.50
84,940.39
66,775.53
28,826.02
16,119.01
19.67
16,138.67
12,687.35
180,541.94
100,955.90
123.17
101,079.06
79,462.88
55.92%
0.07%
55.99%
44.01%
0.900
64,517.42
19.00%
%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48.94
49.04
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
20.00
VALORIZACION N 04
(LIQUIDACION FINAL)
PROYECTO
CONTRATO DE OBRA
: N 143-ALC-MDN 2008
OBRA
VALOR REFERENCIAL
: S/. 974,627.98
ENTIDAD
VALOR OFERTADO
: S/. 877,165.19
PLAZO DE EJECUCION
FECHA PRESUPUESTO
: ABRIL DE 2008
UBICACIN
DESCRIPCION
PARTIDA N
UND.
METRADO
COSTO
UNITARIO
COSTO
PARCIAL
SALDOS
AVANCES
ANTERIOR
METRADO
ACTUAL
COSTO
METRADO
ACUMULADO
COSTO
METRADO
COSTO
METRADO
M2
720.00
0.74
532.80
720.00
532.80
100.00
0.00
0.00
0.00
720.00
532.80
100.00
0.00
M3
100.00
0.00
0.00
0.00
144.00
1,977.12
100.00
0.00
80.71
100.00
0.00
0.00
0.00
6.72
80.71
100.00
0.00
M2
720.00
1,785.60
100.00
0.00
0.00
0.00
720.00
1,785.60
100.00
0.00
M2
720.00
3,117.60
100.00
0.00
0.00
0.00
720.00
3,117.60
100.00
0.00
M3
1,977.12
80.71
1,785.60
3,117.60
2,012.30
6.72
13.73
12.01
2.48
4.33
10.27
1,977.12
M3
144.00
6.72
720.00
720.00
195.94
144.00
195.94
2,012.30
100.00
0.00
0.00
0.00
195.94
2,012.30
100.00
0.00
250.45 19,154.42
24.23 1,318.11
10.32 2,146.56
0.00
0.00
0.00
76.48
19,154.42
100.00
76.48
19,154.42
100.00
0.00
0.00
0.00
0.00
54.40
1,318.11
100.00
54.40
1,318.11
100.00
0.00
0.00
0.00
0.00
208.00
2,146.56
100.00
208.00
2,146.56
100.00
0.00
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
02.05.00
MOVIMIENTO DE TIERRAS
03.00.00
03.01.00
03.02.00
03.03.00
CONCRETO SIMPLE
CONCRETO F'c=175 kg/cm2 (0.10 m)
M3
M2
76.48
54.40
208.00
2.00
1.00
1,800.00
360.00
3,600.00
360.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
GLB
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
05.00.00 PINTURA
05.01.00 PINTADO Y DEMARCACION DE LOSA MULTIDEPORTIVA
GLB
1.00
370.55
370.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
06.00.00 FLETE
06.01.00 FLETE
GLB
1.00
1,000.00
1,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
UND
37,455.77
9,506.13
22,619.09
1.37%
513.14
130.23
309.88
440.12
6.63%
2,483.32
630.26
1,499.65
2,129.90
UTILIDAD
7.00%
MONTO VALORIZADO
FACTOR DE RELACION
2,621.90
665.43
1,583.34
2,248.77
43,074.13
10,932.05
26,011.96
36,944.01
38,766.72
9,838.85
23,410.76
33,249.61
7,365.68
1,869.38
4,448.04
6,317.43
46,132.40
11,708.23
27,858.80
39,567.04
25.38%
60.39%
85.77%
0.900
32,125.22
19.00%
URALES
COSTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,600.00
100.00
360.00
100.00
370.55
100.00
1,000.00
100.00
5,330.55
73.03
353.42
373.14
6,130.14
5,517.13
1,048.25
6,565.38
14.23%
VALORIZACION N 05
(LIQUIDACION FINAL)
PROYECTO
CONTRATO DE OBRA
: N 143-ALC-MDN 2008
OBRA
VALOR REFERENCIAL
: S/. 974,627.98
ENTIDAD
VALOR OFERTADO
: S/. 877,165.19
PLAZO DE EJECUCION
FECHA PRESUPUESTO
: ABRIL DE 2008
UBICACIN
UND. METRADO
PARTIDA N
COSTO
UNITARIO
COSTO
PARCIAL
SALDOS
AVANCES
ANTERIOR
METRADO
01.00.00
01.01.00
01.02.00
01.03.00
OBRAS PROVICIONALES
02.00.00
07.01.00
07.02.00
OBRAS PRELIMINARES
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
MOVIMIENTO DE TIERRAS
04.00.00
04.01.00
04.02.00
04.03.00
04.04.00
04.05.00
CONCRETO SIMPLE
05.00.00
05.01.00
05.02.01
05.01.02
CONCRETO ARMADO
05.02.00
05.02.01
05.02.02
05.02.03
VIGAS DE CIMENTACION
05.03.00
05.03.01
05.03.02
05.03.03
COLUMNAS
05.04.00
05.04.01
05.04.02
05.02.03
VIGAS
CARTEL DE OBRA
UND
ALMACEN DE OBRA
MES
CERCO PROVICIONAL
M2
M2
M2
M3
M3
M3
M3
M2
M2
M3
M2
1.00
4.00
54.00
800.00
200.00
54.34
800.00
800.00
2,934.36
875.43
875.43
0.36
0.74
875.43
142.10
33.73
219.79
ACTUAL
COSTO
METRADO
ACUMULADO
COSTO
METRADO
COSTO
METRADO
COSTO
1.00
800.00
100.00
0.00
0.00
0.00
1.00
800.00
100.00
0.00
0.00
0.00
4.00
800.00
100.00
0.00
0.00
0.00
4.00
800.00
100.00
0.00
0.00
0.00
54.00
2,934.36
100.00
0.00
0.00
0.00
54.00
2,934.36
100.00
0.00
0.00
0.00
315.15
647.82
875.43
315.15
100.00
0.00
0.00
0.00
875.43
315.15
100.00
0.00
0.00
0.00
875.43
647.82
100.00
0.00
0.00
0.00
875.43
647.82
100.00
0.00
0.00
0.00
2.54
13.73
12.01
10.27
2,223.59
1,951.03
405.10
2,257.24
875.43
2,223.59
100.00
0.00
0.00
0.00
875.43
2,223.59
100.00
0.00
0.00
0.00
142.10
1,951.03
100.00
0.00
0.00
0.00
142.10
1,951.03
100.00
0.00
0.00
0.00
33.73
405.10
100.00
0.00
0.00
0.00
33.73
405.10
100.00
0.00
0.00
0.00
219.79
2,257.24
100.00
0.00
0.00
0.00
219.79
2,257.24
100.00
0.00
0.00
0.00
13.72
98.00
809.17
18.83
165.67
108.40
26.08
16.42
138.32
18.26
1,487.25
2,555.84
13,286.57
2,604.57
3,025.13
13.72
1,487.25
100.00
0.00
0.00
0.00
13.72
1,487.25
100.00
0.00
0.00
0.00
98.00
2,555.84
100.00
0.00
0.00
0.00
98.00
2,555.84
100.00
0.00
0.00
0.00
809.17
13,286.57
100.00
0.00
0.00
0.00
809.17
13,286.57
100.00
0.00
0.00
0.00
18.83
2,604.57
100.00
0.00
0.00
0.00
18.83
2,604.57
100.00
0.00
0.00
0.00
165.67
3,025.13
100.00
0.00
0.00
0.00
165.67
3,025.13
100.00
0.00
0.00
0.00
39.20
855.89
233.55
3.96
9,155.16
3,389.32
24.09
192.71
3,337.50
250.45
24.23
3.96
6,033.34
4,669.36
13,216.50
18.52
198.36
2,488.20
290.92
24.23
3.96
5,387.84
4,806.26
9,853.27
42.70
430.94
6,369.43
290.92
24.23
3.96
12,422.28
10,441.68
25,222.94
ZAPATAS
CONCRETO EN ZAPATAS F C=175KG/CM2
M3
ACERO Fy =4200Kg/cm2
KG
CONCRETO FC =175KG/CM2
M3
M2
ACERO FY =4200Kg/cm2
KG
CONCRETO FC=210KG/CM2
M3
M2
ACERO FY =4200Kg/cm2
KG
CONCRETO FC=210KG/CM2
M3
M2
ACERO FY =4200Kg/cm2
KG
39.20
9,155.16
100.00
0.00
0.00
0.00
39.20
9,155.16
100.00
0.00
0.00
0.00
855.89
3,389.32
100.00
0.00
0.00
0.00
855.89
3,389.32
100.00
0.00
0.00
0.00
24.09
6,033.34
100.00
0.00
0.00
0.00
24.09
6,033.34
100.00
0.00
0.00
0.00
192.71
4,669.36
100.00
0.00
0.00
0.00
192.71
4,669.36
100.00
0.00
0.00
0.00
3,337.50
13,216.50
100.00
0.00
0.00
0.00
3,337.50
13,216.50
100.00
0.00
0.00
0.00
18.52
5,387.84
100.00
0.00
0.00
0.00
18.52
5,387.84
100.00
0.00
0.00
0.00
198.36
4,806.26
100.00
0.00
0.00
0.00
198.36
4,806.26
100.00
0.00
0.00
0.00
2,488.20
9,853.27
100.00
0.00
0.00
0.00
2,488.20
9,853.27
100.00
0.00
0.00
0.00
42.70
12,422.28
100.00
0.00
0.00
0.00
42.70
12,422.28
100.00
0.00
0.00
0.00
430.94
10,441.68
100.00
0.00
0.00
0.00
430.94
10,441.68
100.00
0.00
0.00
0.00
6,369.43
25,222.94
100.00
0.00
0.00
0.00
6,369.43
25,222.94
100.00
0.00
0.00
0.00
05.05.00
05.05.01
05.05.02
05,05,03
05.05.04
LOSAS ALIGERADAS
05.06.00
05.06.01
05.06.02
05.06.03
ESCALERAS
05.07.00
05.07.01
05.07.02
05.07.03
LAVADERO Y URINARIOS
06.00.00
06.01.00
06.01.01
06.01.02
07.00.00
07.01.00
07.02.00
07.03.00
07.04.00
07.05.00
08.00.00
08.01.00
CIELORRASOS
09.00.00
09.01.00
09.01.01
PISOS Y PAVIMENTOS
09.02.00
09.02.01
PISOS
09.03.00
09.03.01
09.03.02
VEREDAS DE CONCRETO
09.04.00
09.04.01
SARDINELES
10.00.00
10.01.00
10.01.01
ZOCALOS Y CONTRAZOCALOS
10.02.00
10.02.01
11.00.00
11.01.00
46.46
545.35
3,058.33
4,908.17
260.63
18.31
4.11
2.28
12,108.87
9,985.36
12,569.74
11,190.63
7.91
46.88
634.53
267.68
33.26
4.07
2,117.35
1,559.23
2,582.54
1.75
11.05
75.62
250.45
24.23
3.96
438.29
267.74
299.46
630.51
169.65
29.03
29.03
18,303.71
4,924.94
120.31
1,600.32
133.11
263.62
317.96
8.99
11.20
15.67
18.46
7.89
1,081.59
17,923.58
2,085.83
4,866.43
2,508.70
M2
545.35
23.17
M2
1,517.26
M2
VEREDA F C=140 KG/CM2 E=8.5 CM. + ACABADO COLOREADO Y BRUADO 1:2 (1.5cm.) E= 4"
M2
M3
M2
KG
UND
M3
M2
KG
CONCRETO FC=175KG/CM2
M3
M2
ACERO FY =4200Kg/cm2
KG
46.46
12,108.87
100.00
0.00
0.00
0.00
46.46
12,108.87
100.00
0.00
0.00
0.00
545.35
9,985.36
100.00
0.00
0.00
0.00
545.35
9,985.36
100.00
0.00
0.00
0.00
3,058.33
12,569.74
100.00
0.00
0.00
0.00
3,058.33
12,569.74
100.00
0.00
0.00
0.00
4,908.17
11,190.63
100.00
0.00
0.00
0.00
4,908.17
11,190.63
100.00
0.00
0.00
0.00
7.91
2,117.35
100.00
0.00
0.00
0.00
7.91
2,117.35
100.00
0.00
0.00
0.00
46.88
1,559.23
100.00
0.00
0.00
0.00
46.88
1,559.23
100.00
0.00
0.00
0.00
634.53
2,582.54
100.00
0.00
0.00
0.00
634.53
2,582.54
100.00
0.00
0.00
0.00
1.75
438.29
100.00
0.00
0.00
0.00
1.75
438.29
100.00
0.00
0.00
0.00
11.05
267.74
100.00
0.00
0.00
0.00
11.05
267.74
100.00
0.00
0.00
0.00
75.62
299.46
100.00
0.00
0.00
0.00
75.62
299.46
100.00
0.00
0.00
0.00
568.59
16,506.17
90.18
0.00
0.00
0.00
568.59
16,506.17
90.18
61.92
1,797.54
9.82
169.65
4,924.94
100.00
0.00
0.00
0.00
169.65
4,924.94
100.00
0.00
0.00
0.00
M2
M2
120.31
1,081.59
100.00
0.00
0.00
0.00
120.31
1,081.59
100.00
0.00
0.00
0.00
1,414.56
15,843.07
88.39
0.00
0.00
0.00
1,414.56
15,843.07
88.39
185.76
2,080.51
11.61
133.11
2,085.83
100.00
0.00
0.00
0.00
133.11
2,085.83
100.00
0.00
0.00
0.00
263.62
4,866.43
100.00
0.00
0.00
0.00
263.62
4,866.43
100.00
0.00
0.00
0.00
317.96
2,508.70
100.00
0.00
0.00
0.00
317.96
2,508.70
100.00
0.00
0.00
0.00
12,635.76
545.35
12,635.76
100.00
0.00
0.00
0.00
545.35
12,635.76
100.00
0.00
0.00
0.00
11.70
17,751.94
0.00
0.00
0.00
1,517.26
17,751.94
100.00
1,517.26
17,751.94
100.00
0.00
0.00
0.00
708.09
37.19
26,333.87
0.00
0.00
0.00
708.09
26,333.87
100.00
708.09
26,333.87
100.00
0.00
0.00
0.00
101.08
33.58
74.70
10.32
7,550.68
346.55
0.00
0.00
0.00
101.08
7,550.68
100.00
101.08
7,550.68
100.00
0.00
0.00
0.00
33.58
346.55
100.00
0.00
0.00
0.00
33.58
346.55
100.00
0.00
0.00
0.00
M3
4.24
176.00
746.24
4.24
746.24
100.00
0.00
0.00
0.00
4.24
746.24
100.00
0.00
0.00
0.00
M2
120.31
34.66
4,169.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120.31
4,169.94
100.00
436.40
19.73
8,610.17
0.00
0.00
0.00
300.00
5,919.00
68.74
300.00
5,919.00
68.74
136.40
2,691.17
31.26
60.13
142.89
8,591.98
0.00
0.00
0.00
60.13
8,591.98
100.00
60.13
8,591.98
100.00
0.00
0.00
0.00
M2
M2
M2
M2
CONTRAPISOS
CONTRAPISO DE 38 MM.
ZOCALOS
ZOCALO DE LOZETA DE 0.30X0.30M. EN SS.HH. H=1.20m.
CONTRAZOCALOS
CONTRAZOCALO DE LOZETA CERAMICO DE 10X30 CM.
CARPINTERIA DE MADERA
PUERTA CONTRAPLACADA DE 45 MM TRIPLAY 4 MM INCLUIDO PINTADO
M2
11.02.00
11.03.00
UND
M2
3.00
147.25
217.79
60.00
653.37
8,835.00
0.00
0.00
0.00
3.00
653.37
100.00
3.00
653.37
100.00
0.00
0.00
0.00
0.00
0.00
0.00
96.00
5,760.00
65.20
96.00
5,760.00
65.20
51.25
3,075.00
34.80
12.00.00
12.01.00
12.02.00
CERRAJERIA
70.00
35.00
9.30
73.90
651.00
2,586.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70.00
651.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
35.00
2,586.50
100.00
13.00.00
13.01.00
13.02.00
900.66
77.00
22.41
30.71
20,183.79
2,364.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
900.66
20,183.79
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
77.00
2,364.67
100.00
14.00.00
14.01.00
14.02.00
PINTURA
545.35
2,556.99
4.98
4.42
2,715.84
11,301.90
265.00
1,319.70
48.59
280.35
1,396.14
51.41
545.35
2,715.84
100.00
0.00
0.00
0.00
451.99
1,997.80
17.68
1,700.00
7,514.00
66.48
2,151.99
9,511.80
84.16
405.00
1,790.10
15.84
15.00.00
15.01.00
VARIOS
GLB
1.00
500.00
500.00
0.90
450.00
90.00
0.00
0.00
0.00
0.90
450.00
90.00
0.10
50.00
10.00
16.00.00
16.00.00
16.00.00
16.00.00
UND
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.00
3,956.18
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
536.40
100.00
UND
3,956.18
536.40
60.48
0.00
ESPEJOS DE 0.30X0.40 m
208.22
178.80
10.08
0.00
UND
19.00
3.00
6.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
60.48
100.00
17.00.00
17.01.00
17.02.00
17.03.00
17.05.01
17.05.02
17.05.03
17.06.01
17.06.02
17.06.03
17.06.04
17.06.05
17.06.06
17.06.07
17.06.08
17.07.01
17.07.02
17.07.03
17.08.01
INSTALACIONES SANITARIAS
4.00
14.00
20.00
16.51
20.25
103.98
27.00
5.00
8.00
1.00
8.00
2.00
10.00
12.00
11.00
4.00
20.00
6.00
33.97
33.61
40.74
10.37
10.05
12.85
7.96
11.37
11.37
7.13
10.57
6.97
10.82
10.77
21.22
18.80
5.04
110.40
135.88
470.54
814.80
171.21
203.51
1,336.14
214.92
56.85
90.96
7.13
84.56
13.94
108.20
129.24
233.42
75.20
100.80
662.40
18.00.00
18.01.00
18.02.01
18.02.02
18.03.01
18.03.02
18.03.03
18.03.04
18.03.05
18.03.06
18.04.01
18.04.02
INSTALACIONES DE AGUA
32.00
66.78
61.45
10.00
3.00
34.00
4.00
23.00
6.00
10.00
4.00
28.11
5.33
24.16
4.58
4.58
4.58
4.58
4.58
4.58
30.41
21.04
899.52
355.94
1,484.63
45.80
13.74
155.72
18.32
105.34
27.48
304.10
84.16
PZA
PZA
P2
P2
M2
M2
PTO
PTO
PTO
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
UND
PZA
UND
PZA
PTO
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
4.00
135.88
100.00
0.00
0.00
0.00
4.00
135.88
100.00
0.00
0.00
0.00
14.00
470.54
100.00
0.00
0.00
0.00
14.00
470.54
100.00
0.00
0.00
0.00
20.00
814.80
100.00
0.00
0.00
0.00
20.00
814.80
100.00
0.00
0.00
0.00
16.51
171.21
100.00
0.00
0.00
0.00
16.51
171.21
100.00
0.00
0.00
0.00
20.25
203.51
100.00
0.00
0.00
0.00
20.25
203.51
100.00
0.00
0.00
0.00
103.98
1,336.14
100.00
0.00
0.00
0.00
103.98
1,336.14
100.00
0.00
0.00
0.00
27.00
214.92
100.00
0.00
0.00
0.00
27.00
214.92
100.00
0.00
0.00
0.00
5.00
56.85
100.00
0.00
0.00
0.00
5.00
56.85
100.00
0.00
0.00
0.00
8.00
90.96
100.00
0.00
0.00
0.00
8.00
90.96
100.00
0.00
0.00
0.00
1.00
7.13
100.00
0.00
0.00
0.00
1.00
7.13
100.00
0.00
0.00
0.00
8.00
84.56
100.00
0.00
0.00
0.00
8.00
84.56
100.00
0.00
0.00
0.00
2.00
13.94
100.00
0.00
0.00
0.00
2.00
13.94
100.00
0.00
0.00
0.00
10.00
108.20
100.00
0.00
0.00
0.00
10.00
108.20
100.00
0.00
0.00
0.00
12.00
129.24
100.00
0.00
0.00
0.00
12.00
129.24
100.00
0.00
0.00
0.00
0.00
0.00
0.00
11.00
233.42
100.00
11.00
233.42
100.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
75.20
100.00
4.00
75.20
100.00
0.00
0.00
0.00
20.00
100.80
100.00
0.00
0.00
0.00
20.00
100.80
100.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
662.40
100.00
6.00
662.40
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.00
899.52
100.00
0.00
0.00
0.00
66.78
355.94
100.00
66.78
355.94
100.00
0.00
0.00
0.00
0.00
0.00
0.00
61.45
1,484.63
100.00
61.45
1,484.63
100.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
45.80
100.00
10.00
45.80
100.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
13.74
100.00
3.00
13.74
100.00
0.00
0.00
0.00
0.00
0.00
0.00
34.00
155.72
100.00
34.00
155.72
100.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
18.32
100.00
4.00
18.32
100.00
0.00
0.00
0.00
0.00
0.00
0.00
23.00
105.34
100.00
23.00
105.34
100.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
27.48
100.00
6.00
27.48
100.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
304.10
100.00
10.00
304.10
100.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
84.16
100.00
4.00
84.16
100.00
0.00
0.00
0.00
18.05.01
PZA
1.00
23.60
23.60
0.00
0.00
0.00
1.00
23.60
100.00
1.00
23.60
100.00
0.00
0.00
0.00
19.00.00
19.01.00
19.02.00
19.03.00
19.04.00
INSTALACIONES ELECTRICAS
SALIDA DE TECHO CENTRO DE LUZ
PTO
100.00
0.00
0.00
0.00
75.00
3,246.00
100.00
0.00
0.00
0.00
40.73
100.00
0.00
0.00
0.00
1.00
40.73
100.00
0.00
0.00
0.00
PTO
54.00
2,075.22
100.00
0.00
0.00
0.00
54.00
2,075.22
100.00
0.00
0.00
0.00
PTO
3,246.00
40.73
2,075.22
922.32
1.00
43.28
40.73
38.43
38.43
3,246.00
PTO
75.00
1.00
54.00
24.00
75.00
24.00
922.32
100.00
0.00
0.00
0.00
24.00
922.32
100.00
0.00
0.00
0.00
20.00.00
20.01.00
611.00
4.71
2,877.81
611.00
2,877.81
100.00
0.00
0.00
0.00
611.00
2,877.81
100.00
0.00
0.00
0.00
21.00.00
21.01.00
21.02.00
21.03.00
0.00
100.00
238.00
100.00
100.00
238.00
100.00
0.00
0.00
0.00
0.00
0.00
852.00
1,158.72
100.00
852.00
1,158.72
100.00
0.00
0.00
0.00
238.00
1,158.72
484.70
0.00
2.38
1.36
1.31
0.00
100.00
852.00
370.00
0.00
0.00
0.00
0.00
370.00
484.70
100.00
370.00
484.70
100.00
0.00
0.00
0.00
22.00.00
22.01.00
TABLEROS Y CUCHILLAS
PZA
2.00
35.96
71.92
0.00
0.00
0.00
2.00
71.92
100.00
2.00
71.92
100.00
0.00
0.00
0.00
23.00.00
23.01.00
23.02.00
UND
507.52
436.64
507.52
436.64
0.00
0.00
1.00
507.52
100.00
1.00
507.52
100.00
0.00
0.00
0.00
GLB
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
436.64
100.00
24.00.00
24.01.00
ARTEFACTOS ELECTRICOS
UND
75.00
48.59
3,644.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75.00
3,644.25
100.00
TABLERO DE DISTRIBUCION
409,919.73
271,424.35
87,521.69
358,946.04
1.37%
5,615.90
3,718.51
1,199.05
4,917.56
698.34
6.63%
27,177.68
17,995.43
5,802.69
23,798.12
3,379.56
UTILIDAD
7.00%
MONTO VALORIZADO
FACTOR DE RELACION
28,694.38
18,999.70
6,126.52
25,126.22
3,568.16
471,407.69
312,137.99
100,649.95
412,787.94
58,619.75
424,266.92
280,924.19
90,584.96
371,509.15
52,757.78
80,610.71
53,375.60
17,211.14
70,586.74
10,023.98
504,877.63
334,299.79
107,796.10
442,095.89
62,781.76
66.21%
21.35%
87.56%
12.44%
0.900
50,973.69
19.00%
VALORIZACION N 05
(LIQUIDACION FINAL)
PROYECTO
CONTRATO DE OBRA
: N 143-ALC-MDN 2008
OBRA
VALOR REFERENCIAL
: S/. 974,627.98
ENTIDAD
VALOR OFERTADO
: S/. 877,165.19
PLAZO DE EJECUCION
FECHA PRESUPUESTO
: ABRIL DE 2008
UBICACIN
PARTIDA N
DESCRIPCION
UND. METRADO
COSTO
UNITARIO
COSTO
PARCIAL
SALDOS
AVANCES
ANTERIOR
METRADO
01.00.00
01.01.00
01.02.00
OBRAS PRELIMINARES
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
MOVIMIENTO DE TIERRAS
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
CONCRETO SIMPLE
04.00.00
04.01.00
04.01.01
04.01.02
CONCRETO ARMADO
04.02.00
04.02.01
04.02.02
04.02.03
VIGAS DE CIMENTACION
04.03.00
04.03.01
04.03.02
04.03.03
COLUMNAS
04.04.00
04.04.01
04.04.02
04.04.03
VIGAS
04.05.00
04.05.01
04.05.02
04.05.03
04.05.04
LOSAS ALIGERADAS
M2
M2
M2
M3
M3
M3
M3
M2
M2
M3
M2
ACTUAL
COSTO
METRADO
ACUMULADO
COSTO
METRADO
COSTO
METRADO
192.40
192.40
0.36
0.74
69.26
142.38
192.40
69.26
100.00
0.00
0.00
0.00
192.40
69.26
100.00
0.00
192.40
142.38
100.00
0.00
0.00
0.00
192.40
142.38
100.00
0.00
192.40
58.24
6.22
80.58
2.54
13.73
12.01
10.27
488.70
799.64
74.70
827.56
192.40
488.70
100.00
0.00
0.00
0.00
192.40
488.70
100.00
0.00
58.24
799.64
100.00
0.00
0.00
0.00
58.24
799.64
100.00
0.00
6.22
74.70
100.00
0.00
0.00
0.00
6.22
74.70
100.00
0.00
80.58
827.56
100.00
0.00
0.00
0.00
80.58
827.56
100.00
0.00
4.88
33.28
183.25
4.87
38.95
108.40
26.08
16.42
138.32
18.26
528.99
867.94
3,008.97
673.62
711.23
41.39
289.44
233.55
3.96
9,666.63
1,146.18
5.83
56.22
584.69
250.45
24.23
3.96
1,460.13
1,362.21
2,315.37
12.58
124.62
1,790.97
290.92
24.23
3.96
3,659.77
3,019.55
7,092.24
11.53
130.10
1,550.52
290.92
24.23
3.96
3,354.31
3,152.32
6,140.06
2.11
30.48
211.98
274.32
260.63
18.31
4.11
2.28
549.93
558.09
871.24
625.45
4.88
528.99
100.00
0.00
0.00
0.00
4.88
528.99
100.00
0.00
33.28
867.94
100.00
0.00
0.00
0.00
33.28
867.94
100.00
0.00
183.25
3,008.97
100.00
0.00
0.00
0.00
183.25
3,008.97
100.00
0.00
1.09
150.77
22.38
0.00
0.00
0.00
1.09
150.77
22.38
3.78
8.70
158.80
22.33
0.00
0.00
0.00
8.70
158.80
22.33
30.25
ZAPATAS
CONCRETO EN ZAPATAS F C=175KG/CM2
M3
ACERO Fy =4200Kg/cm2
KG
CONCRETO FC =175KG/CM2
M3
M2
ACERO FY =4200Kg/cm2
KG
CONCRETO FC=210KG/CM2
M3
M2
ACERO FY =4200Kg/cm2
KG
CONCRETO FC=210KG/CM2
M3
M2
ACERO FY =4200Kg/cm2
KG
M3
M2
KG
UND
41.39
9,666.63
100.00
0.00
0.00
0.00
41.39
9,666.63
100.00
0.00
289.44
1,146.18
100.00
0.00
0.00
0.00
289.44
1,146.18
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
56.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
584.69
12.58
3,659.77
100.00
0.00
0.00
0.00
12.58
3,659.77
100.00
0.00
124.62
3,019.54
100.00
0.00
0.00
0.00
124.62
3,019.54
100.00
0.00
1,790.97
7,092.24
100.00
0.00
0.00
0.00
1,790.97
7,092.24
100.00
0.00
11.53
3,354.31
100.00
0.00
0.00
0.00
11.53
3,354.31
100.00
0.00
130.10
3,152.32
100.00
0.00
0.00
0.00
130.10
3,152.32
100.00
0.00
1,550.52
6,140.06
100.00
0.00
0.00
0.00
1,550.52
6,140.06
100.00
0.00
2.11
549.93
100.00
0.00
0.00
0.00
2.11
549.93
100.00
0.00
30.48
558.09
100.00
0.00
0.00
0.00
30.48
558.09
100.00
0.00
211.98
871.24
100.00
0.00
0.00
0.00
211.98
871.24
100.00
0.00
274.32
625.45
100.00
0.00
0.00
0.00
274.32
625.45
100.00
0.00
05.00.00
05.01.00
05.01.01
05.01.02
05.01.03
05.02.00
05.02.01
COBERTURAS
06.00.00
06.01.00
06.01.01
07.00.00
07.01.00
07.02.00
07.03.00
07.04.00
07.05.00
08.00.00
08.01.00
CIELORRASOS
09.00.00
09.01.00
09.01.01
PISOS Y PAVIMENTOS
09.02.00
09.02.01
PISOS
10.00.00
10.01.00
10.01.01
ZOCALOS Y CONTRAZOCALOS
10.02.00
10.02.01
ESTRUCTURAS
5.00
8.00
12.00
390.34
61.77
34.59
1,951.70
494.16
415.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
M2
204.00
59.34
12,105.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
204.00
M2
87.96
29.03
2,553.48
87.96
2,553.48
100.00
0.00
0.00
0.00
87.96
2,553.48
100.00
0.00
M2
M2
M2
M2
39.72
358.68
127.83
117.30
168.92
8.99
11.20
15.67
18.46
7.89
357.08
4,017.22
2,003.10
2,165.36
1,332.78
M2
30.48
23.17
M2
183.25
M2
M2
TIJERAL METALICO N 1
UND
CORREAS METALICAS
UND
5.00
0.00
0.00
0.00
39.72
357.08
100.00
39.72
357.08
100.00
0.00
290.00
3,248.00
80.85
68.68
769.22
19.15
358.68
4,017.22
100.00
0.00
60.00
940.20
46.94
67.83
1,062.90
53.06
127.83
2,003.10
100.00
0.00
58.00
1,070.68
49.45
59.30
1,094.68
50.55
117.30
2,165.36
100.00
0.00
0.00
0.00
0.00
168.92
1,332.78
100.00
168.92
1,332.78
100.00
0.00
706.22
30.48
706.22
100.00
0.00
0.00
0.00
30.48
706.22
100.00
0.00
11.70
2,144.03
0.00
0.00
0.00
183.25
2,144.03
100.00
183.25
2,144.03
100.00
0.00
192.01
37.19
7,140.85
0.00
0.00
0.00
192.01
7,140.85
100.00
192.01
7,140.85
100.00
0.00
39.72
34.66
1,376.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39.72
140.40
19.73
2,770.09
0.00
0.00
0.00
140.40
2,770.09
100.00
140.40
2,770.09
100.00
0.00
24.18
21.19
142.89
60.00
3,455.08
1,271.40
0.00
0.00
0.00
24.18
3,455.08
100.00
24.18
3,455.08
100.00
0.00
0.00
0.00
0.00
15.00
900.00
70.79
15.00
900.00
70.79
6.19
26.00
13.00
9.30
73.90
241.80
960.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
26.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13.00
233.12
26.40
22.41
30.71
5,224.22
810.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
233.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
26.40
30.48
646.04
4.98
4.42
151.79
2,855.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.48
0.00
0.00
0.00
350.00
1,547.00
54.18
350.00
1,547.00
54.18
296.04
1.00
500.00
500.00
0.80
400.00
80.00
0.00
0.00
0.00
0.80
400.00
80.00
0.20
CONTRAPISOS
CONTRAPISO DE 38 MM.
ZOCALOS
ZOCALO DE LOSETA DE 0.30X0.30M. EN SS.HH. H=1.20m.
CONTRAZOCALOS
CONTRAZOCALO DE LOSETA CERAMICO DE 10X30 CM.
11.00.00
11.01.00
11.02.00
CARPINTERIA DE MADERA
12.00.00
12.01.00
12.02.00
CERRAJERIA
13.00.00
13.01.00
13.02.00
14.00.00
14.01.00
14.02.00
PINTURA
15.00.00
15.01.00
VARIOS
M2
M2
PZA
PZA
P2
P2
M2
M2
GLB
16.00.00
16.01.01
16.02.01
16.02.02
16.02.03
17.00.00
17.01.00
17.02.00
17.03.00
17.05.01
17.05.02
17.05.03
17.06.01
17.06.03
17.06.04
17.06.05
17.06.06
17.06.07
17.06.08
17.07.01
17.07.02
17.07.03
INSTALACIONES SANITARIAS
18.00.00
18.01.00
18.02.02
18.03.03
18.03.05
18.04.02
INSTALACIONES DE AGUA
19.00.00
19.00.01
19.00.02
19.00.03
INSTALACIONES ELECTRICAS
19.01.00
19.01.01
19.02.00
19.02.01
19.02.02
19.02.03
19.03.00
19.03.01
TABLEROS Y CUCHILLAS
19.04.00
19.04.01
19.04.02
ARTEFACTOS ELECTRICOS
4.00
3.00
2.00
2.00
208.22
178.80
118.64
10.08
832.88
536.40
237.28
20.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
1.00
7.00
5.00
3.72
9.12
13.91
19.00
4.00
2.00
2.00
2.00
2.00
3.00
2.00
2.00
4.00
33.97
33.61
40.74
10.37
10.05
12.85
7.96
11.37
7.13
10.57
6.97
10.82
10.77
21.22
18.80
5.04
33.97
235.27
203.70
38.58
91.66
178.74
151.24
45.48
14.26
21.14
13.94
21.64
32.31
42.44
37.60
20.16
1.00
33.97
100.00
0.00
0.00
0.00
1.00
33.97
100.00
0.00
7.00
235.27
100.00
0.00
0.00
0.00
7.00
235.27
100.00
0.00
5.00
203.70
100.00
0.00
0.00
0.00
5.00
203.70
100.00
0.00
3.72
38.58
100.00
0.00
0.00
0.00
3.72
38.58
100.00
0.00
9.12
91.66
100.00
0.00
0.00
0.00
9.12
91.66
100.00
0.00
13.91
178.74
100.00
0.00
0.00
0.00
13.91
178.74
100.00
0.00
19.00
151.24
100.00
0.00
0.00
0.00
19.00
151.24
100.00
0.00
4.00
45.48
100.00
0.00
0.00
0.00
4.00
45.48
100.00
0.00
2.00
14.26
100.00
0.00
0.00
0.00
2.00
14.26
100.00
0.00
2.00
21.14
100.00
0.00
0.00
0.00
2.00
21.14
100.00
0.00
2.00
13.94
100.00
0.00
0.00
0.00
2.00
13.94
100.00
0.00
2.00
21.64
100.00
0.00
0.00
0.00
2.00
21.64
100.00
0.00
3.00
32.31
100.00
0.00
0.00
0.00
3.00
32.31
100.00
0.00
2.00
42.44
100.00
0.00
0.00
0.00
2.00
42.44
100.00
0.00
2.00
37.60
100.00
0.00
0.00
0.00
2.00
37.60
100.00
0.00
4.00
20.16
100.00
0.00
0.00
0.00
4.00
20.16
100.00
0.00
11.00
34.42
19.00
11.00
2.00
28.11
24.16
4.58
4.58
21.04
309.21
831.59
87.02
50.38
42.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.00
0.00
0.00
0.00
34.42
831.59
100.00
34.42
831.59
100.00
0.00
0.00
0.00
0.00
19.00
87.02
100.00
19.00
87.02
100.00
0.00
0.00
0.00
0.00
11.00
50.38
100.00
11.00
50.38
100.00
0.00
0.00
0.00
0.00
2.00
42.08
100.00
2.00
42.08
100.00
0.00
24.00
12.00
7.00
43.20
40.65
38.35
1,036.80
487.80
268.45
0.00
0.00
0.00
24.00
1,036.80
100.00
24.00
1,036.80
100.00
0.00
0.00
0.00
0.00
12.00
487.80
100.00
12.00
487.80
100.00
0.00
7.00
268.45
100.00
0.00
0.00
0.00
7.00
268.45
100.00
0.00
120.00
4.71
565.20
120.00
565.20
100.00
0.00
0.00
0.00
120.00
565.20
100.00
0.00
0.00
70.00
162.40
100.00
70.00
162.40
100.00
0.00
0.00
0.00
250.00
325.00
100.00
250.00
325.00
100.00
0.00
162.40
325.00
87.50
0.00
2.32
1.30
1.25
0.00
70.00
250.00
70.00
0.00
0.00
0.00
0.00
70.00
87.50
100.00
70.00
87.50
100.00
0.00
PZA
1.00
35.96
35.96
0.00
0.00
0.00
1.00
35.96
100.00
1.00
35.96
100.00
0.00
UND
48.53
31.22
582.36
374.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
UND
12.00
12.00
0.00
SPOT LIGHT
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
UND
UND
URINARIO DE LOSA
PZA
ESPEJOS DE 0.30X0.40 m
UND
PTO
PTO
PTO
PZA
PZA
PZA
PZA
PZA
PZA
PZA
UND
PZA
UND
PTO
PZA
PZA
PZA
PTO
PTO
PTO
TABLERO DE DISTRIBUCION
118,226.15
57,887.83
25,720.24
83,608.07
1.37%
1,619.70
793.06
352.37
1,145.43
6.63%
7,838.39
3,837.96
1,705.25
5,543.22
UTILIDAD
7.00%
8,275.83
4,052.15
1,800.42
5,852.56
135,960.07
66,571.00
29,578.28
96,149.28
MONTO VALORIZADO
FACTOR DE RELACION
0.900
19.00%
122,364.06
59,913.90
26,620.45
23,249.17
11,383.64
5,057.89
86,534.35
16,441.53
145,613.23
71,297.54
31,678.34
102,975.88
48.96%
21.76%
70.72%
COSTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
522.85
77.62
552.43
77.67
0.00
0.00
0.00
0.00
1,460.13
100.00
1,362.21
100.00
2,315.37
100.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,951.70
100.00
494.16
100.00
415.08
100.00
12,105.36
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,376.70
100.00
0.00
0.00
0.00
0.00
371.40
29.21
241.80
100.00
960.70
100.00
5,224.22
100.00
810.74
100.00
151.79
100.00
1,308.50
45.82
100.00
20.00
832.88
100.00
536.40
100.00
237.28
100.00
20.16
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
309.21
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
582.36
100.00
374.64
100.00
34,618.08
474.27
2,295.18
2,423.27
39,810.80
35,829.72
6,807.65
42,637.37
29.28%
VALORIZACION N 05
(LIQUIDACION FINAL)
PROYECTO
CONTRATO DE OBRA
: N 143-ALC-MDN 2008
OBRA
VALOR REFERENCIAL
: S/. 974,627.98
ENTIDAD
VALOR OFERTADO
: S/. 877,165.19
PLAZO DE EJECUCION
FECHA PRESUPUESTO
: ABRIL DE 2008
UBICACIN
DESCRIPCION
PARTIDA N
UND. METRADO
COSTO
UNITARIO
COSTO
PARCIAL
SALDOS
AVANCES
ANTERIOR
METRADO
01.00.00
01.01.00
01.02.00
OBRAS PRELIMINARES
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
MOVIMIENTO DE TIERRAS
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
CONCRETO SIMPLE
04.00.00
04.01.00
04.01.01
04.01.02
CONCRETO ARMADO
04.02.00
04.02.01
04.02.02
04.02.03
COLUMNAS
04.03.00
04.03.01
04.03.02
04.03.03
VIGAS
05.00.00
05.01.00
05.01.01
06.00.00
06.01.00
06.02.00
06.03.00
06.04.00
M2
M2
M2
M3
M3
M3
M3
M2
M2
M3
M2
ACTUAL
COSTO
METRADO
ACUMULADO
COSTO
METRADO
COSTO
METRADO
242.95
242.95
0.36
0.74
87.46
179.78
242.95
87.46
100.00
0.00
0.00
0.00
242.95
87.46
100.00
0.00
242.95
179.78
100.00
0.00
0.00
0.00
242.95
179.78
100.00
0.00
97.18
53.65
17.60
89.06
2.54
13.73
12.01
10.27
246.84
736.61
211.38
914.65
97.18
246.84
100.00
0.00
0.00
0.00
97.18
246.84
100.00
0.00
53.65
736.61
100.00
0.00
0.00
0.00
53.65
736.61
100.00
0.00
17.60
211.38
100.00
0.00
0.00
0.00
17.60
211.38
100.00
0.00
89.06
914.65
100.00
0.00
0.00
0.00
89.06
914.65
100.00
0.00
41.62
75.00
544.38
21.46
332.28
108.40
26.08
16.42
138.32
18.26
4,511.61
1,956.00
8,938.72
2,968.35
6,067.43
41.62
4,511.61
100.00
0.00
0.00
0.00
41.62
4,511.61
100.00
0.00
75.00
1,956.00
100.00
0.00
0.00
0.00
75.00
1,956.00
100.00
0.00
544.38
8,938.72
100.00
0.00
0.00
0.00
544.38
8,938.72
100.00
0.00
21.46
2,968.35
100.00
0.00
0.00
0.00
21.46
2,968.35
100.00
0.00
332.28
6,067.43
100.00
0.00
0.00
0.00
332.28
6,067.43
100.00
0.00
30.00
803.40
233.55
3.96
7,006.50
3,181.46
17.34
206.25
1,864.76
290.92
24.23
3.96
5,044.55
4,997.44
7,384.45
290.92
24.23
3.96
3,092.48
1,514.38
3,222.45
ZAPATAS
CONCRETO EN ZAPATAS F C=175KG/CM2
M3
ACERO Fy =4200Kg/cm2
KG
CONCRETO FC=210KG/CM2
M3
M2
ACERO FY =4200Kg/cm2
KG
30.00
7,006.50
100.00
0.00
0.00
0.00
30.00
7,006.50
100.00
0.00
803.40
3,181.46
100.00
0.00
0.00
0.00
803.40
3,181.46
100.00
0.00
17.34
5,044.55
100.00
0.00
0.00
0.00
17.34
5,044.55
100.00
0.00
206.25
4,997.44
100.00
0.00
0.00
0.00
206.25
4,997.44
100.00
0.00
1,864.76
7,384.45
100.00
0.00
0.00
0.00
1,864.76
7,384.45
100.00
0.00
10.63
3,092.48
100.00
0.00
0.00
0.00
10.63
3,092.48
100.00
0.00
62.50
1,514.38
100.00
0.00
0.00
0.00
62.50
1,514.38
100.00
0.00
813.75
3,222.45
100.00
0.00
0.00
0.00
813.75
3,222.45
100.00
0.00
0.00
0.00
0.00
289.08
8,391.99
100.00
0.00
CONCRETO FC=210KG/CM2
M3
M2
ACERO FY =4200Kg/cm2
KG
10.63
62.50
813.75
M2
289.08
29.03
8,391.99
289.08
8,391.99
100.00
M2
100.00
0.00
0.00
0.00
753.19
8,435.73
100.00
0.00
990.19
51.06
60.56
948.98
48.94
123.75
1,939.16
100.00
0.00
M2
86.00
1,587.56
50.96
82.75
1,527.57
49.04
168.75
3,115.13
100.00
0.00
8,435.73
1,939.16
3,115.13
214.29
63.19
11.20
15.67
18.46
7.89
8,435.73
M2
753.19
123.75
168.75
27.16
753.19
0.00
0.00
0.00
27.16
214.29
100.00
27.16
214.29
100.00
0.00
07.00.00
07.01.00
07.01.01
PISOS Y PAVIMENTOS
07.02.00
07.02.01
VEREDAS DE CONCRETO
07.03.00
07.03.01
SARDINELES
08.00.00
08.01.00
ZOCALOS Y CONTRAZOCALOS
09.00.00
09.01.00
09.02.00
CARPINTERIA METALICA
10.00.00
10.01.00
10.02.00
CERRAJERIA
11.00.00
11.01.00
PINTURA
12.00.00
12.01.00
12.02.00
JARDINERIA
13.00.00
13.01.00
VARIOS
CONTRAPISOS
M2
544.38
11.70
6,369.25
0.00
0.00
0.00
544.38
6,369.25
100.00
544.38
6,369.25
100.00
0.00
M2
462.79
74.70
34,570.41
0.00
0.00
0.00
462.79
34,570.41
100.00
462.79
34,570.41
100.00
0.00
M3
7.99
176.00
1,406.24
0.00
0.00
0.00
7.99
1,406.24
100.00
7.99
1,406.24
100.00
0.00
105.12
10.17
1,069.07
0.00
0.00
0.00
105.12
1,069.07
100.00
105.12
1,069.07
100.00
0.00
M2
126.05
67.22
3,199.15
6,920.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.38
25.38
102.96
0.00
0.00
0.00
0.00
45.00
3,024.90
43.71
45.00
3,024.90
43.71
57.96
6.00
3.00
9.30
73.90
55.80
221.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
1,052.48
4.42
4,651.96
0.00
0.00
0.00
350.00
1,547.00
33.25
350.00
1,547.00
33.25
702.48
50.00
999.60
17.26
2.40
863.00
2,399.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50.00
0.00
0.00
0.00
500.00
1,200.00
50.02
500.00
1,200.00
50.02
499.60
1.00
500.00
500.00
0.80
400.00
80.00
0.00
0.00
0.00
0.80
400.00
80.00
0.20
CONTRAPISO DE 38 MM.
VEREDA F C=140 KG/CM2 E=8.5 CM. + ACABADO COLOREADO Y BRUADO 1:2 (1.5cm.) E= 4"
PZA
PZA
M2
UND
M2
GLB
146,585.43
82,068.01
51,877.71
133,945.71
1.37%
2,008.22
1,124.33
710.72
1,835.06
6.63%
9,718.61
5,441.11
3,439.49
8,880.60
UTILIDAD
7.00%
10,260.98
5,744.76
3,631.44
9,376.20
168,573.24
94,378.21
59,659.36
154,037.57
151,715.92
84,940.39
53,693.42
138,633.81
28,826.02
16,138.67
10,201.75
26,340.42
180,541.94
101,079.06
63,895.17
164,974.23
55.99%
35.39%
91.38%
MONTO VALORIZADO
FACTOR DE RELACION
0.900
19.00%
COSTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,199.15
100.00
3,896.07
56.29
55.80
100.00
221.70
100.00
3,104.96
66.75
863.00
100.00
1,199.04
49.98
100.00
20.00
12,639.72
173.16
838.01
884.78
14,535.67
13,082.10
2,485.60
15,567.70
8.62%