Transformation in todays electrical system Next generation of energy will see a series of Distributed Energy Resources (DER) These DERs will be owned and operated by independent (non-utility) entities The drivers for these changes are two-fold:
Policy Drivers
Political targets and mandates Financial incentives Technology cost reductions New enabling technologies Service innovations
Technology Drivers
N-GEN Transformation
This transformation will see the change from large, central station power plants with one way energy transmission to DERs with two way transmission. DERs owned and operated by communities
Current Energy System Future Energy System
Generation of their own renewable energy; Management of their energy requirements through Micro Grid technologies.
Provides long term Energy Diversification providing consistent renewable energy over the next 20 years Provides economic development and job creation Renewable Energy Plants
Solar & Wind generation locations Information Technology components EMCC - Energy Management Command & Control Center Ability to use existing energy resources to smooth demand usage and smooth spikes in energy costs Efficient usage and storage of energy Joint Cost for Differences PPP with revenue sharing
5
Entecco Team
Entecco
Richard J. Catanise and John Bay Co-Founders Executive management has over 30 years in government integration experience. 30 months of planning, research on Government modeling and renewable energy development Largest electrical services company in US
Eaton Corporation
CHA (former Clough Harbour & Associates) Storch Cooperative Development Governmental Liaison Additional partners are:
Summary
Entecco has the team experience, knowledge and qualifications to showcase JCIDA to the forefront of energy development in the Central NY. Entecco is developing solutions and programs that coincide with new DER initiatives Entecco will strive to support Public Private Partnerships and the related funding for our joint success JCIDA projects will keep jobs local and in Jefferson County N-GEN renewable energy projects can serve as the differentiator for the enticement of new businesses!
8
First Step
Location County Office Bldg. County Court Complex Subtotal 2 Sites Human Services Bldg. Public Safety Bldg. Total 4 Sites
10
When is Peak Demand being billed? How much are the charges based on Peak Demand?
11
Utilizing natural gas components such as CHP and Generators for the base load/peaks, and Renewables such as Solar for peak demand shaving.
A smart meter deployment at the four locations shown on their maps. This gives us the exact energy utilization and the exact times of peak demand charges (if possible). A rooftop solar implementation at the County Office Building and the County Court Complex under 200kw. A small Smart Grid software solution for the two buildings (if possible). A twelve month analytical study of their consumption with recommendations for Phase two.
12
Proposed Sites
13
14