Vous êtes sur la page 1sur 234

EXECUTIVE ENGINEER

C&W DIVISION BUNER


PHONE NO. 0939-510328

DISTRICT BUNER
SECTOR:
ROADS
SUB SECTOR: ROADS

MONTHLY PROGRESS REPORT


OF DEVELOPMENT SCHEMES
FOR THE MONTH OF JUNE, 2012

C&W DIVISION BUNER

ABSTRACT
MONTHLY PROGRESS REPORT
FOR THE MONTH OF JUNE , 2012

SECTOR: ROAD
SUB SECTOR: (MAJOR ROAD & BRIDGES)
District Buner
S.No

OG

NEW

N/ ADP

Total

Name of Scheme

Estimated
Cost

All

A.A

TS

359.378

Expdr:
Ending
PFY

ADP allocation (CFY)

Original

Revised

222.962

85.000

57.938

25.000

417.316

222.962

Releases

Expenditure
during the

Progressive

Percentage Financial
Utilization (CFY) on

Add:
Demand

Excess (+)
Surrender (-)

Net (+)
or (-)

Month

CFY

48.929

38.929

48.929

271.891

100%

100%

25.000

32.000

28.264

32.000

32.000

100%

100%

110.000

25.000

80.929

80.929

303.891

100%

100%

67.193

Allocation Releases

Add: Demand/Excess (+)


Surrender (-)

PROGRESS REPORT/REVIEW
DISTRICT BUNER

Sector:
Roads
Sub Sector: Major Roads & Bridges
ADP
S.No

2011-12317/30889

Name of scheme

District Roads
Extension Impvt:
and B/Topping of
road from Faiza to
Topai Via Sar Qala
Bazarkot Chamo
Distt: Buner
PK-78

Total
cost

Status of scheme
AA with
date
4

Orign:
90.336
02/03/05
200.218 Revised AA
200.218
24/02/201
0

T.S with
date
5

98.670
06/03/2008
200.218
30/06/2010

Date of
Commence
ment

Expenditure
the end of
Previous
Year

Allocation during
C.F.Y
Released /
Original
revised

Original
05/2010

82.737

30.000

Expenditure
during the

Progressive
Expenditure

Financial
Utilization
During
C.F.Y.

Month

Year

10

11

12

13

30.0000

12.491

30.000

112.737

100%

PROFORMA-I
FOR THE MONTH OF JUNE , 2012
Scope of the
scheme
14

Physical
Target
during
C.F.Y

Achievement

the end of
previous
year

during
C.F.Y

Total
Achievement
Since

15

16

17

18

Achievement

Physical Progress.

317/30889
2011-12

41%

25%

15%

Remarks

Commencement

19
KM

Extension Impvt:
and B/Topping of
road from Faiza to
Topai Via Sar Qala
Bazarkot Chamo
Distt: Buner
PK-78

Scheduled
date of
completion

56%

E/W

20

Str;

S/B

B/C

TST

90%

50%

40%

35%

1.

90%

2.

90%

80%

3.

90%

20%

4.

95%

_-_____-_____-__
-

- _____-_

-_____-__

-_____-__

5.

95%

6.

90% 50%

7.

90% 40%

8.

90% 75%

-______-_

9.

90% 85%

-______-_

10.

90% 80%

11.

90%

60%

-______-_

12.

90%

60%

-______-_

13.

90%

30%

-______-_

14

90%_ 10% _-______-___

15.

90%

20%

16.

90%

30%

-_____-__

17.

90%

40%

-____-__

18.

90%

40%

-____-__

19.

80%

20%

-_____-__

20.

70%

50%

-_____-__

21.

80%

22.

50%

30%
10%

-______-_
-

-______-_

-______-_

-_____-__

-_____-__
-_____-__

06/2013

21
Revised PC-I/
Estimate under
preparation

Sector:
Sub Sector:
ADP
S.#

Name of scheme

Total
Cost

357/80637

Roads
Road

PROGRESS REPORT / REVIEW

Construction 250 Kms


roads i/c 13-Nos Bridges
in KPK SH:- 14 Km road
i/c 2-Nos Bridges in
Distt: Buner

District Buner

Status of scheme
AA with
date
4

A.

Road (14-Km)
= 110.616

B.

Bridges (2-Nos)
= 48.544

Date of
commencement

T.S with
date
5

6
1/2009

6/2011

G.Total= 159.160

Expenditure
the end of
previous
year
7
a)

Allocation during
C.F.Y
Released
Original
/revised
8
9

46.184

b)

94.041
Total:140.225

10.000

18.929

Expenditure
during the

Progressive Financial
expenditure. utilization
during
C.F.Y.

Month

Year

10

11

12

13

8.929

18.929

159.154

Construction
improvement & Black
Topping of Mugh Dara
Nogram road.2-KM

10.550
17/11/08

10.550
17/11/09

9.974
6/10/2009

10/01/2009

9.373

9.373

Improvement & Black


Topping of Amnawar
Shalbandai road 2-Km.

18.800
17/11/08

18.800
17/11/09

20.680
6/11/2009

25/03/2009

16.737

16.737

Construction
improvtment & Black
Topping of road from
Middle School Anghafoor
to Jangdara. 2-Km

12.418
17/11/08

12.418
17/11/09

13.659
5/8/2009

13/03/2009

12.731

12.731

Impv: B/T of Bagh road


(2-Km) PF-77

15.00
19/1/09

17.250
7/9/09

15/11/2010

11.364

0.570

1.255

12.619

Impvt: Widening of Amazai


road (2-Km)PF-77

19.800
6/5/09

19.800
6/5/09

21.780
10/10/09

20/08/2009

16.786

4.242

6.291

23.077

Impvt: & B/T of Dakara


Ghazi Kot road .2-Km

19.610
6/5/09

19.610
6/5/09

21.570
10/10/09

18/8/2009

15.247

0.875

16.122

Re-constn: & B/T of Rega


road to Naeem Khan Hujra
1-Km

7.429
6/5/09

7.429
6/5/09

8.171
6/10/09

16/06/2009

5.689

0.159

1.219

6.908

Constn: & B/T of Haji


Baba road 1-Km

7.009
6/5/09

7.009
6/5/09

7.709
6/10/09

16/06/2009

5.949

0.516

6.010

15.00
19/01/09

PROFORMA-I

FOR THE MONTH OF JUNE , 2012


the end of
previous year

Physical
Target
during
C.F.Y

Achievement
during C.F.Y

15

16

17

Achievement

SCOPE OF THE SCHEME


14
ADP NO: 357/80637

Total
Achievement
Since
Commencement

PHYSICAL PROGRESS.

18

19

Scheduled
date of
completion
20

Construction/Improvement &
B/Topping of Mugh Dara Nogram
road.2-KM

2. Improvement & Black Topping


of Amnawar Shalbandai road
2-Km.
3. Construction improvement &
Black Topping of road from
Middle School Anghapur to
Jangdara. 2-Km

6/2012
89%

12%

11%

100%

Scheme completed

4. Improvement B/T of Bagh road (2Km) PF-77)


5. Improvement Widening of
road (2-Km) PF-77

21
.

Construction 250-Kms roads i/c 12-Nos


Bridges in KPK SH:- 14-Km road in
District Buner
1.

REMARKS

Amazai

6. Improvement & B/T of Dakara


Ghazi Kot road.
7. Re-construction & B/T of Rega
Road to Naeem Khan Hujra
1-Km
8. Construction & B/T of Haji Baba
Road 1-Km

PROGRESS REPORT / REVIEW

Sector:
Sub Sector:
District:
ADP
S.#

Name of scheme

Total
Cost
(M)

Status of scheme
AA with date

357/80637

Roads
Roads
Buner

OG Schemes
Construction of 250-Km
Roads i/c 12-Nos Bridges
in KPK SH:- 14 Km Road
i/c 2-Nos Bridges

Construction of RCC Bridge


at Korya on Chamla Khawar
(PF-77)

30.095

Construction of RCC Bridge


on Bagra Khawar (PF-79)

18.449

48.544

29.645
04/11/09
PC-II 0.450
19/04/09
Total = 30.095

Date of
Expenditure
commencement the end of
previous
T.S with
year
date
5
6
7

Allocation during
C.F.Y

Released
/revised
9

Original

Expenditure during Progressive


the
expenditure.

Financial
utilization
during
C.F.Y.

Month

Year

10

11

12

13

32.600
19/8/11

28/12/2009

24.940

3.545

4.600

29.540

20.523

28/12/2009

21.244

0.412

0.412

21.656

PC-I

PC-I

17.769
04/11/09
PC-II 0.680
19/04/09
Total = 18.449

PROFORMA-I
FOR THE MONTH OF JUNE, 2012
the end of
previous year

Physical
Target
during
C.F.Y

Achievement
during C.F.Y

15

16

17

18

Achievement

Scope of the scheme

14
ADP NO: 357/80637

Construction of 250-Km
Roads i/c 12-Nos Bridges in
KPK SH:- 14 Km Road i/c
2-Nos Bridges
Construction of Bridges at
Korya Chamla Khawar (PF-77)

80%

20%

10%

Total
achievement
since
commencement

100%

Physical Progress.

19

Scheduled
date of
completion

20

Remarks

21

06/2012

Bridge structure
completed

06/2012

Scheme completed

6/2012

Scheme completed

Approach completed

Construction of RCC Bridge on


Bagra Khawar (PF-79)

96%

4%

4%

100%

Bridge structure
completed
Approach completed

Sector:
Sub Sector:
District:
ADP
S.#

Roads
Roads
Buner

Name of scheme

2
New 358/100037

110429New 360/

PROGRESS REPORT / REVIEW

Repair/Rehabilitation and
Construction of road
network in KPK (200-Kms)
SH:-

Total
Cost (M)

Status of scheme

AA with date

T.S with
date

3
57.938
57.938

1. Improvement widening
and Black topping of
Dakara charkot road PK-77

19.985

19.985 (M)
26/8/2011

Road Taking from Sowarai


Qasar Abad Shalbandi by
pass via Takhtaband road in
PK-78

18.350

18.350
11/10/2011

(i) Impvt: Widening and


B/Topping of road from
Daggar Chowk to Daggar
Bridge (1.20-Km)
(Remaining Portion).

9.856

9.856
11/10/2011

(ii) Impvt: and B/Topping


of
Elai road (1-km)

9.747

9.747
11/10/2011

Construction of 13-Nos RCC


Bridges in Khyber
Pakhtunkhwa SH:Construction of RCC Bridge
on Barandu Khuwer PK-78

71.000

Date of
Expenditure
commencemen the end of
t
previous
year

Allocation during
C.F.Y
Release
Original
d
/revised
8
9

15.000

15.000

--

Expenditure during Progressive


the
expenditure.

Financial
utilization
during
C.F.Y.

Month

Year

10

11

12

13

11.264

15.000

15.0000

24%

2.272

6.008

6.008

24%

7.230

7.230

7.230

1.762

1.762

1.762

PROFORMA-I
FOR THE MONTH OF JUNE , 2012
the end of
previous year

Physical
Target
during
C.F.Y

Achievement
during C.F.Y

15

16

17

18

50%

26%

26%

Achievement

Scope of the scheme

14
New 358/100037
1. Earth work
2.
Road work
Structure work

Total
achievement
since
commencement

2. Road Taking from Sowarai


Qasar Abad Shalbandi by pass
via Takhtaband road in PK-78

Physical Progress.

19
E/W S/W S/E B/C
80% 30% 50% 50%

20

Remarks

21

06/2013

E/W S/W S/B B/C TST


50% 40% 75% 50% -

(3)
(i) Impvt: Widening and
B/Topping of road from
Daggar Chowk to Daggar
Bridge (1.20-Km)
(Remaining Portion).

E/W
80%

(ii) Impvt: and B/Topping of


Elai road (1-km)

E/W S/W S/B B/C


30% 20%

New 360/110429
Construction of 13-Nos RCC
Bridges in Khyber
Pakhtunkhwa SH:Construction of RCC Bridge
on Barandu Khuwer PK-78

Scheduled
date of
completion

Tender floated on
12/07/2012

Estimate submitted

Sector:
Sub Sector:
District:
ADP
S.#

Roads
Roads
Buner

Name of scheme

Total
Cost (M)

Status of scheme

AA with date

T.S with
date

Date of
Expenditure
commencemen the end of
t
previous
year
6

Allocation during
C.F.Y
Release
Original
d
/revised
8
9

Expenditure during Progressive


the
expenditure.
Year

10

11

12

13

17.000

17.000

17.000

6.796

6.796

6.796

Up-gradation &
Strengthening of road
network in Khyber
Pakhtunkhwa.

Rehabilitation &
Blacktopping of Baye Kallay
to Katakala (2-Km)

9.950

Strengthening of Katkala
Shoprang road (1-Km)

7.500

1.815

1.815

1.815

7.500

1.944

1.944

1.944

3
4
5
6

Karapa Nawa Kalay road


1-Km
Strengthening Dewana
Baba Main road to Qaisar
Abad
Strengthening of road from
Degree Collage Daggar to
Sunigram
Up-Gradation &
Strengthening of Khanano
Dherai Nagrai road in PK-77

54.850

17.000

9.950
11/2/2012

17.000

Financial
utilization
during
C.F.Y.

Month

2011-12New 361/110224

PROGRESS REPORT / REVIEW

9.950

9.950
11/2/2012

3.134

3.134

3.134

5.000

5.000
11/2/2012

1.290

1.290

1.290

14.950

14.950
11/2/2012

2.021

2.021

2.021

PROFORMA-I
FOR THE MONTH OF JUNE , 2012
the end of
previous year

Physical
Target
during
C.F.Y

Achieveme
nt
during
C.F.Y

15

16

17

18

50%

31%

31%

Achievement

Scope of the scheme

14
New
361/110224/2011-12
Up-gradation & Strengthening
of road network in Khyber
Pakhtunkhwa.

Total
achievement
since
commencement

(1) Rehabilitation &


Blacktopping of Baye Kallay to
Katakala (2-Km)

(2) Strengthening of Katkala


Shoprang road (1-Km)

(3) Karapa Nawa Kalay road


1-Km

(4) Strengthening Dewana


Baba road to Qaisar Abad

(5) Strengthening of road from


Degree Collage Daggar to
Sunigram
(6) Up-Gradation &
Strengthening of Khanano
Dherai Nagrai road in PK-77

Physical Progress.

19

E/W Str: S/B B/C TST


KM-1 80% 40% 70% 30%20%
KM-2 80% 30% 70% 30% -

Scheduled
date of
completion

20

Remarks

21

Work started

E/W Str: S/B B/C TST


50% 10% 20% - -

Work started

E/W Str: S/B B/C TST


40% 50%10% - -

Work order issued

Tender process completed for


approval

SECTOR:
DISTRICT:
SUB SECTOR:

EDUCATION
BUNER
PRIMARY EDUCATION

MONTHLY PROGRESS REPORT OF


DEVELOPMENT SCHEMES
FOR THE MONTH OF JUNE , 2012

C&W DIVISION DISTRICT BUNER

PERFORMA-I

MONTHLY PROGRESS REPORT (ABSTRACT)


MONTH OF JUNE , 2012

SECTOR:
EDUCATION
SUB SECTOR: PRIMARY EDUCATION

Name of scheme

Sub
Sector

Estimated
cost
All

A.A

TS

44.359

NEW=

Primary
Education N/ADP

TOTAL

OG

Expdr:
ending
PFY

District Buner
ADP allocation
(CFY)

(Rupees in Million)

Expenditure
during the
Releases

Original

Revised

33.226

13.031

13.031

247.963

134.645

292.322

33.226

Progressive

%Age financial
utilization (CFY)
on

Month

CFY

Allocation Releases

13.031

10.415

13.031

46.257

100%

100%

134.645

134.645

105.14
3

134.64
5

134.645

100%

100%

147.676

147.676

147.676

115.55
8

147.90
2

180.902

100%

100%

Add: demand/Excess (+)


Surrender (-)
Add:
demand

Excess
(+)
Surrender
(-)

Net
(+)
or (-)

Sector:
District:

Primary Education
Buner

ADP Name of scheme


S.No

OG/4/ 80446

2
Estt: of 200 Pry: Schools for
Boys+Girls on need Basis in
KPK 09-Nos in Buner
1. GPS Kousar Abad Nawagai
2. GGPS Manjar Nawagai.
Shifted to Koga Kharkai
3. GPS Mehran Dehrai
4. GPS Surgal Jaboo
5. GPS Painara
6. GPS Bugh Dara
7. GGPS Charkot
8. GGPS Jaffar Khail Chinglai
9. GPS Bara Jamra

OG/6/90200

PROGRESS REPORT / REVIEW

Establishment of 110 Pry


Schools (G&B) on need
basis 6-Nos in Distt: Buner
SH:- 1. GPS Ghond (Sowawai)
2. GPS Tarok
3. GPS Tassa Ghazikot
4. GPS Dargha Maira Matwanai
5. GPS Wach Dara (Banda)
6. GPS Nakhtar Gudar

Total
cost

3
26.832

Status of scheme

Date of
commencement

AA with
date

T.S with
date

26/11/08
And
26.832
21/11/11

6
1/2009
6/2010

25/2/09
10/2/09
04/3/09
12/2/09
10/2/09
12/2/09

Expenditure
the end of
previous
year

Allocation during C.F.Y


Original

Released
/revised

Expenditure
during the
Month Year

Progressive
expenditur
e.

Financia
l
utilizatio
n during

C.F.Y.

10

11

12

13

18.772

10.550

10.550

7.934

10.550 29.322

100%

14.454

2.481

2.481

2.481

2.481

100%

17.527
2.628
2.628
2.628
2.628
2.628
4.387

02/12/09
And
17.527
21/11/11

05/01/10
05/01/10
05/01/10

16.935

FOR THE MONTH OF JUNE , 2012


District Buner

SCOPE OF THE SCHEME


14

Achievement
the end of
previous
year

Physica
l Target
during
C.F.Y

Achievement
during C.F.Y

15

16

17

71%

29%

Total
Achievement
Since
Commencement.

18

PHYSICAL
PROGRESS.

Scheduled
date of
completion

Remarks

19

20

21

No 04/80446
Estt: of 200 Pry: Schools for
Boys+Girls on need Basis in
KPK 9-Nos in Buner
1. GPS Kausar Abad shifted to
Nawagai

2. GGPS Manjar Nawagai


Shifted to Koga Kharkai
3. GPS Mehran Dehrai
4. GPS Surgal Jaboo
5. GPS Painara
6. GPS Bugh Dara
7. GGPS Charkot
8. GGPS Jaffar Khail Chinglai
9. GPS Bara Jamra

100%

Completed

ADP No 6/90200
Establishment of 110
Primary Schools (G&B) on
need basis
6-Nos in Distt: Buner
SH:- 1. GPS Ghond
(Sowawai)
2. GPS Tarok
3. GPS Tassa Ghazikot
4. GPS Dargha Maira
Matwanai
5. GPS Wach Dara (Banda)
6. GPS Nakhtar Gudar

100%

6/2012

Completed &
H/Over
Roof in
progress

100%

6/2013

6.

80% completed

Sector:
District:

Primary Education
Buner

ADP Name of scheme


S.No

New 8/100289

1
2
3
4
5
6
7
8
9
10
11
12

2
Construction of 300Additional C/Rooms in
Primary Schools in Khyber
Pakhtunkhwa (on need
Basis) 17-Nos in District
Buner.
GGPS Chinglai shifted to
GPS Totalai No.2 4-C/R
GPS Dhandikot 1-C/R
GGPS Nogramme shifted
GPS Kass Korona 2-C/R
GGPS Kass Korona 2-C/R
GPS Kalan 1-C/R
GPS Koga No.1 1-C/R
GPS Toorwarsak 1-C/R
shifted to GGPS Anghapur
GGPS Jangdara
(Toorwarsak) 1-C/R
GPS Gumbat Rega 1-C/R
GPS Matwanai shifted to
GGPS Matwanai 1-C/R
GPS Anghapur No.1 1-C/R
GPS Rega No.3 shifted to
GGPS Kulyarai 1-C/R

Total
cost
3
18.921

PROGRESS REPORT / REVIEW

Status of scheme

Date of
commencement

AA with
date
4
18.921
3/06/2011

T.S with
date
5
20.813
10/2011

6
10/2011
6/2012

Expenditure
the end of
previous year

Allocation during C.F.Y


Original

19.485

Released
/revised
9

19.485

Expenditure
during the
Month Year
10

11

5.249

19.485

Progressive
expenditure.

Financial
utilization

during
C.F.Y.

12

19.485

13

100%

FOR THE MONTH OF JUNE , 2012


District Buner

SCOPE OF THE SCHEME

14
New ADP No. 8/100289
Construction of 300-Additional
C/Rooms in Primary Schools in Khyber
Pakhtunkhwa (on need Basis) 17-Nos in
District Buner.
GGPS Chinglai shifted to GPS
1
Totalai No.2 4-C/R
2
GPS Dhandikot 1-C/R
GGPS Nogramme shifted GPS
3
Kass Korona 2-C/R
4
GGPS Kass Korona 2-C/R
5
GPS Kalan 1-C/R
6
GPS Koga No.1 1-C/R
GPS Toorwarsak 1-C/R shifted
7
to GPS Anghapur
GGPS Jangdara (Toorwarsak) 18
C/R
9
GPS Gumbat Rega 1-C/R
GPS Matwanai shifted to GGPS
10
Matwanai 1-C/R
11 GPS Anghapur No.1 1-C/R
GPS Rega No.3 shifted to GGPS
12
Kulyarai 1-C/R

Achievement
the end of
previous
year

Physical
Target
during
C.F.Y

Achievement
during C.F.Y

Total
Achievement
Since
Commenc
ement.

15

16

17

100%

100%

------do-------

------do------------do-------

18
100%

PHYSICAL PROGRESS.

Scheduled date
of completion
Remarks

19

20

21

Scheme completed

6/2012

------do------------do------------do------------do------------do------------do------------do------------do------------do-------

Sector:
District:

Primary Education
Buner

ADP Name of scheme


S.No

No.07/100264New ADP

1
2
3
4
5
6
7
8
9
10

PROGRESS REPORT / REVIEW

2
Provision of Basic Facilities
(B/W, G/L, W/Supply &
Electrification) in Govt:
Primary, Middle & High
Schools in Khyber
Pakhtunkhwa on need basis
SH:- 26-Nos Primary,
Middle & High Schools
Buner
GGPS Kass Koroona
B/Wall`
GHS Ghazi Kot B/Wall
GPS Dakara B/Wall
GGPS Dargalai B/Wall
GPS Chaprai B/Wall
GMS Jaba Amazai B/Wall
GPS Durmai B./Wall
GGPS Chanal B/Wall
GGPS Pak Banr
GGPS Khadar Khan

Total
cost
3

19.281

1.061
1.061
1.061
1.061
1.061
1.061
1.061
1.061
1.061
1.061

Status of scheme

Date of
commencement

AA with
date
4

19.281
3/6/2011
&
14/2/12

T.S with
date
5

Expenditure
the end of
previous year

Allocation during
C.F.Y
Original
Released
/revised
8
9

Expenditure
during the
Month Year
10

11

Progressive
expenditure
.

Financial

12

13

19.160

100%

utilization

during
C.F.Y.

10/2011
21.209
10/2011

06/2012

19.160

19.160

10.894

19.160

FOR THE MONTH OF JUNE , 2012


District Buner

SCOPE OF THE SCHEME


14
New ADP No.07/100264
Provision of Basic Facilities
(B/W, G/L, W/Supply &
Electrification) in Govt: Primary,
Middle & High Schools in
Khyber Pukhtonkhwa on need
basis SH:- 26-Nos Primary,
Middle & High Schools Buner
GGPS Kass Koroona
1
B/Wall`
2 GHS Ghazi Kot B/Wall
3 GPS Dakara B/Wall
4 GGPS Dargalai B/Wall
5 GPS Chaprai B/Wall
6 GMS Jaba Amazai B/Wall
7 GPS Durmai B./Wall
8 GGPS Chanal B/Wall
9 GGPS Pak Banr B/W
10

GGPS Khadar Khan B/W

Achievement
the end of
previous
year

Physica
l Target
during
C.F.Y

Achievement
during C.F.Y

Total
Achievement
Since
Commencement.

15

16

17

18

100%

100%

100%

PHYSICAL
PROGRESS.

Scheduled
date of
completion

Remarks

19

20

21

Completed

Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed

6/2012

Sector:
District:
ADP
S.No

Primary Education
Buner

Name of scheme

2
No.07/100264New ADP

PROGRESS REPORT / REVIEW

Provision of Basic Facilities


(B/W, G/L, W/Supply &
Electrification) in Govt:
Primary, Middle & High
Schools in Khyber
Pukhtonkhwa on need basis
SH:- 26-Nos Primary, Middle
& High Schools Buner

Total
cost
3

19.281

11
12

GPS Mugh Dara B/Wall


GPS Saroo K.K B/Wall

1.061
1.061

13
14
15
16
17
18
19
20
21
22
23
24
25
26

GGPS Gharib Abad W/S


GHS Nawagai W/S
GMS Jang Dara K.K W/S
GPS Naranj Amazai
GMS Shangra W/S, G/L
GPS Shangra G/L
GPS Ghazi Khanai
GPS Maina Kadal
GPS Gharai Saprai
GPS Ashraf Amazai
GGPS Khardag Durmai
GGPS Saro
GHSS Chinglai (High Portion)
GHS Maradu

0.376
0.376
0.376
0.884
0.502
0.291
0.211
0.884
0.884
0.884
0.884

Status of scheme

Date of
commencement

AA with
date
4

T.S with
date
5

Expenditure
the end of
previous year

Allocation during C.F.Y


Original
8

Released
/revised
9

19.281
3/6/2011
&
14/2/12

Expenditure
during the
Month Year
10

11

Progressive
expenditure.

Financial
utilization

during
C.F.Y.

12

13

FOR THE MONTH OF JUNE , 2012


District Buner

SCOPE OF THE SCHEME


14
New ADP No.07/100264
Provision of Basic Facilities (B/W,
G/L, W/Supply & Electrification) in
Govt: Primary, Middle & High
Schools in Khyber Pakhtunkhwa on
need basis SH:- 26-Nos Primary,

Achievement
the end of
previous year

Physical
Target
during
C.F.Y

Achievement
during C.F.Y

Total
Achievement
Since
Commencement.

15

16

17

18

Completed H/O
---------do----------------do----------------do----------------do----------------do----------------do----------------do----------------do----------------do----------------do----------------do----------------do-------Tender floated on
18/07/2012
---------do----------------do--------

PHYSICAL
PROGRESS.

Scheduled
date of
completion

Remarks

19

20

21

6/2012

Middle & High Schools Buner


11
12
13
14
15
16
17
18
19
20
21
22
23

GPS Mugh Dara B/Wall


GPS Saroo K.K B/Wall
GGPS Gharib Abad W/S
GHS Nawagai W/S
GMS Jang Dara K.K W/S
GPS Naranj Amazai
GMS Shangra
GPS Shangra
GPS Ghazi Khanai
GPS Maina Kadal
GPS Gharai Saprai
GPS Ashraf Amazai
GGPS Khardag Durmai

24

GGPS Saro

25
26

GHSS Chinglai (High Portion)


GHS Maradu

Sector:
District:
ADP
S.No

Name of scheme

Estab: of 200-Primary
Schools (B&G) in Khyber
Pakhtunkhwa (6-Nos in
District Buner

GPS Chown
GGPS Damnair
GPS Qaisar Abad
GPS Kot Bais
GPS Jowary
GPS Landy Jower
New ADP No11/110432

1
2
3
4
5
6

1
2
3
4
5
6

Primary Education
Buner

2
12New 10/110431/2011-

PROGRESS REPORT / REVIEW

Up-Gradation 120-Primary
Schools to Middle level
(B&G) in Khyber
Pakhtunkhwa on need basis
Phase-III (11-Nos in District
Buner.
GPS Damnair
GPS Awanai
GPS Bando
GGPS Ambela
GPS Lalo
GPS Qudratullah Garai

Total
cost
3

Status of scheme

Date of
commencement

AA with
date
4

T.S with
date
5

18.696

18.696
7/1/2012

50.369

50.369
7/1/2012
&
14/2/12

Expenditure
the end of
previous year

Allocation during C.F.Y


Original
8

Released
/revised
9

Expenditure
during the
Month Year

Progressive
expenditure.

Financial
utilization

during
C.F.Y.

10

11

12

13

5.000

5.000

3.054

5.000

5.000

100%

15.000

15.000

9.946

15.000

15.000

100%

7
8
9
10
11

GPS Tangoro
GGPS Mulayousaf
GPS New Karapa
GPS Bekhanai
GGPS Bekhanai

SCOPE OF THE SCHEME

Achievement
the end of
previous year

Physical
Target
during
C.F.Y

14

15

16

17

18

50%

26%

26%

10/110431/2011-12 New
Estab: of 200-Primary Schools
(B&G) in Khyber Pakhtunkhwa (6Nos in District Buner
1
GPS Chown
2
GGPS Damnair
3

FOR THE MONTH OF JUNE , 2012


District Buner
Achievement
Total
during C.F.Y
Achievement
PHYSICAL PROGRESS.
Since
Commencement.

GPS New Karapa

10
11

GPS Bekhanai
GGPS Bekhanai

Remarks

20

21

6/2013
Roof laid
Layout given

GPS Qaisar Abad

4
GPS Kot Bais
5
GPS Jowary
6
GPS Landy Jower
New ADP No11/110432
Up-Gradation 120-Primary Schools
to Middle level (B&G) in Khyber
Pakhtunkhwa on need basis PhaseIII (11-Nos in District Buner.
1
GPS Damnair
2
GPS Awanai
3
GPS Bando
4
GGPS Ambela
5
GPS Lalo
6
GPS Qudratullah Garai
7
GPS Tangoro
8
GGPS Mulayousaf

19

Scheduled
date of
completion

Maintain tempo of
work

Finishing
Work order issued
-----do---------do------

50%

30%

30%
Layout given
-----do---Layout given
Roof laid
Roof laid
Layout given
DPC level
Site not clear
Tender not yet floated due
to clearance by the Edu:
proposed for shifting to
GGPS Shanai Nawakalay
Work order issued
---------do--------

6/2013

Sector:
District:
ADP
S.No

Name of scheme

Conversion of 100-Mosque
Schools in to Regular
Primary schools in Khyber
Pakhtunkhwa SH:-7-No in
District Buner.
GMPS Faqir Shah Koroona
GMPS Ghund Sowawai
No.2
GMPS Dairo (Karorai)
GMPS Bamai
GMPS Shoprang
GMPS Haji Abad Agarai
GMPS Palang Dara

110548ADP No.15/

3
4
5
6
7

1
2
3
4
5

Primary Education
Buner

2
12New 12/110438/2011-

PROGRESS REPORT / REVIEW

Establishment of 10Playground in Khyber


Pakhtunkhwa (ESR
Programme) EU Assisted.
SH:- 5-Nos Playground in
Buner
GHS Dagai
GHSS Chinglai
GHSS Nagrai
GHS Ambella
GHS Bajkata

Total
cost
3

Status of scheme

Date of
commencement

AA with
date
4

T.S with
date
5

18.696

14/12/11
18.696
21/3/12

50.000

50.000
21/3/12

Expenditure
the end of
previous year

Allocation during C.F.Y


Original
8

Released
/revised
9

Expenditure
during the
Month Year

Progressive
expenditure.

Financial
utilization

during
C.F.Y.

10

11

12

13

6.000

6.000

6.000

6.000

6.000

50.000

50.000

FOR THE MONTH OF JUNE , 2012


District Buner
Physical
Target
during
C.F.Y

Achievement
during C.F.Y

SCOPE OF THE SCHEME

Achievement
the end of
previous year

14

15

16

ADP No.12/110438/2011-12New
Conversion of 100-Mosque
Schools in to Regular Primary
schools in Khyber Pakhtunkhwa
SH:- 7-Nos in District Buner.

50%

1
3
4
5
6

GMPS Faqir Shah Koroona


GMPS Ghund Sowawai
No.2
GMPS Dairo (Karorai)
GMPS Bamai
GMPS Shoprang
GMPS Haji Abad Agarai

GMPS Palang Dara

ADP No. 15/110548


Establishment of 10-Playground
in Khyber Pakhtunkhwa (ESR
Programme) EU Assisted.
SH:- 5-Nos Playground in Buner
1
GHS Dagai
2
GHSS Chinglai
3
GHSS Nagrai
4
GHS Ambella
5
GHS Bajkata

Total
Achievement
Since
Commencement.

PHYSICAL
PROGRESS.

Scheduled
date of
completion

Remarks

17

18

19

20

21

50%

32%

Work order issued

06/2014

Work order issued


Layout given
Roof laid
Work order issued
DPC laid
DPC laid
Tender floated on
18/07/2012
Tender under
process of approval

Sector:
District:
ADP
S.No

Primary Education
Buner

Name of scheme

2
110548ADP No.15/

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

PROGRESS REPORT / REVIEW

Establishment of 100-Primary
schools in Khyber Pakhtunkhwa
(ESR Programme) EU Assisted.
SH:- 31-Nos in District Buner
GPS Tawohid Abad Chinglai
GPS Kandy Kalan
GPS Swali Banda
GPS Gorarai Makhranai
GPS Spin Kamar Jehan Abad
GPS Dab Shawee
GPS Murad Khan (Amazai)
GPS Aigan Kangalai
GPS Damberay Chinglai
GPS Khanpur
GGPS Kaila Kanglai
GGPS Zahir Abad Sowawai
GGPS Tass Ghazikot
GGPS Yaseen
GGPS Asharai
GGPS Toha Amazai
GGPS Tareenan
GGPS Thigray

Total
cost
3

72.000

Status of scheme

Date of
commencement

AA with
date
4

72.000
21/3/12

T.S with
date
5

Expenditure
the end of
previous year

Allocation during C.F.Y


Original
8

70.000

Released
/revised
9

70.000

Expenditure
during the
Month Year

Progressive
expenditure.

Financial
utilization

during
C.F.Y.

10

11

12

70.00

7.000

70.000

13

FOR THE MONTH OF JUNE , 2012


District Buner
SCOPE OF THE SCHEME
14
ADP No. 15/110548
Establishment of 100-Primary
schools in Khyber Pakhtunkhwa
(ESR Programme) EU Assisted.
SH:- 31-Nos in District Buner
GPS Tawohid Abad
1
Chinglai
2
GPS Kandy Kalan
3
GPS Swali Banda
4
GPS Gorarai Makhranai
GPS Spin Kamar Jehan
5
Abad
6
GPS Dab Shawee
7
GPS Murad Khan (Amazai)
8
GPS Aigan Kangalai
9
GPS Damberay Chinglai
10 GPS Khanpur
11 GGPS Kaila Kanglai
12 GGPS Zahir Abad Sowawai
13 GGPS Tass Ghazikot
14 GGPS Yaseen
15 GGPS Asharai
16 GGPS Toha Amazai
17 GGPS Tareenan
18 GGPS Thigray

Achieveme
nt
the end of
previous
year

Physical
Target
during
C.F.Y

Achievement
during C.F.Y

Total
Achievement
Since
Commencem
ent.

15

16

17

18

100%

97%

97%

PHYSICAL PROGRESS.

19

DPC level
-------do-----------do-----------do-----------do-----------do-----------do-----------do-----------do-----------do----Lintel level
DPC level
-------do-----------do-----------do-----------do-----------do-----------do-----

Scheduled
date of
completion

Remarks

20

21

Sector:
District:
ADP
S.No

Primary Education
Buner

Name of scheme

2
110548ADP No.15/

19
20
21
22
23
24
25
26
27
28
29
30
31

PROGRESS REPORT / REVIEW

Establishment of 100-Primary
schools in Khyber Pakhtunkhwa
(ESR Programme) EU Assisted.
SH:- 31-Nos in District Buner
GGPS Bazargai Hassan Khel
GGPS Kuz Dab
GGPS Bajru
GGPS Aiwen Garhi
GPS Barandu Sunigram
GGPS Srogolo Jaboo
GPS Mirza Sar
GGPS Malakzai Koga
GPS Bablay
GPS Gajo
GPS Shekhan Hall
GPS Guar Abad
GGPS Aigan

Total
cost
3

Status of scheme

Date of
commencement

AA with
date
4

T.S with
date
5

Expenditure
the end of
previous year

Allocation during C.F.Y


Original
8

Released
/revised
9

Expenditure
during the
Month Year
10

11

Progressive
expenditure.

Financial
utilization

during
C.F.Y.

12

13

FOR THE MONTH OF JUNE , 2012


District Buner
SCOPE OF THE SCHEME
14
ADP No. 15/110548
Establishment of 100-Primary
schools in Khyber Pakhtunkhwa
(ESR Programme) EU Assisted.
SH:- 31-Nos in District Buner
GPS Tawohid Abad
19
Chinglai
20 GPS Kandy Kalan
21 GPS Swali Banda
22 GPS Gorarai Makhranai
GPS Spin Kamar Jehan
23
Abad
24 GPS Dab Shawee
25 GPS Murad Khan (Amazai)
26 GPS Aigan Kangalai
27 GPS Damberay Chinglai
28 GPS Khanpur
29 GGPS Kaila Kanglai
30 GGPS Zahir Abad Sowawai
31 GGPS Tass Ghazikot

Achieveme
nt
the end of
previous
year

Physical
Target
during
C.F.Y

Achievement
during C.F.Y

15

16

17

Total
Achievement
Since
Commencem
ent.

PHYSICAL PROGRESS.

18

19

Tender floated on 12/07/2012


-------do-----------do-----------do-----------do-----------do-----------do-----------do-----------do-----------do----------do----------do------------do-----

Scheduled
date of
completion

Remarks

20

21

SECTOR:
EDUCATION
DISTRICT:
BUNER
SUB SECTOR: SECONDARY EDUCATION

MONTHLY PROGRESS REPORT OF


DEVELOPMENT SCHEMES
FOR THE MONTH OF JUNE , 2012

C&W DIVISION DISTRICT BUNER

Performa-I

MONTHLY PROGRESS REPORT (ABSTRACT)


MONTH OF JUNE , 2012
Sector:
Education Elementary & Secondary
Sub Sector: Secondary Education
District Buner
Sub Sector Name of scheme

All

Secondary
Education

Estimated
cost

A.A

TS

OG-8

341.001

New-11

11

N/ADP

19

Total: 19

Expdr:
ending
PFY

ADP allocation
(CFY)

Releases

(Rupees in Million)
Expenditure during
the
Month

Progressive

CFY

%age financial
utilization (CFY)
on

Add: demand/Excess (+)


Surrender (-)

Allocation Releases

Add:
demand

Excess (+)
Surrender (-)

Net (+)
or (-)

Original

Revised

286.292

44.737

44.737

44.737

19.846

44.737

331.029

100%

100%

938.738

283.741

283.741

283.741

154.271

283.741

283.741

100%

100%

1279.739

286.292

328.478

328.478

328.478

174.117

328.478

614.770

100%

100%

PROFORMA-I
Sector:
District:
Sub Sector:

ADP
S.No.

Education.
Buner
Secondary Education

Name of scheme

Total
cost

Status of scheme

(2011-12)18/ 70100

Construction of 10-Nos
Cluster Hostel for
Teachers in back ward
area of KPK 2-Nos in
Buner
1. GHSS Nagarai
2. GGMS Anghapur

Date of
commencement

AA with
date
1

PROGRESS REPORT / REVIEW

T.S with
date

Expenditure
Allocation during
the end of
C.F.Y
previous year Origina Released
l
/revised

Expenditure during Progressive


the
expenditure.
Month
Year

Financial
utilization
during
C.F.Y.

10

11

12

13

25.733

25.766
24/01/2009

28.300
4/2009

5/2009

26.766

26.766

FOR THE MONTH OF JUNE , 2012


District Buner

Physica
l Target
during
C.F.Y

Achievement
during C.F.Y

SCOPE OF THE SCHEME

Achievement
the end of
previous
year

Total
Achievement
Since
Commencement.

Physical Progress.

14

15

16

17

18

19

ADP No: 18/70100


Construction of 10-Nos cluster
Hostels for Teachers in Back ward
area of KPK 4-Nos in Buner
1. GHSS Nagarai (PF-77)
2. GGMS Anghapur (PF-79)

100%

100%

Scheduled
date of
completion

1.
2.

Completed
completed

Remarks
20

6/2012

21

PROFORMA-I

Sector:
District:
Sub Sector:

2011-1219/ 70570

AD
P
S.N
o
1

PROGRESS REPORT/REVIEW

Education
Buner
Secondary Education

Name of scheme

Reconstruction of Building
Middle & High School in
KPK SH:
1.GHS Jangai
2. GHS Nawagia (5-C/R)

Total
cost
3

18.876

Status of scheme

Date of
commencement

AA with
date
4

T.S with
date
5

18.876

20.763
14/5/08

15/3/2009
20/9/09

Expenditure
the end of
previous
year
7

18.149

Allocation during C.F.Y


Original
8

1.429

Released
/revised
9

1.429

Expenditure during
the
Month
Year

Progressive
expenditure.

10

11

12

Financial
utilization
during
C.F.Y.
13

1.429

19.578

100%

PROFORMA-I

FOR THE MONTH OF JUNE


District Buner

Physical
Target
during
C.F.Y

Achievement
during C.F.Y

15

16

17

18

19

20

100%

100%

Completed

6/2011

Scope of the scheme

14

ADP No 19/70570
Reconstruction of Building
Middle & High School in KPK

Commencement.Since Achievement Total

Achievement
the end of
previous year

, 2012
Scheduled
date of
completion
Physical Progress.

Remarks

21

Sector:
Education
District:
Buner
Sub Sector: Secondary Education
ADP
S.No.
1

Name of scheme

Total
cost
3

PROGRESS REPORT / REVIEW

Status of scheme

Date of
commencement

AA with
date
4

T.S with
date
5

Expenditure
the end of
previous
year
7

Allocation during
C.F.Y
Original
Released
/revised
8
9

Expenditure
during the
Month Year

Progressive
expenditure.

10

11

12

17.813

Financial
utilization
during
C.F.Y.
13

2011-1221/ 80447

1.
Up-gradation of 100 P/S
to M/S (B+G) on need
basis in KPK (4-Nos in
Buner)
SH:- 1. GGPS Makhranai
2. GGPS Shangra
3. GPS Mula Banda
4. GPS Maina Kadal.

4.244
4.244
4.244
4.244

16.976
26/01/08

18.673
19/3/09

6/2/09
26/4/09
15/3/09
25/2/09

17.813

100%

FOR THE MONTH OF JUNE , 2012


District Buner

Scope of the scheme


14
ADP No-21/80447
Up-gradation of 100 P/S to M/S
(B+G) on need basis in KPK
(3-Nos in Buner)
SH:- 1. GGPS Makhranai
2. GGPS Shangra
3. GPS Mula Banda
4. GPS Maina Kadal.

Achievement
the end of
previous
year

Physica
l Target
during
C.F.Y

Achievement
during C.F.Y

Total
Achievement
Since
Commencement.

15

16

17

18

100%

100%

Physical Progress.
19

Scheme completed

Scheduled
date of
completion

20

6/2012

Remarks
21

PROFORMA-I

PROGRESS REPORT / REVIEW


Sector:
District:
Sub Sector:

Education.
Buner
Secondary Education

ADP Name of scheme


S.No
.
2

2010-1122/ 80448

Up-gradation of 100 M/S to


H/Level(B+G)on need basis
in KPK.
Up-gradation of 4 No
(Buner) M/S to H/S
1. GGMS Korya Chamla.
2. GGMS Sawari
3. GMS Dakara
4. GMS Anghapur.

Total
cost
3

Status of scheme

commencement

AA with
date
4

T.S with
date
5

28.896
22/11/08

31.784
7.946
7/3/209
7.946
7/3/2009
7.946
7/3/2009
7.946
7/3/09

28.896
7.224
7.224
7.224
7.224

Date of

1/2/2009
15/01/09
5/02/09
6/02/09

Expenditure
the end of
previous
year
7

27.389

Allocation during
C.F.Y
Original Released /
revised
8
9

0.389

0.389

Expenditure
during the
Month Year

Progressive
expenditure

10

11

12

Financial
utilization
during
C.F.Y.
13

0.389

27.778

100%

PROFORMA-I

FOR THE MONTH OF JUNE


District Buner

Physica
l Target
during
C.F.Y

Achievement
during C.F.Y

SCOPE OF THE SCHEME

Achievement
the end of
previous
year

14

15

16

Up-gradation of 100 M/S to


H/Level (B+G)on need basis in
KPK.
Up-gradation of 4 No (Buner)
M/S to H/S
1. GGMS Korya Chamla.
2. GGMS Sawari
3. GMS Dakara
4. GMS Anghapur.

94%

6%

, 2012

Total
Achievement
Since
Commencement.

Physical Progress.

17

18

19

6%

100%

Scheduled
date of
completion
Remarks

20

ADP No 22/80448

Scheme completed

6/2012

21

Sector:
Education.
District:
Buner
Sub Sector: Secondary Education
ADP
S.No.

2011-1225/90204

2011-12OG 24/90203

Name of scheme

Up-gradation of 150
Middle Schools to High
level in KPK 8-Nos in
Distt: Buner. SH:1. GGMS Dagai
2. GGMS Sura
3. GGMS Sowawai
4. GMS Girarai
5. GMS Elai
6. GMS Bajkata
7. GMS Kingergalai
8. GGMS Kingergalai
Up-gradation of 150
Primary Schools to
Middle status in KPK 10Nos Primary schools in
Distt: Buner. SH:1. GPS Koz Kalay
2. GGPS Amazo Kotai
3. GPS Kanglai
4. GPS Palwarai
5. GPS Rega No.1
6. GPS Sangara
7. GPS Jaba Chowan
8. GGPS Mangal Thana
9. GGPS Dakara
10. GGPS Jower No.2

Total
cost
3

57.086

45.082

PROGRESS REPORT/REVIEW

Status of scheme

Date of
commencement

AA with
date
4

57.860
02/12/2009
&
14/02/2012

45.082
12/04/2010
&
14/02/2012

T.S with
date
5

47.313
1/2010

41.365
1/2010

9/1/10
4/1/10
4/1/10
15/1/10
-18/1/10

1/3/10
1/3/10
21/1/10
21/1/10
21/1/10
21/1/10
1/6/2010
1/6/2010

Expenditure
the end of
previous
year
7

Allocation during C.F.Y


Original
8

Released
/revised
9

Expenditure during
the
Month
Year
10

11

Progressive Financial
expenditure. utilization
during
C.F.Y.
12
13

36.966

10.900

10.900

8.196

10.900

47.866

100%

32.746

9.336

9.336

4.146

9.336

42.082

50%

PROFORMA-I

FOR THE MONTH OF JUNE


during C.F.YAchievement

Commencement.Since Achievement Total

14
ADP No 24/90203
Up-gradation of 150 Middle Schools to
High level in KPK 8-Nos in Distt: Buner.
SH:1. GGMS Dagai
2. GGMS Sura
3. GGMS Sowawai
4. GMS Girarai
5. GMS Elai
6. GMS Bajkata
7. GMS Kingergalai
8. GGMS Kingergalai
ADP NO 25/90204
Up-gradation of 150 Primary Schools to
Middle status in KPK 10-Nos Primary
schools in Distt: Buner. SH:1. GPS Koz Kalay
2. GGPS Amazo Kotai
3. GPS Kanglai
4. GPS Palwarai
5. GPS Rega No.1

during C.F.YPhysical Target

Scope of the scheme

the end of previous yearAchievement

District Buner

15

16

17

18

90%

10%

3%

93%

,2012
Scheduled
date of
completion

Physical Progress.

19

1.
2.
3.
4.
5.
6.

Completed H/O
Handed over
Completed H/O
Completed H/O
completed
completed H/O

Remarks

20

21

6/2012

6/2012

7. DPC level
8. Site not clear
90%

10%

5%

95%
1.
2.
3.
4.
5.
6.

completed
Completed H/O
Completed H/O
completed H/O
Completed H/O
Completed H/O

6. GPS Sangara
7. GPS Jaba Chowan
8. GGPS Mangal Thana
9. GGPS Dakara
10. GGPS Jower No.2

7.
8.
9.
10.

Completed
Completed H/O
DPC level
------do-------

PROGRESS REPORT / REVIEW

Sector:
Education
District:
Buner
Sub Sector: Secondary Education
ADP Name of scheme
S.No

2
26/90205

Construction of 1000-Addl: C/R in Pry:


Middle, High schools in KPK 87-Nos in
Buner

Total
cost

Status of scheme

Date of
commencement

AA
with
date
4

T.S with
date

Expenditure
the end of
previous
year

Allocation during
C.F.Y
Original
Released
/revised

Expenditure
during the
Month Year

Progressive
expenditure.

Financial
utilization
during
C.F.Y.

10

11

12

13

71.432

71.432
8/3/2011

82.146
4/2010

64.463

9.683

9.683

2.302

9.68
3

74.146

100%

24/1/10

07/05/10

1
2

GPS Sher Ali Kotai 1-C/Room PF-77


GPS Dagai No.2 1-C/Room PF-77

0.821
0.821

GPS Rahim Abad 1-C/Room PF-77 shifted to


Mughdara

0.821

07/05/10

GPS Dapona totalai 1-C/Room PF-77

0.821

5/2/10

5
6
7
8
9
10

GPS Bagh 1-C/Room PF-77

0.821
0.821
0.821
0.821
0.821
0.821

05/02/10

03/03/10
03/03/10
03/03/10

03/03/10
03/03/10

GPS Chinglai 1-C/Room PF-77


GPS Ghazikot 1-C/Room PF-77
GPS Charorai 1-C/Room PF-77
GPS Narang Amazai 1-C/Room PF-77
GGPS Khanpur 1-C/Room PF-77

FOR THE MONTH OF JUNE , 2012

Commencement.Since Achievement Total

ADP No 26/90205
Construction of 1000 Addl: C/R in Pry: Middle, High schools
in KPK 87-Nos in Buner

during C.F.YAchievement

14

during C.F.YPhysical Target

Scope of the scheme

the end of previous yearAchievement

District Buner

15

16

17

18

90%

10%

10%

100%

Completed H/O
Completed H/O
Completed H/O
Completed H/O
Completed

Physical Progress.

Scheduled
date of
completion

Remarks

19

20

21

Scheme completed

6/2012

1
2
3
4
5

GPS Sher Ali Kotai 1-C/Room PF-77

GPS Chinglai 1-C/Room PF-77

--

Completed H/O

7
8
9
10

GPS Ghazikot 1-C/Room PF-77

Completed H/O
Completed H/O

GPS Dagai No.2 1-C/Room PF-77


GPS Rahim Abad 1-C/Room PF-77 shifted to Mughdara
GPS Dapona totalai 1-C/Room PF-77
GPS Bagh 1-C/Room PF-77

GPS Charorai 1-C/Room PF-77


GPS Narang Amazai 1-C/Room PF-77
GGPS Khanpur 1-C/Room PF-77

Completed

Completed H/O

PROGRESS REPORT / REVIEW

ADP Name of scheme


S.No

1
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

2
GPS Kalakhiala (Chamla) 1-C/Room PF-77
GGPS Whid Abad 1-C/Room PF-77
GGPS Sura 1-C/Room PF-77
GGPS Wach Khwar shifted to Nawagai
No.2 1-C/Room PF-77
GPS Nawagai No.4 1-C/Room PF-77
GPS Ghumbat Rega shifted to GPS Rega 2C/Room PF-78
GPS Chalandrai 2-C/Room PF-78
GGPS Makho Khapa 2-C/Room PF-78
GGPS Shangra 2-C/Room PF-78
GGPS Barkalai 2-C/Room PF-78
GHS Krapa 1-C/Room PF-79
GPS Rahim Abad 2-C/Room PF-79
GPS Jowar No.3 2-C/Room PF-79
GPS Toorwarsak No.1 1-C/Room PF-79
GMS Mulayousaf 2-C/Room PF-79

Date of
commencement

Sector:
Education
District:
Buner
Sub Sector: Secondary Education

Expenditure
the end of
previous year

Original

Released /
revised

Month

Year

10

11

12

13

14/04/10
25/01/10
25/01/10

25/01/10

25/01/10

1.642

29/1/10

1.642
1.642
1.642
1.642
0.821
1.642
1.642
0.821
1.642

29/01/10
17/2/10
17/02/10
15/2/10
15/02/10
15/02/10
20/2/10
28/2/10
28/02/10

Total
cost

Status of scheme

AA with
date

T.S with
date

0.821
0.821
0.821

0.821

0.821

Allocation during
C.F.Y

Expenditure during
the

Progressive
expenditure.

Financial
utilization
during
C.F.Y.

FOR THE MONTH OF JUNE

GGPS Whid Abad 1-C/Room PF-77


GGPS Sura 1-Class Room PF-77
GGPS Wach Khwar shifted to Nawagai No.2 1-C/Room PF-77
GPS Nawagai No.4 1-C/Room PF-77
GPS Ghumbat Rega shifted to GPS Rega 2-C/Room PF-78
GPS Chalandrai 2-C/Room PF-78
GGPS Makho Khapa 2-C/Room PF-78
GGPS Shangra 2-C/Room PF-78
GGPS Barkalai 2-C/Room PF-78
GHS Krapa 1-C/Room PF-79
GPS Rahim Abad 2-C/Room PF-79
GPS Jowar No.3 2-C/Room PF-79
GPS Toorwarsak No.1 1-C/Room PF-79

Commencement.Since Achievement Total

GPS Kalakhiala (Chamla) 1-C/Room PF-77

during C.F.YAchievement

14
11
12
13
14
15
16
17
18
19
20
21
22
23
24

during C.F.YPhysical Target

Scope of the scheme

the end of previous yearAchievement

District Buner

, 2012

15
-

16
-

17
-

18
-

Scheduled
date of
completion

Physical Progress.

19
Completed H/O
Completed &H/Over

Completed H/O
Completed
Completed
Completed H/O
Completed & Hand Over

Completed H/O
Completed H/O
Completed H/O
Completed H/O
Completed H/O
Completed H/O
Completed H/O

Remarks

20
-

21
-

25

GMS Mulayousaf 2-C/Room PF-79

Completed H/O

Sector:
District:
Sub Sector:

Education
Buner
Secondary Education

ADP Name of scheme


S.No

1
26
27
28
29
30
31
32

33

GPS Totalai No.1 1-C/R shifted to GPS


Sher Ali
GGPS Dagai 1-C/R

34
35
36
37
38
39
40

PROGRESS REPORT / REVIEW

GPS Anghapur No.2 (2-C/Rooms PF-79


GPS Thigrai 2-C/Rooms
GPS Nogram 2-C/Rooms
GGPS Nogram 1-C/R
GPS Akhun Serai 1-C/R
GPS Dapona 1-C/R
GGHS Totalai 3-C/R

GGPS Shamshi Dagai 1-C/R


GGPS Jangdara (K.K) 1-C/R
GPS Khali Kalay 1-C/R
GGPS Ghurghushtoo 1-C/R
GPS Hall 1-C/R
GGPS Kass Korona 4-C/R

Total
cost

3
1.642
1.642
1.642
0.821
0.821
0.821
2.463

Status of scheme
AA with
date
4
08/05/10
08/05/10
08/05/10
08/05/10
08/05/10
08/05/10
08/05/10

Date of

T.S with
date
5
-

6
-

Expenditure
the end of
previous
year
7
-

commencement

Allocation during
C.F.Y
Original
Released
/revised
8
9
-

Expenditure during
the
Month
Year

Progressive
expenditure.

10
-

11
-

12
-

Financial
utilization
during
C.F.Y.
13
-

0.821

08/05/10

0.821
0.821
0.821
0.821
0.821
0.821
3.284

08/05/10

08/05/10
08/05/10
08/05/10
08/05/10
01/07/10
01/07/10

FOR THE MONTH OF JUNE , 2012

GPS Anghapur No.2 (2-C/Rooms PF-79


GPS Thigrai 2-C/Rooms
GPS Nogram 2-C/Rooms
GGPS Nogram 1-C/R
GPS Akhun Serai 1-C/R
GPS Dapona 1-C/R
GGHS Totalai 3-C/R
GPS Totalai No.1 1-C/R Shifted to GPS Sher Ali
GGPS Dagai 1-C/R
GGPS Shamshi Dagai 1-C/R
GGPS Jangdara (K.K) 1-C/R
GPS Khali Kalay 1-C/R
GGPS Ghurghushtoo 1-C/R
GPS Hall 1-C/R

Commencement.Since Achievement Total

26
27
28
29
30
31
32
33
34
35
36
37
38
39

during C.F.YAchievement

14

during C.F.YPhysical Target

Scope of the scheme

the end of previous yearAchievement

District Buner

15
-

16
-

17
-

18
-

Physical Progress.

19
Completed
Completed/H. Over
Completed
Completed
Completed
Completed
Completed/H. Over
Completed
Completed/H. Over
Completed/H. Over
Completed/H. Over
Completed
Completed
Completed

Scheduled
date of
completion

20
6/2012
-

Remarks

21
-

40

GGPS Kass Korona 4-C/R

Completed/H. Over

PROGRESS REPORT / REVIEW

Sector:
Education
District:
Buner
Sub Sector: Secondary Education
ADP Name of scheme
S.No
1
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61

2
GPS Zahoor Abad 1-C/R
GPS Gujar Abad 1-C/R
GPS Batkanai 1-C/R
GPS Sowawai 1-C/R
GGPS Mangal Thana Shifted
GHS Mangal Thana 2-C/R
GPS Mangal Thana shifted to
GHS Mangal Thana 1-C/R
GHSS Ghazikot 2-C/R
GPS Totalai 1-C/R shifted to
Sher Ali
GPS Kuza Jamra 1-C/R
GPS Panjtar 1-C/R
GGPS Dakara 1-C/R
GPS Hissar Baba 2-C/R
GGPS Bato 1-C/R
GGPS Sowawai 1-C/R
GPS Dagai No.3 1-C/R
GGPS Hall 1-C/R
GPS Zahoor Abad 1-C/R
GHS Nogram 2-C/R
GGPS Kass Korona 2-C/R
GHS Dagai 3-C/Rooms
GGHS Mangal Thana 4-C/R

Total
cost

Status of scheme

Date of
commencem
ent

Expenditure
the end of
previous year

Allocation during C.F.Y

Expenditure during the

Original

Month

T.S with
date

3
0.821
0.821
0.821
0.821
1.642

5
-

6
15/07/10
15/07/10
15/07/10
15/07/10
15/07/10

7
-

8
-

9
-

10
-

11
-

12
-

13
-

0.821

15/07/10

1.642
0.821

15/07/10
15/07/10

0.821
0.821
0.821
1.642
0.821
0.821
0.821
0.821
0.821
1.642
1.642
2.463
3.284

15/07/10
15/07/10
15/07/10
15/07/10
15/07/10
15/07/10
01/07/10
01/07/10
-

Year

Financial
utilization
during
C.F.Y.

AA with
date
-

Released
/revised

Progressive
expenditure.

FOR THE MONTH OF JUNE

41
42

during C.F.YAchievement

Commencement.Since Achievement Total

14
GGPS Zahoor Abad 1-C/R

during C.F.YPhysical Target

Scope of the scheme

the end of previous yearAchievement

District Buner

15

16

17

18

,2012

Physical Progress.

19
Completed

Scheduled
date of
completion

Remarks

20
-

21
-

GPS Gujar Abad 1-C/R

43

GPS Batkanai 1-C/R

Completed H/O

44

GPS Sowawai 1-C/R


GGPS Mangal Thana Shifted GHS
Mangal Thana 2-C/R
GPS Mangal Thana shifted to GHS
Mangal Thana 1-C/R
GHSS Ghazikot 2-C/R

Completed H/O

Completed

Completed

Completed H/O
Completed H/O
Completed H/O
Completed H/O
Completed
Completed H/O
Completed
Completed
Completed H/O

45
46
47
48
49
50
51
52
53
54
55

GPS Totalai 1-C/R shifted to Sher Ali

GPS Kuza Jamra 1-C/R


GPS Panjtar 1-C/R
GGPS Dakara 1-C/R
GPS Hissar Baba 2-C/R
GGPS Bato 1-C/R
GGPS Sowawai 1-C/R
GPS Dagai No.3 1-C/R

Competed

56
57
58
59
60
61

Sector:
District:
Sub Sector:

GGPS Hall 1-C/R


GPS Zahoor Abad 1-C/R
GHS Nogram 2-C/R
GGPS Kass Korona 2-C/R
GHS Dagai 3-C/Rooms
GGHS Mangal Thana 4-C/R

Education
Buner
Secondary Education

ADP Name of scheme


S.No
2

27/90206

Re-Construction/Reh: of Bldg: of
Govt: Middle & High schools in
KPK Phase-II (6-Nos in Buner)
SH:1. GHS Totalai
2. GHS Cherorai
3. GHS Koga
4. GHS Chinglai
5. GHS Ghurghushto
6. GHS Nagrai

Total
cost
3

76.920

Completed H/O
Completed
Completed H/O
Completed/H. Over
Completed
Completed

PROGRESS REPORT / REVIEW

Status of scheme
AA with
date
4

T.S with
date
5

76.920
11/11/10

76.920

Date of
commencement
6

Expenditure
the end of
previous
year
7

5/2010

62.000

Allocation during
Expenditure
C.F.Y
during the
Original
Released Month
Year
/revised
8
9
10
11

13.000

13.000

4.813

13.000

Progressive
expenditure

12

75.000

Financial
utilization
during
C.F.Y.
13

100%

PROFORMA-I

FOR THE MONTH OF JUNE ,2012

during C.F.YAchievement

Commencement.Since Achievement Total

14

during C.F.YPhysical Target

SCOPE OF THE SCHEME

the end of previous yearAchievement

DISTRICT BUNER

15

16

17

18

Scheduled
date of
completion
Physical Progress.

19

Remarks

20

21

ADP NO 27/90206
Re-Construction/Reh: of Bldg: of Govt: Middle &
High schools in KPK Phase-II 6-Nos in Buner
SH:- 1. GHS Totalai
2. GHS Cherorai
3. GHS Koga
4. GHS Chinglai
5. GHS Ghurghushto
6. GHS Nagrai

1.

Finishing

2. Finishing office block


in progress

80%

20%

17%

97%

3.
4.
5.
6.

Finishing, B/Wall in
progress
Finishing
Finishing
G/F laid/ 1st floor
roof laid

6/2013

Sector:
Education
District:
Buner
Sub Sector: Secondary Education
ADP
S.No

New 32/100280

Name of scheme

Up-Gradation of 150-High Schools


to High Secondary level in KPK on
need basis 14-Nos in District Buenr
1. GGHS Shahdam
2. GGHS Nawagai
3. GGHS Chinglai
4. GHS Chinglai shifted to GHS
Dakara.
5. GHS Nogram
6. GHS Khanano Dherai
7. GHS Bagra
8. GHS Dokada
9. GHS Topai
10. GHS Amnawar.
11. GHS Toorwarsak.
12. GGHS Bazaargai.
13. GGHS Jowar
14. GHS Bagh

PROGRESS REPORT / REVIEW

Total cost Status of scheme

241.713

AA with
date
4

241.713
3/6/2011,
25/11/2011
&
14/2/2012

Date of
commeT.S with ncement
date
5
6

Expenditure
Allocation during
Expenditure
the end of
C.F.Y
during the
previous year Original
Released / Month
Year
revised
7
8
9
10
11

66.652

66.652

32.338

66.652

Progressive
expenditure

12

66.652

Financial
utilization
during
C.F.Y.
13

100%

PROFORMA-I

FOR THE MONTH OF JUNE ,2012

during C.F.YAchievement

Commencement.Since Achievement Total

14

during C.F.YPhysical Target

SCOPE OF THE SCHEME

the end of previous yearAchievement

DISTRICT BUNER

15

16

17

18

New ADP NO 32/100280


Up-Gradation of 150-High Schools to High Secondary
level in KPK on need basis 14-Nos in District Buner
1. GGHS Shahdam
2. GGHS Nawagai
3. GGHS Chinglai
4. GHS Chinglai shifted to Dakara
5. GHS Nogram
6. GHS Khanano Dherai
7. GHS Bagra
8. GHS Dokada
9. GHS Topai
10. GHS Amnawar.
11. GHS Toorwarsak.
12. GGHS Bazaargai.
13. GGHS Jowar
14. GHS Bagh

28%

27%

27%

Scheduled
date of
completion
Physical Progress.

19
1. G/F,1st Floor roof laid
2. Site not handed over by
Edu: Deptt:
3. 1st floor roof laid
4. Roof level
5. G/F roof laid
6. 1st floor roof laid
7. lintel level
8. G/F roof laid
9. Tender under process
of approval.
10. lintel level
11. ---do----12. foundation concrete
1:4:8 laid
13. ------do----14. Tender under process
of approval.

Remarks

20

6/2014

21

Sector:
Education
District:
Buner
Sub Sector: Secondary Education
ADP
S.No
1

Name of scheme

Total
cost
3

PROGRESS REPORT / REVIEW

Status of scheme
AA with
date
4

T.S with
date
5

65.225
3/6/2011
&
17/11/11

Date of
commencement
6

Expenditure
the end of
previous
year
7

Allocation during
Expenditure
C.F.Y
during the
Original
Released Month
Year
/revised
8
9
10
11

Progressive
expenditure

12

Financial
utilization
during
C.F.Y.
13

New 33/100283

Up-Gradation of 100-Primary
Schools to Middle level in KPK on
need basis 9-Nos in District Buner
1. GPS Shalizara
2. GPS Durmai
3. GGPS Pak Banr
4. GPS Bakht Maira
5. GPS Biampur
6. GPS Bangirai
7. GPS Sharghashay
8. GGPS Bar Kalay
9. GPS Elum

65.225

10/2011
06/201

30.000

30.000

13.128

30.000

30.000

100%

PROFORMA-I

FOR THE MONTH OF JUNE , 2012

during C.F.YAchievement

Commencement.Since Achievement Total

14

during C.F.YPhysical Target

SCOPE OF THE SCHEME

the end of previous yearAchievement

DISTRICT BUNER

15

16

17

18

Scheduled
date of
completion
Physical Progress.

19

Remarks

20

21

6/2013

New ADP NO 33/100283


Up-Gradation of 100-Primary Schools to Middle level in
KPK on need basis 9-Nos in District Buner
1. GPS Shalizara
2. GPS Durmai
3. GGPS Pak Banr
4. GPS Bakht Maira
5. GPS Biampur
6. GPS Bangirai
7. GPS Sharghashay.
8. GGPS Barkaly.
9. GPS Elum

1.
2.
3.

28%

46%

46%

4.
5.
6.
7.
8.
9.

Roof laid.
Lintel level
Main Building/B/Wall in
progress
Roof laid
Lintel level
Lintel level
Lintel level.
Roof laid
DPC level

Sector:
Education
District:
Buner
Sub Sector: Secondary Education
ADP Name of scheme
S.No
2

New 34/100286

Up-Gradation of 100-Middle
Schools to High level in KPK on
need basis 9-Nos in District Buenr
1. GGMS Charorai
2. GMS Mandow
3. GMS Langaw
4. GMS Sowawai
5. GMS Matwanai
6. GMS Dherai
7. GMS Kulyarai
8. GMS Liganai
9. GGMS Anghapur.

Total
cost
3

83.170

PROGRESS REPORT / REVIEW

Status of scheme
AA with
date
4

T.S with
date
5

83.170
3/6/2011
&
17/11/11

Date of
commencement
6

Expenditure
the end of
previous
year
7

Allocation during
Expenditure
C.F.Y
during the
Original
Released Month
Year
/revised
8
9
10
11

37.500

37.500

18.000

37.500

Progressive
expenditure

12

37.500

Financial
utilization
during
C.F.Y.
13

100%

PROFORMA-I

FOR THE MONTH OF JUNE ,2012

during C.F.YAchievement

Commencement.Since Achievement Total

14

during C.F.YPhysical Target

SCOPE OF THE SCHEME

the end of previous yearAchievement

DISTRICT BUNER

15

16

17

18

New ADP NO 34/100286


Up-Gradation of 100-Middle Schools to High level in
KPK on need basis 8-Nos in District Buenr
1. GGMS Charorai
2. GMS Mandow
3. GMS Langaw
4. GMS Sowawai
5. GMS Matwanai
6. GMS Dherai
7. GMS Kulyarai
8. GMS Liganai
9. GGMS Anaghpur.

27%

31%

31%

Scheduled
date of
completion
Physical Progress.

19

1. roof level
2. lintel level
3. Plastering in progress
4. roof level
5. lintel level
6. Finishing.
7. lintel level
8. lintel level
9. DPC level

Remarks

20

6/2013

21

Sector:
District:
Sub Sector:
ADP
S.No

Education
Buner
Secondary Education

Name of scheme

2
New 35/100290

1
2
3
4
5
6
7
8
9

10
11
12
13
14
15
16
17

PROGRESS REPORT / REVIEW

Total
cost
3

Status of scheme
AA with
date
4

T.S with
date
5

Date of
commencement

Expenditure
the end of
previous year

Allocation during
Expenditure
C.F.Y
during the
Original
Released / Month
Year
revised
8
9
10
11

Progressive
expenditure

12

Financial
utilization
during
C.F.Y.
13

34.972
3/6/2011
&
18/8/2011

25.725

25.725

10.528

25.725

25.725

100%

Construction of 300-Addl: C/Rooms in


Govt: Secondary schools in KPK on
need basis 28-Nos in District Buner

34.972

GHS Khararai 2-C/R


GGHS Ghazikot 6-C/R
GGMS Kasskorona 2-C/R
GHS Dewana Baba 1-C/R
GHS Shalbandai 1-C/R
GMS Bazarkot shifted to GHS Bajkata
1-C/R
GHS Bagra 2-C/R
GHS Nawakalay shifted to GHS
Karapa 1-C/R
GHS Ganshal 1-C/R
GGHS Shalbandai shifted to GHSS
Gagra 1-C/R
GHS Pandir 1-C/R
GHS Cheena shifted to GHS Bajkata
1-C/R
GHS Tangora shifted to GHS Sowarai
1-C/R
GHS Sowarai 1-C/R
GHS Bampokha 2-C/R
GHS Katkala 1-C/R shifted to GGPS
Katala
GHS Nanseer 1-C/R

GHS Daggar No.2 1-C/R


GHS Hissar 1-C/R

PROFORMA-I

FOR THE MONTH OF JUNE

Construction of 300-Addl: C/Rooms in Govt: Secondary


schools in KPK on need basis 28-Nos in District Buner
PK-77 10-C/R
PK-78 9-C/R
PK-79 9-C/R

Commencement.Since Achievement Total

14
New ADP NO 35/100290

during C.F.YAchievement

SCOPE OF THE SCHEME

during C.F.YPhysical Target

DISTRICT BUNER

the end of previous yearAchievement

18
19

15
-

16
100%

17
75%

18
75%

,2012

Scheduled
date of
completion
Physical Progress.

19
1. Finishing.
2. 3-C/R roof laid 3-C/R roof level.
3. completed
4. completed
5. completed
6. completed
7. Completed
8. -----do-----9. -----do-----10. -----do-----11. -----do-----12. -----do-----13. -----do-----14. -----do-----15. DPC level
16. layout given

Remarks

20
6/2012

21
-

17. Site not cleared


18. completed
19. completed

Sector:
District:
Sub Sector:
ADP
S.No

Education
Buner
Secondary Education

Name of scheme

2
New 39/110392

40/110434New

1
2
3
4

1
2

PROGRESS REPORT / REVIEW

Total
cost
3

Status of scheme
AA with
date
4

T.S with
date
5

Date of
commencement

Expenditure
the end of
previous year

Allocation during
Expenditure
C.F.Y
during the
Original
Released / Month
Year
revised
8
9
10
11

Progressive
expenditure

12

Financial
utilization
during
C.F.Y.
13

Re-Construction of Buildings in Govt:


Schools in Khyber Pakhtunkhwa DFID
Assisted

GMS Bazarkot
GMS Shangra
GMS Alami Banda
GMS Matwanai

Up-Gradation of 100-High Schools to


Higher Secondary level in Khyber
Pakhtunkhwa (5-Nos in District Buner

GGHS Korya
GHS Asharay

PROFORMA-I

FOR THE MONTH OF JUNE

Re-Construction of Buildings in Govt: Schools in Khyber


Pakhtunkhwa DFID Assisted

1
2
3
4

Commencement.Since Achievement Total

New ADP NO 39/110392

during C.F.YAchievement

14

during C.F.YPhysical Target

SCOPE OF THE SCHEME

the end of previous yearAchievement

DISTRICT BUNER

15

16

17

18

100%

75%

75%

,2012

Scheduled
date of
completion
Physical Progress.

19

Tender on floated on 18/07/2012

GMS Bazarkot
GMS Shangra
GMS Alami Banda
GMS Matwanai

New ADP NO 40/110434


Up-Gradation of 100-High Schools to Higher Secondary
level in Khyber Pakhtunkhwa (5-Nos in District Buner
1 GGHS Korya
2 GHS Asharay

Tender on floated on 18/07/2012

Remarks

20

21

PROGRESS REPORT / REVIEW

Sector:
Education
District:
Buner
Sub Sector: Secondary Education
ADP Name of scheme
S.No

Total
cost

Status of scheme
AA with
date

2
No.41/110392New ADP

1
2
3
4
5
6
7
8
9
10
11
12
13

Date of
commencement

Reconstruction of Building in Govt:


Schools in Khyber Pakhtunkhwa
(DFID) Assisted), Reconstruction of
20-Govt: Schools Buildings in
District Buner.

144.86
8

144.868
25/11/2011
&
21/03/2012

GGPS Totalai
GPS Totalai No.1
GPS Ghurgushto
GPS Chinglai
GPS Nawagai No.1
GPS Ambela
GPS Kowag No.2
GPS Dand Maira
GGPS Makhranai
GPS Daggai No.1
GGPS Bajkata
GPS Dana Dara
GGPS Jowar No.1

8.193
8.193
8.193
8.193
8.193
8.193
8.193
8.193
8.193
8.193
8.193
3.116
3.116

T.S
with
date
5

Expenditure Allocation during


the end of C.F.Y
previous
Original
Released /
year
revised
7

Expenditure
during the
Month Year

Progressive
expenditure.

Financial
utilization
during
C.F.Y.

10

11

12

13

24.868

24.868

14.815

24.86
8

24.868

100%

14

GMS Nawagai

5.359

FOR THE MONTH OF JUNE

, 2012

New ADP No.41/110392


Reconstruction of Building in Govt: Schools in Khyber
Pakhtunkhwa (DFID) Assisted), Reconstruction of 20Govt: Schools Buildings in District Buner.
GGPS Totalai
1
GPS Totalai No.1
2
GPS Ghurgushto
3
GPS Chinglai
4
GPS Nawagai No.1
5
6
GPS Ambela
GPS Kowag No.2
7
8
GPS Dand Maira
GGPS Makhranai
9
10 GPS Daggai No.1
11 GGPS Bajkata

during C.F.YAchievement

Commencement.Since Achievement Total

14

during C.F.YPhysical Target

Scope of the scheme

the end of previous yearAchievement

District Buner

15

16

17

18

100%

17%

17%

Physical Progress.

Scheduled
date of
completion

Remarks

19

20

21

6/2012

The scheme
will be not
completed
dg CFY.

Work Order issued


1st floor roof laid
DPC level
DPC level
Roof laid
st
1 floor BB work in progress
1st floor roof laid
DPC level
DPC level
Roof laid 1st floor in progress
Site not handed over

12
13
14

GPS Dana Dara


GGPS Jowar No.1
GMS Nawagai

Finishing
Roof laid
Roof laid

PROGRESS REPORT / REVIEW

Sector:
Education
District:
Buner
Sub Sector: Secondary Education
ADP Name of scheme
S.No

Total
cost

Status of scheme
AA with
date

2
No.41/110392New ADP

Reconstruction of Building in Govt:


Schools in Khyber Pakhtunkhwa
(DFID) Assisted), Reconstruction of
20-Govt: Schools Buildings in
District Buner.

15

GGPS Battai

16

GPS Karapa

17

GPS Nagrai

18

GPS Mangal Thana

19
20

GGPS Kulyarai
GMS Langow

Date of
commencement

Expenditure
the end of
previous
year

Allocation during
C.F.Y
Original
Released /
revised

Expenditure
Progressive
during the
expenditure.
Month Year

Financial
utilization
during
C.F.Y.

T.S
with
date
5

10

11

12

13

144.86
8

144.868
25/11/2011
&
21/03/2012

FOR THE MONTH OF JUNE

, 2012

15

GGPS Battai

16

GPS Karapa

17

GPS Nagrai

18

GPS Mangal Thana

19

GGPS Kulyarai

Commencement.Since Achievement Total

New ADP No.41/110392


Reconstruction of Building in Govt: Schools in Khyber
Pakhtunkhwa (DFID) Assisted), Reconstruction of 20Govt: Schools Buildings in District Buner.

during C.F.YAchievement

14

during C.F.YPhysical Target

Scope of the scheme

the end of previous yearAchievement

District Buner

15

16

17

18

Physical Progress.

Scheduled
date of
completion

Remarks

19

20

21

6/2012

Work order issued .


-----do-----

-----do-----

-----do-----

Demolition estimate
submitted

Due to
Demolition
of old
buildings
the schemes
could not be
completed
dg: CFY

20

GMS Langow

Layout given

PROGRESS REPORT / REVIEW

Sector:
Education
District:
Buner
Sub Sector: Secondary Education
ADP Name of scheme
S.No

Total
cost

Status of scheme
AA with
date

2
No.42/110407New ADP

1
2
3
4
5
6
7
8
9
10
11

Date of
commencement

Construction of 400-Additional Class


Rooms in Existing Govt: Schools in
Khyber Pakhtunkhwa (EU Assisted)
SH:- Construction 70-Additional
Class Rooms in District Buner.

73.439

73.439
7/8/2011
&
17/11/2011
&
21/3/2012

GGPS Pak Banr (1-C/Room)


GGPS Charorai (1-C/Room)
GGPS Langar (1-C/Room)
GGPS Khanpur (1-C/Room)
GGPS Khadar Khan (1-C/Room)
GGPS Shadam (1-C/Room)
GGPS Nagrai Barkalay (2-C/Rooms)
GPS Shergar (1-C/Room)
GPS Kandar (1-C/Room)
GPS Naranj Amazai (1-C/Room)
GPS Charorai (1-C/Room)

T.S
with
date
5

Expenditure Allocation during


the end of C.F.Y
previous
Original
Released /
year
revised
7

Expenditure
during the
Month Year

Progressive
expenditure.

Financial
utilization
during
C.F.Y.

10

11

12

13

54.728

54.728

13.356

54.72
8

54.728

94%

FOR THE MONTH OF JUNE , 2012

Commencement.Since Achievement Total

New ADP No.42/110407


Construction of 400-Additional Class Rooms in Existing
Govt: Schools in Khyber Pakhtunkhwa (EU Assisted)
SH:- Construction 70-Additional Class Rooms in
District Buner
GGPS Pak Banr (1-C/Room)
1
GGPS Charorai (1-C/Room)
2
GGPS Langar (1-C/Room)
3
GGPS Khanpur (1-C/Room)
4
GGPS Khadar Khan (1-C/Room)
5
6
GGPS Shadam (1-C/Room)
GGPS Nagrai Barkalay (2-C/Rooms)
7
8
GPS Shergar (1-C/Room)
GPS Kandar (1-C/Room)
9
10 GPS Naranj Amazai (1-C/Room)

during C.F.YAchievement

14

during C.F.YPhysical Target

Scope of the scheme

the end of previous yearAchievement

District Buner

15

16

17

18

100%

75%

75%

--

Physical Progress.

Scheduled
date of
completion

Remarks

19

20

21

6/2012

Finishing
-----------do-------------------do-----------Finishing
Plastering in progress
Finishing
Finishing
Finishing
Finishing
Finishing

11

GPS Charorai (1-C/Room)

Finishing.

PROGRESS REPORT / REVIEW

Sector:
Education
District:
Buner
Sub Sector: Secondary Education
ADP Name of scheme
S.No
2
No.42/110407New ADP

12
13
14
15
16
17
18
19
20
21
22

Construction of 400-Additional Class


Rooms in Existing Govt: Schools in
Khyber Pukhtonkhwa (EU Assisted)
SH:- Construction 70-Additional
Class Rooms in District Buner.
GPS Qudratullah Garai (1-C/Room)
GPS Kharairai (1-C/Room)
GPS Mandow (1-C/Room)
GPS Marogai (1-C/Room)
GPS Malka (1-C/Room)
GPS Nawakalay (Charorai) (1C/Room)
GPS Shahdam (1-C/Room)
GPS Garai Saprai (1-C/Room)
GPS Kadal (1-C/Room)
GPS Jehangirai (1-C/Room)
GPS Mian Dand (1-C/Room)

Total
cost
3

Status of scheme

Date of
commencement

AA with
date
4

T.S with
date
5

73.439

73.439
7/8/2011
&
17/11/2011
&
21/3/2012

Expenditure
the end of
previous
year
7

Allocation during
C.F.Y
Original
Released /
revised
8
9

Expenditure
during the
Month Year

Progressive
expenditure.

10

11

12

Financial
utilization
during
C.F.Y.
13

FOR THE MONTH OF JUNE

Commencement.Since Achievement Total

New ADP No.42/110407


Construction of 400-Additional Class Rooms in Existing
Govt: Schools in Khyber Pukhtonkhwa (EU Assisted)
SH:- Construction 70-Additional Class Rooms in
District Buner
12 GPS Qudratullah Garai (1-C/Room)
13 GPS Kharairai (1-C/Room)
14 GPS Mandow (1-C/Room)
15 GPS Marogai (1-C/Room)
16 GPS Malka (1-C/Room)
17 GPS Nawakalay (Charorai) (1-C/Room)
18 GPS Shahdam (1-C/Room)
19 GPS Garai Saprai (1-C/Room)
20 GPS Kadal (1-C/Room)
21 GPS Jehangirai (1-C/Room)

during C.F.YAchievement

14

during C.F.YPhysical Target

Scope of the scheme

the end of previous yearAchievement

District Buner

, 2012

15

16

17

18

100%

--

Physical Progress.

Scheduled
date of
completion

Remarks

19

20

21

6/2012

Plastering in progress
Finishing
Finishing
Roof laid
Finishing
Finishing.
Finishing.
Roof level
Roof level

Finishing

22

GPS Mian Dand (1-C/Room)

Finishing.

PROGRESS REPORT / REVIEW

Sector:
Education
District:
Buner
Sub Sector: Secondary Education
ADP Name of scheme
S.No
2
No.42/110407New ADP

Construction of 400-Additional Class


Rooms in Existing Govt: Schools in
Khyber Pukhtonkhwa (EU Assisted)
SH:- Construction 70-Additional
Class Rooms in District Buner.

23
24
25
26
27
28
29
30
31
32
33

GPS Karaizai (1-C/Room)


GPS Korya (1-C/Room)
GPS Gharib Abad (2-C/Rooms)
GPS Kandaw Patai (1-C/Room)
GPS Katakot (1-C/Room)
GGPS Sura (1-C/Room)
GPS Sura No.1 (1-C/Room)
GPS Sura No.2 (1-C/Room)
GPS Manjar (1-C/Room)
GPS Amazo koto (1-C/Room)
GPS Totpalo (1-C/Room)

Total
cost
3

Status of scheme

Date of
commencement

AA with
date
4

73.439

73.439
7/8/2011
&
17/11/2011
&
21/3/2012

T.S with
date
5

Expenditure
the end of
previous
year
7

Allocation during
C.F.Y
Original
Released /
revised
8
9

Expenditure
during the
Month Year

Progressive
expenditure.

10

11

12

Financial
utilization
during
C.F.Y.
13

FOR THE MONTH OF JUNE

Commencement.Since Achievement Total

New ADP No.42/110407


Construction of 400-Additional Class Rooms in Existing
Govt: Schools in Khyber Pukhtonkhwa (EU Assisted)
SH:- Construction 70-Additional Class Rooms in
District Buner
23 GPS Karaizai (1-C/Room)
24 GPS Korya (1-C/Room)
25 GPS Gharib Abad (2-C/Rooms)
26 GPS Kandaw Patai (1-C/Room)
27 GPS Katakot (1-C/Room)
28 GGPS Sura (1-C/Room)
29 GPS Sura No.1 (1-C/Room)
30 GPS Sura No.2 (1-C/Room)
31 GPS Manjar (1-C/Room)
32 GPS Amazo koto (1-C/Room)

during C.F.YAchievement

14

during C.F.YPhysical Target

Scope of the scheme

the end of previous yearAchievement

District Buner

, 2012

15

16

17

18

--

Physical Progress.

Scheduled
date of
completion

Remarks

19

20

21

6/2012

Finishing
Finishing
Layout given
Finishing
Finishing
Finishing
Finishing
----------do--------Finishing
Completed

33

GPS Totpalo (1-C/Room)

Finishing

PROGRESS REPORT / REVIEW

Sector:
Education
District:
Buner
Sub Sector: Secondary Education
ADP Name of scheme
S.No
2
No.42/110407New ADP

34
35
36
37
38
39
40
41
42
43
44
45
46

Construction of 400-Additional Class


Rooms in Existing Govt: Schools in
Khyber Pukhtonkhwa (EU Assisted)
SH:- Construction 70-Additional
Class Rooms in District Buner.
GPS Kohi (1-C/Room)
GPS Tenawlo Dherai (1-C/Room)
GGPS Tenawlo Dheria (1-C/Room)
GPS Lalo (1-C/Room)
GPS Ambela Dara (1-C/Room)
GPS Ganda Kass (1-C/Room)
GPS Maskipur (1-C/Room)
GGPS Ambela (1-C/Room)
GPS Manaizai Kowga (2-C/Rooms)
GGPS Koga shifted to Koga Karkay
(2-C/Rooms)
GPS Budakas (1-C/Room)
GGPS Malasar (1-C/Room)
GPS Damnair 2-C/Room

Total
cost
3

Status of scheme

Date of
commencement

AA with
date
4

T.S with
date
5

73.439

73.439
7/8/2011
&
17/11/2011
&
21/3/2012

Expenditure
the end of
previous
year
7

Allocation during
C.F.Y
Original
Released /
revised
8
9

Expenditure
during the
Month Year

Progressive
expenditure.

10

11

12

Financial
utilization
during
C.F.Y.
13

FOR THE MONTH OF JUNE

Commencement.Since Achievement Total

New ADP No.42/110407


Construction of 400-Additional Class Rooms in Existing
Govt: Schools in Khyber Pukhtonkhwa (EU Assisted)
SH:- Construction 70-Additional Class Rooms in
District Buner
34 GPS Kohi (1-C/Room)
35 GPS Tenawlo Dherai (1-C/Room)
36 GGPS Tenawlo Dheria (1-C/Room)
37 GPS Lalo (1-C/Room)
38 GPS Ambela Dara (1-C/Room)
39 GPS Ganda Kass (1-C/Room)
40 GPS Maskipur (1-C/Room)
41 GGPS Ambela (1-C/Room)
42 GPS Manaizai Kowga (2-C/Rooms)
43 GGPS Koga shifted to Koga Karkay (2-C/Rooms)
44 GPS Budakas (1-C/Room)
45 GGPS Malasar (1-C/Room)

during C.F.YAchievement

14

during C.F.YPhysical Target

Scope of the scheme

the end of previous yearAchievement

District Buner

, 2012

15

16

17

18

Physical Progress.

Scheduled
date of
completion

Remarks

19

20

21

6/2012

Plastering in progress
Finishing
Finishing
Plastering in progress
Finishing
Finishing
Finishing
DPC level
Finishing
Finishing
Finishing
Plastering in progress

46

GPS Damnair 2-C/Room

Layout given

PROGRESS REPORT / REVIEW

Sector:
Education
District:
Buner
Sub Sector: Secondary Education
ADP Name of scheme
S.No

Total
cost

Status of scheme
AA with
date

2
No.44/110433New ADP

No.45/110434New ADP

1
2
3
4
5
6
7

1
2

Up-Gradation of 150-Middle Schools to


High level (B&G) in Khyber
Pakhtunkhwa on need basis (Phase-III)
SH:- 7-Nos in District Buner.

GGMS Ghazi kot


GMS Shangra
GMS Kalil
GMS Kalan
GGMS Kasskorona
GGMS Nograme
GMS Mughdara
Up-Gradation of 100-High schools to
Higher Secondary level (B&G) in
Khyber Pakhtunkhwa on need basis
Phase-II 3-Nos in District Buner

GGHS Sowari
GHS Bampoha

Date of
commencement

T.S
with
date
5

58.513

58.513
22/02/2012

53.014

53.014
7/1/2012
&
14/2/2012

17.671
17.671

Expenditure Allocation during


the end of C.F.Y
previous
Original
Released /
year
revised
7

Expenditure
during the
Month Year

Progressive
expenditure.

Financial
utilization
during
C.F.Y.

10

11

12

13

20.000

20.000

20.000

20.00
0

20.000

100%

2.322

2.322

2.322

2.322

2.322

100%

GHS Khararai

17.671

FOR THE MONTH OF JUNE , 2012


during C.F.YAchievement

Commencement.Since Achievement Total

14

during C.F.YPhysical Target

Scope of the scheme

the end of previous yearAchievement

District Buner

15

16

17

18

Physical Progress.

Scheduled
date of
completion

Remarks

19

20

21

New ADP No.44/110433


Up-Gradation of 150-Middle Schools to High level (B&G) in
Khyber Pakhtunkhwa on need basis (Phase-III) SH:- 7-Nos in
District Buner.
1 GGMS Ghazi kot
2

GMS Shangra

GMS Kalil

GMS Kalan

5
6
7

GGMS Kasskorona
GGMS Nograme
GMS Mughdara

New ADP No.45/110434


Up-Gradation of 100-High schools to Higher Secondary level
(B&G) in Khyber Pakhtunkhwa on need basis Phase-II 3-Nos
in District Buner
1 GGHS Sowari

50%

34%

34%

10%

4%

4%

Work order issued


S/Str: work
DPC laid
DPC level
DPC level
--------do--------------do-------

6/2014

Work order issued site


not handed over

GHS Bampoha

GHS Khararai

------do---DPC level

PROGRESS REPORT / REVIEW

Sector:
Education
District:
Buner
Sub Sector: Secondary Education
ADP Name of scheme
S.No

Total cost
(M)

Status of scheme
AA with
date

2
46/110435New ADP

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Construction of 300-Additional Class


Rooms in Primary, Middle & High schools
in Khyber Pakhtunkhwa Phase-III
SH:- 30-Nos in District Buner
i.
20-Nos C/Rooms in PK-77
ii.
3-Nos C/Rooms in PK-78
iii.
7-Nos C/Rooms in PK-79
GPS Asharai 2-C/R
GPS Panjtar 2-C/R
GPS Dargalai 2-C/R
GPS Kass Korona 2-C/R
GPS Badher 1-C/R
GPS Naranj (KK) 1-C/R
GPS Sar Pattai 1-C/R
GPS Yasin 1-C/R
GPS Urmal 1-C/R
GPS Sabir Banda
GPS Attaullah Banda 1-C/R
GPS Sura Banda
GPS Tangoro 1-C/R
GPS Qabrona Kandow 1-C/R
GPS Jabai (Panjtar) 1-C/R

Date of
commencement

32.884

32.884
7/1/2012
&
14/2/2012

T.S
with
date
5

Expenditur Allocation during


e the end of C.F.Y
previous
Original Released
year
/revised
7

Expenditure
during the
Month Year

Progressive Financial
expenditure. utilization
during
C.F.Y.

10

11

12

13

16.946

16.946

7.912

16.94
6

16.946

100%

FOR THE MONTH OF JUNE , 2012

during C.F.YAchievement

Commencement.Since Achievement Total

14

during C.F.YPhysical Target

Scope of the scheme

the end of previous yearAchievement

District Buner

15

16

17

18

50%

50%

50%

Physical Progress.

Scheduled
date of
completion

Remarks

19

20

21

New ADP 46/110435


Construction of 300-Additional Class Rooms in Primary, Middle &
High schools in Khyber Pakhtunkhwa Phase-III
SH:- 26-Nos in District Buner
i.
20-Nos C/Rooms in PK-77
ii.
3-Nos C/Rooms in PK-78
iii.
3-Nos C/Rooms in PK-79
1 GPS Asharai 2-C/R
2 GPS Panjtar 2-C/R
3 GPS Dargalai 2-C/R
4 GPS Kass Korona 2-C/R
5 GPS Badher 1-C/R
6 GPS Naranj (KK) 1-C/R
7 GPS Sar Pattai 1-C/R
8 GPS Yasin 1-C/R
9 GPS Urmal 1-C/R
10 GPS Sabir Banda
11 GPS Attaullah Banda 1-C/R

6/2013

Lintel level
Plastering in progress
Roof level
DPC level
Completed
Completed
Roof level
----do----------do-------Roof laid
Finishing

12
13
14
15

GPS Sura Banda


GPS Tangoro 1-C/R
GPS Qabrona Kandow 1-C/R
GPS Jabai (Panjtar) 1-C/R

Lintel level
-----do---------do-----Completed

PROGRESS REPORT / REVIEW

Sector:
Education
District:
Buner
Sub Sector: Secondary Education
ADP Name of scheme
S.No

Total cost
(M)

Status of scheme
AA with
date

2
46/110435New ADP

16
17
18
19
20
21
22
23
24

Construction of 300-Additional Class


Rooms in Primary, Middle & High schools
in Khyber Pakhtunkhwa Phase-III
SH:- 30-Nos in District Buner
iv.
20-Nos C/Rooms in PK-77
v.
3-Nos C/Rooms in PK-78
vi.
7-Nos C/Rooms in PK-79
GPS Koria Dara 1-C/R
GGPS Karapa 2-C/R
GPS Surkhawo Banda 2-C/R
GPS Chola 1-C/R
GHSS Gagra 1-C/R
GPS Gumbat 1-C/R
GPS Gholotangai 1-C/R
GPS Hissar 1-C/R
GPS Naqai 1-C/R

Date of
commencement

32.884

32.884
7/1/2012
&
14/2/2012

T.S
with
date
5

Expenditure Allocation during


the end of C.F.Y
previous
Original Released
year
/revised
7

Expenditure
Progressive Financial
during the
expenditure. utilization
during
Month Year
C.F.Y.
10

11

12

13

FOR THE MONTH OF JUNE , 2012

during C.F.YAchievement

Commencement.Since Achievement Total

14

during C.F.YPhysical Target

Scope of the scheme

the end of previous yearAchievement

District Buner

15

16

17

18

Physical Progress.

Scheduled
date of
completion

Remarks

19

20

21

New ADP 46/110435


Construction of 300-Additional Class Rooms in Primary, Middle &
High schools in Khyber Pakhtunkhwa Phase-III
SH:- 26-Nos in District Buner
iii.
20-Nos C/Rooms in PK-77
iv.
3-Nos C/Rooms in PK-78
iii.
3-Nos C/Rooms in PK-79
16 GPS Koria Dara 1-C/R
17 GGPS Karapa 2-C/R
18 GPS Surkhawo Banda 2-C/R
19 GPS Chola 1-C/R
20 GHSS Gagra 1-C/R
21 GPS Gumbat 1-C/R
22 GPS Gholotangai 1-C/R
23 GPS Hissar 1-C/R
24 GPS Naqai 1-C/R

Roof laid
Not yet started
DPC level
S/Str: work
Finishing
S/Str: work
Lintel level
Roof level
Excavation completed

PROGRESS REPORT / REVIEW

Sector:
Education
District:
Buner
Sub Sector: Secondary Education
ADP
S.No

Name of scheme

Total cost
(M)

Status of scheme
AA with
date

2
No.56/11452New ADP 2011-12New 55/110451 ADP No. 47/110436

Reconstruction of buildings Govt: Middle


& High School in KPK (Phase-III)
(02-Nos) in Buner
SH : GHS Battai
GHS Ambela

Date of
commencement

Expenditur
e the end of
previous
year

Allocation during
C.F.Y
Original Released
/revised

Expenditure
during the
Month Year

Progressive Financial
expenditure. utilization
during
C.F.Y.

T.S
with
date
5

10

11

12

13

5.000

5.000

5.000

5.00
0

5.0000

100%

32.00
21/11/2011
16.00
16.00

Construction of 5-Cluster Hostel (M&F) in


Khyber Pakhtunkhwa on need basis
SH:- Construction of 1-Nos Cluster Hostel
in GGHS Ghazikot

Establishment of Bacha Khan


Model School at Salarzai District
Buner

118.940

FOR THE MONTH OF JUNE , 2012

ADP No. 47/110436


Reconstruction of buildings Govt: Middle & High
School in KPK (Phase-III)
(002-Nos) in Buner
SH : GHS Battai
GHS Ambela

during C.F.YAchievement

Commencement.Since Achievement Total

14

during C.F.YPhysical Target

Scope of the scheme

the end of previous yearAchievement

District Buner

15

16

17

18

100%

16%

16%

New ADP No.55/110451/2011-12

Remarks

19

20

21

6/2012

06/2013

1. Work order
issued.
2. DPC level

Tender floated on
10/07/2012

Construction of 5-Cluster Hostel (M&F) in Khyber Pakhtunkhwa


on need basis
SH:- Construction of 1-Nos Cluster Hostel in GGHS Ghazikot

New ADP No.56/11452


Establishment of Bacha Khan Model School at Salarzai
District Buner

Physical Progress.

Scheduled
date of
completion

Discussed in the PrePDWP meeting not


yet approved.

SECTOR:
HIGHER EDUCATION
SUB SECTOR: HIGHER EDUCATION
DISTRICT:
BUNER

MONTHLY PROGRESS REPORT OF


DEVELOPMENT SCHEMES
FOR THE MONTH OF JUNE, 2012

C&W DIVISION DISTRICTBUNER

PERFORMA-I

Sector :
Sub Sector:District:
Sub
Sector

Higher Education
Collage Education
Buner

Name of scheme

All

OG=-1
NEW=1
N/ADP
Total: -2

MONTHLY PROGRESS REPORT


(ABSTRACT)
MONTH OF JUNE , 2012
PROVINCIAL PROGRAMME
(Rupees in Million)

Estimated Expdr:
cost
ending
PFY

ADP allocation (CFY)

A.A

TS

Original

135.525

60.405

75.120

75.120

6.006

2.000

141.531

60.405

Releases

Revised

Expenditure
during the

Progressive %Age financial


utilization (CFY) on

Month

CFY

Allocation

Releases

75.120

35.120

75.120

135.525

100%

100%

2.000

2.000

2.000

2.000

2.000

77.120

77.120

77.120

37.120

77.120

137.525

100%

100%

Add: demand/Excess (+)


Surrender (-)

Add:
demand

Excess (+)
Surrender (-)

Net
(+) or (-)

PROFORMA-1

PROGRESS REPORT / REVIEW

Sector:
Higher Education
Sub Sector: Colleges
District:
Buner
ADP
S.No.

2
2011-1266/100248 2011-12O/G 64/80389

Name of scheme

Estab: of Govt: Colleges in


KPK (Phase-III) on need
bases SH:Establishment of Govt:
College Chamla Buner
under Estt: of Govt:
Colleges in KPK Phase-III
on need Basis
Establishment of 15-Nos
Govt: Girls Degree
College in Khyber
Pakhtunkhwa SH:- GGDC
Khadu Khel

Total
cost
3
Org:
100.810
Rev:
135.525

Status of scheme

Date of
commencement

AA with
date
4

T.S with
date
5

Expenditure
the end of
previous
year
7

Original
100.810
17/03/2010
Revised
135.525
05/03/2011

135.525

15/11/2010

60.405

Allocation during
C.F.Y
Original
Released
/revised
8
9
20.000
8/2011
20.00
10/2011
75.120
40.00
35.120
3/5/2012
75.120

10.000

10.000
1/2/2012

Expenditure during
the
Month
Year

Progressive
expenditure.

10

11

12

35.120

75.120

135.525

Financial
utilization
during
C.F.Y.
13

100%

2011-12New scheme 75/100252

Construction of
staff/students Hostel in
Govt: Colleges in Khyber
Pakhtunkhwa (Phase-I)
SH:- GGDC Daggar

6.006

6.006
2/2/2012

2.000

2.000

2.000

2.000

2.000

FOR THE MONTH OF JUNE , 2012


District Buner

Physical
Target
during
C.F.Y

Achievement
during C.F.Y

SCOPE OF THE SCHEME

Achievement
the end of
previous year

14

15

16

17

Total
Achievement
Since
Commencement.

18

Physical Progress.

Scheduled
date of
completion

Remarks

19

20

21

ADP No.64/80389/2011-12
Estab: of Govt: Colleges in KPK
(Phase-III) on need bases SH:Establishment of Govt: College
Chamla Buner under Estt: of
Govt: Colleges in KPK Phase-III
on need Basis
1. Main Building
2. Bachelor Hostel
3. 50 Students Hostel
4. Dev: Work
5. Cost of land
ADP No. 66/100248/2011-12
Establishment of 15-Nos Govt:
Girls Degree College in Khyber
Pakhtunkhwa SH:- GGDC Khadu
Khel
ADP No. 75/100252/2011-12
Construction of staff/students
Hostel in Govt: Colleges in
Khyber Pakhtunkhwa (Phase-I)
SH:- GGDC Daggar

44%

56%

56%

100%

Finishing

6/2013

Detailed cost estimate


submitted to SPO H/Edu: for
Rs.230.150 (M) vide this
office No.445/1-M dated
13/03/2012
DPC level

06/2013

SECTOR: INDUSTRIES
DISTRICT:
BUNER
SUB SECTOR: - TECHNICAL EDUCATION

MONTHLY PROGRESS REPORT OF


DEVELOPMENT SCHEMES
FOR THE MONTH OF JUNE , 2012

C&W DIVISION DISTRICT BUNER

(ABSTRACT)
MONTHLY PROGRESS REPORT
MONTH OF JUNE ,2012

SECTOR: INDUSTRIES
DISTRICT:
BUNER
SUB SECTOR: - TECHNICAL EDUCATION

Sub
Sector

Industries

Name of scheme

Estimated
cost

All

A.A

TS

OG = 1

98.900

NEW =

N/ADP -

Total: - 1

Expdr:
ending
PFY

(Rupees in Million)
ADP allocation
(CFY)
Original

Revised

75.400

13.500

13.500

98.900

75.400

Releases

Expenditure
during the

Progressive

%Age financial
utilization (CFY)
on

Add: demand/Excess (+)


Surrender (-)

Allocation

Releases

Add:
demand

Excess (+)
Surrender
(-)

Net (+)
or (-)

100%

100%

13.500

100%

100%

Month

CFY

13.500

13.500

13.500

13.500

13.500

PROFORMA-1

PROGRESS REPORT / REVIEW

SECTOR: INDUSTRIES
DISTRICT:
BUNER
SUB SECTOR: - TECHNICAL EDUCATION
ADP
S.No.

2
2011-12815/70700

Name of scheme

Total
cost
3

Establishment of
commerce college
Daggar Buner

98.900

Status of scheme

Date of

Expenditure
the end of
previous
year
7

20/04/09

75.400

commencement

AA with
date
4

98.900 (M)
03/03/2009

T.S with
date
5

108.790
26/5/2009

Allocation during
C.F.Y
Original
Released
/revised
8
9

13.500

13.500

Expenditure during
the
Month
Year

Progressive
expenditure.

10

11

12

13.500

88.900

Financial
utilization
during
C.F.Y.
13

57%

FOR THE MONTH OF JUNE


District Buner
Physica
l Target
during
C.F.Y

Achievement
during C.F.Y

Scope of the scheme

Achievement
the end of
previous
year

14

15

16

17

Establishment of Commerce
Collage Daggar Buner
ADP No 815/70700
1. Main Buildings
2. 6-Lac Hostel
3. Auditorium
4. Principle Banglow (BPS-19)
5. 80 Students Hostels
6. Dev: Work

, 2012

Total
Achievement
Since
Commencement.

Physical Progress.

18

19

Scheduled
date of
completion
Remarks
20

Scheme completed

76%

24%

14%

90%

6/2012

21
Rs. 10.000 (M)
surrendered by the
Technical Education
the scheme completed
liabilities of contractor
amounting to Rs.10.000
(M) is required to
liaudets contract
liability.

SECTOR:
DISTRICT:
SUB SECTOR:

EDUCATION
BUNER
EDUCATION UNDER SWAP-II

MONTHLY PROGRESS REPORT OF


DEVELOPMENT SCHEMES
FOR THE MONTH OF JUNE, 2012

C&W DIVISION DISTRICT BUNER

PERFORMA-I

MONTHLY PROGRESS REPORT (ABSTRACT)


MONTH OF JUNE

SECTOR:
EDUCATION
SUB SECTOR: EDUCATION UNDER SWAP-II

Sub
Sector

Name of scheme
All

TS

District Buner

ADP allocation
(CFY)
Original

Revised

Deposit

Releases

(Rupees in Million)

Expenditure
during the
Month

CFY

3.600

Progressive

Add: demand/Excess (+)


Surrender (-)

Releases

Add:
demand

Excess (+)
Surrender
(-)

48.3354

107.220

44.754

NEW=

N/ADP=0

TOTAL=6

107.220

44.754

Deposit
ReImbtt:

Deposit

3.600

48.3354

MONTHLY PROGRESS REPORT/REVIEW

%Age financial
utilization (CFY) on
Allocation

Deposit
ReImbtt:

OG= 6

Primary
Education

A.A

Estimated
cost

Expdr:
ending
PFY

, 2012

Net (+)
or (-)
-

Sector Education Swap-II


ADP No

Name of Scheme

District Buner
Total
Cost

Status of scheme
AA with date

1
3/31170

A
1
2
3
4
5
6
7
8
9
10
11
12
B
1
2
C.
1
2
3
4
5
II
1
2
3
4
5
6

2
Basic facilities in Existing Govt:
middle/middle section of
high/higher secondary section
of middle portion under debit
for Education swap-II
BOUNDARY WALL.
GMS Biamdara
GGMS Sowari
GMS Kohay
GMS Rega
GGMS Chanar
GGMS Amnawar
GGMS Pacha Kalay
GHS Bampokha
GHS Gadezai
GHS Nanseer
GGHS Pacha Kalay
GGHS Shahdam
WATER SUPPLY
GGMS Sowari
GGMS Sowawai
GROUP L.
GHS Amnawar
GHS Gadezai
GGMS Dagai
GGMS Anghapur
GGMS Kat Kala
REH: OF C/ROOMS

3
4.886

GGMS Kulyari= 3 C/R


GGMS Daggar= 1 C/R
GGMS Amnawar= 2 C/R
GMS Malakpur= 3 C/R
GHS Gadezai=2 C/R
GGHS Nawagai=3 C/R
Total:-

0.900
0.155
0.298
0.263
0.437
0.446

4
No. 362-76
DFE dated
10-05-06

TS with
date
5
4.89

0.630
0.525
0.356
0.356
0.044
0.140
0.140
0.279
0.698
0.350
0.226
0.126

6
_/7/06

/7/06

0.054
0.196
0.153
0.153
0.153
0.153
0.153
2.500

Date of
Commence
ment

/7/06

/7/06

288-303/PM/DFE
5.5.06

2.500

/7/06

Expenditure
the end of
Previous year
7

Allocation during
CFY
Original Released
/revised
8
9
-

Expenditure
during the
Month
Year

Progressive
expenditure

10

11
0.000

0.630
0.559
0.356
0.335
0.029
0.140
0.067
0.279
0.812
0.350
0.226
0.124

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0.006
0.096

0
_

0
0

0.090
0.153
0.153
0.056
1.937
2.377

0
0
0
0
0
0

0
0
0
0
0
0.000

0.090
_
0.153
0.153
0.056
2.377

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0.813
0.122
0.297
0.263
0.437
0.446
2.377

4.457

0.813
0.122
0.297
0.263
0.437
0.446

FOR THE MONTHLY OF JUNE

, 2012

12
4.457

Financial
utilization
dg: CFY
13
_

0.630
0.559
0.356
0.335
0.029
0.140
0.067
0.279
0.812
0.350
0.226
0.124
0.006
0.095

Achievement the end of


Previous year

Physical Target during


CFY

Achievement during CFY

Total Achievement since


Commencement

14

15

16

17

18

Basic facilities in Existing Govt:


middle/middle section of high/higher
secondary section of middle portion
under debit for Education swapt-II

100%

100%

WATER SUPPLY

100%

100%

GROUP L.

100%

100%

REH: OF C/ROOMS

100%

100%

Physical Progress

19
1. Completed & Handed over
2. -----do-----3. -----do-----4. -----do----5. -----do----6. -----do----7. -----do----8. -----do----9. -----do---10. -----do---11. -----do----12 ------do--1. Completed & H/Over
2. Completed & H/Over
1. Completed & H/Over
2. -----d0----3. -----d0----4. -----d0----5. ----- d0----1.
2.
3.
4.
5.
6.

Completed & H/Over


Completed & H/Over
Completed & H/Over
Completed & H/Over
Completed & H/Over
Completed & H/Over

MONTHLY PROGRESS REPORT/REVIEW

Scheduled date of
completion

Scope of the scheme

Remarks

20

21

Sector :Education Swap-II


ADP
No

1
3/31170

Name of Scheme

2
Up-gradation of 143
Govt: Primary Schools
to Middle level in KPK
under debt for
Education Swap- II
18 Nos in Buner.

Total
Cost

3
62.293

District Buner
Status of scheme

Date of
Commencement

AA with
date

TS with
date

4
No 13231382 dated
8/2/2007
Rs: 9.231

5
10.154
03/06/2008

6
-

Expenditur
e the end of
Previous
year

Allocation during
CFY
Original

7
35.642

8
_

Released
/revised
9

Expenditure
during the
Month

Year

10
-

11

Progressive
expenditure

Financial
utilization
during
CFY

12

13
_

35.642

GGPS Khanano Dherai

3.077

GPS Jangdara

3.077

No 4977-89
dated
01/08/2008
Rs.16.070
-

GGPS Bajkata

3.077

10/12/2007.

10-12-07

2.657

GPS Totalai # 2

3.214

15/01/09.

15-01-09

2.043

GPS Mughdara

3.214

15/12/08.

15-12-08

3.086

6
7
8

GPS Hall (k.K)


GGPS Kass Korona
GGPS Ghazi Kot

3.214
3.214
3.214

10/01/09.
25/04/09
20/02/09

25-09-09
20-02-09
15-03-09

3.509
3.529
2.232

GPS Dandikot

4.175

01-02-09

4.150

10
11
12

GPS Jangdara (Khadu Khail)

4.175
3.214
3.214

No. 5293
dated
20/11/2008
-

15/03/09
02/01/09
-

15-01-2010
15-01-2010
15-01-2010

4.107
2.463
0.860

3.214

15-02-2010

1.656

13

GGPS Nogram
GGPS Bagh
GPS Makhranai shifted
to Akhun Serai

29/04/07

29-04-07

2.416

1/4/2007.

01-04-07

2.934

FOR THE MONTH OF JUNE

, 2012

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.

GPS Khanano Dherai


GPS Jangdara
GGPS Bajkata
GPS Totalai # 2
GPS Muhgdara
GPS Hall (K.K)
GGPS Kass Korona
GGPS Ghazi Kot
GPS Dandikot
GPS Jangdara (Khudu Khail)
GGPS Nogram
GGPS Bagh
GPS Makhranai Shifted to Akhun Serai

18

19

Physical Progress

15

16

17

18

19

87%

13%

87%

20

21
Remarks

Scheduled date of
completion

Total Achievement since


Commencement

14
Up-gradation of 143 Govt: primary schools to
Middle level in KPK under Debt for Education
Swap-II, 18 Nos in District Buner.

17

Achievement during CFY

16

Physical Target during


CFY

15

Achievement the end of


Previous year

14

Scope of the scheme

1. Completed & Handed Over


2. Completed & Handed Over
3. Completed
4. Completed & H/Over
5. Completed & Handed Over
6. Completed & Handed Over
7. Completed& H/Over
8. Completed & H/Over
9. Completed & Handed over
10. Completed and Handed Over
11. Completed Handed over
12. Finishing.
13. completed Handed over

20

21

6/2011
-

MONTHLY PROGRESS REPORT/REVIEW


Sector :Education Swap-II
ADP
No

Name of Scheme

Total
Cost

District Buner
Status of scheme
AA with
date

1
3/31170

2
Up-gradation of 143
Govt: Primary Schools
to Middle level in KPK
under debt for
Education Swap- II
18 Nos in Buner.

3
19.00

4
19.000

Date of
Commencement

TS with
date

Allocation during
CFY

Expenditure
during the

Expenditur
e the end of
Previous
year

Original

Released
/revised

Month

Year

Progressive
expenditure

Financial
utilization
during
CFY

5
-

6
-

7
1.500

8
-

9
-

10
-

11
-

12
1.500

13
-

14

GPS Kala Khela

3.800

15

GPS Kankoyai

3.800

No
PM/DES-II
7623-35
dated
15/11/2010
-

16

GPS Karorai

3.800

17

GPS Damnair

3.800

1.500

1.500

18

GPS Maina Koga

3.800

FOR THE MONTH OF JUNE

14
Up-gradation of 143 Govt: primary schools to
Middle level in KPK under Debt for Education
Swap-II, 18 Nos in District Buner.
14.
15.
16.
17.
18.

17

18

19

15

16

17

18

19

85%

15%

21%

87%

GPS Kala Khela


GPS Kankoyai
GPS Karorai
GPS Damnair
GPS Maina Koga

14. DPC work


15. Roof laid
16. Roof laid/ B/Wall in progress
17. Roof laid/ B/Wall in progress
18. Roof laid/ B/Wall in progress
-

20

21
Remarks

Scheduled date of
completion

Physical Progress

Achievement during CFY

Total Achievement since


Commencement

16

Physical Target during


CFY

15

Achievement the end of


Previous year

14

Scope of the scheme

, 2012

20

21

6/2011
-

MONTHLY PROGRESS REPORT/REVIEW


Sector :Education Swap-II
ADP No

1
3/31170

Name of Scheme

2
Construction of 229 Addl: C/R
in Govt: Middle Schools to
High-Higher Secondary
Schools in KPK under debt for
Education Swap-II, 13-Nos
C/R in District: Buner.

District Buner
Total
Cost
3
8.541

Status of scheme
AA with
date
4
No 12631322 dt:
8/2/2007
Rs: 4.550

TS with
date
5
8.600

Date of
Expenditure
Commencement the end of
Previous year
6
_

7
6.255

Allocation during CFY


Original
8
Deposit

Released/
revised

Expenditure
during the

Month

9
Deposit
0.546

10
-

Progressive
expenditure

Financial
utilization
during
CFY

12

13
_

Year
11
-

6.255

GGHS Totalai 1 C/R

0.650

---do---

27/3/07

0.571

0.571

GMS Dagai

0.650

---do---

01/04/07.

0.534

0.534

GMS Shalbandai 2 C/R

1.300

---do---

26/03/07.

1.143

1.143

GGMS Kingergalai 1 C/R

0.650

---do--

15/02/07.

0.589

0.589

GHS Toorwarsak

1 C/R

0.650

---do--

10/03/07.

0.542

0.542

GHS Nawakalay

1 C/R

0.650

---do--

27/02/07.

0.659

0.659

---do--

8/12/08.

0.603

0.603

1 C/R

GMS Wach Khwar 1 C/R

0.668

No.49905102 dated
01/08/2008
3.341

GGMS Janak Banda 1 C/R

0.668

---do--

7/12/08.

0.563

0.563

GMS Totalai 3 C/R shifted to


GHS Chinglai

2.005

---do---

01/05/09.

0.798

0.798

GGMS Nawagai 1-C/Room

0.650

0.650

---do---

22/02/2010

0.253

0.253

10

, 2012

15

16

17

18

19

20

21

22

Scope of the scheme

Achievement
the end of
Previous
year

Physica
l Target
during
CFY

Achievement
during CFY

Total
Achievement
since
Commencement

Physical Progress

Scheduled date of completion

FOR THE MONTH OF JUNE

Remarks

14

15

16

17

18

19

Construction of 229-Additional Class


Rooms in Govt: Middle Schools to HighHigher Secondary Schools in KPK under
debt for Education Swap-II, 13-Nos Class
Rooms in District Buner.

77%

23%

8%

85%

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed/H.O

20
-

21

MONTHLY PROGRESS REPORT/REVIEW


Sector :Education Swap-II
ADP
No

Name of Scheme

4/31170

Up-Gradation of 137Primary schools to


Middle status (Male and
Female) under the
project debt for edu:
Swap-ii civil work i/c
int: w/s & inst:

Total
Cost

District Buner
Status of scheme

Date of
Commencement

Allocation during
CFY

Expenditure
during the

Expenditur
e the end of
Previous
year

Original

Released
/revised

Month

Year

Progressive
expenditure

Financial
utilization
during
CFY

AA with
date

TS with
date

3
10.000

4
No 7046-58
dated
14/07/2010
10.000

5
-

6
-

7
0.500

8
-

9
-

10
-

11
-

12
0.500

13
-

GPS Dargalai

5.00

GPS Batkanai

5.00

0.500

0.500

Physical Target during


CFY

17

18

19

Physical Progress

14

15

16

17

Up-Gradation of 137-Primary schools to Middle


status (Male and Female) under the project debt
for edu: Swap-ii civil work i/c int: w/s & inst:

18

19

1. GPS Dargalai
2. GPS Batkanai

20

21
Remarks

Scheduled date of
completion

16

, 2012

Total Achievement since


Commencement

15

Achievement during CFY

14

Scope of the scheme

Achievement the end of


Previous year

FOR THE MONTH OF JUNE

20

21

1. Roof laid
2. Roof laid/ B/Wall in
progress
6/2012
-

SECTOR: HEALTH
DISTRICT:
BUNER
SUB SECTOR: - HEALTH

MONTHLY PROGRESS REPORT OF


DEVELOPMENTAL SCHEMES
FOR THE MONTH OF JUNE, 2012

C&W DIVISION DISTRICT BUNER

ABSTRACT

SECTOR: DISTRICT:
SUB SECTOR:
Sub
Sector

HEALTH
BUNER
HEALTH

Name of scheme

All

MONTHLY PROGRESS REPORT


MONTH OF JUNE ,2012

Estimate
d cost

(Rupees in Million)
Expdr:
ending
PFY

ADP allocation (CFY)

Expenditure
during the
Month

Revised

Progressive

%Age financial
utilization (CFY) on

Add: demand/Excess (+)


Surrender (-)

Allocation

Releases

Add:
demand

Excess (+)
Surrender
(-)

Net (+)
or (-)

5.811

37.300

100%

100%

2.085

5.811

37.300

100%

100%

A.A

TS

OG 2

90.360

31.489

5.811

5.811

5.811

2.085

N/ADP

Total: - 2

90.360

31.489

5.811

5.811

5.811

New =

Original

Releases

CFY

Health
-

SECTOR: DISTRICT:
SUB SECTOR: ADP S.No.

1
121/80642
2011-12

199/80644
2011-12

PROFORMA-1
PROGRESS REPORT/REVIEW

HEALTH
BUNER
HEALTH

Name of scheme

2
Balance work and
purchase of Equip: in
deferent Hospital of
KPK on need Basis
SH:- Category-D
Hospital Pacha Kalay.
Establishment of 15Nos BHUs in KPK on
need Basis. 2-Nos in
District Buner
Sub Head:
1. BHU Anghapur
2. BHU Amnawar

Total
cost
3

Status of scheme
AA with
date
4

36.500

36.500
14/10/09

53.860

26.930
27/03/2010
26.930
27/03/2010

Date of
commencement

T.S with
date
5

40.105
26/12/09

02/01/10
02/01/10
02/01/10

Expenditure
the end of
previous year

31.489

Allocation during C.F.Y


10.00 (M)
Original
Released
/revised
8
9
5.811

Expenditure during
the
Month
Year

Progressive
expenditure.

Financial
utilization
during
C.F.Y.
13

10

11

12

5.811

2.085

5.811

37.300

100%

FOR THE MONTH OF JUNE, 2012

Scope of the scheme

14
ADP NO-121/80642
Balance works and Purchase of Eqp: in
deferent Hospital of KPK on need Basis SH:
Civil Hospital Pacha Kalay
16-Nursies, Category-III Residence 2-Nos,
Type-IV quarter 9-Nos
ADP No-199/80644
Establishment of 15-Nos BHUs in KPK on
need Basis SH: BHU Anghapur under CMD
SO-III /CMS/KPK/6-6-2008 Buner Dated
17-11-2008 (1) BHU Anghapur (2) BHU
Amnawar

the end of previous yearAchievement

District Buner

Physical
Target
during
C.F.Y

Achievement
during C.F.Y

Total
Achievement
Since
Commencement.

Physical Progress.

15

16

17

18

19

20

21

86%

14%

100%

Completed

6/2013

1. Site identified.
2. Site finalized but not handed over

6/2013

Revise PC-I
submitted

Scheduled
date of
completion
Remarks

DISTRICT BUNER
Sector :
CMW School
Sub Sector: MNCH Programme

MONTHLY PROGRESS REPORT OF


DEVELOPMENT SCHEMES
FOR THE MONTH OF JUNE ,2012
.

C&W DIVISION DISTRICTBUNER

PERFORMA-I
MONTHLY PROGRESS REPORT(ABSTRACT)
MONTH OF JUNE , 2012
Sector :
Sub Sector:
DISTRICT:
Sub
Sector

CMW School
MNCH Programme
BUNER

Name of scheme

All

Estimated
cost

(Rupees in Million)

Expdr:
ending
PFY

ADP allocation
(CFY)

A.A

TS

Original

OG=-1

29.710

4.639

NEW=

N/ADP=

Total: -1

29.710

Releases

Expenditure
during the
Month

Revised

Progressive

CFY

%Age financial
utilization (CFY) on

Add: demand/Excess (+)


Surrender (-)

Allocation

Releases

Add:
demand

Excess (+)
Surrender
(-)

Net
(+) or
(-)

deposit

2.361
deposit

2.330

6.969

99%

99%

4.639

2.361

2.361
deposit

2.330

6.969

99%

99%

2.361

deposit

PROFORMA-1
PROGRESS REPORT / REVIEW
Sector :
Sub Sector:
DISTRICT:
ADP
S.No.

CMW School
MNCH Programme
BUNER

Name of scheme

Total
cost

Status of scheme
AA with
date

(2011-2012)191/70198

Construction of Community
Mid Wifery Schools in KPK
under MNCH Programme
1. CMW School at DHQ
Hospital Daggar
2. Labour suit

18.894
10.816

1-02/SPOIII/PC/H/M
NCH/09-10
dated
19/10/09
Rs.29.710

Date of
commencement

Expenditure
the end of
previous year

T.S
with
date
5

3/10

4.639

2/10

Allocation during
Expenditure
C.F.Y
during the
Original Released Month Year
/revised/
Deposit
8
9
10
11

0.361
2.000
10/2011
2.361
-

2.330

Progressive Financial
expenditure utilization
during
C.F.Y.
12

6.969

13

98%

FOR THE MONTH OF JUNE


District Buner
Achievement
the end of
previous year

Scope of the scheme


14

Construction of Community
Mid Wifery Schools in KPK
under MNCH Programme
1. CMW School at DHQ
Hospital Daggar
2. Labour suit

15

16%

Physical
Target
during
C.F.Y

Achievement
during C.F.Y

16

17

84%

20%

, 2012

Total
Achievement
Since
Commencement

Physical Progress.

18

19

36%

Scheduled
date of
completion
Remarks
20

1. G/F Plaster in
progress. 1st floor BB
up to roof level
2. Excavation completed
18-Months
further work stopped
by sponsoring agency,
and also no funds
released.

21

Due to non availability


of funds the progress of
the scheme is very slow.
Full fund is required for
early completion of the
scheme.

DISTRICT BUNER
SECTOR: Regional Development
SUB SECTOR: - (Local Development)

MONTHLY PROGRESS REPORT OF


DEVELOPMENT SCHEMES
FOR THE MONTH OF JUNE , 2012

C&W DIVISION DISTRICTBUNER

PROFORMA-I
MONTHLY PROGRESS REPORT (ABSTRACT)
MONTH OF JUNE, 2012
SECTOR:
Regional Development.
Sub Sector: Local Development
PROVINCIAL PROGRAMME
Sub Sector

Regional
Development.

Name of scheme

District Buner

(Rupees in Million)

Estimated
cost

Expdr:
ending
PFY

ADP allocation
(CFY)
Original
Revise

Releases

Expenditure
during the
Month
CFY

Progressive

%Age financial
utilization (CFY) on
Allocation Releases

Add: demand/Excess (+)


Surrender (-)
Add:
Excess (+) Net
demand Surrender (+) or
(-)
(-)
-

All

A.A

TS

OG = 3

93.436

51.889

38.385

38.385

38.385

14.087

31.860

New =

Non ADP

Total: - 3

93.436

51.889

38.385

38.385

38.385

14.087

31.860

83.749

83.749

83%

83%

83%

83%

SECTOR:
Regional Development.
Sub Sector: Local Development
PROVINCIAL PROGRAMME
Name of scheme

2011-2012864/ 80016

2011-2012862/80012

2011-2012861/80010

ADP
S.No
.

Construction of 8-Tehsil
Complex buildings for newly
created TMAs
Amzai (Mandanr) Buner PF-77

SH:- i. Main Buildings


ii. Quarter/Girage
iii. Dev: works
iv. Dev: Works T/Well
Purchase of land
Construction of 4-Nos Distt:
Secretariat at Swabi, Buner,
Swat & Haripur
SH:- District Secretariat

Total cost

18.984
10/3/2010

Date of
commencement

Status of scheme
AA with
date
4

DD(D&M)
LG/DDWP
10.3.2010
Rs.18.984

T.S with
date
5

Expenditure
the end of
previous
year
7

79.469

21/12/09
21/12/09
28/12/09
22/12/09

50.000

Allocation during
C.F.Y
Original
Released /
revised
8
9

10.385

Expenditure during
the
Month
Year

Progressive
expenditure.

Financial
utilization
during
C.F.Y.
13

10

11

12

8.333
23/11/10
deposit
2.052
10/10/11
10.385

5.001

5.001

48%

23.000
22/8/2011

13.510

23.000

73.000

42%

3.000
deposit
2.00 ADP
5.000

0.577

3.859

5.748

65%

69.104
69.104
15/10/2009

Buner

Construction of offices for


20-Nos U/Council in KPK
2-Nos in District Buner SH:1. Union Council Amazi
2. Union Council Makhranai.

PROFORMA-1
PROGRESS REPORT / REVIEW

23.000

5.348
2.674
2.674

DD(D&M)
LG/3867-38
11/05/2010

1.889
30/04/11
25/09/10

5.000

FOR THE MONTH OF JUNE, 2012


District Buner

Physica
l Target
during
C.F.Y

Achievement
during C.F.Y

SCOPE OF THE SCHEME

Achievement
the end of
previous
year

14

15

16

17

Total
Achievement
Since
Commencement.

Physical Progress.

18

19

Scheduled
date of
completion
Remarks

20

21

6/2012

ADP No.861/80010
Construction of 8-Tehsil Complex
buildings for newly created TMAs

Amzai Buner
SH:- i. Main Buildings
ii. Quarter/Girage
iii. Dev: works
iv. Dev: Works T/Well
Purchase of land
ADP NO 862/80012
1. DCO Block
2. Nazim Block
3. Offices
4. Dev: Works
T/Well, B/Wall, P/Machinery,
Ext:/Int: W/S, Swerage system and
int: Roads/Drains
ADP No.864/80016
Construction of offices for 20-Nos
U/Council in KPK 2-Nos in District
Buner SH:- 1. Union Council Amazi
2. Union Council Makhranai.
Buildings Cost of land

65%

26%

26%

73%

27%

27%

100%

35%

65%

65%

100%

i. 1st Floor Roof laid.


ii. Girage Level O/H
Tanks layout given.
iii. B/W in progr:

Completed

1.
2.

Completed
Completed

6/2012

6/2012

Completed

DISTRICT BUNER
SECTOR:SUB SECTOR:-

AGRICULRURE (ADP)
AGRICULTURE

MONTHLY PROGRESS REPORT OF


DEVELOPMENT SCHEMES
FOR THE MONTH OF JUNE , 2012

C&W DIVISION BUNER

PERFORMA-I

MONTHLY PROGRESS REPORT (ABSTRACT)


District:
SECTOR:
Sub Sector:
Sub
Sector

MONTH OF JUNE , 2012


PROVINCIAL PROGRAMME

Buner
Agriculture (ADP)
Research System

Name of scheme
All

(Rupees in Million)

Estimated Expdr:
cost
ending
PFY

ADP allocation
(CFY)
Original

Releases

Expenditure
during the
Month

Revised

Progressive

%Age financial
utilization (CFY) on
Releases

Add: demand/Excess (+)


Surrender (-)
Add:
demand

Excess (+)
Surrender (-)

Net
(+) or
(-)

100%

18.644

100%

100%

A.A

TS

CFY

Allocation

OG =1

19.957

10.661

7.983

7.983

7.983

3.131

7.983

18.644

100%

NEW =

N/ADP =

Total: - =1

19.957

10.661

7.983

7.983

7.983

3.131

7.983

Agriculture

Sector

Sector:
Sub Sector:
District:
ADP
S.No.
1

OG
595/60355
2011-12

PROFORMA-1
PROGRESS REPORT / REVIEW
MONTH OF JUNE , 2012

Agriculture (ADP)
Research System
Buner

Name of scheme

Establishment of
Agriculture research
Centre in District Buner
A(DDWP) 16/01/2006

Total
cost
3

19.957

Status of scheme
AA with
date
4

(O) 9.470
30/10/2007
Rev: AA
19.957
30/1/2010

T.S with
date
5

19.957
01/03/2010

Date of
commencement

01/03/2010

Expenditure
the end of
previous
year
7

10.661

Allocation during
C.F.Y
Original Released /
revised
8
9

7.983

7.983

Expenditure during
the
Month
Year

Progressive
expenditure.

10

11

12

3.131

7.983

18.644

Financial
utilization
during
C.F.Y.
13

100%

FOR THE MONTH OF JUNE


District Buner

SCOPE OF THE SCHEME

Achievement
the end of
previous
year

Physica
l Target
during
C.F.Y

Achievement
during C.F.Y

15

16

40%

14

595/60355/2011-12
Establishment of Agri: Research centre
at Buner
1. Office Building.
2. 6-Beded Beach: Hostel.
3. 2-Rooms store.
4. Machy:/veh: sheed (20x60).
5. T/Well,P/Chamber,Chow:Hut
pumping Machinery.
6. B/Well,Barbed wire & Fen:
7. Ext: W/Supply
8. Ext: Elec:

60%

, 2012

Total
Achievement
Since
Commencement.

PHYSICAL
PROGRESS.

17

18

19

40%

100%

Completed

Scheduled
date of
completion

REMARKS

20

21

6/2012

DISTRICT BUNER
SECTOR:MNA Funded Schemes/PM Directives
SUB SECTOR:- MNA Funded schemes/PM Directives

MONTHLY PROGRESS REPORT OF


DEVELOPMENT SCHEMES
FOR THE MONTH OF JUNE , 2012

C&W DIVISION DISTRICT BUNER

PERFORMA-I
MONTHLY PROGRESS REPORT (ABSTRACT)
MONTH OF JUNE , 2012
Sector:
MNA Funded Schemes/PM Directives
Sub Sector: MNA Funded Schemes/PM Directives
District:
Buner
Sub
Sector

Name of scheme
All

Estimated
cost

A.A

TS

OG = 4

22.00

NEW =

Expdr:
ending
PFY

ADP allocation
(CFY)

(Rupees in Million)

Releases

Expenditure
during the
Month

Progressive

%Age financial
utilization (CFY) on

Add: demand/Excess (+)


Surrender (-)

Releases

Add:
demand

Excess (+)
Surrender
(-)

Net
(+) or
(-)

20.129

Original

Deposit

CFY

Allocation

20.129

22.00

7.789

7.789

1.130

20.129

14.00

14.00

22.00

20.129

22.00

7.789

7.789

1.130

N/ADP =
Total: 4

PROFORMA-1

SECTOR :
Sub Sector:District:
ADP
S.No.
1
1

3
4
5
6

PROGRESS REPORT / REVIEW

MNA Funded schemes/PM Directives


MNA Funded schemes/PM Directives
Buner

Name of scheme

2
Reh: B/Topping & widening of
Ambella Nawagai road
(Remaining Portion Nawagia
Bazar). Prime Minister
Directives
B/Topping of road Nara-Gata
Yakhdara (PMD) Jamaila Gillani
MNA funds
Link road Baba Jee Bajkata
(PMD) Jamila Gillani Funds
Link road Sangara Amnawar
Impvt: Wideing & B/Topping of
Chinglai Kangalai road
Senator Abdul Nabi Banghash
B/Topping of Road from
Nograme to Mughdara
PMD PWP-II/2010-11
Estt: of Women Vocational
centre at Gagra Distt: Buner

Total
cost
3

Status of scheme
AA with
date
4

Date of

T.S with
date
5

Expenditure
the end of
previous
year
7

commenc
ement

Allocation during
C.F.Y
Original
Released
/revised
8
9
5.000
deposit

Expenditure during
the
Month
Year

Progressive
expenditure.

10

11

12

Financial
utilization
during
C.F.Y.
13

5.000

1.500

5.000

5.000
12/12/08

5.00
03/03/09

1/2009

5.000

1.500

1.500
11/11/09

1.500
04/04/10

12/2009

1.500

1.500
11/11/09
1.00
11/11/09
10.000
6/3/2010

1.500
03/03/10

12/2009

1.487

1.487

1.00
03/03/10

12/2009

1.000

1.000

10.00
15/04/10

4/2010

8.142

1.858

1.130

9.989

3.000

3.000
24/2/2010

3.00
15/05/10

5/2010

3.000

3.000

14.00

14.000
04/03/2011

1.500
1.000
10.000

FOR THE MONTH OF JUNE


District Buner

SCOPE OF THE SCHEME

3
4
5

14
Reh: B/Topping & widening of
Ambella Nawagai road
(Remaining Portion Nawagia
Bazar). Prime Minister
Directives
B/Topping of road Nara-Gata
Yakhdara (PMD) Jamaila
Gillani MNA funds
Link road Baba Jee Bajkata
(PMD) Jamila Gillani Funds
Link road Sangara Amnawar

Impvt: Wideing & B/Topping


of Chinglai Kangalai road
6 Senator Abdul Nabi
Banghash
B/Topping of Road from
Nograme to Mughdara
7 PMD PWP-II/2010-11
Estt: of Women Vocational
centre at Gagra Distt: Buner

Achievement
the end of
previous
year

Physical
Target
during
C.F.Y

Achievement
Du
ring C.F.Y

15

16

17

100%

70%

30%

100%

Total
Achievement
Since
Commencement.

18

, 2012
Scheduled
date of
completion
PHYSICAL
PROGRESS.
19

REMARKS

20

21

100%

100% Completed

100%

100% Completed

100%

100% completed

100%

100%

100% Completed

81%

19%

100%

100% Completed

100%

100%

100% Completed

Work order issued


site not handed over
by social welfare
Deptt:

30%

19%

DISTRICT BUNER
SECTOR:FOOD
DISTRICT:BUNER
SUB SECTOR:- FOOD

MONTHLY PROGRESS REPORT OF


DEVELOPMENT SCHEMES
FOR THE MONTH OF JUNE , 2012

C&W DIVISION DISTRICT BUNER

PERFORMA-I
MONTHLY PROGRESS REPORT(ABSTRACT)
MONTH OF JUNE , 2012
Sector:
FOOD
Sub Sector: FOOD
District:
Buner
Sub
Sector

(Rupees in Million)

Name of scheme
All

Estimated
cost

A.A

TS

OG = 1

111.601

Total: 1

111.601

Expdr:
ending
PFY

ADP allocation
(CFY)
Original

Revised

9.153

27.178

27.178

9.153

27.178

27.178

Releases

Expenditure
during the

Progressive

Month

CFY

27.178

27.178

27.178

36.331

27.178

27.178

27.178

36.331

%Age financial
utilization (CFY) on

Add: demand/Excess (+)


Surrender (-)

Releases

Add:
demand

Excess (+)
Surrender
(-)

Net
(+) or
(-)

100%

100%

100%

100%

Allocation

PROFORMA-1

PROGRESS REPORT / REVIEW


SECTOR :
FOOD
Sub Sector:- FOOD
District:
Buner
ADP
S.No.

948/90103OG

Name of scheme

2
Construction of Food Grain
Godown at Buner

Total
cost
3

111.601

Status of scheme
AA with
date
4

111.601
13/01/2012

Date of

T.S with
date
5

Expenditure
the end of
previous
year
7

9.153

commenc
ement

Allocation during
C.F.Y
Original
Released
/revised
8
9

27.178

27.178

Expenditure during
the
Month
Year

Progressive
expenditure.

10

11

12

Financial
utilization
during
C.F.Y.
13

27.178

27.178

36.331

FOR THE MONTH OF JUNE


District Buner

SCOPE OF THE SCHEME

14
ADP No.948/90103
Construction of Food Grain Godown at Buner
1. 8-Nos Grain Godown
2. Residence &
Developmental work

Achievement
the end of
previous
year

Physical
Target
during
C.F.Y

Achievement
during C.F.Y

Total
Achievement
Since
Commencement.

15

16

17

18

24%

24%

, 2012
Scheduled
date of
completion
PHYSICAL
PROGRESS.
19

1. DPC level
2.Work order issued.

REMARKS

20

21

DISTRICT BUNER
SECTOR:-

Road (Flood Damages)


DISTRICT:BUNER
SUB SECTOR:- Road (Flood Damages)

MONTHLY PROGRESS REPORT OF


DEVELOPMENT SCHEMES
FOR THE MONTH OF JUNE , 2012

C&W DIVISION DISTRICT BUNER

PERFORMA-I
MONTHLY PROGRESS REPORT (ABSTRACT)
MONTH OF JUNE , 2012
Sector:
Road (Flood Damages)
Sub Sector: Road (Flood Damages)
District:
Buner
Sub
Sector

Name of scheme
All

NEW =

Expdr:
ending
PFY

ADP allocation
(CFY)

Expenditure
during the

Progressive

Month

CFY

29.477

23.241

29.477

29.477

29.477

23.241

29.477

TS

29.477

29.477

29.477

29.477

Original

Releases

A.A

N/ADP =
Total:

Estimated
cost

(Rupees in Million)

Deposit

%Age financial
utilization (CFY) on

Add: demand/Excess (+)


Surrender (-)

Releases

Add:
demand

Excess (+)
Surrender
(-)

Net
(+) or
(-)

100%

100%

29.477

100%

100%

Allocation

PROFORMA-1

PROGRESS REPORT / REVIEW

SECTOR :
Road (Flood Damages)
Sub Sector:- Road (Flood Damages)
District:
Buner
ADP Name of scheme
S.No
.
1

Total
cost

Ambela Nagrai Amazai road


(Reconstruction of Wahid Abad Culvert)
Nawagai Nagrai road (Reconstruction of
Cause road Faizabad)
Bar Tiraj road

3
4
5
6
7

Sowari Budal Shaheeda Sar road (Repair


of Tango Bridge)
Jower Pir Baba road (Reconstruction of
Cause way at Jower)
Pir Baba Balo Khan road (Reconstruction
of causeway at Pir Baba)

Expendi
ture the
end of
previous
year
7

T.S with
date

Allocation during
C.F.Y
Original Released
/revised

Expenditure
during the
Month Year

Progressive
expenditure
.

Financial
utilization
during
C.F.Y.

10

11

12

13

29.477

23.241

29.477

29.477

29.477 (M)
29.477

Kankawai Totalai Road

Date of
commencement

AA with
date

Road (Flood Damages)

Status of scheme

No.SOR/V39/W&S/03/V
ol-III dated
22/12/2010

8.925

7.908

9.220

9.230

1.494

0.266

1.728

1.728

6.441

6.767

6.767

6.767

6.834

5.525

7.302

7.302

0.497

0.262

0.262

2.643

1.528

1.528

1.528

2.643

1.247

2.670

2.670

FOR THE MONTH OF JUNE


District Buner
Physical
Target
during
C.F.Y

Achievement
during C.F.Y

SCOPE OF THE SCHEME

Achievement
the end of
previous
year

14

15

16

17

18

100%

100%

100%

Road (Flood Damages)


1

Kankawai Totalai Road

Ambela Nagrai Amazai


road (Reconstruction of
Wahid Abad Culvert)
Nawagai Nagrai road
(Reconstruction of Cause
road Faizabad)
Bar Tiraj road
Sowari Budal Shaheeda
Sar road (Repair of Tango
Bridge)
Jower Pir Baba road
(Reconstruction of Cause
way at Jower)
Pir Baba Balo Khan road
(Reconstruction of
causeway at Pir Baba)

3
4
5
6
7

Total
Achievement
Since
Commencement.

, 2012
Scheduled
date of
completion
PHYSICAL
PROGRESS.
19

REMARKS
20
12-Months

Completed
Completed
Completed
100%
Completed
Work started
Completed

21

UNDER CMD
COMMUNICAION & WORKS DIVISION BUNER
PHONE NO. 0939-510328

PROGRESS REPORT / CMD


DISTRICT BUNER
Sector:
Sub Sector:
ADP
S.No.

Roads, Education, Collages, Sports & Madaras


Roads, Education, Collages, Sports & Madaras

Name of scheme

01

Provision/ grant of funds


amounting to Rs.5.000
(m) for grand Dev: at PF77 out of Dev: Init: in
KPK (Nawagai Bazar
Road)

02

Provision/grant of funds
Rs.0.540 (m) under
special package CMD SOIII/CMS/KPK/66/2009/Buner/W/14
Dated 22-5-2009

Total
cost
(M)
3

Status of scheme
AA with
date
4

T.S with
date
5

Date of
commencement
6

Expenditure
the end of
previous
year
7

Allocation during
C.F.Y
Original Released
/revised
8
9

Expenditure
during the
Month
Year

Progressive
expenditure.

10

11

12

Financial
utilization
during
C.F.Y.
13

5.00
04/06/09

5.00
01/07/09

08/06/09

3.863

Deposit
5.00

Deposit
5.00

0.665

4.528

91%

Construction of RCC
bridge over Barandu
Khawar link Annawar
Shalbandai with Sowarai

PC-II
0.540
(M)

5.00
06/05/09

0.490
11/2009

11/2009

0.490

0.490

II

Protection work at
Sowari, Sunigram, Shal
Bandi Amnawar Road

0.540

5.00
04/06/09

30/04/201
0

0.590

0.590

5.00

FOR THE MONTH OF JUNE


DISTRICT BUNER
Sector:
Sub Sector:

, 2012

Roads, Education, Collages, Sports & Madaras


Roads, Education, Collages, Sports & Madaras
Achievement
the end of
previous
year

Physica
l Target
during
C.F.Y

Achievement
during C.F.Y

Total
Achievement
Since
Commencement.

Physical
Progress.

Scheduled
date of
completion

Remarks

14

15

16

17

18

19

20

21

Provision/grant of funds
amounting to Rs.5.00 (M) in
PF-77 Special Package SO-III
CMS/KPK/6-6/1612-18, dated:
20-01-2009

77%

23%

14%

100%

100%

SCOPE OF THE SCHEME

Provision/grant of funds
Rs.0.540 (m) under special
package CMD SO-III/CMS/
KPK/6-6/2009/Buner/W/14
Dated 22-5-2009

Construction of RCC bridge


over Barandu Khawar link
Annawar Shalbandai with
Sowarai

Protection work at Sowari, Sunigram,


Shal Bandi Amnawar Road

100%

100%

100%

100%

completed

Completed

PC-I/Cost Estimate for the Scheme


Construction of RCC Bridge our
Barandu Khwar link with Amnawar
Shalbandai with Sowarai has been
prepared
by
consultant
for
including in the draft ADP but the
scheme has not been considered
for inclusion in the ADP. The public
representative of PF-78 has now
received Directive for the inclusion
of bridge in ADP.
-

PROGRESS REPORT / CMD


DISTRICT BUNER
Sector:
Sub Sector:
ADP
S.No

Roads, Education, Collages, Sports & Madaras


Roads, Education, Collages, Sports & Madaras

Name of scheme

Total
cost

Status of scheme
AA with
date

2
COLLEGES
Estt: of Govt: Collage at
Jowar Buner
1. Purchase of Land
2. Estt: of main Bldg:
3. 80 students Hostel
4. Constn: of 6-No Class
Rooms
5. W/S foe Jowar Collages
6. Const: of examination
Hall
7. Collage Cafeteria
8. Const: of Bachelor
Hostel
SO-III/CMS/KPK66/2008/Buner 2208-85/
17-11-2008
EDUCATION
Up-gradation of Govt:
Secondary Schools Males &
Female at Kingargalai
(Non-ADP) SOIII/CMS/KPK/66/09/Buner/43-22
Dated 03-01-2009

T.S
with
date
5

Date of
commencemen
t

Expenditure
the end of
previous
year

Allocation during
C.F.Y
Original
Released
/revised

Expenditure
during the
Month
Year

10

Progressive
expenditure

Financial
utilization
during
C.F.Y.

11

12

13

FOR THE MONTH OF JUNE , 2012


DISTRICT BUNER
Sector:
Sub Sector:

Roads, Education, Collages, Sports & Madaras


Roads, Education, Collages, Sports & Madaras

SCOPE OF THE SCHEME

14
COLLAGES
Estt: of Govt: Collage at
Jowar Buner
1. Purchase of Land
2. Estt: of main Bldg:
3. 80 students Hostel
4. Constn: of 6-No Class
Rooms
5. W/S foe Jowar Collages
6. Const: of examination
Hall
7. Collage Cafeteria
8. Const: of Bachelor Hostel
SO-III/CMS/KPK66/2008/Buner 2208-85/
17-11-2008
EDUCATION
Up-gradation of Govt:
Secondary Schools Males &
Female at Kingargalai (NonADP) SO-III/CMS/KPK/66/09/Buner/43-22
Dated 03-01-2009

Achievement
the end of
previous
year

Physica
l Target
during
C.F.Y

Achievement
during C.F.Y

Total
Achievement
Since
Commencement.

15

16

17

Physical Progress.

Scheduled
date of
completion

Remarks

18

19

20

21

Included in the DNA


Report

PC-I/D.C.E
submitted to EDO
(Education) Buner
for approval from
the Competent
Authority.

PROGRESS REPORT / CMD


DISTRICT BUNER
Sector:
Sub Sector:

Roads, Education, Collages, Sports & Madaras


Roads, Education, Collages, Sports & Madaras

ADP
S.No

Name of scheme

2
PF-78
Provision/Grant for
construction of Play
ground at PF-78 out of
ADP Scheme
No.709/90195
Provision of Sport
Faci: in KPK
Provision of funds for
Establishment of one
No. Dasta karai Centre
out of ADP No.287
code No. 100154
Establishment of 25
Handi crafts/Dastakari
Centre in Khyber
Pkhtonkhwa
Provision of funds for
construction of Two
Nos Patwar Khanan at
Ghurghshto of Sarwai
District Buner under
ADP No,971 code
No.100314
Construction of 100Nos patwar Khana in
Khyber Pkhutonkhwa

Total
cost

Status of
scheme
AA
T.S
with
with
date
date
4
5

Date of

commencement

Expenditure
the end of
previous year

Allocation during
C.F.Y
Original
Released
/revised

Expenditure
during the
Month
Year

Progressive
expenditure

Financial

10

11

12

13

utilization
during
C.F.Y.

9.102
(M)

--

3.378
(M)

Sector:
Sub Sector:

FOR THE MONTH OF JUNE


DISTRICT BUNER
Roads, Education, Collages, Sports & Madaras
Roads, Education, Collages, Sports & Madaras

Scope of the scheme

14
PF-78
Provision/Grant for
construction of Play
ground at PF-78 out of
ADP Scheme
No.709/90195 Provision
of Sport Faci: in KPK
Provision of funds for
Establishment of one
No. Dasta karai Centre
out of ADP No.287 code
No. 100154
Establishment of 25
Handi crafts/Dastakari
Centre in Khyber
Pkhtonkhwa
Provision of funds for
construction of Two Nos
Patwar Khanan at
Ghurghshto of Sarwai
District Buner under
ADP No,971 code
No.100314
Construction of 100Nos patwar Khana in
Khyber Pkhutonkhwa

, 2012

Achievem
ent
the end of
previous
year

Physical
Target
during
C.F.Y

Achiev
ement
during
C.F.Y

Total
Achievement
Since
Commencement.

Scheduled
date of
completion

Physical Progress.

15

16

17

18

19

20

21

PC-I/D.C.E submitted
to Director (Sports) for
approval

Remarks

PC-I/D.C.E of Rs.9.102
(M) is submitted to the
District officer Social
Welfare Department
Buner vide this office
no.2392/1-M dated
11/12/2010

PC-I/D.C.E of Rs.3.378
(M) is submitted to the
EDO F/P Buner vide
this office No.2077/1M dated 21/10/2010

PROGRESS REPORT / CMD


DISTRICT BUNER
Sector:
Sub Sector:
ADP
S.#

Name of scheme

Roads, Education, Collages, Sports & Madaras


Roads, Education, Collages, Sports & Madaras
Total
cost

Status of scheme
AA with
date

2
I

So-III/CMS/KPK/66/2009/Bunre/ dated
15/9/2009
Construction of food grain
godown from ADP
No.443/9013 SH:- Village
Ghurghushto
Development of existing
sports facilities from ADP
No. 708/90194, at village
Makhranai
Provision/grant in Aid of
0.500 (M) for Imp: & Deni
Madrasa at Totalai ADP
No.279/90202 SOIII/CMS/KPK/66/2009/Buner/28398 dt:
14/9/09
Provision of Sports Fac:
from ADP No.709/90195
provision & Sport Fac: in
KPK SO-III/CMS/KPK/66/2009/Buner/28398 dt:
14/9/09

T.S
with
date
5

Date of
commencement

Expenditur
e the end
of previous
year

Allocation during
C.F.Y
Original
Released
/revised

Expenditure during
the
Month
Year

Progressive Financial
expenditure. utilizatio
n during
C.F.Y.

10

11

12

13

--

FOR THE MONTH OF JUNE


DISTRICT BUNER
Sector:
Sub Sector:

, 2012

Roads, Education, Collages, Sports & Madaras


Roads, Education, Collages, Sports & Madaras
Achievement
the end of
previous year

Physical
Target
during
C.F.Y

Achievement
during C.F.Y

Total
Achievement
Since
Commencement.

PHYSICAL
PROGRESS.

15

16

17

18

19

20

SCOPE OF THE SCHEME


14
So-III/CMS/KPK/6-6/2009/Buner
dated 15/9/2009

Construction of food grain go


down from ADP No.443/9013
SH:- Village Ghurghushto

Development of existing sports


facilities from ADP No.
708/90194, at village Makhranai
Provision/grant in Aid of 0.500
(M) for Imp: & Deni Madrasa at
Totalai ADP No.279/90202 SOIII/CMS/KPK/66/2009/Buner/28398 dt: 4/9/09
Provision of Sports Fac: from
ADP No.709/90195 provision &
Sport Fac: in KPK SOIII/CMS/KPK/66/2009/Buner/28398 dt:14/9/09

Scheduled
date of
completion

REMARKS

21

PC-I/C.C.E submitted
but Food Department
directed by PDWP to
work out its
requirement on
Provincial Level and
submit proposal for
inclusion in ADP.
PC-I/D.C.E submitted
for approval

---------------do------------

----------------do-------------

DISTRICT BUNER
SECTOR:- ROADS & BRIDGES UNDER D.F.I.D
DISTRICT:BUNER
SUB SECTOR:-

MONTHLY PROGRESS REPORT OF


DEVELOPMENT SCHEMES
FOR THE MONTH OF JUNE , 2012

C&W DIVISION DISTRICT BUNER

PERFORMA-I
MONTHLY PROGRESS REPORT (ABSTRACT)
MONTH OF JUNE , 2012
Sector: ROADS & BRIDGES UNDER D.F.I.D
Sub Sector:
District:
Buner
Sub
Sector

Name of scheme
All

Estimated
cost

Expdr:
ending
PFY

ADP allocation
(CFY)
Original

(Rupees in Million)
Releases

Expenditure
during the
Month

Revise

Progressive

A.A

TS

OG = 1

13.375

13.000

0.375

0.375

0.375

0.375

13.375

New =1

18.062

--

13.000

13.000

13.000

13.000

13.000

13.000

Total: 2

31.437

13.000

13.375

13.375

13.375

13.375

13.375

PROFORMA-1

CFY

%Age financial
utilization (CFY) on
Releases

Add:
demand

Excess (+)
Surrender
(-)

Net
(+) or
(-)

100%

100%

100%

100%

Allocation

13.375

Add: demand/Excess (+)


Surrender (-)

PROGRESS REPORT / REVIEW


SECTOR : ROADS & BRIDGES UNDER D.F.I.D
Sub Sector:District:
Buner
ADP
S.No.

OG/364/100038

Name of scheme

2
D.F.I.D Assisted Steel Bridges
Project in Crisis Affected
Districts of Malakand Division
SH:1. Steel Bridge at Riyal

2. Steel Bridge Nagrai

Total
cost
3

Status of scheme
AA with
date
4

Date of

T.S with
date
5

Expenditure
the end of
previous
year
7

commenc
ement

13.375

13.000
SOR/V-39/
W&S/03/
Vol-II
dated
21/04/2011
13.375
07/06/2011

4/2011

13.000

18.062

13.000

Allocation during
C.F.Y
Original
Released
/revised
8
9

0.375

13.000

FOR THE MONTH OF JUNE

0.375

13.000

, 2012

Expenditure during
the
Month
Year
10

11

12

Financial
utilization
during
C.F.Y.
13

0.375

13.375

100%

13.000

13.000

Progressive
expenditure.

13.000

District Buner
Physical
Target
during
C.F.Y

Achievement
during C.F.Y

SCOPE OF THE SCHEME

Achievement
the end of
previous
year

Total
Achievement
Since
Commencement.

14

15

16

17

18

90%

10%

10%

100%

Completed

(12-Months)

72%

72%

60% completed

6-Months

Scheduled
date of
completion
PHYSICAL
PROGRESS.
19

REMARKS

20

ADP No.364/100038

D.F.I.D Assisted Steel Bridges


Project in Crisis Affected
Districts of Malakand Division
SH:1. Steel Bridge at Riyal
120-ft span abutments protection
approaches x-drainage
Length:- 36.57 Mtr:
2. Steel Bridge at Nagrai

Length:- 48.76 Mtr:

21

DISTRICT BUNER
SECTOR:PRIMARY EDUCATION (BASIC EDUCATION IMPROVEMENT PROGRAMME-II
DISTRICT:BUNER
SUB SECTOR:- FLOOD DAMAGES (EDUCATION)

MONTHLY PROGRESS REPORT OF


DEVELOPMENT SCHEMES
FOR THE MONTH OF JUNE, 2012

C&W DIVISION DISTRICT BUNER

PERFORMA-I
MONTHLY PROGRESS REPORT (ABSTRACT)
MONTH OF JUNE , 2012
Sector:
PRIMARY EDUCATION (BASIC EDUCATION IMPROVEMENT PROGRAMME-II
Sub Sector: FLOOD DAMAGES (EDUCATION)
District:
Buner
(Rupees in Million)

Sub
Sector

Name of scheme

All

Estimated
cost

Expdr:
ending
PFY

ADP allocation
(CFY)

A.A

TS

Original

New

52.968

--

14.249

Total:

52.968

--

14.249

Releases
Deposit

Expenditure
during the

Progressive

Month

CFY

14.249

10.433

14.249

14.249

14.249

10.433

14.249

14.249

Deposit

%Age financial
utilization (CFY) on

Add: demand/Excess (+)


Surrender (-)

Releases

Add:
demand

Excess (+)
Surrender
(-)

100%

100%

100%

100%

Allocation

Net
(+) or
(-)

OG
-

PROFORMA-1

PROGRESS REPORT / REVIEW


SECTOR : PRIMARY EDUCATION (BASIC EDUCATION IMPROVEMENT PROGRAMME-II
Sub Sector:- FLOOD DAMAGES (EDUCATION)
District:
Buner
ADP
S.No.
1

Name of scheme

2
Repair/Rehabilitation 01-Govt:
Girls Middle School in District
Buner under Assistance to Basic
Education Improvement
Programme-II for
repair/Rehabilitation of flood
affected 122-Grils Schools in 9Districts of Khyber
Pakhtunkhwa province. 1-No in
Buner
SH:- GGMS Charorai

Total
cost
3

Status of scheme
AA with
date
4

Date of

T.S with
date
5

Expenditure
the end of
previous
year
7

8/2011

commenc
ement

Allocation during
C.F.Y
Original
Released
/revised
8
9

Expenditure during
the
Month
Year

Progressive
expenditure.

10

11

12

Financial
utilization
during
C.F.Y.
13

2.000

4.158

4.158

100%

(o) 4.800
5.760

6/4/2011
(R) 5.760
22/07/2011

4.158

FOR THE MONTH OF JUNE , 2012


District Buner

SCOPE OF THE SCHEME

14
Repair/Rehabilitation 01-Govt:
Girls Middle School in District
Buner under Assistance to Basic
Education Improvement
Programme-II for
repair/Rehabilitation of flood
affected 122-Grils Schools in 9Districts of Khyber
Pakhtunkhwa province
SH:- GGMS Charorai

Achievement
the end of
previous
year

Physical
Target
during
C.F.Y

Achievement
during C.F.Y

15

16

17

100%

Total
Achievement
Since
Commencement.

Physical Progress.

18

19

Scheduled
date of
completion

G/F floor Plastering


in progress
3-C/R
st
1 Floor roof laid

Remarks

20

21

30/06/2012

PROFORMA-1

PROGRESS REPORT / REVIEW


SECTOR :
Sub Sector:-

District:
S.No.

1
2
3
4
5
6
7

PRIMARY EDUCATION (BASIC EDUCATION IMPROVEMENT PROGRAMME-II


FLOOD DAMAGES (EDUCATION)

Buner

Name of scheme

2
Repair/Rehabilitation 15-Govt:
Girls School in District Buner
under Assistance to Basic
Education Improvement
Programme-II for
repair/Rehabilitation of flood
affected 122-Grils Schools in 9Districts of Khyber
Pakhtunkhwa province SH:GGHS Panjtar (civil work, B/W)
GGPS Kanglai (civil work, W/S,
L/B)
GGPS Panjtar (civil work)
GGPS Kass Korona (civil work,
W/S, L/B)
GGPS Hall (civil work, W/S,
L/B)
GGPS Mangal Thana (civil
work)
GGPS Ghazi Kot (civil work)

Total
cost

10

11

12

Financial
utilization
during
C.F.Y.
13

--

0.561

0.561

0.561

0.561

3.358

2.588

0.756

0.227

0.756

0.756

1.136

1.136

1.136

1.136

4.478

0.537

0.537

0.537

0.537

2.239

47.208

Status of scheme
AA with
date
4

47.208
30/7/2011

Date of

T.S with
date
5

Expenditure
the end of
previous
year
7

commenc
ement

Allocation during
C.F.Y
Original
Released
/revised
8
9

Deposit

3.718

Expenditure during
the
Month
Year

Progressive
expenditure.

2.708

2.841

FOR THE MONTH OF JUNE


District Buner
SCOPE OF THE SCHEME

14
Repair/Rehabilitation 15-Govt: Girls
School in District Buner under
Assistance to Basic Education
Improvement Programme-II for
repair/Rehabilitation of flood
affected 122-Grils Schools in 9Districts of Khyber Pakhtunkhwa
province SH:1
GGHS Panjtar (civil work,
B/W)
2
GGPS Kanglai (civil work,
W/S, L/B)
3
GGPS Panjtar (civil work)
4
GGPS Kass Korona (civil
work, W/S, L/B)
5
GGPS Hall (civil work,
W/S, L/B)
6
GGPS Mangal Thana (civil
work)
7
GGPS Ghazi Kot (civil
work)

, 2012

Achievement
the end of
previous
year

Physical
Target
during
C.F.Y

Achievement
during C.F.Y

Total
Achievement
Since
Commencement.

PHYSICAL
PROGRESS.

Scheduled
date of
completion

REMARKS

15

16

17

18

19

20

21

100%

12%

12%

30/06/2012

Notices issued to all


contractors to speed
up the progress

Roof level
Work as in S/Str:

1st Running Bill for


Rs: 370209/-

Lintel Level
Roof laid
Finishing
DPC laid
Roof level

1st Running Bill for


Rs: 529657/- to P.M

PROFORMA-1

PROGRESS REPORT / REVIEW


SECTOR :
Sub Sector:-

District:
S.No.

Continued

8
9
10
11
12
13
14
15

PRIMARY EDUCATION (BASIC EDUCATION IMPROVEMENT PROGRAMME-II


FLOOD DAMAGES (EDUCATION)

Buner

Name of scheme

2
Repair/Rehabilitation 15-Govt:
Girls School in District Buner
under Assistance to Basic
Education Improvement
Programme-II for
repair/Rehabilitation of flood
affected 122-Grils Schools in 9Districts of Khyber
Pakhtunkhwa province SH:GGPS Dargalai (civil work,
W/S, L/B)
GGPS Khardag Durmai (civil
work)
GGPS Shagai Sowawai (civil
work, W/S, L/B)
GGPS Kadal (W/S), (C/W)
GGPS Nogram (civil work)
GGPS Sowawai (L/B,C/W)
GGPS Malka (C/W,W/S)
GGPS Dakara (L/B,C/W,W/S)

Total
cost

10

11

12

Financial
utilization
during
C.F.Y.
13

14.249

10.433

14.249

14.249

2.708

1.190

0.597

1.190

1.190

3.358

1.481

0.886

1.481

1.481

2.479

1.377

0.621

1.377

1.377

2.359
3.358
3.708
3.478
3.828

0.754
1.615
0.320
1.307
2.844

0.754
1.615
0.320
1.307
2.257

0.754
1.615
0.320
1.307
2.844

0.754
1.615
0.320
1.307
2.844

47.208

Status of scheme
AA with
date
4

47.208
30/7/2011

Date of

T.S with
date
5

Expenditure
the end of
previous
year
7

commenc
ement

Allocation during
C.F.Y
Original
Released
/revised
8
9

Deposit

Expenditure during
the
Month
Year

Progressive
expenditure.

FOR THE MONTH OF JUNE , 2012


District Buner
SCOPE OF THE SCHEME

14
Repair/Rehabilitation 15-Govt: Girls
School in District Buner under Assistance
to Basic Education Improvement
Programme-II for repair/Rehabilitation of
flood affected 122-Grils Schools in 9Districts of Khyber Pakhtunkhwa
province SH:8
GGPS Dargalai (civil work,
W/S, L/B)
9
10

GGPS Khardag Durmai (civil


work)
GGPS Shagai Sowawai (civil
work, W/S, L/B)

11
12

GGPS Kadal (W/S), (C/W)


GGPS Nogram (civil work)

13
14
15

GGPS Sowawai (L/B,C/W)


GGPS Malka (C/W,W/S)
GGPS Dakara (L/B,C/W,W/S)

Achievement
the end of
previous
year

Physical
Target
during C.F.Y

Achievement
during C.F.Y

Total
Achievement
Since
Commencement.

PHYSICAL
PROGRESS.

Scheduled
date of
completion

REMARKS

15

16

17

18

19

20

21

100%

30/06/2012

Roof laid

1st Running bill


submitted for Rs.
879122/-

2-C/R Plastering
in progress &
DPC level

Paid Rs: 594664/-

Roof laid

1st Running bill


submitted for Rs.
834566/-

Roof level
2-C/Rooms Roof
laid one C/Room
roof laid
2-C/R lintel level
Roof laid
Finishing

Paid Rs: 586899/-

DISTRICT BUNER
SECTOR:DISTRICT:-

SPORTS
BUNER

MONTHLY PROGRESS REPORT OF


DEVELOPMENT SCHEMES
FOR THE MONTH OF JUNE, 2012

C&W DIVISION DISTRICT BUNER

PERFORMA-I
MONTHLY PROGRESS REPORT (ABSTRACT)
MONTH OF JUNE, 2012
Sector:
District:
Sub
Sector

SPORTS

Buner

(Rupees in Million)

Name of scheme

All

Estimated
cost

A.A

TS

New

13.500

Total:

13.500

Expdr:
ending
PFY

ADP allocation
(CFY)

Original

Revised

--

8.500

8.500

--

8.500

8.500

Releases

Expenditure
during the

Progressive

%Age financial
utilization (CFY) on

Month

CFY

8.500

8.500

8.500

8.500

100%

8.500

8.500

8.500

8.500

100%

Allocation

Releases

Add: demand/Excess (+)


Surrender (-)

Add:
demand

Excess (+)
Surrender
(-)

100%

100%

Net
(+) or
(-)

OG

PROFORMA-1

PROGRESS REPORT / REVIEW


SECTOR: SPORTS
District:
Buner
ADP
S.No.

New 744/110097 New 741/100227 736/100229New

Name of scheme

2
Improvement & Rehabilitation
of Sports Facilities in Khyber
Pakhtonkhwa Sub Head
Play Ground at Nogramme
shifted to Dagai

Total
cost
3

5.500

New schemes
Establishment of Play grounds in
Khyber Pakhtunkhwa

Status of scheme
AA with
date
4
5.500
10/6/2011
&
19/3/2012

Date of

T.S with
date
5

Expenditure
the end of
previous
year
7

=-

commenc
ement

Allocation during
C.F.Y
Original
Released
/revised
8
9

Expenditure during
the
Month
Year

Progressive
expenditure.

10

11

12

Financial
utilization
during
C.F.Y.
13

4.500

4.500

4.500

4.500

4.500

2.000

2.000

2.000

2.000

2.000

2.000
20/5/2012

2.000

2.000

2.000

2.000
19/3/2012
2.000
19/3/2012

Playground at GHS Amnawar


Playground at GHS Daggar No.1
Improvement & Rehabilitation
of play grounds in Khyber
Pakhtunkhwa

2.000
2.000

Playground at GHSS Agrai


Volley ball Court at Barkalay
(Cheena)

2.000

2.000

2.000

2.000
19/3/2012
2.000
19/3/2012

FOR THE MONTH OF JUNE , 2012


District Buner
Physical
Target
during
C.F.Y

Achievement
during C.F.Y

SCOPE OF THE SCHEME

Achievement
the end of
previous
year

Total
Achievement
Since
Commencement.

14

15

16

17

18

Work order issued.

Layout given

Scheduled
date of
completion
PHYSICAL
PROGRESS.
19

REMARKS

20

21

06/2013

Payment made to
DOR of land

New 736/100229

Improvement & Rehabilitation


of Sports Facilities in Khyber
Pakhtonkhwa Sub Head
Play Ground at Nogramme
New schemes
ADP.No 741/100227

Establishment of Play grounds in


Khyber Pakhtunkhwa
Playground at GHS Amnawar
Playground at GHS Daggar No.1

Completed
---do----

ADP.No 744/110097

Improvement & Rehabilitation


of play grounds in Khyber
Pakhtunkhwa
Playground at GHSS Agrai
Volley ball Court at Barkalay
(Cheena)

Completed
---do----

Dimension yet not


decided

DISTRICT BUNER
SECTOR:DISTRICT:-

SOCIAL WELFARE
BUNER

MONTHLY PROGRESS REPORT OF


DEVELOPMENT SCHEMES
FOR THE MONTH OF JUNE, 2012

C&W DIVISION DISTRICT BUNER

PERFORMA-I
MONTHLY PROGRESS REPORT (ABSTRACT)
MONTH OF JUNE, 2012
Sector:
District:
Sub
Sector

Social Welfare
Buner

Name of scheme

All

Estimated
cost

(Rupees in Million)
Expdr:
ending
PFY

ADP allocation
(CFY)

Original

Releases

A.A

TS

New

117.860

--

117.860

Total:

117.860

--

117.860

Expenditure
during the

Progressive

%Age financial
utilization (CFY) on

Month

CFY

Deposit

Allocation

Releases

Add: demand/Excess (+)


Surrender (-)

Add:
demand

Excess (+)
Surrender
(-)

Net
(+) or
(-)

OG

PROFORMA-1

PROGRESS REPORT / REVIEW


SECTOR: Social Welfare
District:
Buner
ADP
S.No.

2
New 244/100133

Name of scheme

Establishment of 4-Social
Welfare complex in Khyber
Pakhtunkhwa SH:- Social
Welfare complex in District
Buner

Total
cost
3

117.860

Status of scheme
AA with
date
4

Date of

T.S with
date
5

Expenditure
the end of
previous
year
7

=-

commenc
ement

Allocation during
C.F.Y
Original
Released
/revised
8
9

29.928
compact

Expenditure during
the
Month
Year

Progressive
expenditure.

10

11

12

Financial
utilization
during
C.F.Y.
13

FOR THE MONTH OF JUNE , 2012


District Buner
Physical
Target
during
C.F.Y

Achievement
during C.F.Y

SCOPE OF THE SCHEME

Achievement
the end of
previous
year

14

15

16

17

Total
Achievement
Since
Commencement.

18

Scheduled
date of
completion
PHYSICAL
PROGRESS.
19

REMARKS

20

21

PC-I/Detailed Cost
Estimate amounting
to Rs.117.860 (M) is
submitted to the
Director Social
Welfare vide Secy:
C&W No.D(P&M)
dated C&W 1/2/2012

New ADP No.244/100133

Establishment of 4-Social
Welfare complex in Khyber
Pakhtunkhwa SH:- Social
Welfare complex in District
Buner
-

DISTRICT BUNER
SECTOR:- Auqaf, Hajj & Minority Affairs
Sub Sector Minority/Religious

MONTHLY PROGRESS REPORT OF


DEVELOPMENT SCHEMES
FOR THE MONTH OF JUNE , 2012

C&W DIVISION DISTRICT BUNER

PERFORMA-I
MONTHLY PROGRESS REPORT (ABSTRACT)
MONTH OF JUNE , 2012
Sector:

Auqaf, Hajj & Minority Affairs


Sub Sector Minority/Religious
District:
Buner
Sub
Sector

Name of scheme

All

A.A

OG

Estimated
cost

TS

1.268
Buner

Expdr:
ending
PFY

(Rupees in Million)

ADP allocation
(CFY)

1.268
Buner

Expenditure
during the

Month

Progressive

Allocation

Releases

Add: demand/Excess (+)


Surrender (-)

Add:
demand

Excess (+)
Surrender
(-)

100%

Deposit

0.858

0.858

0.858

0.858

0.858

0.858

100%

100%

0.858

0.858

0.858

0.858

0.858

100%

0.858

CFY

%Age financial
utilization (CFY) on

Original

New

Total:

Releases

Net
(+) or
(-)

PROFORMA-1

PROGRESS REPORT / REVIEW


SECTOR: Auqaf, Hajj & Minority Affairs
Sub Sector Minority/Religious

District:
ADP
S.No.

Name of scheme

2
New 278/110079

Buner

Welfare package of Minority in


Khyber Pakhtunkhwa Phase-III
SH:- Re-Construction of
Shamshangot at Dewana Baba

Total
cost
3

0.858

Status of scheme
AA with
date
4

0.858
14/03/012

Date of

T.S with
date
5

Expenditure
the end of
previous
year
7

=-

commenc
ement

Allocation during
C.F.Y
Original
Released
/revised
8
9

0.858

0.858

Expenditure during
the
Month
Year

Progressive
expenditure.

10

11

12

Financial
utilization
during
C.F.Y.
13

0.858

0.858

0.858

FOR THE MONTH OF JUNE , 2012


District Buner
Physical
Target
during
C.F.Y

Achievement
during C.F.Y

SCOPE OF THE SCHEME

Achievement
the end of
previous
year

Total
Achievement
Since
Commencement.

14

15

16

17

18

Scheduled
date of
completion
PHYSICAL
PROGRESS.
19

REMARKS

20

New ADP No. 278/110079

Welfare package of Minority in


Khyber Pakhtunkhwa Phase-III
SH:- Re-Construction of
Shamshangot at Dewana Baba
Completed

6/2012

21

DISTRICT BUNER
SECTOR:DISTRICT:-

HOME
PRISIONS

MONTHLY PROGRESS REPORT OF


DEVELOPMENT SCHEMES
FOR THE MONTH OF JUNE, 2012

C&W DIVISION DISTRICT BUNER

PERFORMA-I
MONTHLY PROGRESS REPORT (ABSTRACT)
MONTH OF JUNE, 2012
Sector:
District:
Sub
Sector

Home
Prisions

Name of scheme

All

(Rupees in Million)
Estimated
cost

Expdr:
ending
PFY

ADP allocation
(CFY)

Original

Releases

A.A

TS

New

24.210

--

Total:

24.210

--

Expenditure
during the

Progressive

%Age financial
utilization (CFY) on

Month

CFY

Deposit

Allocation

Releases

Add: demand/Excess (+)


Surrender (-)

Add:
demand

Excess (+)
Surrender
(-)

Net
(+) or
(-)

OG

PROFORMA-1

PROGRESS REPORT / REVIEW


SECTOR: Home
District:
Prision
ADP
S.No.

2
New 1032/110131

Name of scheme

Improvement of existing Jail in


Khyber Pakhtunkhwa
SH:- Sub Jail Daggar District
Buner.

Total
cost
3

24.210

Status of scheme
AA with
date
4

24.210
19/4/2012

Date of

T.S with
date
5

Expenditure
the end of
previous
year
7

=-

commenc
ement

Allocation during
C.F.Y
Original
Released
/revised
8
9

Expenditure during
the
Month
Year

Progressive
expenditure.

10

11

12

Financial
utilization
during
C.F.Y.
13

FOR THE MONTH OF JUNE , 2012


District Buner
Physical
Target
during
C.F.Y

Achievement
during C.F.Y

SCOPE OF THE SCHEME

Achievement
the end of
previous
year

14

15

16

17

Total
Achievement
Since
Commencement.

18

Scheduled
date of
completion
PHYSICAL
PROGRESS.
19

REMARKS

20

21

Tender was called on


24/05/2012, but
cancelled due to
contractors boycot
from tender. The next
date of tender
05/06/2012 was also
cancelled now the
tender floated on
12/07/2012

New ADP No.1032/110131

Improvement of existing Jail in


Khyber Pakhtunkhwa
SH:- Sub Jail Daggar District
Buner.
50%

PROGRESS REPORT CHIEF MINISTER DIRECTIVES


S/N
o

Reference of SO(III) C.M


Secretariat

1
1

2
SO-III/CMS/1-4/
2010/Buner/G/4453-59 dated
22/03/2011
SO-III/CMS/1-4/
2010/Buner/PF-79/3351 dated
05/03/2011
SO-III/CMS/14/2010/Buner/Genral/8078 dated
20/05/2011
------do------

2
3

SO-III/CMS/1-18/2010/Mardan/
7601 dated 11/05/2011

SO-III/CMS/6-1/2010/G/
12439-4 dated 24/08/2011

Reference of
Implementation Section,
Establishment
Department
3
SO(IMP)E&AD/CMD/2-4/
2010/Buner 9438-42 dated
26/03/2011

SO(IMP)E&AD/CMD/2-4/
2010/Buner 5465-75 dated
24/05/2011
--------do-----

FOR THE MONTH OF JUNE 2012


Text of CM Directives

Latest Position

4
Construction of Pir Baba Mazar road in PF-79
E/Cost 1.680 (M)

5
100% completed
Rs.1.680 (M) Expenditure

Construction of Bar Room at Buner


E/Cost 3.500 (M)

Roof laid

Improvement/Widening and Black Topping of Khanano


Dherai Nagra road in reaches.
E/Cost 15.000 (M)
Improvement/Widening and black Topping of Chinglai
Ghurghshtoo road in reaches E/Cost 15.000 (M)
Construction of 10-Nos RCC Bridges in Khyber
Pakhtunkhwa ADP No.397/100429.
SH:- Construction of RCC Bridge on Barandu Khwar
Shalbandai PK-78
Up-gradation and strengthening of road network in Khyber
Pakhtunkhwa ADP No.361/110224 Rs.15.000 (M) of each
MPA PF-77,PF-78 & PF-79

E/W S/W
15% 20%
E/W S/W S/B B/S R/W
90% 40% 50% 30%
3.890 (M)
Consultancy for the Bridge completed and
payment made
PC-I/detailed cost estimate submitted to
chief Engineer (North) C&W Department
Peshawar.