KORSCH
Operation Qualification
Logon Single Sided with
Screen Navigation
Document No.:
011_LOGS_1.5
Revision Date:
Issued To:
Amway Vietnam
Machine Model:
XL400FT
Serial Number:
K1500201
This document contains technical information and procedures that were prepared by KORSCH
America Inc. and are highly confidential and proprietary in nature. This document is provided
under our scope of supply for the project referenced above and is intended for use in conjunction
with the same. The contents of this document shall not be disclosed to a third party without prior
written consent from KORSCH America Inc. Copies and distribution of this document (either
paper or software) shall be limited to the requirements for installing, validating, operating, and/or
maintaining the KORSCH equipment.
Operation Qualification
Document No.: 011_LOGS_1.5
May 21, 2010
Record of Revisions
Date
Revision Number
1.0
1.1
Format Update
1.2
Format Update
1.3
December 5, 2009
1.4
Screen Update
1.5
Format Update
Page 2 of 12
Operation Qualification
Document No.: 011_LOGS_1.5
May 21, 2010
Signature Page
Signature / Initials
Print Name / Date
Title
Company Name
Signature / Initials
Print Name / Date
Title
Company Name
Signature / Initials
Print Name / Date
Title
Company Name
Signature / Initials
Print Name / Date
Title
Company Name
Signature / Initials
Print Name / Date
Title
Company Name
Page 3 of 12
Operation Qualification
Document No.: 011_LOGS_1.5
May 21, 2010
Table of Contents
1) System Logon - Operator ..............................................................................5
2) System Logon - Maintenance.........................................................................6
3) System Logon - Supervisor ...........................................................................7
4) System Logon - Administrator........................................................................8
5) Password Authorization - Screen Access.....................................................9
Page 4 of 12
Operation Qualification
Document No.: 011_LOGS_1.5
May 21, 2010
Test Description:
1) System Logon - Operator
Equipment Required:
None
Test Procedure:
1.
2.
3.
4.
Complete the system Logon using an Operator level name and password.
Attempt to access each screen listed in Tables 1 - 7.
Place a check mark in each box in the tables where access is possible.
If access is not possible, indicate Fail in the applicable box.
Validation Criteria:
1. The message, Logon Successful will appear at the bottom of the Logon screen when
the user logs on correctly.
2. Screen access will be allowed to screens indicated by an X in Tables 1 - 7.
3. Screen access will NOT be allowed to screens indicated by an N/A in Tables 1 -7.
Result:
Comments:
Accept: ________________
Reject: ________________
__________________________________________________________
__________________________________________________________
Completed By:
_________________________________
Page 5 of 12
Date:
________________
Operation Qualification
Document No.: 011_LOGS_1.5
May 21, 2010
Test Description:
2) System Logon - Maintenance
Equipment Required:
None
Test Procedure:
1.
2.
3.
4.
Complete the system logon using a Maintenance level name and password.
Attempt to access each screen listed in Tables 1 7.
Place a check mark in each box in the tables where access is possible.
If access is not possible, indicate Fail in the applicable box.
Validation Criteria:
1. The message, Logon Successful will appear at the bottom of the Logon screen when
the user logs on correctly.
2. Screen access will be allowed to screens indicated by an X in Tables 1 - 7.
3. Screen access will NOT be allowed to screens indicated by an N/A in Tables 1 -7.
Result:
Comments:
Accept: ________________
Reject: ________________
__________________________________________________________
__________________________________________________________
Completed By:
_________________________________
Page 6 of 12
Date:
________________
Operation Qualification
Document No.: 011_LOGS_1.5
May 21, 2010
Test Description:
3) System Logon - Supervisor
Equipment Required:
None
Test Procedure:
1.
2.
3.
4.
Complete the system logon using a Supervisor level name and password.
Attempt to access each screen listed in Tables 1 7.
Place a check mark in each box in the tables where access is possible.
If access is not possible, indicate Fail in the applicable box.
Validation Criteria:
1. The message, Logon Successful will appear at the bottom of the Logon screen when
the user logs on correctly.
2. Screen access will be allowed to screens indicated by an X in Tables 1 - 7.
3. Screen access will NOT be allowed to screens indicated by an N/A in Tables 1 -7.
Result:
Comments:
Accept: ________________
Reject: ________________
__________________________________________________________
__________________________________________________________
Completed By:
_________________________________
Page 7 of 12
Date:
________________
Operation Qualification
Document No.: 011_LOGS_1.5
May 21, 2010
Test Description:
4) System Logon - Administrator
Equipment Required:
None
Test Procedure:
1.
2.
3.
4.
Complete the system logon using an Administrator level name and password.
Attempt to access each screen listed in Tables 1 - 7.
Place a check mark in each box in the tables where access is possible.
If access is not possible, indicate Fail in the applicable box.
Validation Criteria:
1. The message, Logon Successful will appear at the bottom of the Logon screen when
the user logs on correctly.
2. Screen access will be allowed to screens indicated by an X in Tables 1 - 7.
3. Screen access will NOT be allowed to screens indicated by an N/A in Tables 1 -7.
Result:
Comments:
Accept: ________________
Reject: ________________
__________________________________________________________
__________________________________________________________
Completed By:
_________________________________
Page 8 of 12
Date:
________________
Operation Qualification
Document No.: 011_LOGS_1.5
May 21, 2010
5) Password Authorization - Screen Access
From Force
Control Screen
Main
Table 1
Operator
Mainten.
Superv.
Admin.
Installed
Initial
Date
Main
Standard
Service
Standard
Pre Forces
Yes / No
Ejection Forces
Yes / No
Weight Control
Yes / No
Single Forces
Standard
Missing Punches
Standard
Rejects
Standard
Trend Forces
Standard
FC Setup
From Force
Control Pre
Screen
Yes / No
Special
Screen
Installed
Table 2
Operat.
Mainten
Superv.
Admin.
Installed
Initial
Date
Yes / No
Installed
Initial
Date
Main
Standard
Main Forces
Standard
Ejection Forces
Yes / No
Weight Control
Yes / No
Single Forces
Standard
Missing Punches
Standard
Rejects
Standard
Trend Forces
Standard
FC Setup
Standard
Initialed By:
_________________________________
Page 9 of 12
Date:
________________
Operation Qualification
Document No.: 011_LOGS_1.5
May 21, 2010
Table 3
From Ejection
Forces Screen
Operator
Mainten.
Superv.
Admin.
Installed
Initial
Date
Main
Standard
Main Forces
Standard
Pre-Forces
Yes / No
Weight Control
Yes / No
Single Forces
Yes / No
Missing Punches
Standard
Trend Forces
Standard
FC Setup
Yes / No
Table 4
From Calibrate
General
Operator
Mainten.
Superv.
Admin.
Installed
Initial
Date
Main
N/A
N/A
Standard
Calibrate Main
N/A
N/A
Standard
Calibrate Amplifier
N/A
N/A
Standard
Resolver
N/A
N/A
Standard
N/A
N/A
Standard
Initialed By:
N/A
_________________________________
Page 10 of 12
Date:
________________
Operation Qualification
Document No.: 011_LOGS_1.5
May 21, 2010
Table 5
From Calibrate
Single Sort
Setpoints
Operator
Mainten.
Superv.
Admin.
Installed
Initial
Date
Main
N/A
N/A
Standard
Calibrate Main
N/A
N/A
Standard
Calibrate General
N/A
N/A
Standard
From Calibrate
Amplifier Screen
Table 6
Operator
Mainten.
Superv.
Admin.
Installed
Initial
Date
Main
N/A
N/A
Standard
Calibrate General
N/A
N/A
Standard
Calibrate Main
N/A
N/A
Standard
From Force
Control Rejects
Screen
Table 7
Operator
Mainten.
Superv.
Admin.
Installed
Initial
Date
Main
Standard
Force Control
Standard
Single Forces
Standard
Reject Setup
Standard
Pre Main
Main Pre
(Toggle only)
Result:
Comments:
Yes / No
Accept: ________________
Reject: ________________
__________________________________________________________
__________________________________________________________
Completed By:
_________________________________
Page 11 of 12
Date:
Operation Qualification
Document No.: 011_LOGS_1.5
May 21, 2010
Completed by
KORSCH Technician:
Signature/Date:
Approved by
Customer:
Signature/Date:
Page 12 of 12