2014, APRIL 09th

WHAT WE HAVE DONE FOR CYCLING

DUARTE DARAJO MATA,


LANDSCAPE ARCHITECT, ADVISER AT GREEN STRUCTURE AND ENERGY DEPUTY MAYOR OFFICE
duarte.mata@cm-lisboa.pt

THIS WAS THE FRAMEWORK IN 2007.

H ACTUALMENTE UM CONTEXTO EXISTENTE

BEFORE

AFTER

AFTER

SOME CHANGES HAVE OCCURED IN LISBON SINCE THEN

HOWEVER SOME CHANGES, THIS STILL IS THE FRAMEWORK IN 2014...

H ACTUALMENTE UM CONTEXTO EXISTENTE

BECAUSE THIS MODEL WAS DEVELOPED DURING DECADES

BECAUSE THIS MODEL WAS DEVELOPED DURING DECADES

THERE ARE SEVERAL CONFLICTS WITH PEDESTRIANS AND CYCLISTS

IN A CITY OF CARS, WHAT STRATEGY DID WE CHOOSE TO INCREASE CYCLISTS? AND

COULD WE HAVE MADE DIFFERENTLY?

IN 2007:
VERY FEW CYCLISTS IN THE CITY VERY FEW INFRASTRUCURE AND NO FACILITIES FEW BIKE ACCEPTANCE BY THE SOCIETY
DRIVERSCULTURE OF INTOLERANCE OVER ROAD USERS

IN 2007 : BESIDES
-

SOME CHANGES, FINANCIAL RUPTURE IN THE MUNICIPALITY THIS IS THE FRAMEWORK IN 2014. URBAN PROBLEMS:
LACK OF PUBLIC SPACE FOR PEDESTRIANS EXTREME CAR CULTURE NEW GREEN SPACES NEEDS & LACK OF ECOLOGICAL CONTINUITY

DECISION: TO CHANGE FAST


- TO INVEST ON GREEN AND PUBLIC SPACE, SIMULTANEOUSLY - TO CREATE ECOLOGICAL CONTINUITIES AND GREENWAYS - TO LEAD THAT RECREATIONAL CYCLING TURNS TO COMMUTING CYCLING

- TO PUT CYCLING FAST ON THE MAINSTREAM

WHAT KIND OF INVESTMENTS?


1. Largely on the City flat areas 2. Mainly associated to greenways
3. Clear language, as a new image entering in the City 4. Usefull, linking to main transport interfaces or major equipments 5. Safe structures, atractive to new users

6. Financial adjustable to the situation

ECOLOGICAL STRUCTURE

MAIN GREENWAYS
EXISTING PROPOSAL

+20% OF GREEN AREAS ON NEW MASTER PLAN

PEDESTIANS AND BICYCLES CONNECTIVITY GREENWAYS NEW PARKS AND GARDENS

LISBONS GREEN PLAN

PARKS AND GARDENS RENOVATIONS

URBAN FARMING

REDUCING MAINTENANCE

AN INTEGRATED APPROACH
URBAN FARMING 2011 PRIVATE FARM 2 PHASE CYCLEPATH 2011

1 PHASE CYCLEPATH 2009

URBAN PARK 2009

ECOLOGICAL STRUCTURE

MAIN NEW PARKS AND RENOVATIONS

ESPAOS VERDES CONSOLIDADOS REAS POTENCIAIS A CONSOLIDAR

HOW DID WE FINANCE THE CYCLE NETWORK SO FAR?

GREEN GREEN CYCLE


CYCLE

- EU FUNDS (QREN) - CASINO LISBOA FUNDS - LISBON PORT AUTORITY - BETTER-WORLD (ROCK-IN-RIO) - REN REDE ELCTRICA NACIONAL - ANA AEROPORTOS, S.A. - FUNDAO GALP ENERGIA -METROPOLITANO DE LISBOA E.P.
-MUNICIPAL BUDGET

GREEN & CYCLE


URBAN CYCLEPATHS ON OPERATION = 60 km FOR RECREATION IN MONSANTO PARK = 42,7km

ANTES

2+2 LANES BEFORE 1+1 LANES AFTER

CYCLEPATH BENFICA-TELHEIRAS: THIS WAS THE FIRST CLASH BETWEEN BICYCLE INFRASTRUCTURE AND CARS INTERESTS

ANTES

BEFORE

AFTER

ANTES

DEPOIS

2014 Current Tipology Distribution


on Road Spaces 33%
< 2007 17%

on Green Spaces 24%

on Pedestrian areas 26%

% Final Tipology Predicted


> 2013 21,21% < 2007 13,50%

on Road Spaces 25,96%


on Green Spaces 18,91%

on Pedestrian areas 20,42%

LISBON AND ITS CYCLE SUITABILITY

+ 60 km PERCURSOS

4 (+1) BIKE & PEDESTRIAN BRIDGES SO FAR


2014, TORRES DE LISBOA 2012, BELA-VISTA

2009, PUPILOS
2009, AV. GULBENKIAN

2012, M. FRONTEIRA

4 NEW CYCLE AND PEDESTRIAN BRIDGES SINCE 2008

1 MORE NEW CYCLE AND PEDESTRIAN BRIDGE THIS APRIL 2014

LISBON IS IN THE FIRST STEPS TO BE A REAL CITY FOR CICLISTS

BUT, STEP BY STEP!

A bike park in a high school in lisbon (Carnide), 2011

DIFFERENT FACILITIES FOR BIKES

+60 bike parks on streets

http://lisboaciclavel.cm-lisboa.pt/

1st indoor bike park in lisbon municipality

SAFETY AND SECURRITY AWARENESS

BIKE-TO-WORK DAY, SINCE 2011 BY LOCAL ENERGY AGENCY

CAMPAINGN
COME TO LOCAL MARKETS BY BICYCLE

SEPTEMBER 2011

THE MAKING-OFF

CAMPAINGN
GO TO ROCK-IN-RIO BY BICYCLE

THE FIRST DEDICATED BIKE PARK AT A PUBLIC FESTIVAL IN PORTUGAL

2012

THE MAKING-OFF

EVENTS SHOW THAT STREETS CAN BE DIFFERENT

AV. LIBERDADE MEGA PIC-NIC EVENT, 2011

AND THEN A REALITY!

RUA NOVA DO CARVALHO, 2013

A NEW GREEN LANGUAGE IN THE CITY

BUT ALSO A NEW LANGUAGE

BETTER ECOLOGICAL STRUCTURE

OPEN
PARQUE DA QUINTA DA GRANJA
HORTAS DOS JARDINS DE CAMPOLIDE TELHEIRAS NASCENTE

OLIVAIS POENTE QUIINTA N.S. DA PAZ


HORTAS NO PARQUE BENSADE

PARQUE HORTCOLA DO VALE DE CHELAS


HORTAS DA GRAA

TO BE OPEN IN 2014
QUINTA DAS FLORES
VALE DA AMEIXOEIRA

CASALINHO DA AJUDA OLIVAIS NASCENTE BELA-FLOR BOAVISTA

IN STUDY
VALE FUNDO PARQUE PERIFRICO / B PADRE CRUZ

URBAN FARMING PLAN

NUCLEO DE CARNIDE MADRE DE DEUS PARQUE OESTE CASAL VISTOSO

OPEN GYM POINTS

OPEN GYM POINTS

30

BETTER ECOLOGICAL STRUCTURE

+50 NEW COFFEE POINTS NETWORK IN PARKS AND GARDENS

STREET KIOSKS IN PARKS

38

CHILDREN PLAYGROUND

24
NEW

120
IMPROVED

RAISING NUMBER OF CYCLING

2011

GREEN PLAN

2010

2007

2008

STRATEGY FOR CONSOLIDATION

NEW MASTER PLAN

2013

THE FUTURE?

LESS CARS!

FREIBURG, GERMANY

LESS CARS!

FREIBURG, GERMANY

LESS CARS!

In Cycling by Design Scottish Executive Publications, 1999

RELIANCE?

RELIANCE!

CONFIANA PARA ANDAR A P E DE BICICLETA

TO ADJUST CYCLE TIPOLOGIES TO LISBONS TARGET AND TO SPECIFIC MINDSETS

BERLIN, GERMANY

GOOD TRAFFIC CALMING DESIGN

!
VEVEY, SUIA

PORTO , PORTUGAL

FREIBURG, GERMANY

AVENIDA DA LIBERDADE, LISBON

MORE INTEGRATION ON TRANSPORT AND BUIDINGS

CADA VEZ MAIOR INTEGRAO NO SISTEMA DE TRANSPORTES


COPENHAGEN, DANMARK

MORE DIRECT INFRASTRUCTURE

COPENHAGEN, DANMARK

MORE CYCLE FACILITIES

COPENHAGEN, DANMARK

MORE INFORMATION

COPENHAGEN, DANMARK

ENTRADA PARA CICLISTAS E PEES NUM CENTRO COMERCIAL DE COPENHAGA.

AND

MORE GREEN (& CYCLE)!

2012
IMPLEMENTED

BEFORE / AFTER

VIEWPOINT 3 CALHAU PARK

URBAN AGRICULTURE VIEWPOINT 2

MONSANTO FOREST PARK

Z PINTO PARK

SKATE PARK

CEREAL FIELD

BRIDGE 2

BRIDGE 1 BIODIVERSE PASTURES

VIEWPOINT 1

EDUARDO VII PARK

MONSANTO PARK MAIN CENTRAL PARK (EDUARDO VII) GREENWAY

2013
IN PROGRESS

2014
IN STUDY

GREEN PLAN

MONSANTO URBAN GREENWAY (2012)

GREEN PLAN

EAST GREENWAY
(IN PROGRESS)

GREEN PLAN

North Greenway
(in progress)

GREEN PLAN

ALCNTARA VALLEY
(in study)

Vale de Alcntara Lisboa Foto SIMTEJO

GREEN PLAN

OLIVAIS PARKS GREENWAYS


(in progress)

GREEN PLAN

WESTERN GREENWAY
(in progress)