Algoma
Capacity: 515 MW Fuel: Natural gas/Naphtha Offtake: Gujarat Electricity Board, Essar Steel COD: Oct 1997 Location: Gujarat, India
Capacity: 500 MW Fuel: Natural gas Offtake: Essar Group companies COD: Jan 2006 Oct 2008 Location: Gujarat, India
Capacity: 120 MW
Fuel: Refinery residue Offtake: Essar Oil COD: May 2008 Location: Gujarat, India
Capacity: 380 MW
Fuel: Natural Gas Offtake: Essar Oil Sync: Unit I Oct 2010 Unit II Jan 2011 Location: Gujarat, India
Capacity: 85 MW Fuel: Blast furnace gas / Coke oven gas Offtake: Ontario Power Authority
Capacity: 515 MW Fuel: Natural gas/Naphtha Off take: Gujarat Electricity Board, Essar Steel COD: Oct 1997 Location: Gujarat, India
Capacity: 500 MW Fuel: Natural gas Off take: Essar Group companies COD: Jan 2006 Oct 2008 Location: Gujarat, India
Salient Features
Plant Configuration EPOL- 515 MW 3 Gas Turbines Generators-3 X 110 MW 1 Steam Turbine Generator-1 X 185 MW
BPOL - 500 MW 3 Gas Turbines 1x100+2x110 MW Steam Turbine - I 55 MW Steam Turbine- II 125 MW
Fuel NGL/ Naphtha / HSD / Natural Gas
= 320 MW = 55 MW = 125 MW
Exhaust
Boiler
To other Boilers
Deareator
Steam Turbine
Alternator
Compressor
Gas Turbine
PACKAGE
STG & Auxiliaries
VENDOR
SIEMENS
BWE SPIG Jyoti Tyco Sanmar ABB ABB ABB GMMCO Honeywell
Thermosystems
Mcawber Beekay
DESCRIPTION
PROGRESS
BASIC ENGINEERING
100%
TECHNICAL SPECIFICATION
95%
ENGINEERING EESL
70%
ENGINEERING VENDORS
90%
S.N. 1 2 3
% COMPLETION 77 21 46
4
5 6 7
Structural Erection
Equipment Erection Piping Cable Laying
MT
MT IM RM
12035
16244 190952 315000
804
6.5
TG-1 DECK
TG-2 DECK
CHIMNEY
CURRENT STATUS
CURRENT STATUS
STG DECK 1
STG DECK 2
PILING EXCAVATION
TG BLDG FOUNDATIONS
TG DECK REINFORCEMENT
TG DECK CONCRETING
TG DECK COLUMNS
BOILER -1FOUNDATIONS
BOILER -2FOUNDATIONS
CURRENT STATUS
PILING EXCAVATION
PILING EXCAVATION
PILING
CURRENT STATUS
PCC WORK
CURRENT STATUS
Operating Units
Plant Performance
PLF (%)
2006-07
2007-08 2008-09 2009-10 2010 - 11
4714
5394 4858 5086 5364
538
616 555 581 612
2852.2
3357.1 2979.7 3192.1 3778.0
1779.0
1946.3 1782.3 1796.8 1493.1
74.1%
76.8% 59.2% 57.2% 60.3%
Generation at Hazira
6000 5394 5000 4858 4714 4228 Generation (MU) 4000 3643 3000 3188 2821 2516 2000 2084 1968 2975 5086 5364
1000
0 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 Generation MU
98.0%
90.0%
88.0%
86.0% 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11
Availability %
Reliability (%)
Plant Performance
90% 2.7%
80%
2.4%
70%
2.1%
PLF (%)
50%
1.5%
40%
1.2%
30%
0.9%
20%
0.6%
10%
0.3%
0%
0.0% 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 PLF % Aux Cons %
60%
1.8%
Highlights
Essar Power 515 MW: Received Integrated Management Systems, PAS:99
Highlights
Shreshtha Suraksha Puraskar for EPOL in 2001 from National Safety Council of India Major Overhaul and Other Scheduled Inspections of Gas Turbines and Steam Turbines carried out In house at Essar Power Limited and Bhander Power Limited Multi fuel Capability with Gas and Naphtha fuels that can be used independently, as well as in Mixed mode. Leads to flexibility in case of fuel pricing variations, and ensures cost benefit to customer
Pump(55 KW ) and one ACW Booster Pump ( 31 KWH) Instrument air system modified to reduce aux power (saving of 75 kW) and to improve compressor life. Clarified water pump impeller trimmed to reduce power consumption. Net power saving would be 20 KWH Raw water Pump replaced by VFD Motor. Saving potential of 35 KWH. Installation of Wind Spin Fans, in place of Roof Ventilator in all Roofs.
Wind Spin
Provision to receive fuel gas supply from three different gas supplier .
GTG lube oil filtration and dehydration machine installed. Flux detectors installed on STG generator.
Maintenance Standards
Maintaining high availability of major equipments Viz. Gas Turbines, Steam turbine and HRSGs Over 300 modifications carried out to improve various systems performance In house capability to carry out major inspections of gas turbines and steam turbines Various modifications done on turbine parts to extend the parts life High reliability of Liquid Fuel System by improvements on the Flow divider , Warren Pump seal design, Liquid fuel lines, etc Commissioning of inlet air cooling system carried out with in house expertise
Major inspection of GTG# 3 carried out in 21 days Major Inspection of steam turbine carried out in 22 days simultaneous with Gas Turbine Major Inspection
Developed card repair facility for Mark V and DCS electronic cards.
In house repair of expensive equipments like Warren pump, Flow divider, Dual fuel nozzles, Hydraulic pump, CW Pump Relay testing facility developed for testing and calibration of relays
SAFETY MEASURES
HIGH RISK JOBS DONE SAFELY
Hydrogen sensors in Battery Room. Naphtha Detectors in Gas Turbine Compt. Monsoon preparedness improved. Behaviour Based Safety on Stream. Auto HVWS system at Station Transformers. OHSAS 18001 Certified
Environmental Management
ESSAR POWER LIMITED received Integrated Management Systems, PAS:99 Certification for OHSAS 18001:2007 and ISO14001 Uses clean fuel, natural gas with very low emissions level . Green belt developed all around the plant with planting of over one lakh trees. Water systems modified to optimize the water requirements. Chlorine Dioxide System introduced in Nov 2005 COC improved from 5 to 5.5. Cooling Water blow down used for Cooling purpose in HBI plant and gardening in township. Treated effluent water used for horticulture. Control room - back up alarm system, made paperless.
Dec-07
Jan-08
272
216
8
8.1
32.1
32.7
Reliability Improvements.
DD 1 & 3 hydraulic system accumulators.
Naphtha settling & Inter tank Filtration Scheme introduced to ensure clean Naphtha without filterable particles for the gas turbines.
Significant improvements on the reliability of Liquid Fuel System by improvements on the Flow divider , Warren Pump seal design etc. Accumulator for GTGs Naphtha forwarding system. Auto islanding scheme for station with stable load. New common header for GT ACW IDCT. GTG Misc MCC- DC supply 110 V DC instead of 110V AC 6.6 KV Station switchgear auto-changeover scheme.
HR Development Practices
12 Engineers sent to G.E, USA for Systems training
Job Rotation within functions and lateral transfers for wider exposure
Employees exposed to seminars & workshops related to Power industry
Manpower to MW Ratio
2.75
1.50
0.43 0.11
BPL receives CII "Most Water Efficient Unit" award November 2011 Greentech Foundation Silver award for Environment Excellence 2011 EPOL & BPL BSI Management System BPL - ISO14001 & PAS 99
Greentech Gold and silver award Certificate of Appreciation BSI Management System Gujarat Safety Council EPOL - ISO14001 & PAS 99 Certificate of Appreciation National Safety Council BSI Management System Shreshtha Surksha Puraskar OHSAS 18001 BSC - National Safety Award Gujarat Safety Council GSC - Certificate of Appreciation Certificate of Appreciation Gujarat Safety Council BSC - Five star rating & Sword of honour Certificate of Appreciation GSC - Certificate of Appreciation National Safety Council National Safety Council Shreshtha Surksha Yogyata Praman patra Puraskar BSC - National Safety Award Essar Power 100% operational
DNV - ISRS Level III
GSC - Certificate of Appreciation 1997 1998 1999 2000 BSC - Five star rating & Sword of honour GSC - Certificate of Appreciation National Safety Council Yogyata Praman patra Essar Power 100% operational DNV - ISRS Level III 1997 1998 1999 2000 2001
2001
2005
2006
2007
2008
2009
2010
51
2005
2006
2007
2008
2009
2010
2011