National Engineering and

Technical Company Limited


FACILITY:

EKU EA WELLHEAD PLATFORM


PROJECT TITLE:

PIGGING FACILITIES UPGRADE PROJECT PHASE 5


DOCUMENT TITLE:

PIPE STRESS CALCULATION REPORT FOR STRESS


SYSTEM EKU EA PIG LAUNCHER
DOCUMENT NUMBER : NGEA-NT-LRSTS-0030215

Country Code

Facility/Plant
Code

Originating
Organization

Discipline Code

Document
Type

Document Sub
Type Code

Component
location Code

Sequential Doc.
Number

NG

EA

NT

STS

00

30215

O
Rev.

16 Sept 09

Issued for Construction

TJM

JAA

OPO

CCU

EA

Date

Description

By

Checked

QA
Checked

PM
Approval

Approval

Client

This document contains information, which is for company use only. This information is to be held in
Confidence. Disclosure, reproduction, or other use of this document is prohibited without the prior
written consent of MPN

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

TABLE OF CONTENTS
1.0

PAGE

INTRODUCTION

1.1 OVERVIEW OF THE PLATFORM AND PIPLINE FACILITY

1.2 PIPING STRESS SCOPE OF WORK

2.0

OBJECTIVE

3.0

CONCLUSION

4.0

REFERENCES (GP) & CODE COMPLIANCES (ASME31.3 / 31.8)

5.0

4.1

INTERNATIONAL CODES

4.2

PROJECT DOCUMENTS

DESIGN INPUTS

5.1 PIPE DATA

5.2 PIPING MATERIAL PROPERTIES

5.3 FLANGE LEAKAGE ASSESSSMENT

21

OVERALL PIPING NETWORK

22

6.1 SUPPORT LOADINGS/RESTRAINTS REPORTS

22

7.0

STRESS CALCULATION

22

7.1

RESTRAINT SUMMARY REPORT

36

7.2 RESTRAINTS SUMMARY ON PIPE SUPPORT

46

7.3 FLANGE LEAKAGE CALCULATION

48

GLOBAL FORCES ELEMENT

50

6.0

8.0

ATTACHMENT
PIPING STRESS ISOMETRICS
PIPING STRESS ISOMETRICS

NGEA-NT-LRSTS-0030215 REV O

SHT 1 of 2
SHT 2 of 2

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

1.0
1.1

PIPE STRESS CALCULATION REPORT

INTRODUCTION
OVERVIEW OF THE PLATFORM AND PIPLINE FACILITY
Mobil Producing Nigeria Unlimited (MPN) desires to upgrade the Eku EA
and UNAM CB Wellhead Platforms. The intent of the upgrade is to bring
the pipelines into compliance with the requirements of the MPN Pipeline
Integrity Management System by installing pigging facilities capable of
launching and retrieving intelligent pig tools at the platforms. A pig
launcher is installed at Eku EA and a pig receiver at Unam CB platform.
The general project scope is as detailed below:

Review the project scope of work and conceptual engineering conducted


to date as related in the Project Design Basis (PDBs).
As-build affected drawings and information relating to the project.
Produce new documents (analysis reports, studies, demolition and
modification drawings, data sheets, specifications, etc.) as required to
complete the FEED/Detailed engineering work and produce the IFC
package.
Develop the Project Design Basis (PDB) Addendum/Supplement for the
pipelines. This document shall be created by updating information from
the PDBs to reflect changes and additional detail made during
FEED/Detailed Engineering.
Update all existing drawings affected by the modifications and produce
new drawings as required
Develop Equipment procurement specifications for long lead and
specialty items. This will include complete procurement specifications,
not just data sheets).
Address interfaces between this project and other applicable projects.
Prepare Construction Scope of Work.
Produce a complete design package.

NGEA-NT-LRSTS-0030215 REV O

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

1.2

PIPE STRESS CALCULATION REPORT

PIPING STRESS SCOPE OF WORK


The Piping Thermal flexibility analysis scope of work is to examine the
compliance of piping systems from the pig receiver to Tie-In Point 64201-01 on
Unam CB platform.
The analysis was performed as required by ASME B31.3 / B31.8 on the
following lines:
18 LN 642 0002 E8E
12 LN 642 0001 E1E

8 LN 527 0001 E1E.

NGEA-NT-LRSTS-0030215 REV O

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

2.0

PIPE STRESS CALCULATION REPORT

OBJECTIVE
The stress analysis examines the compliance of piping systems to the
requirements of ASME B31.3 / B31.8 Process Piping / Pipeline codes, for
metallic pipes. Only lines NPS 12 and larger in accordance with GP 03-01-01
and GP 03-07-01 were considered.

3.0

CONCLUSION
The stress analysis examines the compliance of piping systems for the pig
receiver at Unam CB platform to the requirements of ASME B31.3 / B31.8
Process Piping / Pipeline codes, for metallic pipes. Only lines NPS 12 and
larger in accordance with GP 03-01-01 and GP 03-07-01 were considered.
However, Kicker Line ( 8 NPS ) has been considered.

Piping displacement values as shown in the static analysis output are


consistent and compatible with the analysis input data.

All calculated stress values on piping elements are within the allowable
stresses of ASME code B31.3 / B31.8 for metallic pipes, which is 47720/20,000 X
100%=23.9% @ Node 460 Loadcase of the allowable (Page 23).

Flange leakage calculation result satisfy the code requirement of ASME


B31.3/B31.8. (Page 48 - 50)

Resultant Allowable Bending moment on 18 900LB RF, A105 Flanges


according to ASME B16.5 Flanges; Ref- ASME III is 85737.63lb, i. e, ratio of
20315.311
/85737.63 X 100% = 23.7%
Caesar II Ver. 5.10 out to allowable is
(Pages 48-50)

4.0

REFERENCES (GP) & CODE COMPLIANCES (ASME31.3/8)


The principles governing how pipe stress analysis should be carried out from
the GPs is situated in GP 03-01-01 and GP 03-07-01 as applicable.

4.1

INTERNATIONAL CODES
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B16.5:

Pipe Flanges and Flanged Fittings

ASME B16.7:

Large Diameter Steel Flanges (NPS 26 through


NPS 60)

NGEA-NT-LRSTS-0030215 REV O

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

ASME B31.3

Process Piping

PD 5500:

Unfired Fusion Welded Pressure Vessels

AMERICAN PETROLEUM INSTITUTE (API)


API RP 14C:

Recommended Practice for Analysis, Design, Installation


and Testing of Basic Surface Safety Systems for Offshore
Production Platform

API RP 521:

Guide for Pressure Relieving and Depressurizing Systems

API STD 590:

Steel Line Blanks

Welding and Research Council (WRC)

WRC-107:

Local Stresses in Spherical and Cylindrical Shells


due to External Load.

Classification Notes
DNV RP-C203:

Fatigue Strength Analysis for Mobile Offshore


Units

4.2

PROJECT DOCUMENTS
The following project documents were considered
Process Line List
Process Simulation report
Process basis of Design

Section

Global Practice
Requirements
GP 03-01-01 and GP
03-07-01

Action
Taken

Comments

3.4
General:
1) Weight of pipe,
components & fluid

Considered

2) External loads like


wind, snow etc

Not
considered

This is reflected from the


given load cases and the
results generated by Caesar.

3) Loads due to slug flow


Not
or pressure surges
considered
NGEA-NT-LRSTS-0030215 REV O

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

3.4.1

4) Thermal expansion,
contraction or settlement
of end connections at
Equipment.

Considered

5) Loads on connected
equipment, support
points etc

Considered

Piping Expansion
Stresses:
1)Temp
(Design/Operating)

2) Possible upset temp


(max/min) etc.

3.4.2

PIPE STRESS CALCULATION REPORT

Considered

3.4.3

Connection to rotating
equipment

Not
Applicable
Not
Considered

3.4.4

Computerized Analysis

Considered

Loads on rotating
equipment, fixed
equipment and the
Liberal equation/
additional analysis

Not
Applicable

3.4.5 3.4.8

Use of bellows-type
expansion joints

Considered

NGEA-NT-LRSTS-0030215 REV O

As stated in Section 3.4.1of


GP 07-07-01; the Design
temperature shall be the
greatest temperature
differential of design between
ambient and installation
temperature regardless of
pressure. This temperature,
assumed to be the highest
among those listed in section
3.4.1 when compared to the
design minimum temperature
(DMT) gives the highest
differential temperature of
20F which forms the basis of
this analysis.

Caesar II version 5.10

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

5.0

DESIGN INPUTS

5.1

PIPE DATA: NOMINAL PIPE SIZES 18, 12 & 8

COMPONENT
18" 900# RTJ
WN FLANGE
12" 900# RTJ
WN FLANGE
10" 900# RTJ
WN FLANGE
8" 900# RTJ WN
FLANGE
18 900# FLGD
BALL
VALVE,RTJ
12 900# FLGD
BALL
VALVE,RTJ
10 900# FLGD
BALL
VALVE,RTJ
10 900# FLGD
CHECK
VALVE,RTJ
8 900# FLGD
BALL
VALVE,RTJ

5.2

DIM (LENGTH)
in inches

WEIGHT

9 1/2"

695.16lb

8 3/16"

362.35 lb

7 9/16"

270.7 lb
180.44 lb

6 11/16"
481/2"

5979.85

381/8"

2817.46

331/8"

1964.51

381/8"

2914.61

291/8"

1278.87

PIPING MATERIAL PROPERTIES OF E1E

Material A 333 Grade 6


Corrosion Allowance 0.118
Density= .2830 lb./cu.in
Stresses in accordance with ASME B31.3/B31.8
API 5L X65 E = 29,821,212 lb./sq.in
Poission Ratio v = .300

NGEA-NT-LRSTS-0030215 REV O

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

PIPE DATA
--------------------------------------------------------------------------------------------------------------------------------------------------------From 10 To 20 DX= 1.016 ft.
PIPE
Dia= 22.000 in. Wall= .875 in. Insul= .000 in. Cor= .1181 in.
GENERAL
T1= 100 F T2= 80 F P1= 220.0000 lb./sq.in. P2= 180.0000 lb./sq.in.
Mat= (306)API-5L X65 E= 29,821,212 lb./sq.in. EH1= 29,300,000 lb./sq.in.
EH2= 29,433,334 lb./sq.in. EH3= 29,500,000 lb./sq.in.
EH4= 29,500,000 lb./sq.in. EH5= 29,500,000 lb./sq.in.
EH6= 29,500,000 lb./sq.in. EH7= 29,500,000 lb./sq.in.
EH8= 29,500,000 lb./sq.in. EH9= 29,500,000 lb./sq.in. v = .300
Density= .2830 lb./cu.in. Insul= .0000 lb./cu.in.
Fluid= .0000000 lb./cu.in.
RIGID Weight= 600.00 lb.
RESTRAINTS
Node 20 ANC Cnode 5020
ALLOWABLE STRESSES
B31.8 (2003)
Sh1= 65,000 lb./sq.in. Sh2= 65,000 lb./sq.in.
Sh3= 65,000 lb./sq.in. Sh4= 65,000 lb./sq.in. Sh5= 65,000 lb./sq.in.
Sh6= 65,000 lb./sq.in. Sh7= 65,000 lb./sq.in. Sh8= 65,000 lb./sq.in.
Sh9= 65,000 lb./sq.in. Sy= 65,000 lb./sq.in.
----------------------------------------------------------------------------From 5020 To 30 DX= 1.016 ft.
GENERAL
Fluid= .3543100 lb./cu.in.
RIGID Weight= 600.00 lb.
----------------------------------------------------------------------------From 30 To 40 DX= 1.000 ft.
----------------------------------------------------------------------------From 40 To 50 DX= 2.250 ft.
----------------------------------------------------------------------------From 50 To 60 DX= 6.917 ft.
----------------------------------------------------------------------------From 60 To 70 DX= 1.667 ft.
REDUCER
Diam2= 18.000 in. Wall2= .875 in. Angle= 20.00
----------------------------------------------------------------------------From 70 To 80 DX= 1.167 ft.
PIPE
Dia= 18.000 in. Wall= .875 in. Insul= .000 in.
----------------------------------------------------------------------------From 80 To 90 DX= 2.083 ft.
-----------------------------------------------------------------------------

NGEA-NT-LRSTS-0030215 REV O

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

From 90 To 100 DX= .792 ft.


RIGID Weight= 695.50 lb.
RESTRAINTS
Node 100 ANC Cnode 5100
----------------------------------------------------------------------------From 100 To 110 DX= 4.063 ft.
RIGID Weight= 5,980.00 lb.
RESTRAINTS
Node 110 ANC Cnode 5110
----------------------------------------------------------------------------From 5110 To 120 DX= .792 ft.
RIGID Weight= 696.00 lb.
----------------------------------------------------------------------------From 120 To 130 DX= 3.766 ft.
RESTRAINTS
Node 130 Y
----------------------------------------------------------------------------From 130 To 140 DX= 3.750 ft.
----------------------------------------------------------------------------From 140 To 150 DX= .792 ft.
RIGID Weight= 696.00 lb.
RESTRAINTS
Node 150 ANC Cnode 5150
----------------------------------------------------------------------------From 5150 To 160 DX= 4.063 ft.
RIGID Weight= 5,980.00 lb.
RESTRAINTS
Node 160 ANC Cnode 5160
----------------------------------------------------------------------------From 5160 To 170 DX= .792 ft.
RIGID Weight= 696.00 lb.
----------------------------------------------------------------------------From 170 To 175 DX= 2.500 ft.
RESTRAINTS
Node 175 Y
Node 175 Z
----------------------------------------------------------------------------From 175 To 180 DX= 2.885 ft.
SIF's & TEE's
Node 180 Extruded Tee
----------------------------------------------------------------------------From 180 To 190 DX= 8.854 ft.
RESTRAINTS
Node 190 Y
-----------------------------------------------------------------------------

NGEA-NT-LRSTS-0030215 REV O

10

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

From 190 To 200 DX= 6.083 ft.


BEND at "TO" end
Radius= 27.000 in. (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 199
Angle/Node @2= .00 198
----------------------------------------------------------------------------From 200 To 210 DZ= 14.729
RESTRAINTS
Node 210 Y
Node 210 Z
----------------------------------------------------------------------------From 210 To 212 DZ= 3.000 ft.
----------------------------------------------------------------------------From 212 To 214 DZ= .792 ft.
RIGID Weight= 696.00 lb.
RESTRAINTS
Node 214 ANC Cnode 5214
----------------------------------------------------------------------------From 5214 To 216 DZ= .792 ft.
RIGID Weight= 696.00 lb.
----------------------------------------------------------------------------From 216 To 218 DZ= 12.000 ft.
RESTRAINTS
Node 218 Y
----------------------------------------------------------------------------From 218 To 220 DZ= 7.667 ft.
BEND at "TO" end
Radius= 27.000 in. (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 219
Angle/Node @2= .00 221
----------------------------------------------------------------------------From 220 To 230 DX= -9.000 ft.
BEND at "TO" end
Radius= 27.000 in. (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 229
Angle/Node @2= .00 228
----------------------------------------------------------------------------From 230 To 240 DY= -4.500 ft.
----------------------------------------------------------------------------From 240 To 250 DY= -.792 ft.
RIGID Weight= 696.00 lb.
RESTRAINTS
Node 250 ANC Cnode 5250
----------------------------------------------------------------------------From 5250 To 260 DY= -4.063 ft.
RIGID Weight= 5,980.00 lb.
RESTRAINTS
Node 260 ANC Cnode 5260

NGEA-NT-LRSTS-0030215 REV O

11

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

----------------------------------------------------------------------------From 5260 To 270 DY= -.792 ft.


RIGID Weight= 696.00 lb.
----------------------------------------------------------------------------From 270 To 280 DY= -2.911 ft.
RESTRAINTS
Node 280 X
Node 280 Y
Node 280 Z
----------------------------------------------------------------------------From 280 To 290 DY= -2.912 ft.
----------------------------------------------------------------------------From 290 To 300 DY= -.792 ft.
RIGID Weight= 696.00 lb.
RESTRAINTS
Node 300 ANC Cnode 5300
----------------------------------------------------------------------------From 5300 To 310 DY= -.792 ft.
RIGID Weight= 696.00 lb.
----------------------------------------------------------------------------From 310 To 320 DY= -18.000 ft.
DISPLACEMENTS
Node 320 DX1= .000 in. DZ1= .000 in. RX1= .000 RY1= .000
RZ1= .000
----------------------------------------------------------------------------From 180 To 400 DY= 1.052 ft.
PIPE
Dia= 12.750 in. Wall= .875 in. Insul= .000 in.
GENERAL
Mat= (177) A333 6 E= 29,500,000 lb./sq.in. EH1= 29,400,000 lb./sq.in.
EH2= 29,466,666 lb./sq.in. EH3= 29,500,000 lb./sq.in.
EH4= 29,500,000 lb./sq.in. EH5= 29,500,000 lb./sq.in.
EH6= 29,500,000 lb./sq.in. EH7= 29,500,000 lb./sq.in.
EH8= 29,500,000 lb./sq.in. EH9= 29,500,000 lb./sq.in. v = .292
Density= .2830 lb./cu.in.
ALLOWABLE STRESSES
B31.3 (2006)
Sc= 20,000 lb./sq.in. Sh1= 20,000 lb./sq.in.
Sh2= 20,000 lb./sq.in. Sh3= 20,000 lb./sq.in. Sh4= 20,000 lb./sq.in.
Sh5= 20,000 lb./sq.in. Sh6= 20,000 lb./sq.in. Sh7= 20,000 lb./sq.in.
Sh8= 20,000 lb./sq.in. Sh9= 20,000 lb./sq.in. Sy= 35,000 lb./sq.in.
----------------------------------------------------------------------------From 400 To 410 DY= .432 ft.
RIGID Weight= 364.00 lb.
RESTRAINTS
Node 410 ANC Cnode 5410
-----------------------------------------------------------------------------

NGEA-NT-LRSTS-0030215 REV O

12

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

From 5410 To 420 DY= 3.875 ft.


RIGID Weight= 364.00 lb.
----------------------------------------------------------------------------From 420 To 430 DY= .432 ft.
----------------------------------------------------------------------------From 430 To 440 DY= 4.927 ft.
BEND at "TO" end
Radius= 18.000 in. (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 439
Angle/Node @2= .00 438
----------------------------------------------------------------------------From 440 To 450 DZ= 4.542 ft.
BEND at "TO" end
Radius= 18.000 in. (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 449
Angle/Node @2= .00 448
----------------------------------------------------------------------------From 450 To 460 DX= -12.068 ft.
SIF's & TEE's
Node 460 Welding Tee
----------------------------------------------------------------------------From 460 To 470 DX= -.833 ft.
REDUCER
Diam2= 8.625 in. Wall2= .875 in. Angle= 40.00
----------------------------------------------------------------------------From 470 To 480 DX= -.667 ft.
PIPE
Dia= 8.625 in. Wall= .875 in. Insul= .000 in.
----------------------------------------------------------------------------From 480 To 490 DX= -10.875 ft.
RESTRAINTS
Node 490 X
Node 490 Y
Node 490 Z
----------------------------------------------------------------------------From 490 To 500 DX= -13.833 ft.
BEND at "TO" end
Radius= 12.000 in. (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 499
Angle/Node @2= .00 498
----------------------------------------------------------------------------From 500 To 510 DZ= -4.542 ft.
BEND at "TO" end Radius= 12.000 in. (LONG) Bend Angle= 90.000 Angle/Node
@1= 45.00 509
Angle/Node @2= .00 508
----------------------------------------------------------------------------From 510 To 520 DY= -3.479 ft.
----------------------------------------------------------------------------From 520 To 530 DY= -.557 ft.
RIGID Weight= 180.00 lb.

NGEA-NT-LRSTS-0030215 REV O

13

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

RESTRAINTS
Node 530 ANC Cnode 5530
----------------------------------------------------------------------------From 5530 To 540 DY= -3.875 ft.
RIGID Weight= 1,280.00 lb.
RESTRAINTS
Node 540 ANC Cnode 5540
----------------------------------------------------------------------------From 5540 To 550 DY= -.557 ft.
RIGID Weight= 180.00 lb.
----------------------------------------------------------------------------From 550 To 555 DY= -1.333 ft.
RESTRAINTS
Node 555 ANC Cnode 5555
----------------------------------------------------------------------------From 5555 To 40 DY= -.917 ft.
----------------------------------------------------------------------------From 460 To 600 DZ= 4.193 ft.
PIPE
Dia= 10.750 in. Wall= .875 in. Insul= .000 in.
BEND at "TO" end
Radius= 15.000 in. (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 599
Angle/Node @2= .00 598
----------------------------------------------------------------------------From 600 To 610 DX= 3.271 ft.
RESTRAINTS
Node 610 Y
----------------------------------------------------------------------------From 610 To 620 DX= 3.500 ft.
----------------------------------------------------------------------------From 620 To 630 DX= .630 ft.
RIGID Weight= 271.00 lb.
RESTRAINTS
Node 630 ANC Cnode 5630
----------------------------------------------------------------------------From 5630 To 635 DX= 3.177 ft.
RIGID Weight= 2,818.00 lb.
RESTRAINTS
Node 635 ANC Cnode 5635
----------------------------------------------------------------------------From 5635 To 640 DX= .630 ft.
RIGID Weight= 271.00 lb.
----------------------------------------------------------------------------From 640 To 650 DX= 6.000 ft.
DISPLACEMENTS
Node 650 DY1= .000 in. DZ1= .000 in. RX1= .000 RY1= .000

NGEA-NT-LRSTS-0030215 REV O

14

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

RZ1= .000
----------------------------------------------------------------------------From 70 To 700 DY= -.750 ft.
PIPE
Dia= 18.000 in. Wall= .875 in. Insul= .000 in.
RIGID Weight= .00 lb.
RESTRAINTS
Node 700 X
Node 700 Y
Node 700 Z
----------------------------------------------------------------------------From 50 To 750 DY= -.917 ft.
RESTRAINTS
Node 750 Y
Node 750 Z
MATERIAL Changes:
10
20

Mat= (306)API-5L X65


E= 29,821,212 lb./sq.in. v = .300
Density= .2830 lb./cu.in.
180
400
Mat= (177)A333 6 E= 29,500,000 lb./sq.in.
v = .292 Density= .2830 lb./cu.in.
JOBNAME: \\192.168.0.13\1192\PIPING\EKU PLATFORM\PHASE
18_LN_642_0001

C...\SK-

ALLOWABLE STRESS Changes


10
20
B31.8 (2003)
Sh1= 65,000 lb./sq.in.
Sh2= 65,000 lb./sq.in.
Sh3= 65,000 lb./sq.in.
Sh4= 65,000 lb./sq.in.
Sh5= 65,000 lb./sq.in.
Sh6= 65,000 lb./sq.in.
Sh7= 65,000 lb./sq.in.
Sh8= 65,000 lb./sq.in.
Sh9= 65,000 lb./sq.in.
Sy= 65,000 lb./sq.in.
180
400
B31.3 (2006)
Sc= 20,000 lb./sq.in.
Sh1= 20,000 lb./sq.in.
Sh2= 20,000 lb./sq.in.
Sh3= 20,000 lb./sq.in.
Sh4= 20,000 lb./sq.in.
Sh5= 20,000 lb./sq.in.
Sh6= 20,000 lb./sq.in.
Sh7= 20,000 lb./sq.in.
Sh8= 20,000 lb./sq.in.
Sh9= 20,000 lb./sq.in.

NGEA-NT-LRSTS-0030215 REV O

15

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

Sy= 35,000 lb./sq.in.


BEND ELEMENTS
190
200

218

220

220

230

430

440

440

450

490

500

500

510

460

600

Radius= 27.000 in. (LONG)


Bend Angle= 90.000 Angle/Node @1= 45.00
199 Angle/Node @2= .00 198
Radius= 27.000 in. (LONG)
Bend Angle= 90.000 Angle/Node @1= 45.00
219 Angle/Node @2= .00 221
Radius= 27.000 in. (LONG)
Bend Angle= 90.000 Angle/Node @1= 45.00
229 Angle/Node @2= .00 228
Radius= 18.000 in. (LONG)
Bend Angle= 90.000 Angle/Node @1= 45.00
439 Angle/Node @2= .00 438
Radius= 18.000 in. (LONG)
Bend Angle= 90.000 Angle/Node @1= 45.00
449 Angle/Node @2= .00 448
Radius= 12.000 in. (LONG)
Bend Angle= 90.000 Angle/Node @1= 45.00
499 Angle/Node @2= .00 498
Radius= 12.000 in. (LONG)
Bend Angle= 90.000 Angle/Node @1= 45.00
509 Angle/Node @2= .00 508
Radius= 15.000 in. (LONG)
Bend Angle= 90.000 Angle/Node @1= 45.00

599 Angle/Node @2= .00 598


RIGIDS
10
5020
90
100
5110
140
5150
5160
212
5214
240
5250
5260
290
5300
400

20
30
100
110
120
150
160
170
214
216
250
260
270
300
310
410

RIGID Weight= 600.00 lb.


RIGID Weight= 600.00 lb.
RIGID Weight= 695.50 lb.
RIGID Weight= 5,980.00 lb.
RIGID Weight= 696.00 lb.
RIGID Weight= 696.00 lb.
RIGID Weight= 5,980.00 lb.
RIGID Weight= 696.00 lb.
RIGID Weight= 696.00 lb.
RIGID Weight= 696.00 lb.
RIGID Weight= 696.00 lb.
RIGID Weight= 5,980.00 lb.
RIGID Weight= 696.00 lb.
RIGID Weight= 696.00 lb.
RIGID Weight= 696.00 lb.
RIGID Weight= 364.00 lb.

NGEA-NT-LRSTS-0030215 REV O

16

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

5410
520
5530
5540
620
5630
5635
70

420
530
540
550
630
635
640
700

SIF's & TEE's


175
180
450
460
REDUCERS
60
70
460

470

PIPE STRESS CALCULATION REPORT

RIGID Weight= 364.00 lb.


RIGID Weight= 180.00 lb.
RIGID Weight= 1,280.00 lb.
RIGID Weight= 180.00 lb.
RIGID Weight= 271.00 lb.
RIGID Weight= 2,818.00 lb.
RIGID Weight= 271.00 lb.
RIGID Weight= .00 lb.

Node 180 Extruded Tee


Node 460 Welding Tee

Diam2= 18.000 in. Wall2= .875 in.


Angle= 20.00
Diam2= 8.625 in. Wall2= .875 in.
Angle= 40.00

RESTRAINTS

Len
MU
GAP
YIELD
Dir
NODE TYPE CNODE
STIF1
STIF2
FORCE
Vectors
-------+-------+------+----------+----------+----------+--------------------20 ANC 5020
.000 .000 .000
100 ANC 5100
.000 .000 .000
110 ANC 5110
.000 .000 .000
130 Y
.000 1.000 .000
150 ANC 5150
.000 .000 .000
160 ANC 5160
.000 .000 .000
175 Y
.000 1.000 .000
175 Z
.000 .000 1.000
190 Y
.000 1.000 .000
210 Y
.000 1.000 .000
210 Z
.000 .000 1.000
214 ANC 5214
.000 .000 .000
218 Y
.000 1.000 .000
250 ANC 5250
.000 .000 .000
260 ANC 5260
.000 .000 .000
280 X
1.000 .000 .000
280 Y
.000 1.000 .000
280 Z
.000 .000 1.000
300 ANC 5300
.000 .000 .000
410 ANC 5410
.000 .000 .000
490 X
1.000 .000 .000
490 Y
.000 1.000 .000
490 Z
.000 .000 1.000

NGEA-NT-LRSTS-0030215 REV O

17

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

530
540
555
610
630
635
700
700
700
750
750

ANC
ANC
ANC
Y
ANC
ANC
X
Y
Z
Y
Z

5530
5540
5555

640

.000 .000 .000


.000 .000 .000
.000 .000 .000
.000 1.000 .000
.000 .000 .000
.000 .000 .000
1.000 .000 .000
.000 1.000 .000
.000 .000 1.000
.000 1.000 .000
.000 .000 1.000

5630
5635

DISPLACEMENTS
310
320
650

PIPE STRESS CALCULATION REPORT

Node 320 DX1= .000 in. DZ1= .000 in.


RX1= .000 RY1= .000 RZ1= .000
Node 650 DY1= .000 in. DZ1= .000 in.
RX1= .000 RY1= .000 RZ1= .000

INPUT UNITS USED...


UNITS= ENGLISH NOM/SCH INPUT= ON
LENGTH
inches
x
1.000 = in.
FORCE
pounds
x
1.000 = lb.
MASS(dynamics) pounds
x
1.000 = lbm
MOMENTS(INPUT) inch-pounds x
1.000 = in.lb.
MOMENTS(OUTPUT) inch-pounds x
0.083 = ft.lb.
STRESS
lbs./sq.in. x
1.000 = lb./sq.in.
TEMP. SCALE
degrees F. x
1.000 = F
PRESSURE
psig
x
1.000 = lb./sq.in.
ELASTIC MODULUS lbs./sq.in. x
1.000 = lb./sq.in.
PIPE DENSITY
lbs./cu.in. x
1.000 = lb./cu.in.
INSULATION DENS. lbs./cu.in. x
1.000 = lb./cu.in.
FLUID DENSITY
lbs./cu.in. x
1.000 = lb./cu.in.
TRANSL. STIF
lbs./in.
x
1.000 = lb./in.
ROTATIONAL STIF in.lb./deg. x
1.000 = in.lb./deg
UNIFORM LOAD
lb./in.
x
1.000 = lb./in.
G LOAD
g's
x
1.000 = g's
WIND LOAD
lbs./sq.in. x 144.000 = lb./sq.ft.
ELEVATION
inches
x
0.083 = ft.
COMPOUND LENGTH inches
x
0.083 = ft.
DIAMETER
inches
x
1.000 = in.
WALL THICKNESS inches
x
1.000 = in.
SETUP FILE PARAMETERS
-----------------------------------------------------------------------------CONNECT GEOMETRY THRU CNODES = YES

NGEA-NT-LRSTS-0030215 REV O

18

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

MIN ALLOWED BEND ANGLE =


5.00000
MAX ALLOWED BEND ANGLE =
95.0000
BEND LENGTH ATTACHMENT PERCENT = 1.00000
MIN ANGLE TO ADJACENT BEND PT = 5.00000
LOOP CLOSURE TOLERANCE =
1.00000 in.
THERMAL BOWING HORZ TOLERANCE = 0.100000E-03
AUTO NODE NUMBER INCREMENT=
10.0000
Z AXIS UP=
NO
USE PRESSURE STIFFENING =
DEFAULT
ALPHA TOLERANCE =
0.500000E-01
RESLD-FORCE =
NO
HGR DEF RESWGT STIF =
0.100000E+13 lb./in.
DECOMP SNG TOL =
0.100000E+11
BEND AXIAL SHAPE =
YES
FRICT STIF =
0.100000E+07 lb./in.
FRICT NORM FORCE VAR =
0.150000
FRICT ANGLE VAR =
15.0000
FRICT SLIDE MULT =
1.00000
ROD TOLERANCE =
1.00000
ROD INC =
2.00000
INCORE NUMERICAL CHECK =
NO
OUTCORE NUMERICAL CHECK =
NO
DEFAULT TRANS RESTRAINT STIFF= 0.100000E+13 lb./in.
DEFAULT ROT RESTRAINT STIFF=
0.100000E+13 in.lb./deg
IGNORE SPRING HANGER STIFFNESS = NO
MISSING MASS ZPA =
EXTRACTED
MIN WALL MILL TOLERANCE =
12.5000
WRC-107 VERSION =
MAR 79 1B1/2B1
WRC-107 INTERPOLATION =
LAST VALUE
DEFAULT AMBIENT TEMPERATURE=
70.0000
F
BOURDON PRESSURE=
NONE
COEFFICIENT OF FRICTION (MU) =
0.000000
INCLUDE SPRG STIF IN HGR OPE = NO
INCLUDE INSULATION IN HYDROTEST = NO
REDUCED INTERSECTION =
B31.1(POST1980)
USE WRC329
NO
NO REDUCED SIF FOR RFT AND WLT NO
B31.1 REDUCED Z FIX =
YES
CLASS 1 BRANCH FLEX
NO
ALL STRESS CASES CORRODED =
NO
ADD TORSION IN SL STRESS =
DEFAULT
ADD F/A IN STRESS =
DEFAULT
OCCASIONAL LOAD FACTOR =
0.000000
DEFAULT CODE =
B31.3
B31.3 SUS CASE SIF FACTOR =
1.00000
ALLOW USERS BEND SIF =
NO

NGEA-NT-LRSTS-0030215 REV O

19

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

USE SCHNEIDER
NO
YIELD CRITERION STRESS =
MAX 3D SHEAR
USE PD/4T
NO
BASE HOOP STRESS ON ? =
ID
EN13480 USE IN OUTPLANE SIFS=
NO
LIBERAL EXPANSION ALLOWABLE=
YES
B31.3 SEC 319.2.3C SAXIAL=
NO
B31.3 WELDING/CONTOUR TEE ISB16.9 NO
PRESSURE VARIATION IN EXP CASE= DEFAULT
IMPLEMENT B313 APP-P
NO
IMPLEMENT B313 CODE CASE 178
NO
USE FRP SIF =
YES
USE FRP FLEX =
YES
BS 7159 Pressure Stiffening=
Design Strain
FRP Property Data File=
CAESAR.FRP
FRP Emod (axial) =
0.320000E+07 lb./sq.in.
FRP Ratio Gmod/Emod (axial) =
0.250000
FRP Ea/Eh*Vh/a =
0.152727
FRP Laminate Type =
THREE
FRP Alpha =
12.0000
F
FRP Density =
0.600000E-01 lb./cu.in.
EXCLUDE f2 FROM UKOOA BENDING = NO
EXECUTION CONTROL PARAMETERS
Rigid/ExpJt Print Flag ..... 1.000
Bourdon Option ............. .000
Loop Closure Flag .......... .000
Thermal Bowing Delta Temp .. .000 F
Liberal Allowable Flag ..... 1.000
Uniform Load Option ........ .000
Ambient Temperature ........ 70.000 F
Plastic (FRP) Alpha ........ 12.000
Plastic (FRP) GMOD/EMODa ... .250
Plastic (FRP) Laminate Type. 3.000
Eqn Optimizer .............. .000
Node Selection ............. .000
Eqn Ordering ............... .000
Collins .................... .000
Degree Determination ....... .000
User Eqn Control ........... .000
1. Design Temperature (oF):

100

2. Design Pressure P1 (Psig):

220

3. Operating Temperature (oF):

100

NGEA-NT-LRSTS-0030215 REV O

20

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

4. Operating Pressure P2 (Psig):

180

5. Ambient Temperature (oF):

80

6. Installation Temperature (oF):

80

7. Highest Differential Temp T1 (oF):

(100-80) = 201

8. Minimum Differential Temp T2 (oF):

(100-80) = 201

9. Pipe outside Diameter (in):

22/18/12./10.

10. Wall Thickness (in):

0.875/0.750

11. Corrosion Allowance (in):

None

12. Pipe Material:

API 5L X65/A 333 GR. 6

13. Flange Rating (#):

900

14. Sc. (Ib /sq. in.):

20,000

12. Sh. (Ib /sq. in.):

20,000

13. Ec. (Ib /sq. in.):

2.9500E+007

15. Content Density (Ib /cub. in.):

0.0018

16. Insulation Thickness (in):

None

17. Insulation Density (Ib /sq. in.);

None

18. Corrosion Allowance

0.118

5.3

FLANGE LEAKAGE ASSESSMENT


In determining the possibility of flange leakage on the Pig trap, NETCO
applied CNode 5000 + the node number to simulate the forces and moments
on the flanges. The summary from Caesar II out put is on Pages 48 50

NGEA-NT-LRSTS-0030215 REV O

21

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

6.0

PIPE STRESS CALCULATION REPORT

OVERALL PIPING NETWORK

CAESAR II: PIPING STRESS ISOMETRIC (SHADED)


Refer to Attachment of Piping Stress Isometrics Sht 1 of 2 & Sht 2 of 2

NGEA-NT-LRSTS-0030215 REV O

22

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

CAESAR II: PIPING STRESS ISOMETRIC PLAN VIEW (SHADED)

6.1

.
SUPPORT LOADINGS / RESTRAINTS REPORTS
All pipe support loadings are satisfactory. See loads on restraints for each of
the given load cases on page: 36-46

7.0

STRESS CALCULATIONS
LISTING OF STATIC LOAD CASES FOR THIS ANALYSIS

LOAD CASE DEFINITION KEY


CASE 1 (OPE) W+T1+P1
CASE 2 (OPE) W+T2+P2
CASE 3 (SUS) W+P1
CASE 4 (SUS) W+P2
CASE 5 (EXP) L5=L1-L3
CASE 6 (EXP) L6=L2-L3

NGEA-NT-LRSTS-0030215 REV O

23

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

Piping Code: Multiple Codes


B31.8
= B31.8 -2003, February 6, 2004
B31.3
= B31.3 -2006, May 31, 2007
*** CODE COMPLIANCE EVALUATION PASSED ***
Highest Stresses: (lb./sq.in.)
CodeStress Ratio (%) is 23.9 at Node 460 LOADCASE: 3 (SUS) W+P1
Code Stress:
4772.0 Allowable: 20000.0
Axial Stress:
868.9 @Node 280 LOADCASE: 1 (OPE) W+T1+P1
Bending Stress:
4163.5 @Node 460 LOADCASE: 3 (SUS) W+P1
Torsion Stress:
825.8 @Node 450 LOADCASE: 3 (SUS) W+P1
Hoop Stress:
2765.7 @Node 40 LOADCASE: 1 (OPE) W+T1+P1
3D Max Intensity: 4903.3 @Node 460 LOADCASE: 3 (SUS) W+P1
Load
Case

From
Node

Code
Stress
lb./sq.in.
0.0
0.0
0.0
0.0
0.0
0.0

Allowable
Stress
To Node
lb./sq.in.
0.0
20
0.0
0.0
0.0
0.0
0.0

Code
Stress
lb./sq.in.
0.0
0.0
0.0
0.0
0.0
0.0

Allowable
Stress
lb./sq.in.
0.0
0.0
0.0
0.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

30

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

Piping
Code

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

10

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

5020

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

30

2477.0
2030.3
2477.0
2030.3
0.0
0.0

58500.0
58500.0
58500.0
58500.0
0.0
0.0

40

2515.5
2070.5
2515.5
2070.5
0.0
0.0

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)

40

2527.0

58500.0

50

3239.0

58500.0

B31.8

2076.7
2518.8
2073.9

58500.0
58500.0
58500.0

2862.7
3203.0
2851.0

58500.0
58500.0
58500.0

B31.8
B31.8
B31.8

2(OPE)
3(SUS)
4(SUS)

NGEA-NT-LRSTS-0030215 REV O

24

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

5(EXP)
6(EXP)

33.1
10.8

0.0
0.0

PIPE STRESS CALCULATION REPORT

41.8
13.6

0.0
0.0

B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

50

3239.0
2862.7
3203.0
2851.0
41.8
13.6

58500.0
58500.0
58500.0
58500.0
0.0
0.0

60

2521.7
2070.7
2513.7
2068.6
69.2
23.0

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

60

1189.0
1006.6
1146.4
995.5
137.0
45.5

58500.0
58500.0
58500.0
58500.0
0.0
0.0

70

1656.0
1493.3
1603.6
1480.2
259.3
86.2

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

70

2228.7
1868.3
2205.0
1854.1
134.6
44.9

58500.0
58500.0
58500.0
58500.0
0.0
0.0

80

2029.7
1656.1
2024.2
1658.7
108.9
36.3

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

80

2029.7
1656.1
2024.2
1658.7
108.9
36.3

58500.0
58500.0
58500.0
58500.0
0.0
0.0

90

2553.9
2275.1
2568.1
2280.1
63.0
21.0

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

90

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

100

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
1(OPE)

5100

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

110

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

5110

NGEA-NT-LRSTS-0030215 REV O

120

25

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

PIPE STRESS CALCULATION REPORT

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

120

2558.6
2254.6
2535.3
2247.3
68.3
22.8

58500.0
58500.0
58500.0
58500.0
0.0
0.0

130

2504.1
2232.2
2531.6
2243.6
151.3
50.4

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

130

2504.1
2232.2
2531.6
2243.6
151.3
50.4

58500.0
58500.0
58500.0
58500.0
0.0
0.0

140

2326.9
1980.1
2256.1
1961.2
228.7
76.2

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

140

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

150

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

5150

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

160

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

5160

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

170

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)

170

2161.5
1743.2
2093.1
1731.2

58500.0
58500.0
58500.0
58500.0

175

2626.3
2305.5
2603.0
2315.0

58500.0
58500.0
58500.0
58500.0

B31.8
B31.8
B31.8
B31.8

NGEA-NT-LRSTS-0030215 REV O

26

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

5(EXP)
6(EXP)

346.8
115.5

0.0
0.0

PIPE STRESS CALCULATION REPORT

399.3
133.0

0.0
0.0

B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

175

2626.3
2305.5
2603.0
2315.0
399.3
133.0

58500.0
58500.0
58500.0
58500.0
0.0
0.0

180

2863.3
2538.1
2611.4
2487.9
1122.7
374.1

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

180

3023.6
2905.2
3114.5
2991.1
1418.1
475.1

58500.0
58500.0
58500.0
58500.0
0.0
0.0

190

4342.1
4008.3
4273.6
3985.6
80.0
26.6

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

190

4342.1
4008.3
4273.6
3985.6
80.0
26.6

58500.0
58500.0
58500.0
58500.0
0.0
0.0

198

2264.3
1917.2
2221.8
1890.4
134.6
44.8

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

198

1515.2
1320.9
1413.4
1290.0
235.1
78.3

58500.0
58500.0
58500.0
58500.0
0.0
0.0

199

1161.8
1024.8
1162.7
1039.3
331.8
110.6

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

199

1161.8
1024.8
1162.7
1039.3
331.8
110.6

58500.0
58500.0
58500.0
58500.0
0.0
0.0

200

1654.1
1534.1
1672.6
1549.2
381.0
127.1

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

200

2421.4
2119.0
2406.8
2118.8
200.4
66.9

58500.0
58500.0
58500.0
58500.0
0.0
0.0

210

3506.2
3152.8
3412.6
3124.6
257.5
85.9

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

NGEA-NT-LRSTS-0030215 REV O

27

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

210

3528.8
3166.3
3421.6
3133.6
271.1
90.4

58500.0
58500.0
58500.0
58500.0
0.0
0.0

212

2375.1
2016.0
2281.7
1993.7
274.2
91.4

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

212

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

214

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

5214

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

216

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

216

2180.0
1783.7
2132.7
1774.0
279.6
93.2

58500.0
58500.0
58500.0
58500.0
0.0
0.0

218

3393.1
3152.6
3472.6
3184.6
345.8
115.3

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

218

3393.1
3152.6
3472.6
3184.6
345.8
115.3

58500.0
58500.0
58500.0
58500.0
0.0
0.0

221

2156.4
1722.7
2062.6
1698.7
327.2
109.1

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

221

1232.8
897.2
960.5
837.1
601.9
200.6

58500.0
58500.0
58500.0
58500.0
0.0
0.0

219

1242.5
895.9
940.3
816.9
581.4
193.8

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)

219

1242.5
895.9

58500.0
58500.0

220

1360.8
1097.5

58500.0
58500.0

B31.8
B31.8

NGEA-NT-LRSTS-0030215 REV O

28

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

3(SUS)
4(SUS)
5(EXP)
6(EXP)

940.3
816.9
581.4
193.8

58500.0
58500.0
0.0
0.0

PIPE STRESS CALCULATION REPORT

1180.1
1056.6
511.2
170.4

58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

220

2201.6
1786.3
2124.1
1764.7
278.6
92.9

58500.0
58500.0
58500.0
58500.0
0.0
0.0

228

2076.1
1726.0
2118.0
1758.1
374.7
124.9

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

228

972.9
978.1
1228.3
1104.9
650.2
216.7

58500.0
58500.0
58500.0
58500.0
0.0
0.0

229

1400.9
992.8
1004.5
881.1
690.9
230.3

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

229

1400.9
992.8
1004.5
881.1
690.9
230.3

58500.0
58500.0
58500.0
58500.0
0.0
0.0

230

1632.4
1266.8
1285.6
1162.2
556.0
185.3

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

230

2578.5
2136.2
2347.9
2059.9
238.0
79.3

58500.0
58500.0
58500.0
58500.0
0.0
0.0

240

2557.8
2147.7
2376.1
2088.1
197.1
65.7

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

240

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

250

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)

5250

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

260

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8

NGEA-NT-LRSTS-0030215 REV O

29

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

6(EXP)

0.0

0.0

PIPE STRESS CALCULATION REPORT

0.0

0.0

B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

5260

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

270

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

270

2887.7
2371.8
2592.5
2304.5
507.5
169.2

58500.0
58500.0
58500.0
58500.0
0.0
0.0

280

3102.4
2452.6
2638.6
2350.6
716.6
238.9

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

280

2340.5
1779.8
2100.7
1739.4
705.3
235.1

58500.0
58500.0
58500.0
58500.0
0.0
0.0

290

2111.9
1689.6
2040.1
1675.1
343.0
114.3

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

290

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

300

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

5300

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

310

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

310

2044.3
1659.1
2019.6
1654.0
145.9
48.6

58500.0
58500.0
58500.0
58500.0
0.0
0.0

320

2101.1
1698.8
2053.0
1688.6
227.5
75.8

58500.0
58500.0
58500.0
58500.0
0.0
0.0

B31.8
B31.8
B31.8
B31.8
B31.8
B31.8

1(OPE)

180

1580.5

0.0

400

745.4

0.0

B31.3

NGEA-NT-LRSTS-0030215 REV O

30

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

1812.3
2527.6
2388.5
1174.8
407.1

0.0
20000.0
20000.0
47472.4
47472.4

PIPE STRESS CALCULATION REPORT

665.0
990.7
851.7
369.7
127.7

0.0
20000.0
20000.0
49009.3
49009.3

B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

400

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

410

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

5410

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

420

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

420

1178.9
981.0
1242.8
1103.7
266.4
91.0

0.0
0.0
20000.0
20000.0
48757.2
48757.2

430

1225.8
1025.0
1288.4
1149.3
257.4
87.8

0.0
0.0
20000.0
20000.0
48711.6
48711.6

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

430

1225.8
1025.0
1288.4
1149.3
257.4
87.8

0.0
0.0
20000.0
20000.0
48711.6
48711.6

438

1607.3
1404.9
1708.1
1569.0
203.1
68.4

0.0
0.0
20000.0
20000.0
48291.9
48291.9

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

438

2144.2
1913.1
2262.4
2123.3
237.1
79.4

0.0
0.0
20000.0
20000.0
47737.6
47737.6

439

1915.7
1675.4
1928.8
1789.7
237.4
79.2

0.0
0.0
20000.0
20000.0
48071.2
48071.2

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)

439

1915.7
1675.4
1928.8
1789.7

0.0
0.0
20000.0
20000.0

1366.9
1168.8
957.5
818.5

0.0
0.0
20000.0
20000.0

B31.3
B31.3
B31.3
B31.3

NGEA-NT-LRSTS-0030215 REV O

440

31

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

5(EXP)
6(EXP)

237.4
79.2

48071.2
48071.2

PIPE STRESS CALCULATION REPORT

189.8
63.1

49042.5
49042.5

B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

440

1329.5
1150.4
911.1
772.0
145.0
48.1

0.0
0.0
20000.0
20000.0
49088.9
49088.9

448

1696.3
1566.9
1723.2
1584.1
98.6
31.9

0.0
0.0
20000.0
20000.0
48276.8
48276.8

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

448

1928.5
1796.4
2023.1
1884.0
132.6
43.2

0.0
0.0
20000.0
20000.0
47976.9
47976.9

449

2172.7
2054.3
1843.5
1704.5
85.9
26.8

0.0
0.0
20000.0
20000.0
48156.5
48156.5

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

449

2172.7
2054.3
1843.5
1704.5
85.9
26.8

0.0
0.0
20000.0
20000.0
48156.5
48156.5

450

2174.9
2060.7
1330.9
1191.8
45.0
13.4

0.0
0.0
20000.0
20000.0
48669.1
48669.1

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

450

2118.4
2007.7
1125.7
986.6
36.3
11.0

0.0
0.0
20000.0
20000.0
48874.3
48874.3

460

2204.4
2096.9
1467.6
1328.5
255.5
84.9

0.0
0.0
20000.0
20000.0
48532.4
48532.4

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

460

2118.4
2007.7
1472.3
1333.3
90.9
30.5

0.0
0.0
20000.0
20000.0
48527.7
48527.7

460

2204.4
2096.9
1690.0
1605.1
151.1
50.7

0.0
0.0
20000.0
20000.0
48310.0
48310.0

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

470

1783.5
1621.7
1690.0
1605.1
151.1
50.7

0.0
0.0
20000.0
20000.0
48310.0
48310.0

480

1822.1
1656.7
1731.6
1646.7
154.6
51.8

0.0
0.0
20000.0
20000.0
48268.4
48268.4

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

NGEA-NT-LRSTS-0030215 REV O

32

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

480

1822.1
1656.7
1731.6
1646.7
154.6
51.8

0.0
0.0
20000.0
20000.0
48268.4
48268.4

490

3273.8
3314.3
3783.1
3698.2
213.8
70.4

0.0
0.0
20000.0
20000.0
46216.9
46216.9

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

490

3293.0
3344.0
3823.3
3738.4
213.8
70.4

0.0
0.0
20000.0
20000.0
46176.7
46176.7

498

1139.1
1069.3
958.8
873.9
189.1
62.2

0.0
0.0
20000.0
20000.0
49041.2
49041.2

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

498

498

1170.9
1090.8
990.6
905.7
198.6
65.3

499

1125.4
1015.1
1170.2
1085.3
213.0
70.1

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

499

1125.4
1015.1
1170.2
1085.3
213.0
70.1

0.0
0.0
20000.0
20000.0
48829.8
48829.8

500

995.0
871.5
1063.1
978.2
207.7
68.3

0.0
0.0
20000.0
20000.0
48936.9
48936.9

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

500

938.9
823.9
1015.6
930.7
202.4
66.6

0.0
0.0
20000.0
20000.0
48984.4
48984.4

508

1320.3
1187.8
1405.8
1320.9
208.3
68.5

0.0
0.0
20000.0
20000.0
48594.2
48594.2

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

508

1431.4
1289.1
1512.3
1427.4
215.6
70.9

0.0
0.0
20000.0
20000.0
48487.7
48487.7

509

1774.1
1624.6
1833.9
1749.0
220.4
72.5

0.0
0.0
20000.0
20000.0
48166.1
48166.1

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)

509

1774.1
1624.6
1833.9

0.0
0.0
20000.0

510

1868.8
1722.3
1925.7

0.0
0.0
20000.0

B31.3
B31.3
B31.3

NGEA-NT-LRSTS-0030215 REV O

0.0
0.0
20000.0
20000.0
49009.4
49009.4

33

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

4(SUS)
5(EXP)
6(EXP)

1749.0
220.4
72.5

20000.0
48166.1
48166.1

PIPE STRESS CALCULATION REPORT

1840.8
201.8
66.4

20000.0
48074.3
48074.3

B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

510

1684.8
1550.4
1734.0
1649.1
191.5
63.0

0.0
0.0
20000.0
20000.0
48266.0
48266.0

520

1408.7
1301.1
1454.5
1369.6
109.4
36.0

0.0
0.0
20000.0
20000.0
48545.5
48545.5

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

520

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

530

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

5530

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

540

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

5540

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

550

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

550

846.5
768.0
823.9
738.9
159.9
51.9

0.0
0.0
20000.0
20000.0
49176.1
49176.1

555

740.5
656.2
673.7
588.8
208.6
67.8

0.0
0.0
20000.0
20000.0
49326.3
49326.3

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

5555

740.5
656.2
673.7
588.8
208.6
67.8

0.0
0.0
20000.0
20000.0
49326.3
49326.3

40

681.2
586.7
570.5
485.6
243.6
79.2

0.0
0.0
20000.0
20000.0
49429.5
49429.5

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

NGEA-NT-LRSTS-0030215 REV O

34

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

460

4198.5
4143.6
4772.0
4659.2
180.8
59.6

0.0
0.0
20000.0
20000.0
45228.0
45228.0

598

1616.7
1570.7
1218.6
1105.9
165.3
54.5

0.0
0.0
20000.0
20000.0
48781.4
48781.4

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

598

1740.7
1668.9
1407.4
1294.6
183.2
60.4

0.0
0.0
20000.0
20000.0
48592.6
48592.6

599

1571.0
1499.6
1329.5
1216.7
179.4
59.2

0.0
0.0
20000.0
20000.0
48670.5
48670.5

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

599

740.5
656.2
1329.5
1216.7
179.4
59.2

0.0
0.0
20000.0
20000.0
48670.5
48670.5

40

681.2
586.7
1277.8
1165.0
167.0
55.1

0.0
0.0
20000.0
20000.0
48722.2
48722.2

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

600

1523.5
1426.0
1114.5
1001.7
143.5
47.4

0.0
0.0
20000.0
20000.0
48885.5
48885.5

610

3093.0
2966.0
3259.7
3146.9
99.7
33.0

0.0
0.0
20000.0
20000.0
46740.3
46740.3

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

610

3093.0
2966.0
3259.7
3146.9
99.7
33.0

0.0
0.0
20000.0
20000.0
46740.3
46740.3

620

1422.7
1376.9
1041.5
928.7
74.8
24.7

0.0
0.0
20000.0
20000.0
48958.5
48958.5

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

620

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

630

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)

5630

0.0
0.0

0.0
0.0

635

0.0
0.0

0.0
0.0

B31.3
B31.3

NGEA-NT-LRSTS-0030215 REV O

35

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

3(SUS)
4(SUS)
5(EXP)
6(EXP)

0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0

PIPE STRESS CALCULATION REPORT

0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0

B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
6(EXP)

5635

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

640

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

640

2046.2
1979.3
2057.2
1944.4
87.8
28.8

0.0
0.0
20000.0
20000.0
47942.8
47942.8

650

2219.5
2128.1
2243.0
2130.2
155.3
50.9

0.0
0.0
20000.0
20000.0
47757.0
47757.0

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

70

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

700

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

50

518.2
332.5
611.0
402.8
17.5
5.8

0.0
0.0
20000.0
20000.0
49389.0
49389.0

750

470.6
296.5
576.5
368.3
0.0
0.0

0.0
0.0
20000.0
20000.0
49423.5
49423.5

B31.3
B31.3
B31.3
B31.3
B31.3
B31.3

7.1 RESTRAINT SUMMARY REPORT.


LOAD CASE DEFINITION KEY

CASE 1 (OPE) W+T1+P1


CASE 2 (OPE) W+T2+P2
CASE 3 (SUS) W+P1
CASE 4 (SUS) W+P2
CASE 5 (EXP) L5=L1-L3
CASE 6 (EXP) L6=L2-L3

NGEA-NT-LRSTS-0030215 REV O

36

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

NODE

Load
Case

20

FX lb.

PIPE STRESS CALCULATION REPORT

FY lb.

FZ lb.

MX ft.lb.

MY ft.lb.

MZ ft.lb.

-600

-0.0

0.0

304.7

-0

-600

-0

0.0

0.0

304.7

-0

-600

0.0

0.0

304.7

-0

-600

0.0

0.0

304.7

-0.0

0.0

0.0

-0

-0

0.0

0.0

0.0

0/L5

-600/L1

0/L1

-0.0/L1

0.0/L1

304.7/L1

-676

4790

-311

994.0

416.2

-20098.7

-778

4722

-85

903.2

-11.9

-20239.3

-835

4688

27

856.6

-225.0

-20311.1

-835

4688

27

856.6

-225.0

-20311.1

158

102

-338

137.4

641.1

212.4

57

34

-112

46.5

213.1

71.9

-338/L5 994.0/L1

641.1/L5

20311.1/L3

ANC
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

100

ANC
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

110

-835/L3 4790/L1
ANC

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)

-676

-4772

-311

994.0

-846.7

-20135.7

-778

-4840

-85

903.2

-357.8

-19999.4

-835

-4874

27

856.6

-114.0

-19933.9

-835

-4874

27

856.6

-114.0

-19933.9

158

102

-338

137.4

-732.7

-201.7

NGEA-NT-LRSTS-0030215 REV O

37

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

NODE

Load
Case
6(EXP)
MAX

FX lb.

FY lb.

FZ lb.

MX ft.lb.

MY ft.lb.

MZ ft.lb.

57

34

-112

46.5

-243.9

-65.5

-846.7/L1

20135.7/L1

-835/L3 -4874/L3

130

X
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

-338/L5 994.0/L1

-19091

0.0

0.0

0.0

-19155

0.0

0.0

0.0

-19185

0.0

0.0

0.0

-19185

0.0

0.0

0.0

94

0.0

0.0

0.0

30

0.0

0.0

0.0

19185/L3

MAX
150

PIPE STRESS CALCULATION REPORT

ANC
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

160

-676

3702

-311

994.0

-3675.1

-15119.7

-778

3698

-85

903.2

-1132.6

-14653.5

-835

3694

27

856.6

134.7

-14417.4

-835

3694

27

856.6

134.7

-14417.4

158

-338

137.4

-3809.7

-702.2

57

-112

46.5

-1267.3

-236.1

-835/L3 3702/L1

-338/L5 994.0/L1

3809.7/L5 15119.7/L1

ANC
1(OPE)
2(OPE)

-676

-5860

-311

994.0

-4937.9

-10736.8

-778

-5864

-85

903.2

-1478.5

-10253.3

-835

-5868

27

856.6

245.7

-10002.5

NGEA-NT-LRSTS-0030215 REV O

38

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

NODE

Load
Case
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

FX lb.

FY lb.

FZ lb.

MX ft.lb.

MY ft.lb.

MZ ft.lb.

-835

-5868

27

856.6

245.7

-10002.5

158

-338

137.4

-5183.6

-734.3

57

-112

46.5

-1724.2

-250.8

-835/L3 -5868/L3

175

X
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

4(SUS)
5(EXP)
6(EXP)

Z
-1267

0.0

0.0

0.0

-21583

-615

0.0

0.0

0.0

-21528

-290

0.0

0.0

0.0

-21528

-290

0.0

0.0

0.0

-164

-977

0.0

0.0

0.0

-55

-325

0.0

0.0

0.0

21692/L1 1267/L1
X

3(SUS)

5183.6/L5 10736.8/L1

-21692

190

2(OPE)

-338/L5 994.0/L1

MAX

1(OPE)

PIPE STRESS CALCULATION REPORT

-21944

0.0

0.0

0.0

-22024

0.0

0.0

0.0

-22069

0.0

0.0

0.0

-22069

0.0

0.0

0.0

126

0.0

0.0

0.0

45

0.0

0.0

0.0

MAX

NGEA-NT-LRSTS-0030215 REV O

22069/L3
39

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

210

X
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

Y
-17894

-1062

0.0

0.0

0.0

-17672

-637

0.0

0.0

0.0

-17560

-425

0.0

0.0

0.0

-17560

-425

0.0

0.0

0.0

-333

-637

0.0

0.0

0.0

-112

-212

0.0

0.0

0.0

17894/L1 1062/L1

214

2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

-154

3384

1458

-8167.0

4410.1

-1111.4

-113

3217

653

-8094.1

1731.9

-2182.0

-93

3132

250

-8055.3

392.4

-2717.1

-93

3132

250

-8055.3

392.4

-2717.1

-62

252

1208

-111.6

4017.8

1605.7

-20

84

403

-38.8

1339.6

535.1

3384/L1

1458/L1

4410.1/L1 -2717.1/L3
8167.0/L1

MAX -154/L1
218

X
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)

MAX

1(OPE)

PIPE STRESS CALCULATION REPORT

-16693

0.0

0.0

0.0

-17215

0.0

0.0

0.0

-17475

0.0

0.0

0.0

-17475

0.0

0.0

0.0

782

0.0

0.0

0.0

261

0.0

0.0

0.0

NGEA-NT-LRSTS-0030215 REV O

40

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

6(EXP)
17475/L3

MAX
250

ANC
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

-154

-12928

1458

-175.2

-5221.5

-11476.5

-113

-12574

653

-1287.9

-1581.4

-9582.2

-93

-12398

250

-1844.3

238.7

-8634.7

-93

-12398

250

-1844.3

238.7

-8634.7

-62

-530

1208

1669.1

-5460.2

-2841.7

-20

-177

403

556.4

-1820.1

-947.4

MAX -154/L1
260

1458/L1
12928/L1
1844.3/L3 5460.2/L5 11476.5/L1

ANC
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

-154

-22490

1458

5749.6

-5221.5

-10849.4

-113

-22137

653

1365.1

-1581.4

-9122.0

-93

-21960

250

-826.9

238.7

-8257.8

-93

-21960

250

-826.9

238.7

-8257.8

-62

-530

1208

6576.5

-5460.2

-2591.6

-20

-177

403

2192.0

-1820.1

-864.2

MAX -154/L1
280

X
1(OPE)
2(OPE)
3(SUS)
4(SUS)

1458/L1 6576.5/L5
22490/L1
5460.2/L5 10849.4/L1
Y

1659

-35863

3426

0.0

0.0

0.0

1422

-35509

1321

0.0

0.0

0.0

1304

-35333

268

0.0

0.0

0.0

1304

-35333

268

0.0

0.0

0.0

356

-530

3158

0.0

0.0

0.0

NGEA-NT-LRSTS-0030215 REV O

41

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

5(EXP)
6(EXP)

119

MAX 1659/L1
300

-177

1053

0.0

0.0

0.0

3426/L1
35863/L1

ANC
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

-1814

4519

-1968

3863.9

-5221.5

-3561.6

-1536

4519

-668

1311.1

-1581.4

-3015.7

-1397

4519

-18

34.8

238.7

-2742.5

-1397

4519

-18

34.8

238.7

-2742.5

-417

-1950

3829.1

-5460.2

-819.0

-139

-650

1276.3

-1820.1

-273.2

-1814

-1968

-3596.5

-5221.5

3315.1

-1536

-668

-1220.4

-1581.4

2807.0

-1397

-18

-32.4

238.7

2552.7

-1397

-18

-32.4

238.7

2552.7

-417

-1950

-3564.1

-5460.2

762.4

-139

-650

-1188.0

-1820.1

254.3

Displ.
Reaction

320
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

3315.1/L1
1968/L1 3596.5/L1 5460.2/L5

MAX -1814/L1
410

ANC
1(OPE)
2(OPE)
3(SUS)
4(SUS)

-522

9785

560

-3201.8

1168.8

-96.0

-664

9699

514

-3138.2

379.4

1493.6

-742

9658

492

-3104.0

-30.5

2334.0

-742

9658

492

-3104.0

-30.5

2334.0

NGEA-NT-LRSTS-0030215 REV O

42

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

220

127

68

-97.8

1199.3

-2430.0

77

42

22

-34.1

409.9

-840.4

9785/L1

560/L1

1199.3/L5 -2430.0/L5
3201.8/L1

-409

-4582

536

0.0

0.0

0.0

-634

-4653

508

0.0

0.0

0.0

-751

-4688

495

0.0

0.0

0.0

-751

-4688

495

0.0

0.0

0.0

342

106

41

0.0

0.0

0.0

117

35

13

0.0

0.0

0.0

-751/L3

-4688/L3

536/L1

-113

-2924

-324

3251.9

1083.1

100.7

-31

-2865

-297

3091.5

1197.0

149.6

-2836

-283

3012.7

1251.5

175.1

-2836

-283

3012.7

1251.5

175.1

-122

-88

-41

239.2

-168.5

-74.4

-40

-29

-13

78.8

-54.5

-25.5

-122/L5

-2924/L1

324/L1

3251.9/L1

1251.5/L3

175.1/L3

-4815

-324

1994.7

1083.1

538.7

5(EXP)
6(EXP)

MAX -742/L3

490
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

PIPE STRESS CALCULATION REPORT

ANC

530
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

ANC

540
1(OPE)

-113

NGEA-NT-LRSTS-0030215 REV O

43

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

PIPE STRESS CALCULATION REPORT

-31

-4756

-297

1941.1

1197.0

268.6

-4727

-283

1914.3

1251.5

139.2

-4727

-283

1914.3

1251.5

139.2

-122

-88

-41

80.4

-168.5

399.5

-40

-29

-13

26.8

-54.5

129.4

-122/L5

-4815/L1

324/L1

1994.7/L1

1251.5/L3

538.7/L1

-113

-5390

-324

1381.3

1083.1

752.4

-31

-5331

-297

1379.8

1197.0

326.7

-5302

-283

1378.4

1251.5

121.7

-5302

-283

1378.4

1251.5

121.7

-122

-88

-41

2.9

-168.5

630.7

-40

-29

-13

1.4

-54.5

205.1

-122/L5

-5390/L1

324/L1

1381.3/L1

1251.5/L3

752.4/L1

ANC

555
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

610
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

-10518

0.0

0.0

0.0

-10569

0.0

0.0

0.0

-10593

0.0

0.0

0.0

-10593

0.0

0.0

0.0

75

0.0

0.0

0.0

24

0.0

0.0

0.0

MAX

NGEA-NT-LRSTS-0030215 REV O

10593/L3
44

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

ANC

630
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

-0

2946

349

-4365.6

-355.6

-3611.2

-0

2923

303

-4569.7

-401.4

-3755.7

2912

280

-4669.3

-423.1

-3827.8

2912

280

-4669.3

-423.1

-3827.8

-0

34

68

303.7

67.6

216.7

-0

11

22

99.6

21.7

72.1

-0/L5

2946/L1

349/L1

4669.3/L3

-423.1/L3

-3827.8/L3

-731

349

-4365.6

752.3

-7129.0

-754

303

-4569.7

560.9

-7201.4

-765

280

-4669.3

468.0

-7237.5

-765

280

-4669.3

468.0

-7237.5

34

68

303.7

284.3

108.4

11

22

99.6

92.9

36.1

-765/L3

349/L1

4669.3/L3

752.3/L1

-7237.5/L3

-3349

349

-4365.6

3064.3

7036.5

-3372

303

-4569.7

2569.1

7114.8

-3383

280

-4669.3

2327.7

7153.8

-3383

280

-4669.3

2327.7

7153.8

ANC

635
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

Displ.
Reaction

650
1(OPE)
2(OPE)
3(SUS)

NGEA-NT-LRSTS-0030215 REV O

45

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

4(SUS)
5(EXP)
6(EXP)

34

68

303.7

736.7

-117.4

11

22

99.6

241.4

-39.1

-3383/L3

349/L1

4669.3/L3

3064.3/L1

7153.8/L3
MAX

700
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

563

-13329

465

0.0

0.0

0.0

747

-13302

62

0.0

0.0

0.0

844

-13288

-138

0.0

0.0

0.0

844

-13288

-138

0.0

0.0

0.0

-281

-41

602

0.0

0.0

0.0

-97

-14

200

0.0

0.0

0.0

844/L3

13329/L1

602/L5

750
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)

-23474

-478

0.0

0.0

0.0

-23373

-274

0.0

0.0

0.0

-23325

-173

0.0

0.0

0.0

-23325

-173

0.0

0.0

0.0

-149

-305

0.0

0.0

0.0

-49

-101

0.0

0.0

0.0

23474/L1

478/L1

MAX

NGEA-NT-LRSTS-0030215 REV O

46

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

PIPE STRESS CALCULATION REPORT

7.2 RESTRAINTS SUMMARY ON PIPE SUPPORT

NODE

Load
Case

FX lb.

130

X
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

0
0
0
0
0
0

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

0
0
0
0
0
0

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

0
0
0
0
0
0

175

190

210

FY lb.
Y
-19091
-19155
-19185
-19185
94
30
-19185/L3
Y
-21692
-21583
-21528
-21528
-164
-55
-21692/L1
Y
-21944
-22024
-22069
-22069
126
45
-22069/L3

MX
ft.lb
.

MY ft.lb.

MZ ft.lb.

0
0
0
0
0
0

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

Z
-1267
-615
-290
-290
-977
-325
-1267/L1

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

FZ lb.
Z

Z
0
0
0
0
0
0

1(OPE) 0

-19073

-23

0.0

0.0

0.0

2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

-17894
-17672
-17560
-17560
-333
-112

-1062
-637
-425
-425
-637
-212

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0
0
0
0
0

NGEA-NT-LRSTS-0030215 REV O

47

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

218

X
0
0
0
0
0
0

Y
-16693
-17215
-17475
-17475
782
261
-17475/L3

0
0
0
0
0
0

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

X
1659
1422
1304
1304
356
119
1659/L1

Y
-35863
-35509
-35333
-35333
-530
-177
-35863/L1

Z
3426
1321
268
268
3158
1053
3426/L1

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

X
-409
-634
-751
-751
342
117
-751/L3

Y
-4582
-4653
-4688
-4688
106
35
-4688/L3

Z
536
508
495
495
41
13
536/L1

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

Y
-10518
-10569
-10593
-10593
75
24
-10593/L3

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX
280

490

610
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

7.3

PIPE STRESS CALCULATION REPORT

0
0
0
0
0
0

Z
0
0
0
0
0
0

FLANGE LEAKAGE CALCULATION

NODE

Load
Case

FX lb.

FY lb.

FZ lb.

MX ft.lb.

MY ft.lb.

MZ ft.lb.

20

NGEA-NT-LRSTS-0030215 REV O

48

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

NODE

Load
Case
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

PIPE STRESS CALCULATION REPORT

FX lb.

FY lb.

FZ lb.

MX ft.lb.

MY ft.lb.

MZ ft.lb.

-0

-600

0.0

-0.0

304.7

-600

-0.0

0.0

304.7

-0

-600

0.0

0.0

304.7

-0

-600

0.0

0.0

304.7

-0

0.0

-0.0

0.0

-0.0

0.0

0.0

-0/L1

600/L1

-0.0/L2

0.0/L2

304.7/L1

-676

4790

-311

994.0

416.2

-20098.7

-778

4722

-85

903.2

-11.9

-20239.3

-835

4688

27

856.6

-225.0

-20311.1

-835

4688

27

856.6

-225.0

-20311.1

158

102

-338

137.4

641.1

212.4

57

34

-112

46.5

213.1

71.9

-835/L3

4790/L
-338/L5
1

994.0/L1

641.1/L5

-20311.1/L3

-676

-4772

-311

994.0

-846.7

-20135.7

-778

-4840

-85

903.2

-357.8

-19999.4

-835

-4874

27

856.6

-114.0

-19933.9

-835

-4874

27

856.6

-114.0

158

102

-338

137.4

-732.7

100
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

110
1(OPE)
2(OPE)
3(SUS)

-19933.9
4(SUS)
5(EXP)

NGEA-NT-LRSTS-0030215 REV O

-201.7

49

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

NODE

Load
Case
6(EXP)
MAX

PIPE STRESS CALCULATION REPORT

FX lb.

FY lb.

FZ lb.

MX ft.lb.

MY ft.lb.

MZ ft.lb.

57

34

-112

46.5

-243.9

-65.5

-835/L3

4874/L -338/L5
3

994.0/L1

-846.7/L1

-20135.7/L1

-676

3702

-311

994.0

-3675.1

-15119.7

-778

3698

-85

903.2

-1132.6

-14653.5

-835

3694

27

856.6

134.7

-14417.4

-835

3694

27

856.6

134.7

-14417.4

158

-338

137.4

-3809.7

-702.2

57

-112

46.5

-1267.3

-236.1

-835/L3

3702/L
-338/L5
1

994.0/L1

-3809.7/L5

-15119.7/L1

-676

-5860

-311

994.0

-4937.9

-10736.8

-778

-5864

-85

903.2

-1478.5

-10253.3

-835

-5868

27

856.6

245.7

-10002.5

-835

-5868

27

856.6

245.7

-10002.5

158

-338

137.4

-5183.6

-734.3

57

-112

46.5

-1724.2

-250.8

994.0/L1

-5183.6/L5

-10736.8/L1

994.0

-4937.9

-10736.8

150
1(OPE)
2(OPE)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX
160
1(OPE)
2(OPE)
3(SUS)
3(SUS)
4(SUS)
5(EXP)
6(EXP)
MAX

8.0

-835/L3
-676

5868/L -338/L5
3
-5860 -311

GLOBAL FORCES ELEMENT: NOT CONSIDERED

NGEA-NT-LRSTS-0030215 REV O

50

PIGGING FACILITIES UPGRADE PROJECT PHASE 5

NGEA-NT-LRSTS-0030215 REV O

PIPE STRESS CALCULATION REPORT

51