RISK ASSESSMENT FORM

Terga FRIDI.ALI
5 4 3 2 1 1 Minor 10 8 6 4 2 2 Serious Severity 15 12 9 6 3 3 Major

Date of Assessment: System/Activity:


20 16 12 8 4 4 Catastrophic

11-07-2010

Assessment No:

97

Erection of steel structure building (E06)

Medium Priority (5 days)

Key to Priorities High Priority (2-3 days)

Immediate

INTRODUCTION The table below provides a simplified representation of the methodology used and the processes involved in this Hazard Identification & Risk Analysis Procedure (Risk Management) to be undertaken by OCIA and all Subcontractors in order to initiate, act on, review and effectively manage project-related related risks throughout the Construction Phase.

IDENTIFICATION - Pre planning, Method statement , Job safety analysis.

ASSESSMENT Impact, Risk factor, Mitigation measure, Residual risk

IMPLEMENTATION & COMMUNICATION

REVIEW & UP DATE

Identify activities , Identify hazards

Assess Impacts, Analyze Risk , Establish Mitigation Measures.

Communication & Training

Audit, Inspection & Up dating of Log.

Page 2 of 9


Tasks Hazards Identified (include the exposed groups)
Probability 1-5

RISK ASSESSMENT FORM

Severity 1-4

Risk 1 - 20

Control Measures to be Implemented

Probability 1-5

Severity 1-4

Risk 1 - 20

Residual Risk

Date Action Completed

Transfer of equipment

Transfer device collide with other things; Oil leakage

12

Chose a qualified driver before work Check the calibration of all tools Make sure the transport device in good condition

Locate the crane

Hitting injury

12

Solid the ground Reinforce the pads beneath the outriggers Check the around circumstance before working

Transport

Traffic risk Collision with person Collision device

The trucks must respect: The limited speed in the site The circulation signs The circulation plan (updated)

Page 3 of 9


Tasks Hazards Identified (include the exposed groups)
Probability 1-5

RISK ASSESSMENT FORM

Severity 1-4

Risk 1 - 20

Control Measures to be Implemented

Probability 1-5

Severity 1-4

Risk 1 - 20

Residual Risk

Date Action Completed

Movement of traffic

3 Slip/trip/all

All hose/ropes/cables in use shall be secured to the side of walkways and handrails All unnecessary materials and equipment to be immediately removed from site All exits and walkways to be kept clear for use of personnel High standard of housekeeping to be maintained at all times

Lifting

4 Fall from height and hurt workers Component fall down Component collide with other things surrounded

16

Lifting crane, wires should be regularly calibrated, safe working loads are announced max speed at site is respected for all vehicle It is not allowed to work under loads Handling by qualified riggers worn the related PPE and under supervision Qualified crane operator and qualified rigger to operate lifting work Crane in calibrated period Barricade the lifting area

Collision with person Falling materials Poor visibility for the driver Crane tilt

Page 4 of 9


Tasks Hazards Identified (include the exposed groups)
Probability 1-5

RISK ASSESSMENT FORM

Severity 1-4

Risk 1 - 20

Control Measures to be Implemented

Probability 1-5

Severity 1-4

Risk 1 - 20

Residual Risk

Date Action Completed

Lifting

Proper lifting tools Make sure lifting wok operated in good weather Mark the area of operations of the crane Officer commanding the ship maneuver through regulatory actions to avoid accidents Control of the safety catch hook the slings Ensure the crane on his dashboard that the load weight does not exceed the maximum allowed Ban the person be under a suspended load Defining the radius of the rotary crane Prohibit the movement of people around the handling Stop the lifting operation in strong winds exceed the 50km /h and heavy rain Not lifting at night
Page 5 of 9


Tasks Hazards Identified (include the exposed groups)
Probability 1-5

RISK ASSESSMENT FORM

Severity 1-4

Risk 1 - 20

Control Measures to be Implemented

Probability 1-5

Severity 1-4

Risk 1 - 20

Residual Risk

Date Action Completed

Erection and dismantling of scaffolding

Personnel falling from height

16

Safeguards needed to control risk to acceptable level No erection/dismantling of scaffolding shall be carried out during the hours of darkness Over the site scaffolding operations shall cease in case of high winds. Wind speed maximum 20 knots Safety belt/harness shall be worn by scaffolders working over the side All gaps in scaffolding structure shall be highlighted by tiger tape Gaps in scaffold boards shall be well secured Scaffold boards shall be well secured Use of scafftag Removal of garnet from boards to avoid stress on scaffolding

Page 6 of 9


Tasks Hazards Identified (include the exposed groups)
Probability 1-5

RISK ASSESSMENT FORM


Severity 1-4 Risk 1 - 20

Control Measures to be Implemented

Probability 1-5

Severity 1-4

Risk 1 - 20

Residual Risk

Date Action Completed

Erection

4 Falls from height Falling objects material and falling down tools

16

Prohibition to work at heights of night Prohibit work at height if the weather affected the safety of persons Protection of persons with safety harnesses the scaffolding should be based on graded soil with good foundation Protect a guard with a height of 1.15 m Protect with an end-board 10 to 15 cm high All gaps in scaffolding structure shall be highlighted by tiger tape the scaffolding boards shall be well secured Use of scafftag Removal of garnet from boards to avoid stress on scaffolding Tools put into the tools pocket their capacity.

Work at height

Pipe rack fall down

Page 7 of 9


Tasks Hazards Identified (include the exposed groups)
Probability 1-5

RISK ASSESSMENT FORM

Severity 1-4

Risk 1 - 20

Control Measures to be Implemented

Probability 1-5

Severity 1-4

Risk 1 - 20

Residual Risk

Date Action Completed

Work at height

Erection in accordance with the requirement It is forbidden to exceed the prescribed load on the Man basket All man baskets will be load tested and certified. All man baskets will not be overloaded and will be used inside

forklift

crushing of person orderly Person by gear

12

Beep back officer commanding the ship maneuver through regulatory actions to avoid accidents forbids the person to move near the gear

Use tools

Hand injuries crushed fingers smooth head against the frame

ensure protection adequate PPE (gloves, helmet, goggles, harness

Page 8 of 9


Tasks Hazards Identified (include the exposed groups)
Probability 1-5

RISK ASSESSMENT FORM

Severity 1-4

Risk 1 - 20

Control Measures to be Implemented

Probability 1-5

Severity 1-4

Risk 1 - 20

Residual Risk

Date Action Completed

House keeping Material causing falls Abrasive /paint material debris

Clearance of work area Good access Regular housekeeping after each shift Scaffolding platforms and walkways to be cleaned each shift from any remains or obstacles to ensure proper working area and to save the scaffolding material from any damages

Environmental

Pollution the air: Exhaust gas, The dust Leaking oil or diesel machines on soil

Checking the condition of equipments before beginning the work ventilation Workstation

Assessor

Print :

Sign:

Date: