Vous êtes sur la page 1sur 4

SECTION 16124 MEDIUM VOLTAGE CABLES

PART 1 - GENERAL 1.1 SUMMARY

PHAN 16124 CA P !IE"N TRUNG THE#


PHAN 1 $ TO%NG &UA T 1.1 TO M TA'T

This Section covers the furnishing and installation of medium voltage cables for +u2c na3y no4i ve5 trang b6 va3 la7p 8a9t he: tho;ng 8ie:n ca4p 8ie:n trung the; 6.6 <v. use in a 6.6 kV power system. 1.2 RELATED DOCUMENTS eneral !lectrical $aceways and A. "ha5n 16010 to?ng @ua4t. #. "ha5n 16110 tu3ng. &. 1.3 A. #. &. 1.4 A. AND "ha5n 1611' THAM )HA*O (!& )0* Buy trCnh +!A , #.!. *)-. /%"A 00 , TieDu chua?n 8ie:n CO+NG VIE"C !E" TR,NH =Ea ra ca4c 8ie5u khoa>n theo spec. =ie5u khoa>n 8ie:n 1.2 CA C TA(I LIE"U LIE"N &UAN

A. Section 16010 "rovision. #. Section %ittings. &. 1.3 A. #. &. 1.4 A. #. 16110

Aa7p ra4p thie;t b6 phu2

Section 1611' &able Trays. REFERENCES (!& )0* +!A $egulation , #.!. *)-. /%"A 00 , /ational !lectrical &ode. SUBMITTALS Submit under specification "rovide product data for cables. STORAGE

+a4ng ca4p.

1.5 DELIVERY, HANDLING

#. &ung ca;p dEF lie:u sa>n pha?m cho ca4p.

A. #efore acceptance1 inspect for PHA+N PHO#I, L-U GI-. VA( VA"N damage to insulation and ensure that cable 1.5 HA(NH end seals are in place and undamaged. TrEG4c khi 8Ea ra cha;p thua:n pha>i #. !ach reel shall be insulation tested A. with a *1)00 V megger before entering kie?m tra tHnh ca4ch 8ie:n va3 8a>m ba>o storage. ca4p co4 8u4ng loa2i va3 khoDng b6 hE ho>ng. &. $eel shall be installed on a hard #. +oIi cuo:n daDy 8ie:n seF 8EG2c kie?m surface that flanges will not sink into. tra tHnh ca4ch 8ie:n *1)00V trEG4c khi nha:p kho. 1.6 COORDINATION &. &uo:n daDy 8ie:n seF 8EG2c la7p no?i 16124 - 1 MEDIUM VOLTAGE CABLES

A. &oordinate Jork under provisions of treDn be5 ma9t Section 16010. #. Ketermine re@uired between cable and other work. separation 1.6 PHO#I H23P

A. "ho;i hG2p coDng vie:c theo mu2c 16010 &. Ketermine cable routing to avoid cu>a 8ie5u khoa>n interference with other work. PART 2 - PRODUCTS 2.1 APPROVED MANUFACTURERS #. LeDu ca5u @uye;t 86nh rieDng bie:t giEFa ca4p va3 ca4c coDng vie:c kha4c

&. Ma4c 86nh va2ch tuye;n ca4p 8e? tra4nh can thie:p va3o coDng vie:c kha4c The products of the following manufacturers represent the acceptable standard of @uality for materials to be furnished. PHAN 2 $ SA*N PHA%M A. &AK(V( #. TALA 2.1 CHA#P THUA"N CU*A NHA( SA*N &. #angkok &able 1UA#T K. &ontractor shall submit for Sa>n pha?m cu>a ca4c nha3 sa>n Pua;t sau approval tEG2ng trEng cho tieDu chua?n 8EG2c cha;p thua:n cu>a cha;t lEG2ng va:t lie:u 8EG2c 2.2 24 )V., /0 DEGREE- C CABLES trang b6. &opper1 single or multi,cored1 stranded1 MA"! insulated1 shielded1 "V& sheathed1 *' kV1 N0 degree &1 conforming to (!& )0* standard. 2.3 TERMINATIONS AND SPLICING A. #. &. duye:t &AK(V( TALA #angkok &able K. /ha3 tha5u 8e: trCnh Pin pheD

CA P /0 456 C, 24 )V Ose termination kit of the heat shrink type1 2.2 manufactured by $aychem or approved e@ual. Splices shall be of the same type and /ha3 tha5u 8e: trCnh Pin pheD duye:t.$uo:t manufacturer. 8o5ng mo:t loFi hay 8a loFi1 daDy ca4p1 ca4ch 8ie:n MA"!1 ma3ng cha7n ba>o ve:1 vo> "V&1 *' kV1 N0 8o: &1 phu3 hG2p vG4i tieDu chua?n PART 3 - E1ECUTION (!& )0*. 3.1 E1AMINATION 2.3 !IE%M CUO#I 789 NO#I GHE P

A. Verify that the raceway system has been completed. Jiring installation shall Ku3ng bo: 8ie?m cuo;i loa2i ch6u nhie:t cu>a not be commenced until the raceway haFng $aychem sa>n Pua;t hay tEGng 8EGng haFng $aychem. /o;i ghe4p pha>i 8o5ng bo: installation is complete. vG4i 8ie?m cuo;i ve5 chu>ng loa2i va3 nha3 #. Verify that interior of buildings has sa>n Pua;t. been protected from weather1 prior to pulling wire. PHAN 3 $ THI CO+NG &. Verify that all mechanical work that are likely to cause damage to wires and 3.1 )IE%M TRA cables have been completed. 3.2 PREPARATION A. <ie?m tra he: tho;ng ma4ng ho3an chQnh. <hoDng tie;n ha3nh la7p 8a9t daDy 16124 - 2 MEDIUM VOLTAGE CABLES

&ompletely and thoroughly cleaning inside cho 8e;n khi ho3an thie:n pha5n la7p ma4ng. and outside of raceways before installing wires. 3.3 :IRING METHOD Ose wiring methods indicated drawings. 3.4 INSTALLATION on #. <ie?m tra nhie:t 8o: beDn trong coDng the trCnh trEG4c khi ke4o daDy.

&. <ie?m tra ta;t ca> coDng vie:c mang tHnh ma4y mo4c co4 kha> naUng gaDy ra hE A. The ampacity of cables installed in ho>ng cho vie:c ho3an chQnh daDy daIn va3 cable trays is determined by the placement ca4p. of cables and re@uirements in +!A CHUA%N B; $egulation. "lace cables per sectional 3.2 details shown on the drawings. Ve: sinh sa2ch seF beDn trong va3 beDn ngoa3i #. +edium voltage cables shall be ma4ng trEG4c khi la7p 8a9t daDy. installed in separate trays from all other cables. 3.3 PH-2NG PHA P !I DA+Y "hEGng pha4p 8i daDy 8EG2c ghi trong ba>n &. &ables shall be laid in tray by hand. veF. &ables shall be positioned without kinks1 twisting or unnecessary crossing. 3.4 LA'P !A<T K. #ending radius of cables1 both during Ko3ng 8ie:n 86nh mE4c cu>a and after installation1 shall not be less than A. the values recommended by cable 8EG2c la7p trong khay ca4p theo yeDu theo @uy 86nh +!A. V6 trH 8a9t ca4p manufacturer. moIi chi tie;t treDn ba>n veF. !. &able tray system shall be complete before installation of cables. "roper care shall be taken to avoid damaging cables #. &a4p 8ie:n trung the; 8EG2c la7p and cable trays during installation. ca4c khay rieDng bie:t. ca4p ca5u treDn

treDn

%. &able trays shall not be used as a &. &oDng nhaDn la7p ca4p treDn khay. walkway at any time. &a4p 8EG2c naVm 8u4ng v6 trH khoDng b6 Poa7n1 Poa7n 8oDi hay ba7t ngang khoDng . /o splices or taps shall be made in ca5n thie;t. cable trays. R. Ose plastic cable ties to support cables within tray system at an interval not ePceeding 6 meters on a horiSontal run and at every 1.)0 meters in a slope or vertical run. 3.5 TERMINATIONS AND SPLICING K. TaUng so; lEG2ng ca4p1 trong va3 sau khi 8i daDy 8e? phu3 hG2p vG4i coDng sua;t1 seF khoDng nho> hGn gia4 tr6 ca4p cu>a nha3 sa>n Pua;t yeDu ca5u.

!. Re: tho;ng khay ca4p seF 8EG2c hoa3n tha3nh trEG4c khi la7p ca4p. <ie?m tra ca4p va3 khay ca4p trong suo;t @ua4 trCnh la7p A. &ables shall be terminated or spliced 8a9t 8e? tra4nh hE ho>ng by means of kits of the heat shrink type. The cable termination shall be applied in accordance with manufacturerTs %. <hay ca4p seF khoDng du3ng nhE lo;i 8i instructions. ba;t cE4 lu4c na3o. #. &able termination and splicing shall be done only by electricians ePperienced . <hay ca4p khoDng 8EG2c Pe;p cho5ng. MEDIUM VOLTAGE CABLES

16124 - 3

with $aychem heat shrink terminations. 3.6 R. Ku3ng ca4p me5m 8e? hoI trG2 co; 86nh he: tho;ng khay ca4p Pen keF khoDng A. "erform inspection and testing in vEG2t @ua4 6m va3 1.)0m theo 8o: do;c hay accordance with applicable provisions. raFnh 8E4ng. #. (nspect wires and cables for physical damage and proper connection. FIELD &UALITY CONTROL

3.5

!IE%M CUO#I VA( !IE%M NO#I

&. +easure tightness of bolted &a4p seF 8EG2c no;i va3 Pe;p cho5ng connections and compare tor@ue A. measurements with manufacturerTs baVng thie;t b6 ch6u nhie:t. =ie?m cuo;i cu>a ca4p seF tuaDn theo hEG4ng daIn cu>a nha3 recommended values. sa>n Pua;t. K. Verify continuity of each feeder cable. #. =ie?m cuo;i cu>a ca4p va3 8ie?m no;i chQ 8EG2c la3m bG>i ca4c thG2 8ie:n co4 kinh nghie:m vG4i 8ie?m cuo;i ch6u nhie:t $aychem. 3.6 CHA#T L-23NG CO+NG TR,NH

A. ThE2c hie:n coDng vie:c tha?m tra va3 kie?m tra theo @uy 86nh a4p du2ng. #. <ie?m tra daDy va3 ca4p do hE ho>ng va:t ly4 va3 tHnh lieDn tu2c. &. =o 8o: kHn cu>a ke;t no;i bu loDng va3 so sa4nh phEGng pha4p Poa7n theo 8e5 ngh6 cu>a nha3 sa>n Pua;t.

K.

<ie?m tra tHnh lieDn tu2c cu>a daDy ca4p.

16124 - 4

MEDIUM VOLTAGE CABLES

Vous aimerez peut-être aussi