There are many stages of cleanup including site study, remedy selection, remedy design, remedy construction, and post-construction. Activities undertaken early in the cleanup process focus on understanding problems at the site while those taken later in the cleanup process focus on physically addressing those problems identified. This tab provides a detailed list of cleanup activities at this site. Sometimes, these cleanup activities are called actions.
Activities Underway
Activity FEDERAL FACILITY REMEDIAL INVESTIGATION (see glossary) Restoration Advisory Board (see glossary) Area of Site Leading Addressed Organization (OU) Federal Facilities Federal Facilities Start Date
see glossary for definitions of activities, leading organization, operable units (OUs) or start dates >>
Activities Completed
Activity PROPOSAL TO NATIONAL PRIORITIES LIST (see glossary) Area of Site Leading Addressed Organization (OU) EPA FundFinanced SITEWIDE (00) Start Date Completion Date
http://cfpub.epa.gov/supercpad/SiteProfiles/index.cfm?fuseaction=second.CleanupActs&id=0501172
Page 1 of 3
11/19/13 11:07 PM
ENGINEERING EVALUATION/COST ANALYSIS (see glossary) ENGINEERING EVALUATION/COST ANALYSIS (see glossary) INFORMATION REPOSITORY ESTABLISHED (see glossary) SITE INSPECTION (see glossary) Outcome: High Priority NATIONAL PRIORITIES LIST RESPONSIBLE PARTY SEARCH (see glossary) PRELIMINARY ASSESSMENT (see glossary) Outcome: Low Priority DISCOVERY (see glossary)
Federal Facilities
PROPOSED FOR NPL (02) PROPOSED FOR NPL (02) SITEWIDE (00) SITEWIDE (00)
04/21/1999
11/04/1999
Federal Facilities
04/21/1999
11/04/1999
Federal Enforcement
SITEWIDE (00)
Federal Facilities
SITEWIDE (00)
EPA FundFinanced
SITEWIDE (00)
see glossary for definitions of activities, leading organization, operable units (OUs), start dates, and completion dates
The majority of these documents are in PDF format. To download a document, right click on the respective link and select Save Target As. Please note that download time may be extended given the size of the document. File size is noted in kilobytes (KB) or megabytes (MB) next to each download link. If file size exceeds 15MB, the link will be inactive. Please submit a request for the document instead, as files of this size are not available for download. This page may not list all documents available for this site. DISCLAIMER: Be advised that the data contained in these profiles are intended solely for informational purposes use by employees of the U.S. Environmental Protection Agency for management of the Superfund program. They are not intended for use in calculating Cost Recovery Statutes of Limitations and cannot be relied upon to create any rights, substantive or procedural, enforceable by any party in litigation with the United States. EPA reserves the right to change these data at any time without public notice.
Return to Search Results | Return to Search Superfund Site Information OSWER Home | Superfund Home
http://cfpub.epa.gov/supercpad/SiteProfiles/index.cfm?fuseaction=second.CleanupActs&id=0501172
Page 2 of 3
11/19/13 11:07 PM
EPA Home | Privacy and Security Notice | Contact Us URL: http://cfpub.epa.gov/supercpad/SiteProfiles/second.CleanupActs This page design was last updated on Tuesday, January 20, 2009 Content is dynamically generated by ColdFusion
http://cfpub.epa.gov/supercpad/SiteProfiles/index.cfm?fuseaction=second.CleanupActs&id=0501172
Page 3 of 3