01-Apr-14 01-Apr-14 01-Apr-14* 01-Apr-14* 07-Apr-14 01-Apr-14* 09-Apr-14 09-Apr-14 01-Apr-14* 28-Apr-14 28-Apr-14 28-Apr-14 02-May-14 06-May-14 06-May-14 10-May-14 14-May-14 18-May-14 18-May-14 23-May-14 28-May-14 10-Jul-14 28-May-14 23-May-14 23-May-14 23-May-14 28-May-14 28-May-14 10-Jul-14 10-Jul-14 16-Jul-14 06-Jun-14 06-Jun-14 12-Jun-14 12-Jun-14 12-Jun-14 12-Jun-14 12-Jun-14 15-Jun-14 13-Jun-14 22-Jun-14 13-Jun-14 13-Jun-14 22-Jun-14 13-Jun-14 22-Jun-14 10-Jul-14 Summary 22-Apr-14 13-Jun-14 17-Apr-14 28-Apr-14 25-Jun-14 10-Jul-14 27-Jul-14 17-May-14 01-May-14 05-May-14 09-May-14 09-May-14 13-May-14 17-May-14 26-May-14 21-May-14 26-May-14 20-Jul-14 20-Jul-14 05-Jun-14 10-Jun-14 05-Jun-14 09-Jun-14 10-Jun-14 10-Jun-14 21-Jul-14 15-Jul-14 21-Jul-14 21-Jun-14 11-Jun-14 21-Jun-14 29-Jun-14 29-Jun-14 15-Jun-14 13-Jun-14 15-Jun-14 01-Jul-14 23-Jun-14 15-Jun-14 15-Jun-14 24-Jun-14 15-Jun-14 01-Jul-14 13-Jul-14 Finish Mar 06-Nov-14 10-Jul-14 Apr
Classic WBS Layout 2014 May Jun Jul Aug Sep Oct
24-Mar-14 09:46 2015 Nov Dec Jan 06-Nov-14, DOHA CLINIC HOSPITAL-PROGRAM Feb
10-Jul-14, PRE-CONSTRUCTION PHASE PROJECT AWARD-START MILESTONE MEP DESIGN PREPARATIONS, SUBMISSIONS AND APPROVALS PROCUREMENT OF LOOSE FURNITURES MATERIALS SUBMISSION AND APPROVALS SHOP DRAWINGS SUBMISSIONS AND APPROVALS PROCUREMENT OF MEP LONG LEAD MATERIALS PROCUREMENT OF VINYL FLOORS,CEILING TILES, & ACROVYN HANDRAIL & LIFT PLATFORM 27-Jul-14, CONSTRUCTION PHASE-Zone 1 17-May-14, DEMOLITION Temporary Closure, Night Lighting of Zone 1 Door Removal Wall Demolition False Ceiling Removal Existing Flooring Removal Debris & Material Removal, Site Cleaning, Set out. 26-May-14, WALL CONSTRUCTION Blockworks (200mm Thick) Plastering for Blockworks. 20-Jul-14, CEILING WORKS Installation of Metal Ceiling Tiles. Installation of Standard Gypsum Board Ceiling. 10-Jun-14, MEP WORKS-FIRST FIX HVAC-1st Electrical Works-1st Fire Fighting-1st CCTV-1st 21-Jul-14, FLOORING WORKS Installation of Vinyl Flooring Installation of PVC Skirting (Height 100mm) 21-Jun-14, PAINTING WORKS Ceiling Painting Wall Painting 29-Jun-14, WOODWORKS Installation of Wood Wall with Sitting in Melamine Panels. Installation of Wooden Frames for Doors Installation of Sliding Door Frame Installation of Sliding Door 01-Jul-14, FURNITURES Supply and Install of Flower Boxes Supply and Install of Waiting Chairs Supply and Install of Office Chairs Installation of Typing Desk Supply and Install of Squared Tables Installation of Reception Counter 13-Jul-14, WALLS Page 1 of 4
CONSTRUCTION PHASE-Zone 1
DEMOLITION
Temporary Closure, Night Lighting of Zone 1 Door Removal Wall Demolition False Ceiling Removal Existing Flooring Removal Debris & Material Removal, Site Cleaning, Set out.
WALL CONSTRUCTION
Blockworks (200mm Thick) Plastering for Blockworks.
CEILING WORKS
Installation of Metal Ceiling Tiles. Installation of Standard Gypsum Board Ceiling.
FLOORING WORKS
Installation of Vinyl Flooring Installation of PVC Skirting (Height 100mm)
PAINTING WORKS
Ceiling Painting Wall Painting
WOODWORKS
Installation of Wood Wall with Sitting in Melamine Panels. Installation of Wooden Frames for Doors Installation of Sliding Door Frame Installation of Sliding Door
FURNITURES
Supply and Install of Flower Boxes Supply and Install of Waiting Chairs Supply and Install of Office Chairs Installation of Typing Desk Supply and Install of Squared Tables Installation of Reception Counter
WALLS
Actual Work Remaining Work
DOHA CLINIC HOSPITAL-PROGRAM Activity Name Installation of Acrovyn 4000 Handrails Original Duration 4 47 10 5 15 18 15 15 15 15 1 3 56 13 2 2 2 2 2 2 9 4 3 5 5 4 5 13 12 12 12 12 12 11 5 3 24 6 3 9 6 6 24 5 5 4 2 5 4 Start 10-Jul-14 16-Jun-14 16-Jun-14 22-Jun-14 10-Jul-14 25-Jun-14 25-Jun-14 26-Jun-14 26-Jun-14 26-Jun-14 25-Jul-14 25-Jul-14 29-Jul-14 29-Jul-14 29-Jul-14 31-Jul-14 02-Aug-14 02-Aug-14 04-Aug-14 06-Aug-14 08-Aug-14 08-Aug-14 13-Aug-14 16-Aug-14 16-Aug-14 16-Aug-14 16-Aug-14 16-Aug-14 16-Aug-14 16-Aug-14 16-Aug-14 16-Aug-14 16-Aug-14 21-Aug-14 21-Aug-14 27-Aug-14 16-Aug-14 16-Aug-14 05-Sep-14 28-Aug-14 28-Aug-14 30-Aug-14 22-Aug-14 22-Aug-14 03-Sep-14 06-Sep-14 10-Sep-14 03-Sep-14 03-Sep-14 Summary Finish Mar 13-Jul-14 24-Jul-14 25-Jun-14 26-Jun-14 24-Jul-14 10-Jul-14 10-Jul-14 10-Jul-14 10-Jul-14 10-Jul-14 27-Jul-14 27-Jul-14 15-Sep-14 07-Aug-14 30-Jul-14 01-Aug-14 03-Aug-14 03-Aug-14 05-Aug-14 07-Aug-14 15-Aug-14 11-Aug-14 15-Aug-14 20-Aug-14 20-Aug-14 19-Aug-14 20-Aug-14 27-Aug-14 27-Aug-14 27-Aug-14 27-Aug-14 27-Aug-14 27-Aug-14 29-Aug-14 25-Aug-14 29-Aug-14 07-Sep-14 21-Aug-14 07-Sep-14 04-Sep-14 02-Sep-14 04-Sep-14 11-Sep-14 26-Aug-14 07-Sep-14 09-Sep-14 11-Sep-14 06-Sep-14 06-Sep-14 Apr
Classic WBS Layout 2014 May Jun Jul Aug Installation of Acrovyn 4000 Handrails 24-Jul-14, OTHERS Installation of Signages Installation of Window Blinds Installation of Straight Rail Platform Lift 10-Jul-14, MEP WORKS-FINAL FIX HVAC-Final Electrical Works-Final Fire Fighting-Final CCTV-Final 27-Jul-14, SNAGGING, CLEARING and HAND OVER CLEARING AND HAND OVER, REMOVAL OF TEMPORARY CLOSURE 15-Sep-14, CONSTRUCTION PHASE-Zone 2 07-Aug-14, DEMOLITION Temporary Closure, Night Lighting of Zone 2 Door Removal Wall Demolition False Ceiling Removal Existing Flooring Removal Debris & Material Removal, Site Cleaning, Set out. 15-Aug-14, WALL CONSTRUCTION Blockworks (200mm Thick) Plastering for Blockworks. 20-Aug-14, CEILING WORKS Installation of Standard Gypsum Board Ceiling. Installation of Moisture Resistant Gypsum Board Ceiling. Installation of Metal Ceiling Tiles. 27-Aug-14, MEP WORKS-FIRST FIX HVAC-1st Electrical Works-1st Fire Fighting-1st CCTV-1st Plumbing-1st 29-Aug-14, FLOORING WORKS Installation of Vinyl Flooring Installation of PVC Skirting (Height 100mm) 07-Sep-14, WALLS Installation of Ceramic Tiles on Toilet Walls. Installation of Acrovyn 4000 Handrails 04-Sep-14, PAINTING WORKS Ceiling Painting Wall Painting 11-Sep-14, WOODWORKS Installation of New Door to WC Room Installation of Wood Wall with Sitting in Melamine Panels. Installation of Sliding Door Frame Installation of Sliding Door 06-Sep-14, METAL WORKS Installation of Metal Doors with Panic Bar Handle. Page 2 of 4 Sep Oct Nov Dec
OTHERS
Installation of Signages Installation of Window Blinds Installation of Straight Rail Platform Lift
CONSTRUCTION PHASE-Zone 2
DEMOLITION
Temporary Closure, Night Lighting of Zone 2 Door Removal Wall Demolition False Ceiling Removal Existing Flooring Removal Debris & Material Removal, Site Cleaning, Set out.
WALL CONSTRUCTION
Blockworks (200mm Thick) Plastering for Blockworks.
CEILING WORKS
Installation of Standard Gypsum Board Ceiling. Installation of Moisture Resistant Gypsum Board Ceiling. Installation of Metal Ceiling Tiles.
FLOORING WORKS
Installation of Vinyl Flooring Installation of PVC Skirting (Height 100mm)
WALLS
Installation of Ceramic Tiles on Toilet Walls. Installation of Acrovyn 4000 Handrails
PAINTING WORKS
Ceiling Painting Wall Painting
WOODWORKS
Installation of New Door to WC Room Installation of Wood Wall with Sitting in Melamine Panels. Installation of Sliding Door Frame Installation of Sliding Door
METAL WORKS
Installation of Metal Doors with Panic Bar Handle. Actual Work Remaining Work Critical Remaining Work Milestone
DOHA CLINIC HOSPITAL-PROGRAM Activity Name Original Duration 13 4 2 4 2 8 3 2 1 1 1 1 4 2 5 9 8 8 8 8 8 1 3 136 14 3 3 3 3 3 2 11 6 5 13 8 7 19 12 12 12 12 12 6 3 2 30 5 4 Critical Remaining Work Milestone Start 30-Aug-14 30-Aug-14 03-Sep-14 05-Sep-14 09-Sep-14 05-Sep-14 05-Sep-14 05-Sep-14 11-Sep-14 11-Sep-14 11-Sep-14 11-Sep-14 11-Sep-14 11-Sep-14 11-Sep-14 28-Aug-14 28-Aug-14 28-Aug-14 28-Aug-14 28-Aug-14 28-Aug-14 12-Sep-14 12-Sep-14 12-Jul-14 15-Sep-14 15-Sep-14 18-Sep-14 18-Sep-14 21-Sep-14 21-Sep-14 24-Sep-14 26-Sep-14 26-Sep-14 02-Oct-14 07-Oct-14 07-Oct-14 10-Oct-14 02-Oct-14 07-Oct-14 07-Oct-14 07-Oct-14 07-Oct-14 02-Oct-14 19-Oct-14 19-Oct-14 22-Oct-14 07-Oct-14 07-Oct-14 28-Oct-14 Summary Finish Mar 10-Sep-14 02-Sep-14 04-Sep-14 08-Sep-14 10-Sep-14 11-Sep-14 07-Sep-14 06-Sep-14 11-Sep-14 11-Sep-14 11-Sep-14 11-Sep-14 15-Sep-14 12-Sep-14 15-Sep-14 04-Sep-14 04-Sep-14 04-Sep-14 04-Sep-14 04-Sep-14 04-Sep-14 14-Sep-14 14-Sep-14 06-Nov-14 25-Sep-14 17-Sep-14 20-Sep-14 20-Sep-14 23-Sep-14 23-Sep-14 25-Sep-14 06-Oct-14 01-Oct-14 06-Oct-14 16-Oct-14 14-Oct-14 16-Oct-14 18-Oct-14 18-Oct-14 18-Oct-14 18-Oct-14 18-Oct-14 13-Oct-14 23-Oct-14 21-Oct-14 23-Oct-14 31-Oct-14 11-Oct-14 31-Oct-14 Apr
Classic WBS Layout 2014 May Jun Jul Aug Sep Oct 10-Sep-14, GLAZING WORKS Installation of Laminated Glass Partition. Installation of Glass Sliding Doors. Installation of Laminated Glass Partition. Installation of Sliding Doors. 11-Sep-14, FURNITURES Installation of Reception Desk Installation of Back Office Cabinet Supply and Install of Waiting Chairs Supply and Install of Flower Boxes Supply and Install of Office Chairs Supply and Install of Squared Tables 15-Sep-14, OTHERS Installation of Window Blinds Installation of Signages 04-Sep-14, MEP WORKS-FINAL FIX HVAC-Final Plumbing-Final Electrical Works-Final Fire Fighting-Final CCTV-Final 14-Sep-14, SNAGGING, CLEARING and HAND OVER CLEARING AND HAND OVER, REMOVAL OF TEMPORARY CLOSURE 06-Nov-14, CONSTRUCTION PHASE-Zone 3 25-Sep-14, DEMOLITION Temporary Closure, Night Lighting of Zone 3 Door Removal Wall Demolition False Ceiling Removal Existing Flooring Removal Debris & Material Removal, Site Cleaning, Set out. 06-Oct-14, WALL CONSTRUCTION Blockworks (200mm Thick) Plastering for Blockworks. 16-Oct-14, CEILING WORKS Installation of Standard Gypsum Board Ceiling. Installation of Metal Ceiling Tiles. 18-Oct-14, MEP WORKS-FIRST FIX HVAC-1st Electrical Works-1st Fire Fighting-1st CCTV-1st Plumbing-1st 23-Oct-14, FLOORING WORKS Installation of Vinyl Flooring Installation of PVC Skirting (Height 100mm) 31-Oct-14, WALLS Installation of Ceramic Tiles on Toilet Walls. Installation of Acrovyn 4000 Handrails Page 3 of 4 Nov Dec
GLAZING WORKS
Installation of Laminated Glass Partition. Installation of Glass Sliding Doors. Installation of Laminated Glass Partition. Installation of Sliding Doors.
FURNITURES
Installation of Reception Desk Installation of Back Office Cabinet Supply and Install of Waiting Chairs Supply and Install of Flower Boxes Supply and Install of Office Chairs Supply and Install of Squared Tables
OTHERS
Installation of Window Blinds Installation of Signages
CONSTRUCTION PHASE-Zone 3
DEMOLITION
Temporary Closure, Night Lighting of Zone 3 Door Removal Wall Demolition False Ceiling Removal Existing Flooring Removal Debris & Material Removal, Site Cleaning, Set out.
WALL CONSTRUCTION
Blockworks (200mm Thick) Plastering for Blockworks.
CEILING WORKS
Installation of Standard Gypsum Board Ceiling. Installation of Metal Ceiling Tiles.
FLOORING WORKS
Installation of Vinyl Flooring Installation of PVC Skirting (Height 100mm)
WALLS
Installation of Ceramic Tiles on Toilet Walls. Installation of Acrovyn 4000 Handrails Actual Work Remaining Work
DOHA CLINIC HOSPITAL-PROGRAM Activity Name Original Duration 14 4 4 9 2 3 3 2 2 8 6 18 10 2 9 8 23 10 10 8 10 6 136 93 2 0 Start 15-Oct-14 15-Oct-14 24-Oct-14 24-Oct-14 24-Oct-14 28-Oct-14 28-Oct-14 31-Oct-14 31-Oct-14 26-Oct-14 26-Oct-14 19-Oct-14 19-Oct-14 02-Nov-14 28-Oct-14 28-Oct-14 19-Oct-14 19-Oct-14 28-Oct-14 28-Oct-14 28-Oct-14 28-Oct-14 12-Jul-14 12-Jul-14 05-Nov-14 Finish Mar 27-Oct-14 18-Oct-14 27-Oct-14 01-Nov-14 25-Oct-14 30-Oct-14 30-Oct-14 01-Nov-14 01-Nov-14 31-Oct-14 31-Oct-14 03-Nov-14 28-Oct-14 03-Nov-14 04-Nov-14 04-Nov-14 06-Nov-14 28-Oct-14 06-Nov-14 04-Nov-14 06-Nov-14 02-Nov-14 06-Nov-14 12-Oct-14 06-Nov-14 06-Nov-14 Apr
Classic WBS Layout 2014 May Jun Jul Aug Sep Oct Nov Dec 27-Oct-14, PAINTING WORKS Ceiling Painting Wall Painting 01-Nov-14, WOODWORKS Installation of New Door to WC Room Installation of Wooden Frames for Doors Installation of Sliding Door Frame Installation of Sliding Door Installation of Wooden Doors 31-Oct-14, METAL WORKS Installation of Metal Doors with Panic Bar Handle. 03-Nov-14, FURNITURES
PAINTING WORKS
Ceiling Painting Wall Painting
WOODWORKS
Installation of New Door to WC Room Installation of Wooden Frames for Doors Installation of Sliding Door Frame Installation of Sliding Door Installation of Wooden Doors
METAL WORKS
Installation of Metal Doors with Panic Bar Handle.
FURNITURES
SUPPLY AND INSTALLATION OF LABORATORY FURNITURES Supply of Laboratory Chairs
SUPPLY AND INSTALLATION OF LABORATORY FURNITURES Supply of Laboratory Chairs 04-Nov-14, OTHERS Installation of Signages 06-Nov-14, MEP WORKS-FINAL FIX HVAC-Final Electrical Works-Final Fire Fighting-Final CCTV-Final Plumbing-Final 06-Nov-14, SNAGGING, CLEARING and HAND OVER TESTING AND COMMISSIONING CLEARING, REMOVAL OF TEMPORARY CLOSURE FINAL HANDING OVER
OTHERS
Installation of Signages
Summary