Informe Final
CONTENIDO
Pg.
INTRODUCCIN
GLOSARIO
10
1. GENERALIDADES DE LA EMPRESA
11
11
11
13
14
1.5. Telfono
15
1.6. Direccin
15
15
17
2. DIAGNSTICO DE LA EMPRESA
19
3. ANTECEDENTES
20
4. JUSTIFICACIN
21
5. OBJETIVOS
22
22
22
6. MARCO TERICO
23
23
25
25
7. ACTIVIDADES DESARROLLADAS
33
33
33
34
39
40
7.1.5 Grficas
43
44
8. IMPLEMENTACIN DE PROPUESTAS
45
45
45
CONCLUSIONES
BIBLIOGRAFA
ANEXOS
LISTA DE ANEXOS
LISTA DE FIGURAS
AUTOR(ES):
FACULTAD:
DIRECTOR(A):
AUTOR(ES):
FACULTAD:
DIRECTOR(A):
The actual project under the figure of Internship was implemented in Ford Motor
Company of Venezuela, which presents as main economic activity, vehicles
assemble and that produces 4 different kinds of catalogues at present: Fiesta
Amazon, Explorer XLT and Eddie Bauer, F-350 and Cargo 815 y 1721. The
mentioned Internship had place inside the department of Material Planning and
Logistic (MP&L) that is in charge of the supplement of the required material, in the
right amounts and at the right moment, to the respective assembling lines. Due to
an increase of production, the operations at MP&L were unbalanced and there was
not detailed and updated information of the operations and the staff that worked
into this department. Reason why inside of MP&L was necessary to make a time
study that would allow the following: To balance the operations of each department
and to determine the authorized by area (maximum number of staff required that
would be in charge of the production). Thanks to the implemented time study,
several results were achieved and allowed the supplement of the previous needs
into the three department areas: Vestment Area, Chassis Area and Final Line
Area, each one with its respective authorized. At Vestment Area some material
was relocated to redistribute and to balance some operations, another new
resources were designed to supply material and get a continuous supply flow to
assemble line to diminish inventory into the same area. At Final Line Area,
standard parts operations were transferred to night turn, to avoid previous delay
and to accelerate the supplying process. This way, the internship purpose and
some auspicious results were achieved inside the company, according to the
needs required there.
PALABRAS
CLAVES:
INTRODUCCIN
GLOSARIO
TARJETA SMART: tarjeta para cada una de las partes que se suministran en las
colocaciones de produccin, la cual contiene los datos de identificacin, ubicacin
mximos, mnimos, y unidad de empaque entre otros.
RACK: facilidad de tipo fija, que almacena cestas y materiales de gran tamao.
TORTERA: facilidad fija y giratoria, donde se ubican los potes que contienen el
material pequeo como tornillos, arandelas, etc.
HOJA DE PREUSO: planilla que debe diligenciar cada operario que utilice un
medio de transporte (remolcador montacargas) para realizar su operacin.
ROSTER: listado que identifica los lderes de un rea y los operarios dentro de ella
con su cdula y un nmero asignado por la Empresa.
10
1. GENERALIDADES DE LA EMPRESA1
En lo que respecta a los servicios ofrecidos por esta casa matriz de Ford en
Venezuela, se encuentran:
http://www.ford.com.ve/
11
las 7:50 a.m., y almuerzo desde las 11:15 hasta la 1:00 p.m., ambos con
men diferente, los cuales se encuentran especificados por da en la pgina
de intranet de Ford Andina. La adquisicin de los platos se hace a travs
de ticket que son vendidos en el mismo comedor a cualquier hora del da.
12
Esta planta de ensamble de Ford cuenta con 1.500 trabajadores, lo que le permite
tener una capacidad de produccin de 300 unidades por da en un solo turno.
13
Figura 1.
14
1.5. Telfono
(+0058) 0241 8746397 u 8746398.
1.6. Direccin
Avenida Henry Ford, Zona Industrial Sur, Valencia - Estado Carabobo, Venezuela.
1.7. Resea histrica2
Henry Ford junto con once socios ms y con 28.000 dlares de capital fund en
1903, Ford Motor Company, una empresa que se convertira en una de las ms
grandes y reconocidas del mundo. Despus de 15 meses de haber sido fundada
ya se haban vendido 1700 caros modelo A, siendo ste el primero de una
generacin de 19 modelos.
http://www.fordandina.ford.com/esp/historia.html
15
16
17
Figura 2.
18
2. DIAGNSTICO DE LA EMPRESA
19
3. ANTECEDENTES
20
4. JUSTIFICACIN
21
5. OBJETIVOS
Identificar
las
operaciones
que
realiza
cada
operario
dentro
del
departamento de MP&L.
-
22
6. MARCO TERICO
Existen dos tcnicas que permiten realizar este tipo de estudio, tales como:
23
TPS CV
Tolerancias
Donde:
TE = Tiempo Estndar
TPS = Tiempo Promedio Seleccionado
Cv = Calificacin de Velocidad
En ese sentido, es importante aclarar tambin conceptos como Tiempo promedio
seleccionado y Calificacin de velocidad:
24
http://www.fordandina.ford.com/Proyectos/fps/PaginaFPS/vision.htm
25
FPS
del
Producto,
Orden-a-Entrega,
Manufactura,
Suministros
Administracin.
en
forma
segura,
para
producir
entregar
productos
que
26
Tarjeta
Smart
es
el
instrumento
de
activacin
del
sistema
de
reaprovisionamiento.
1.
2.
3.
Una vez que el envase est vaco, el operario de produccin debe ubicarlo
en el nivel E, nivel superior del Rack giratorio (Mecanismo para solicitar a
MP&L el reaprovisionamiento de la pieza).
4.
5.
6.
1. Cada cesta de material tiene una Tarjeta Smart con cdigo de barras.
27
Son aquellas partes que por su gran peso y dimensiones, requieren ser
surtidas a travs de montacargas. En este sistema La Bandera, que funciona
como seal visual, es el instrumento de activacin del reaprovisionamiento.
28
3. Secuenciacin
29
donde se surten los materiales que conforman el lado derecho de los vehculos y
la ruta azul por donde se surten todos los materiales del lado izquierdo.
Sistema reaprovisionamiento
Transporte
Medio de surtido
Colocacin en lnea
Remolcador
Potes - cestas
Montacargas
Cajas - guacales
Remolcador
Facilidades
Facilidades
Remolcador
Cestas
Rack de gravedad
30
Figura 3
31
Una lnea de color azul que describe la ruta de las molduras de compuerta
del catlogo Explorer por el lado izquierdo, esta ruta tiene una frecuencia de
surtido a la lnea de ensamble de 3 a 4 veces por da para cumplir con la
produccin de este catlogo, siendo una de las frecuencias ms altas de
surtido.
Una lnea de color rojo que representa la ruta de surtido de las gomas de
marco de puerta, la cual se realiza una vez por da, ya que es un material
que obedece al sistema de partes por llamada al surtirse en grandes
cantidades.
Las lneas punteadas representan el retorno de cada ruta de surtido, esto se debe
a que al realizar el estudio de tiempos se tuvo en cuenta el momento en que parte
el operario del rea de Almacn y Mercado de partes, surte el material en la
estacin correspondiente de la lnea de ensamble y se devuelve al rea de
Almacn, para recoger otro material y realizar el mismo proceso.
32
7. ACTIVIDADES DESARROLLADAS
identifica
cada
operario
del
rea
y 2
de
las
operaciones de
33
Diseo
Todos los elementos que los operarios realizan dentro de esa operacin de
reaprovisionamiento.
34
Los Turnos o personal requerido para realizar todos los elementos de cierta
cantidad diaria de vehculos por catlogo.
Paso 2. Se determin que el formato deba estar diseado para cada operacin
de reaprovisionamiento y presente en cada uno de los tres catlogos de
vehculos correspondientes al Grupo de camiones, adicionalmente un formato
para el catlogo Fiesta Amazon del grupo de pasajeros. De esa manera para el
catlogo Explorer se disearon 5 formatos: del sistema de Secuenciacin:
Elaboracin de Kits y Cedulaciones y del sistema de Partes por Llamada:
Surtido con remolcador, con montacargas y trasiego. Igualmente se hizo para
cada catlogo y rea estudiada.
Estructura
35
Secuenciacin - Cedulaciones:
36
37
38
39
freno de Explorer XLT (sencilla), ste contiene una pieza ms que el kit
para la Explorer Eddie Bauer (lujo).
Realizado este proceso, se completa cada dato del formato y se hace el respectivo
anlisis del estudio de tiempos.
Horas laborales
9,5
Minutos laborales
570
30
Minutos de holgura
10
Tiempo da (minutos)
530
10% overspeed
53
Tiempo/da (minutos)
477
Horas efectivas
7,95
Horas
TR * Cantidad
60
Horas
17,586 * 34
60
9,965
Donde:
TR: Tiempo Requerido (min), para este caso esta dado como TRK: Tiempo
Requerido para los Kits (17,586 minutos).
Cantidad: nmero de vehculos a producir en el da de acuerdo al catlogo y
a la programacin de la produccin; para el catlogo Explorer son 34
vehculos.
41
Turnos
Turnos
9,965
1,254 personas
7,95
TRC
TRS
TRT
TRM
Donde:
TRK: Tiempo Requerido para Kits
TRC: Tiempo Requerido para Cedulaciones
TRS: Tiempo Requerido para Surtido (remolcador)
TRT: Tiempo Requerido para Trasiego
TRM: Tiempo Requerido para Montacargas
42
Basndose
en
este
proceso,
se
implementaron
cambios
como:
7.1.5 Grficas
43
44
8. IMPLEMENTACIN DE PROPUESTAS
45
Se reubic personal: un operario del rea de vestidura que realiza kits fue
trasladado para el turno nocturno y todas las operaciones pertenecientes a
Standard Part igualmente se asignaron para la noche.
Al llevar a cabo estas operaciones de kits y de standard part en el turno
nocturno, el proceso de surtido en la jornada de produccin se agiliza ya
que solo se requiere recoger los materiales que fueron ordenados.
46
CONCLUSIONES
47
BIBLIOGRAFA
http://www.fordandina.ford.com/esp/
http://www.ford.com.ve/
Intranet Ford Motor de Venezuela S.A.
BURGOS, Fernando. Ingeniera de mtodos. IV Edicin.
48
ANEXO A
49
Copiar el PVS
Kits de Freno
Numero de
Parte
t 1 min
t 2 min
t 3 min
Pasos de la Operacin
Kits de Cerradura
Kits de Cinturon de Seguridad
Kits de Columna de Direccion
Kits de Complemento de Carton de Pta
Kits de Espejos Retrovisores
Kits de Cocullo de Techo
Kits de Ventila
Kits de Grumer
Kits de Soporte de asiento
Tablero
Tablero
5
50
t 4 min T prom
Cv
Tol
TN
Frecuencia
Hr Hombre
requeridas
Desviacin
estandar
10
11
12
13
Notificar el ADR
Xm
Vcam
(m/min
)
Desviacin
estandar
t min
Total de hr hombre
por operacion
Distancia de Caminata
N Carros
TE
HrHmb
Req
N
persona
s
Capacidad Requerida
51
ANEXO B
52
Produccin lnea de
Pasajeros
Camiones
Tiempo produccin de 1 vehculo (min.)
7,119403
4,631067961
1 Turno laboral (min.)
477
Produccin estndar diaria de vehculos
67
103
ELABORACION DE KITS
Operaciones estndar
Pasos
1
2
3
4
5
6
8
T1
T2
T3 F1 F2 F3
FP
Elementos
10,690
12,405
9,505
2
3
3
2,6667
Verificar niveles de inventario de material en cada estacin de la lnea de produccin
4,380 4,121 3,750 3 2 3 2,6667
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
0,707 1,144 0,928 3 2 3 2,6667
Dirigirse hacia la estacin de trabajo.
Ubicar la facilidad en la zona donde se encuentran las piezas para armar determinado kit 0,091 0,077 0,084 10 12 9 10,333
0,027 0,031 0,034 10 12 9 10,333
Tomar las cestas y ubicarlas en la facilidad
0,132 0,132 0,099 80 40 70 63,333
Abrir los empaques donde se encuentran las piezas a trasegar.
0,184 0,123 0,128 30 15 25 23,333
Ordenar desechos en la paleta para que el montacarguista los retire
53
Operario:
Operario:
Catalogo
Operacin
Kits de Compuerta
Kits de Ramal de Puerta Lado Izquierdo
Explorer Kits de Ramal de Puerta Lado Derecho
Kits de Principio de Lnea
Kits de Manija de Puerta
Kits de Cocullo de Techo
Cargo
Kits de Grumer
Kits de Soporte de Asiento
350
Kits de Ramal de Techo y Puerta
T1
1,044
1,223
1,246
0,571
0,077
1,456
0,666
0,455
0,398
Minutos
T2
1,487
1,006
1,454
0,849
0,131
0,875
1,003
0,515
0,717
T3
1,266
1,267
1,321
0,371
0,104
0,977
0,771
0,536
0,430
Catalogo
Operacin
Kit de Freno Eddie Bauer
Kit de Freno XLT
Explorer
Kit de Cerradura Delantera
Kit de Cerradura Trasera
Kit de Freno 815
Kit de Freno 1721
Cargo
Kit de Cerradura
Kit de complemento de Cerradura
Kit de Freno
350
Kit de Cerradura
T1
0,769
0,941
0,329
0,239
1,595
1,883
0,184
0,787
1,235
0,610
minutos
T2
T3
0,745 0,713
1,266 0,810
0,317 0,270
0,242 0,226
1,439 1,517
1,645 1,764
0,283 0,794
0,745 0,766
1,096 1,110
0,488 0,470
Operario:
Operario:
minutos
Catalogo
T1
T2
T3
Operacin
0,593 0,690 0,632
Kit de Volante
Explorer
0,251 0,270 0,196
Kit de Consola de Techo
Cargo
Kits de Columna de Direccin 0,810 0,675 0,810
Kit de Columna de Direccin 0,040 0,032 0,052
0,939 0,538 0,647
Kit de Reservorio
350
0,092 0,098 0,115
Kit Palanca de Freno
0,038 0,031 0,028
Ramal
0,028 0,027 0,029
Claxon
Amazon Kit de Columna de Direccin 0,379 0,320 0,428
minutos
Catalogo
T1
T2
T3
Operacin
Kits de Complemento de Cartn de Puerta LD 1,054 0,858 0,853
Explorer Kits de Complemento de Cartn de Puerta LI 0,946 0,779 1,152
0,464 0,419 0,392
Kits de Espejos Retrovisores
0,989 1,166 1,021
Kits de Complemento de Cartn de Puerta
Cargo
0,735 0,741 0,850
Kits de Espejos Retrovisores
0,661 0,713 0,576
Kits de Complemento de Cartn de Puerta
350
0,218 0,218 0,217
Kits de Espejos Retrovisores
54
Operario:
Catalogo
Operacin
Kits de Silvin
Kits de Cinturn de Seguridad
Kits de Ramal de Piso Lado izquierdo
Explorer Kits de Ramal de Piso Lado derecho
Kit de cerradura
Kit Ramal
Kit de Ramal de lmpara trasera (LD - LI)
Kits de Cinturn de Seguridad
Kits Canaleta de Estribo
Cargo
Kits Cerradura Cabina
Pin de remolque 815
Pin de remolque 1721
Kits de Silvin
350
Kits de Cinturn de Seguridad
Kits de Manguera de Radiador
55
T1
0,083
1,334
0,376
0,294
0,032
0,159
0,555
0,488
0,376
0,207
0,144
0,176
0,622
0,239
0,169
minutos
T2
T3
0,099 0,110
0,741 0,842
0,377 0,290
0,434 0,346
0,041 0,036
0,183 0,171
0,605 0,580
0,696 0,592
0,345 0,422
0,214 0,211
0,168 0,153
0,181 0,169
0,507 0,378
0,240 0,222
0,173 0,173
CEDULACIONES
Operaciones estndar
Pasos
1
2
3
4
5
7
8
Elementos
Verificar niveles de inventario de material en cada estacin de la lnea de produccin.
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
Dirigirse hacia la estacin de trabajo.
Ubicar la facilidad en la zona donde se encuentran las piezas a trasegar.
Destapar los empaques donde se encuentran las piezas a trasegar.
Trasladar hasta el terminal donde ser remolcada
Ordenar desechos en la paleta para que el montacarguista los retire
T1
2,139
2,724
0,997
0,300
0,908
0,249
0,298
T2
2,174
3,035
0,942
0,332
1,017
0,232
0,149
T3
2,219
2,553
0,902
0,262
0,770
0,292
0,279
F1 F2 F3
0
5
3
0
5
3
0
5
3
10
5
9
250 110 20
7
6
9
50
5
5
FP
3,2
5
5
7,2
84
4,4
13,8
Operario:
Operario:
minutos
Catalogo
T1
T2
T3
Operacin
Explorer Cedulacin de Ventila
0,220 0,300 0,250
0,270 0,150 0,133
Cedulacin Parrilla
350
Cedulacin Motor Wipper 0,100 0,420 0,200
minutos
Catalogo
T1
T2
T3
Operacin
Explorer Cedulacin de cmara plenum (XLT - EB)
1,270 0,580 0,700
Cedulacin de Cmara Plenum y evaporadores 1,280 3,120 2,410
Cargo
0,412 0,375 0,387
Trasiego de Toldo y Respaldo (815 - 1721)
0,420 0,420 0,530
Cedulacin de ramal de piso
0,560 1,060 1,200
Cedulacin de Cmara Plenum
350
0,160 0,330 0,550
Cedulacin de Evaporadores
0,210 0,190 0,220
Cedulacin Condensadores
0,120 0,083 0,133
Cedulacin Radiadores
Amazon Cedulacin Cmara plenum
0,560 1,060 1,200
Operario:
minutos
Catalogo
Operacin
Cedulacin de Vidrio de Puerta
Explorer
Cedulacin de Tablero
Kits de Ventila
Cargo
Cedulacin de Vidrio de Puerta
350
Cedulacin de Vidrio de Puerta
Amazon Armado Soporte de tablero
T1
T2
T3
3,200
2,880
1,010
0,250
0,320
0,500
2,400
3,660
1,270
0,230
0,550
0,300
1,630
2,200
1,560
0,200
0,440
0,583
56
Operario:
Catalogo
Operacin
Kits de Faldones
Cedulacin de Rieles de Techo (LD - LI)
Explorer Cedulacin de Moldura de bagueta (EB - XLT)
Kit de Deflector de Condensador
Cedulacin de Moldura Cuarto Trasero (EB - XLT) (solo LI)
Cargo
Cedulacin de Tapa Guantera
Kits de Faldones
350
Kits de Deflector de Condensador
Cedulacin de Moldura de bagueta
T1
0,420
0,810
1,010
0,580
0,387
0,110
2,020
0,580
0,130
minutos
T2
T3
0,480 0,450
0,520 0,530
1,280 1,460
0,720 0,610
0,367 0,377
0,160 0,290
2,700 1,600
0,720 0,610
0,100 0,130
Operario:
Catalogo
Operacin
Cedulacin de Cartones de Puerta (EB - XLT / Del - Tras / LD - LI)
Explorer Cedulacin de Deshidratador
Cedulacin Moldura de Compuerta (EB - XLT)
Cargo
Cedulacin de Cartones de Puerta (LD - LI)
Cedulacin de Cartones de Puerta (LD - LI)
350
Cedulacin de Ramal de compartimiento de motor
Ramal de Tablero (4x4 - 4x2) (kanban)
Amazon Ramal de tablero (A1V - A4V - A5V)
57
T1
0,760
0,208
0,269
0,540
0,742
0,674
0,485
0,365
minutos
T2
0,669
0,220
0,286
0,480
0,693
0,575
0,479
0,382
T3
0,655
0,211
0,260
0,527
0,853
0,635
0,472
0,347
Operaciones Estndar
Pasos
Elementos
1
Verificar niveles de inventario de material en cada estacin de la lnea de produccin.
2
Dirigirse hacia la estacin de trabajo donde debe recoger la facilidad.
Operario:
Operario:
Catalogo
Operacin
Kit de freno
Explorer Kit de cerradura
Kit espejos retrovisores
Kit de freno
Cargo
Kit de cerradura y complemento
Kit espejos retrovisores
Kit de freno
350
Kit de cerradura
Kit espejos retrovisores
T1
T2
T3 F1 F2 F3
FP
5,380 9,240 7,310 8 12 7
9,000
2,253 2,665 2,462 40 50 45 45,000
minutos
T1
T2
T3
0,537 0,040 0,034
0,853 0,852 0,025
0,745 0,827 0,527
1,060 0,872 0,672
0,632 0,511 0,936
0,545 0,476 0,486
0,916 0,834 0,583
0,956 0,857 0,931
0,870 0,965 0,616
minutos
Catalogo
T1
T2
T3
Operacin
0,288 0,283 0,285
Cedulacin riel de techo LD/LI
Cedulacin moldura de bagueta (EB - XLT / LD - LI) 0,512 0,503 0,461
0,768 0,754 0,692
Cedulacin de Moldura de Cuarto Trasero
Explorer
0,791 0,813 0,802
Cedulacin de Moldura de Compuerta (EB - XLT)
0,512 0,503 0,461
Cedulacin cartn pta Del/Tras. LD/LI
1,222 0,692 0,957
Cedulacin Cmara Plenum
1,153 0,753 0,953
Cedulacin Cmara Plenum
Cargo
0,768 0,754 0,692
Cedulacin cartn pta LD/LI
0,461 0,453 0,415
Cedulacin Tapa Guantera
0,192 0,189 0,173
Cedulacin cartn pta LD/LI
0,256 0,167 0,212
Cedulacin Cmara Plenum
350
0,755 0,613 0,684
Cedulacin de Evaporadores
0,200 0,197 0,180
Cedulacin moldura bagueta LD/LI
0,384 0,377 0,346
Ramal compartimiento de motor
Amazon Surtido Cmara Plenum
0,228 0,230 0,229
58
Operario:
minutos
Catalogo
Explorer
Cargo
350
T1
T2
T3
0,786
0,463
0,577
0,770
0,587
1,011
0,437
0,352
0,275
Kit de Silvin
0,808
0,703
0,736
0,425
0,542
0,471
Frontal
0,360
0,418
0,387
Kit de Faldones
0,516
0,533
0,621
Corneta
0,255
0,320
0,372
Consola
0,524
0,548
0,535
0,580
0,944
0,509
0,352
0,361
0,374
0,259
0,301
0,291
0,342
0,360
0,350
0,255
0,236
0,240
0,893
0,721
1,077
Kit de silvin
0,404
0,352
0,368
Soporte de radiador
0,173
0,384
0,272
Freno de mano
0,145
0,142
0,143
Aislante
0,134
0,160
0,163
Kit de faldones
0,311
0,186
0,258
0,279
0,358
0,351
Operacin
59
Operario:
Operario:
Catalogo
Operacin
Vidrio trasero (compuerta)
Motor Wipper
Ramal de piso
Hidrobag
Explorer Toldo de techo
Cmara plenum (XLT - EB)
Cortina de airbag
Ramal de compartimiento de motor
Radiador
Ramal de piso
Cargo
Respaldo
Motor Wipper
Motor Wipper
Hidrobag
Parrilla
Cmara plenum
350
Condensadores
Radiadores
Ducto A/A
Toldo de techo
Tapacloster
Surtido de carcaza de tablero
Amazon
Cmara plenum
T1
0,489
0,171
0,214
0,142
0,596
0,794
0,214
1,285
1,028
0,285
2,056
0,071
0,128
0,214
0,380
0,232
0,128
0,856
0,428
0,128
0,285
0,214
0,174
minutos
T2
T3
0,361 0,429
0,126 0,150
0,158 0,187
0,105 0,125
0,474 0,563
0,762 0,778
0,158 0,187
0,948 1,126
1,076 0,901
0,210 0,250
1,518 1,802
0,052 0,062
0,094 0,112
0,158 0,187
0,281 0,333
0,265 0,249
0,210 0,250
0,632 0,750
0,316 0,375
0,094 0,112
0,210 0,250
0,158 0,187
0,199 0,187
Catalogo
Operacin
Goma de puerta del/tras
Goma de marco de puerta del/tras
Goma corredera de vidrio de puerta del
Goma de vidrio trasero y compuerta
Ventila corredera de vidrio
Explorer Goma rejilla coraza
Goma de compuerta
Rejilla de coraza
Tubera aire de calefaccin
Papel de Agua puerta del/tras
Papel de agua compuerta
Goma de marco de puerta
Goma corredera de vidrio
Goma de vidrio trasero y compuerta
350
Goma rejilla coraza
Tubera aceite hidrulico
Rejilla de coraza
Papel de agua puerta
Goma de marco de puerta
Goma de vidrio trasero y compuerta
Goma parabrisa
Goma de ventila (Lder)
Cargo
Ventila corredera de vidrio (Lizq)
Deflector
Papel de agua puerta
Aislante calor
60
T1
0,437
0,688
0,654
0,225
1,061
0,084
0,207
0,978
0,240
0,181
0,220
0,186
0,438
0,225
0,082
0,231
0,181
0,178
0,381
0,225
0,528
0,149
0,423
0,354
0,105
0,470
minutos
T2
T3
0,433 0,442
0,732 0,643
0,605 0,634
0,237 0,232
0,950 0,902
0,144 0,114
0,248 0,232
0,733 0,855
0,333 0,299
0,166 0,174
0,198 0,209
0,228 0,207
0,442 0,434
0,237 0,232
0,177 0,129
0,192 0,196
0,221 0,242
0,161 0,171
0,360 0,370
0,237 0,232
0,679 0,603
0,213 0,181
0,554 0,426
0,414 0,384
0,096 0,101
0,542 0,607
Operario:
Catalogo
Operario:
minutos
Catalogo
T1
T2
T3
Operacin
0,860 0,457 0,658
Vidrio trasero (Venz - Col)
0,113 0,110 0,111
Motor Wipper
0,192 0,203 0,198
Ramal de piso
0,336 0,310 0,420
Hidrobag
1,397 0,568 0,983
Toldo de techo
Explorer Cortina de airbag
0,429 0,518 0,473
0,786 0,812 0,738
Cedulacin de ventila
0,180 0,231 0,175
Deflector de calor ( aislante dash panel)
0,931 0,426 0,678
Ramal de compartimiento de motor
2,221 0,848 1,535
Woofer
0,326 0,748 0,537
Radiador
0,359 0,266 0,312
Ramal de piso
Cargo
0,816 0,870 0,982
Respaldo
0,126 0,151 0,194
Motor Wipper
0,079 0,082 0,103
Motor Wipper
0,440 0,526 0,480
Hidrobag
0,832 1,392 1,112
Parrilla
350
0,089 0,261 0,175
Ducto A&A
0,086 0,102 0,094
Toldo de techo
0,254 0,297 0,275
Tapacloster
Amazon Surtido Cmara plenum de G3 a zona cero 0,214 0,158 0,187
61
Operacin
Cedulacin vidrio de puerta del/tras
Explorer
Cedulacin de tablero
Ductos de A&A, cenicero
Cargo
Ventila
Cedulacin vidrio de puerta
Cedulacin de vidrio de puerta
Surtido de condensadores
Cedulacin de radiadores
Rejilla de A&A y cenicero
350
Ramal de 350
Fusilera
Clster
Control A&A
Base de paral
Ductos de A/A
Tapa columna de direccin
Clster
Tapacloster
Amazon Control de A/A
Guantera
Tapaductos
Botones de tapaciega
Abremaleta
Desempaante
T1
0,897
0,678
1,367
0,461
1,160
0,897
0,396
0,354
0,370
0,278
0,278
0,278
0,089
0,221
0,177
0,313
0,221
0,231
0,108
0,100
0,301
0,005
0,008
0,008
minutos
T2
T3
1,036 0,966
0,672 0,675
1,337 1,317
0,521 0,491
1,255 1,134
1,036 0,966
0,351 0,373
0,340 0,347
0,363 0,367
0,272 0,275
0,272 0,275
0,272 0,275
0,087 0,088
0,217 0,219
0,175 0,176
0,308 0,311
0,217 0,219
0,227 0,229
0,106 0,107
0,099 0,099
0,296 0,299
0,005 0,005
0,007 0,008
0,008 0,008
Operario:
Operario:
Catalogo
Catalogo
Etiquetas
Retrovisores
Explorer Cilindros
Emblemas
Mdulos
Cilindros
350
Emblemas
Mdulos
Cargo
Etiquetas
Tablero
Amazon
Carcaza
Operacin
T1
0,673
0,673
0,673
0,673
0,673
0,610
0,610
0,610
0,684
2,050
0,610
T2
0,620
0,620
0,620
0,620
0,620
0,698
0,698
0,698
0,652
2,117
0,645
T3
0,663
0,663
0,663
0,663
0,663
0,627
0,627
0,627
0,615
2,084
0,628
Operario:
Catalogo
Operacin
Cedulacin de cartn de Puerta
Cedulacin de Moldura de Compuerta
Cedulacin de Moldura de Cuarto Trasero
Explorer Molduras de Bagueta
tapaguantera TR - Z0 - TR
Riel de techo TR - Z0 - TR
Faldones TR-Z0
Tablero TR - Z0
Cedulacin de cartn de Puerta
Ramal de tablero
350
Molduras de Bagueta
Faldones
Ramales de Compartimiento de motor
Cargo
Cedulacin de cartn de Puerta
Carcaza de tablero TR - z0
Amazon
Ramal de tablero
T1
0,294
0,260
0,358
0,339
0,156
0,134
0,129
0,390
0,110
0,260
0,187
0,114
0,136
0,442
0,368
0,130
T2
0,275
0,347
0,380
0,360
0,130
0,118
0,114
0,375
0,095
0,225
0,179
0,103
0,117
0,380
0,375
0,146
T3
0,258
0,301
0,346
0,326
0,146
0,106
0,128
0,385
0,107
0,241
0,168
0,110
0,122
0,421
0,362
0,179
62
Operacin
Consola de Techo
Amortiguadores
Bisagras
Kit de manija de puerta
Cuplon
Explorer Kit de volante
Kit de compuerta
Kit de ramal de puerta
Regletas
Antirruido
Kit de Protectores
Kit Columna de direccin
Soporte de cabina
Cargo
Kit esponja y gomas
Antirruido
Golpeador
Ventila ( Surtido por tarjeta)
Kit Columna de direccin
Kit Reservorio
350
Ramal de corneta ( Surtido por tarjeta)
Goma bota agua
Corneta o claxon ( Surtido por tarjeta)
Golpeadores ( Surtido por tarjeta)
Amazon Kit de columna de direccin
T1
0,205
0,052
0,055
0,085
0,137
0,145
0,608
0,802
0,396
0,426
0,252
0,757
0,327
0,343
0,520
0,036
0,185
0,421
0,094
0,260
0,140
0,131
0,041
0,145
minutos
T2
T3
0,113 0,089
0,038 0,056
0,058 0,060
0,047 0,094
0,161 0,149
0,520 0,332
0,653 0,630
0,413 0,884
0,376 0,386
0,724 0,575
0,136 0,277
0,597 0,677
0,218 0,360
0,198 0,176
0,151 0,157
0,028 0,032
0,355 0,270
0,407 0,414
0,294 0,194
0,303 0,280
0,163 0,213
0,200 0,184
0,071 0,056
0,230 0,184
Pasos
1
2
3
4
6
7
Operaciones estndar
Elementos
Dirigirse hacia la zona donde se encuentra ubicado el montacargas
Verificar estado del montacargas
Diligenciar hoja de preuso
Verificar niveles de inventario de material en cada estacin de la lnea de produccin
Trasladar las cajas hacia la zona de desechos
Trasladar los guacales hacia la zona de desechos
T1
4,210
3,560
1,460
4,420
1,500
7,400
T2
3,470
3,870
1,090
8,380
1,480
5,340
T3
F1
F2
F3
FP
4,030
2
2
2
2
2,795
1
1
1
1
1,275
1
1
1
1
6,400
5
4
6
5
1,580 0,42 0,211 0,125 0
6,370 0,04 0,028 0,159 0
Operario:
Operario:
Catlogo
Operacin
Moldura cuarto trasero (solo LD)
Vidrio parabrisa
Aislante calor
Explorer
Aislante dash panel
Tubera calefaccin A/A cmara trasera
Moldura Parabrisa
Tablero
Vidrio parabrisa
350
Aislante
Vidrio Trasero
Moldura Parabrisa
Vidrio parabrisa
Alfombra piso tras/del (solo LD)
Cargo
Vidrio Trasero
Ventila Techo
minutos
T1
T2
T3
0,618 0,753 0,686
0,509 0,468 0,489
0,490 0,109 0,158
0,182 0,159 0,171
0,502 0,751 0,627
0,144 0,120 0,132
0,654 1,010 0,832
0,672 0,582 0,594
0,110 0,159 0,218
0,049 0,055 0,050
0,066 0,124 0,095
0,608 0,631 0,595
0,598 0,617 0,608
0,099 0,090 0,102
0,179 0,166 0,190
Catlogo
Operacin
Alfombra trasera
Woofer
Cmara Plenum EB Superior
Explorer Vidrio Trasero (Venz - Col)
Vidrio Delantero
Deflector de calor
Tablero
Toldo de techo
350
Vidrio de puerta
Vidrio de puerta
Cargo
Ventila
Complemento de ventila
Amazon Surtido Soporte de tablero
63
T1
0,056
0,028
0,169
0,457
0,421
0,111
0,438
0,158
0,296
0,367
0,052
0,051
0,605
minutos
T2
T3
0,054 0,055
0,028 0,028
0,222 0,380
0,431 0,434
0,463 0,452
0,138 0,125
0,258 0,326
0,136 0,132
0,247 0,271
0,362 0,365
0,055 0,053
0,054 0,046
0,365 0,456
Pasos
1
2
3
4
5
7
Operaciones estndar
T1
T2
T3 F1 F2 F3
Elementos
Verificar niveles de inventario de material en cada estacin de la lnea de produccin 10,690 12,405 9,505 2 3 3
3,555 4,121 4,295 2 2 3
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
0,707 1,144 0,928 2 2 3
Dirigirse hacia la estacin de trabajo.
0,091 0,077 0,084 8 5 9
Ubicar la facilidad en la zona donde se encuentran las piezas a trasegar
0,027 0,031 0,034 6 9 5
Abrir los empaques donde se encuentran las piezas a trasegar.
0,132 0,132 0,099 80 40 70
Ordenar desechos en la paleta para que el montacarguista los retire
Operario:
Catalogo
Operacin
Trasiego de Motor Wipper
Trasiego de Ramal de Piso
Trasiego Hidrobag
Explorer Trasiego Toldo de Techo
Trasiego Cortina de Airbag
Trasiego Radiador
Trasiego ramal compartimiento motor
Trasiego Ramal de Piso
Cargo
Trasiego Motor Wipper
Trasiego Hidrobag
350
Trasiego Ductos A/A
Trasiego Tapa Clster
64
T1
0,350
0,250
0,420
0,300
0,370
0,200
0,120
0,270
0,433
0,120
0,183
0,170
minutos
T2
T3
0,330 0,300
0,266 0,283
0,330 0,470
0,410 0,380
0,320 0,330
0,130 0,130
0,183 0,120
0,200 0,383
0,350 0,583
0,133 0,200
0,250 0,220
0,010 0,183
FP
2,6667
2,3333
2,3333
7,3333
6,6667
63,333
CATLOGO EXPLORER
65
ELABORACION DE KITS
Pasos
1
2
3
4
5
6
7
Elementos
Verificar niveles de inventario de material en cada estacin de la lnea de
produccin.
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
Dirigirse hacia la estacin de trabajo.
Ubicar la facilidad en la zona donde se encuentran las piezas para armar
determinado kit
Tomar las cestas y ubicarlas en la facilidad
Abrir los empaques donde se encuentran las piezas a trasegar.
Proceder a armar el kit
Kits de Compuerta (EB - XLT)
Kits de Ramal de Puerta Lado Izquierdo (EB - XLT)
Kits de Ramal de Puerta Lado Derecho (EB - XLT)
Kits de Principio de Lnea (EB - XLT)
Kits de Manija de Puerta (EB - XLT)
Kit de Freno Eddie Bauer
Kit de Freno XLT
Kit de Cerradura Delantera
Kit de Cerradura Trasera
Kit de Volante (EB - XLT)
Kit de Consola de Techo (EB - XLT)
Kits de Complemento de Cartn de Puerta LD (EB - XLT)
Kits de Complemento de Cartn de Puerta LI (EB - XLT)
Kits de Espejos Retrovisores (EB - XLT / LD - LI)
Kits de Silvin (LD - LI)
Kits de Cinturn de Seguridad (EB - XLT / LD - LI)
Kits de Ramal de Piso Lado derecho
Kits de Ramal de Piso Lado izquierdo
Kit de cerradura (EB - XLT)
Kit de ramal
66
T1
minutos
T2
T3
T.P
Cv
min.
TN Tol
minutos
TE
0,281
1,070 0,301 7%
0,322
0,106
0,024
1,070 0,113 7%
1,070 0,026 7%
1
1
0,121
0,027
0,008
1,070 0,009 7%
0,010
0,003
0,074
1,070 0,003 7%
1,070 0,080 7%
1
1
0,004
0,085
1,044
1,223
1,246
0,571
0,077
0,769
0,941
0,329
0,239
0,593
0,251
1,054
0,946
0,464
0,083
1,334
0,376
0,294
0,032
0,159
1,266
1,165
1,340
0,597
0,104
0,742
1,006
0,305
0,236
0,638
0,239
0,922
0,959
0,425
0,097
0,972
0,348
0,358
0,036
0,171
1,060
1,060
1,060
1,060
1,060
1,120
1,120
1,120
1,120
1,080
1,080
1,120
1,120
1,120
1,030
1,030
1,030
1,030
1,030
1,030
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1,436
1,322
1,520
0,677
0,118
0,890
1,205
0,366
0,282
0,738
0,276
1,105
1,149
0,509
0,107
1,072
0,383
0,395
0,040
0,188
1,487
1,006
1,454
0,849
0,131
0,745
1,266
0,317
0,242
0,690
0,270
0,858
0,779
0,419
0,099
0,741
0,377
0,434
0,041
0,183
1,266
1,267
1,321
0,371
0,104
0,713
0,810
0,270
0,226
0,632
0,196
0,853
1,152
0,392
0,110
0,842
0,290
0,346
0,036
0,171
1,342
1,235
1,421
0,633
0,110
0,831
1,126
0,342
0,264
0,689
0,258
1,032
1,074
0,476
0,100
1,002
0,358
0,369
0,037
0,176
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
TRK: Tiempo requerido para elaborar todos los kit para fabricar una Explorer
0,555
0,420
0,580
1,010
0,042
0,605
0,480
0,720
1,270
0,028
0,580
0,450
0,610
1,560
0,029
0,580
0,450
0,637
1,280
0,033
1,030
1,030
1,030
1,030
1,070
0,597
0,464
0,656
1,318
0,035
7%
7%
7%
7%
7%
1
1
1
1
1
TRK
0,639
0,496
0,702
1,411
0,038
17,632
Cap. Requerida
Cant. Horas Turno
34,000 9,991 1,257
Nota: la elaboracin de kits se realiza de acuerdo a prioridades identificadas en el paso 1, es decir, el material que se presente como crtico en la
lnea de produccin es el que se debe realizar primero, atendiendo a la mezcla del da.
Observaciones:
___________________________________________________________________________________________________________________________
67
CEDULACIONES
Pasos
1
2
3
4
5
6
7
8
Elementos
Verificar niveles de inventario de material en cada estacin de la lnea de
produccin.
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
Dirigirse hacia la estacin de trabajo.
Ubicar la facilidad en la zona donde se encuentran las piezas para realizar
la cedulacin correspondiente
Destapar los empaques donde se encuentran las piezas a trasegar.
Realizar la cedulacin
Cedulacin de Ventila
Cedulacin de Cmara Plenum (EB - XLT)
Cedulacin de Vidrio de puerta (LD - LI / Vzla - Col)
Cedulacin de Tablero (EB - XLT)
Cedulacin de Rieles de Techo
Cedulacin de Moldura de Bagueta (LD - LI)
Cedulacin de Moldura Cuarto Trasero (solo LI)
Cedulacin de Cartones de Puerta Del/Tras. (EB - XLT / LD - LI)
Cedulacin de Deshidratador
Cedulacin Moldura de Compuerta (EB - XLT)
Trasladar hasta el terminal donde ser remolcada
Ordenar desechos en la paleta para que el montacarguista los retire
T1
minutos
T2
T3
T.P
Cv
min.
TN Tol
0,068 0,069
0,063
0,066
0,147 0,124
0,046 0,044
0,125
0,056
0,132
0,048
7%
1,092 0,144 7%
1,092 0,053 7%
0,023 0,018
0,021
0,021
1,092 0,023
0,829 0,628
0,765
0,741
7%
1,092 0,809 7%
0,220
1,270
3,200
2,880
0,810
1,010
0,387
0,760
0,208
0,269
0,010
0,020
0,250
0,700
1,630
2,200
0,530
1,460
0,377
0,655
0,211
0,260
0,010
0,062
0,257
1,250
2,410
2,913
0,620
1,250
0,377
0,695
0,213
0,272
0,011
0,040
1,090
1,110
1,100
1,100
1,080
1,080
1,080
1,060
1,060
1,060
1,092
1,092
0,300
0,580
2,400
3,660
0,520
1,280
0,367
0,669
0,220
0,286
0,012
0,037
1,092 0,073
0,280
1,388
2,651
3,205
0,670
1,350
0,407
0,736
0,226
0,288
0,012
0,044
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
F
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
TRC
minutos
TE
0,078
0,155
0,057
0,025
0,865
0,299
1,485
2,837
3,429
0,716
1,445
0,436
0,788
0,242
0,308
0,012
0,047
13,221
Cap. Requerida
Cant. Horas Turno
34,000 7,492 0,942
Observaciones:
___________________________________________________________________________________________________________________________
68
Pasos
1
2
3
minutos
T2
T3
T.P
Cv
min.
TN
0,639
0,639
1,090
0,696
7%
0,745
1,164
1,076
1,075
1,090
1,171
7%
1,253
0,040
0,852
0,827
0,283
0,503
0,754
0,813
0,503
0,692
0,463
0,587
0,352
0,703
0,542
0,418
0,533
0,320
0,548
0,433
0,732
0,605
0,237
0,950
0,144
0,248
0,034
0,025
0,527
0,285
0,461
0,692
0,802
0,461
0,957
0,577
1,011
0,275
0,736
0,471
0,387
0,621
0,372
0,535
0,442
0,643
0,634
0,232
0,902
0,114
0,232
0,204
0,577
0,700
0,285
0,492
0,738
0,802
0,492
0,957
0,609
0,789
0,355
0,749
0,479
0,388
0,557
0,316
0,536
0,437
0,688
0,631
0,231
0,971
0,114
0,229
1,100
1,100
1,100
1,080
1,080
1,080
1,080
1,080
1,080
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
0,224
0,634
0,770
0,308
0,531
0,797
0,866
0,531
1,034
0,670
0,868
0,390
0,824
0,527
0,427
0,612
0,347
0,589
0,481
0,756
0,694
0,254
1,068
0,125
0,252
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0,240
0,679
0,824
0,330
0,569
0,853
0,927
0,569
1,106
0,716
0,929
0,417
0,882
0,564
0,457
0,655
0,372
0,631
0,515
0,809
0,743
0,272
1,143
0,134
0,270
Elementos
T1
0,470
0,807
0,984
0,537
0,853
0,745
0,288
0,512
0,768
0,791
0,512
1,222
0,786
0,770
0,437
0,808
0,425
0,360
0,516
0,255
0,524
0,437
0,688
0,654
0,225
1,061
0,084
0,207
69
|
Tol
minutos
TE
0,978
0,240
0,181
0,220
0,489
0,171
0,214
0,142
0,596
0,794
0,214
1,285
1,028
0,897
0,678
0,860
0,113
0,192
0,336
1,397
0,429
0,786
0,180
0,931
2,221
0,326
0,205
0,052
0,055
0,085
0,137
0,145
0,608
0,802
0,396
70
0,733
0,333
0,166
0,198
0,361
0,126
0,158
0,105
0,474
0,762
0,158
0,948
1,076
1,036
0,672
0,457
0,110
0,203
0,310
0,568
0,518
0,812
0,231
0,426
0,848
0,748
0,113
0,038
0,058
0,047
0,161
0,520
0,653
0,413
0,376
0,855
0,299
0,174
0,209
0,429
0,150
0,187
0,125
0,563
0,778
0,187
1,126
0,901
0,966
0,675
0,658
0,111
0,198
0,420
0,983
0,473
0,738
0,175
0,678
1,535
0,537
0,089
0,056
0,060
0,094
0,149
0,332
0,630
0,884
0,386
0,855
0,291
0,174
0,209
0,426
0,149
0,186
0,124
0,544
0,778
0,186
1,120
1,002
0,966
0,675
0,658
0,111
0,198
0,355
0,983
0,473
0,779
0,195
0,678
1,535
0,537
0,136
0,049
0,058
0,075
0,149
0,332
0,630
0,700
0,386
1,100
1,100
1,100
1,100
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,110
1,110
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,090
1,090
1,090
1,090
1,090
1,090
1,090
1,090
1,090
0,941
0,320
0,191
0,230
0,460
0,161
0,201
0,134
0,588
0,840
0,201
1,209
1,082
1,073
0,749
0,711
0,120
0,213
0,384
1,061
0,511
0,841
0,211
0,733
1,657
0,580
0,148
0,053
0,063
0,082
0,162
0,362
0,687
0,763
0,421
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1,007
0,342
0,204
0,246
0,493
0,172
0,215
0,143
0,629
0,899
0,215
1,294
1,157
1,148
0,802
0,761
0,129
0,228
0,411
1,136
0,547
0,900
0,226
0,784
1,773
0,621
0,158
0,057
0,067
0,088
0,174
0,388
0,735
0,816
0,450
0,426
0,252
0,673
0,673
0,673
0,673
0,673
0,294
0,260
0,358
0,339
0,129
Antirruido
Kit de Protectores
Etiquetas
Retrovisores
Cilindros
Emblemas
Mdulos
Cedulacin de cartn de Puerta
Cedulacin de Moldura de Compuerta
Cedulacin de Moldura de Cuarto Trasero
Molduras de Bagueta
Faldones
TRS: Tiempo requerido para surtir todos los kit y cedulaciones para fabricar una Explorer.
0,724
0,136
0,620
0,620
0,620
0,620
0,620
0,275
0,347
0,380
0,360
0,114
0,575
0,277
0,663
0,663
0,663
0,663
0,663
0,258
0,301
0,346
0,326
0,128
0,575
0,222
0,652
0,652
0,652
0,652
0,652
0,276
0,303
0,361
0,342
0,124
1,090
1,090
1,090
1,090
1,090
1,090
1,090
1,080
1,080
1,080
1,080
1,080
0,627
0,242
0,711
0,711
0,711
0,711
0,711
0,298
0,327
0,390
0,369
0,134
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
1
1
1
1
1
1
1
1
1
1
1
1
TRS
0,671
0,259
0,760
0,760
0,760
0,760
0,760
0,319
0,350
0,418
0,395
0,143
43,370
Cap. Requerida
Cant. Horas Turno
34,000 24,577 3,091
Observaciones:
___________________________________________________________________________________________________________________________
71
Pasos
Elementos
1
Dirigirse hacia la zona donde se encuentra ubicado el montacargas
2
Verificar estado del montacargas
3
Diligenciar hoja de preuso
Verificar niveles de inventario de material en cada estacin de la lnea de
4
produccin
5
Surtido de partes por llamada
Moldura cuarto trasero
Vidrio Parabrisa
Aislante de calor
Aislante dash panel
Tubera calefaccin A/A cmara trasera
Moldura Parabrisa
Alfombra trasera
Woofer
Cmara Plenum EB Superior
Vidrio Trasero (Venz - Col)
Vidrio Delantero
Deflector de calor
Tablero
6
Trasladar las cajas hacia la zona de desechos
7
Trasladar los guacales hacia la zona de desechos
TRM: Tiempo requerido para surtir las partes por llamada para fabricar una Explorer
minutos
T1
T2
T3
0,082 0,067 0,078
0,035 0,038 0,027
0,014 0,011 0,012
T.P
0,076
0,033
0,012
min.
Cv
TN
1,150 0,087
1,150 0,038
1,150 0,014
Tol
7%
7%
7%
F
1
1
1
minutos
TE
0,093
0,041
0,015
0,215 0,407
0,311
0,311
1,150 0,357 7%
0,382
0,618
0,509
0,490
0,182
0,502
0,144
0,056
0,028
0,169
0,457
0,421
0,111
0,438
0,006
0,003
0,686
0,489
0,158
0,171
0,627
0,132
0,055
0,028
0,380
0,434
0,452
0,125
0,326
0,006
0,002
0,686
0,489
0,252
0,171
0,627
0,132
0,055
0,028
0,257
0,441
0,445
0,125
0,341
0,006
0,002
1,120
1,120
1,120
1,120
1,120
1,120
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,150
1,150
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
TRM
0,822
0,586
0,302
0,205
0,751
0,158
0,064
0,033
0,302
0,519
0,524
0,147
0,401
0,008
0,003
5,356
0,753
0,468
0,109
0,159
0,751
0,120
0,054
0,028
0,222
0,431
0,463
0,138
0,258
0,006
0,002
0,768
0,547
0,283
0,191
0,702
0,148
0,060
0,031
0,283
0,485
0,490
0,137
0,375
0,007
0,003
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
Cap. Requerida
Cant. Horas Turno
34,000 3,035 0,382
Observaciones:
___________________________________________________________________________________________________________________
72
Pasos
1
2
3
4
5
6
T1
Elementos
Verificar niveles de inventario de material en cada estacin de la lnea de
produccin
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
Dirigirse hacia la estacin de trabajo.
Ubicar la facilidad en la zona donde se encuentran las piezas a trasegar
Abrir los empaques donde se encuentran las piezas a trasegar.
Trasiego de
Trasiego de Motor Wipper
Trasiego de Ramal de Piso
Trasiego Hidrobag
Trasiego Toldo de Techo
Trasiego Cortina de Airbag
Trasiego Radiador
Trasiego ramal compartimiento motor
Ordenar desechos en la paleta para que el montacarguista los retire
TRT: Tiempo requerido para trasegar todas las partes por llamada para fabricar una Explorer.
minutos
T2
T3
T.P
Cv
min.
TN Tol
minutos
TE
0,277 0,321
0,246
0,281
1,090 0,307 7%
0,328
0,081
0,016
0,007
0,002
0,093
0,026
0,006
0,002
0,097
0,021
0,006
0,002
0,090
0,021
0,006
0,002
1,090
1,090
1,090
1,090
0,099
0,023
0,007
0,002
7%
7%
7%
7%
1
1
1
1
0,105
0,024
0,007
0,002
0,350
0,250
0,420
0,300
0,370
0,200
0,120
0,081
0,330
0,266
0,330
0,410
0,320
0,130
0,183
0,081
0,300
0,283
0,470
0,380
0,330
0,130
0,120
0,061
0,327
0,266
0,407
0,363
0,340
0,153
0,141
0,074
1,090
1,090
1,090
1,090
1,090
1,090
1,090
1,090
0,356
0,290
0,443
0,396
0,371
0,167
0,154
0,081
7%
7%
7%
7%
7%
7%
7%
7%
1
1
1
1
1
1
1
1
TRT
0,381
0,311
0,474
0,424
0,397
0,179
0,164
0,087
2,884
Cap. Requerida
Cant. Horas Turno
34,000 1,634 0,206
Observaciones:
________________________________________________________________________________________________________________________________
73
CATLOGO F - 350
74
ELABORACION DE KITS
Pasos
1
2
3
4
5
6
7
Elementos
Verificar niveles de inventario de material en cada estacin de la lnea de
produccin.
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
Dirigirse hacia la estacin de trabajo.
Ubicar la facilidad en la zona donde se encuentran las piezas para armar
determinado kit
Tomar las cestas y ubicarlas en la facilidad
Abrir los empaques donde se encuentran las piezas a trasegar.
Proceder a armar el kit
Kits de Ramal de Techo y Puerta
Kit de Freno
Kit de Cerradura
Kit de Columna de Direccin
Kit de Reservorio
Kit Palanca de Freno
Ramal
Claxon
Kits de Complemento de Cartn de Puerta (LD - LI)
Kits de Espejos Retrovisores (LD - LI)
Kits de Silvin (LD - LI)
Kits de Cinturn de Seguridad (LD - LI)
Kits de Manguera de Radiador (LD - LI)
Kits de Faldones (LD - LI)
Kits de Deflector de Condensador
Ordenar desechos en la paleta para que el montacarguista los retire
T1
minutos
T2
T3
T.P
Cv
75
minutos
TE
0,281
1,070 0,301 7%
0,322
0,106
0,024
1,070 0,113 7%
1,070 0,026 7%
1
1
0,121
0,027
0,008
1,070 0,009 7%
0,010
0,003
0,074
1,070 0,003 7%
1,070 0,080 7%
1
1
0,004
0,085
0,398
1,235
0,610
0,040
0,939
0,092
0,038
0,028
0,661
0,218
0,622
0,239
0,169
2,020
0,580
0,042
0,515
1,147
0,523
0,041
0,708
0,102
0,032
0,028
0,650
0,218
0,502
0,234
0,172
2,107
0,637
0,033
1,060
1,120
1,120
1,080
1,080
1,080
1,080
1,080
1,120
1,120
1,030
1,030
1,030
1,030
1,030
1,070
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
TRK
0,584
1,375
0,626
0,048
0,818
0,117
0,037
0,032
0,779
0,261
0,554
0,258
0,189
2,322
0,702
0,038
9,308
0,717
1,096
0,488
0,032
0,538
0,098
0,031
0,027
0,713
0,218
0,507
0,240
0,173
2,700
0,720
0,028
0,430
1,110
0,470
0,052
0,647
0,115
0,028
0,029
0,576
0,217
0,378
0,222
0,173
1,600
0,610
0,029
Cap. Requerida
Cant. Horas Turno
54,000 8,377 1,054
TRK: Tiempo requerido para elaborar todos los kit para fabricar un F-350
min.
TN Tol
0,546
1,285
0,585
0,045
0,765
0,110
0,035
0,030
0,728
0,244
0,517
0,241
0,177
2,170
0,656
0,035
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
CEDULACIONES
Pasos
1
2
3
4
5
6
7
8
Elementos
Verificar niveles de inventario de material en cada estacin de la lnea de
produccin.
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
Dirigirse hacia la estacin de trabajo.
Ubicar la facilidad en la zona donde se encuentran las piezas para realizar la
cedulacin correspondiente
Destapar los empaques donde se encuentran las piezas a trasegar.
Realizar la cedulacin
Cedulacin Parrilla
Cedulacin Motor Wipper
Cedulacin de ramal de piso
Cedulacin de Cmara Plenum
Cedulacin de Evaporadores
Cedulacin Condensadores
Cedulacin Radiadores
Cedulacin de Vidrio de Puerta (LD - LI)
Cedulacin de Moldura de Bagueta (LD - LI)
Cedulacin de Cartones de Puerta (LD - LI)
Cedulacin de Ramal de Piso
Ramal de Tablero (4x4 - 4x2) (kanban)
Trasladar hasta el terminal donde ser remolcada
Ordenar desechos en la paleta para que el montacarguista los retire
76
T1
minutos
T2
T3
T.P
Cv
min.
TN Tol
0,068 0,069
0,063
0,066
0,147 0,124
0,046 0,044
0,125
0,056
0,132
0,048
7%
1,092 0,144 7%
1,092 0,053 7%
0,023 0,018
0,021
0,021
1,092 0,023
0,829 0,628
0,765
0,741
7%
1,092 0,809 7%
0,270
0,100
0,420
0,560
0,160
0,210
0,120
0,320
0,130
0,742
0,674
0,485
0,010
0,020
0,133
0,200
0,530
1,200
0,550
0,220
0,133
0,440
0,130
0,853
0,635
0,472
0,010
0,062
0,184
0,240
0,457
0,940
0,347
0,207
0,112
0,437
0,120
0,763
0,628
0,479
0,011
0,040
1,090
1,100
1,080
1,080
1,110
1,100
1,080
1,090
1,090
1,060
1,060
1,060
1,092
1,092
0,150
0,420
0,420
1,060
0,330
0,190
0,083
0,550
0,100
0,693
0,575
0,479
0,012
0,037
1,092 0,073
Cap. Requerida
Cant. Horas Turno
54,000 6,213 0,781
0,201
0,264
0,493
1,015
0,385
0,227
0,121
0,476
0,131
0,808
0,666
0,507
0,012
0,044
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
F
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
TRC
minutos
TE
0,078
0,155
0,057
0,025
0,865
0,215
0,282
0,528
1,086
0,412
0,243
0,129
0,509
0,140
0,865
0,712
0,543
0,012
0,047
6,903
Pasos
1
2
3
Elementos
Verificar niveles de inventario de material en cada estacin de la lnea
de produccin.
Dirigirse hacia la estacin de trabajo donde debe recoger la facilidad.
Surtido de
Kit de freno
Kit de cerradura
Kit espejos retrovisores
Cedulacin cartn pta Del/Tras.
Cedulacin Cmara Plenum
Cedulacin de Evaporadores
Cedulacin moldura
Ramal compartimiento de motor
Kit Cinturn seguridad
Kit complemento cartn de puerta
Kit de silvin
Soporte de radiador
Freno de mano
Aislante
Kit de faldones
Kit de deflector de condensador y tubera
Goma de marco de puerta Est. 37
Goma corredera de vidrio Est. 20-21
Goma de vidrio trasero y compuerta Est. 2
Goma rejilla coraza Est. 34
tubera aceite hidrulico Est. 31
Rejilla de coraza Est. 35
Papel de agua puerta Est. 36
Motor Wipper
Hidrobag
Parrilla
77
T1
minutos
T2
T3
T.P
Cv
min.
TN
Tol
minutos
TE
0,470
0,807
0,639
0,639
1,090
0,696
7%
0,745
0,984
1,164
1,076
1,075
1,090
1,171
7%
1,253
0,916
0,956
0,870
0,192
0,256
0,755
0,200
0,384
0,255
0,893
0,404
0,173
0,145
0,134
0,311
0,279
0,186
0,438
0,225
0,082
0,231
0,181
0,178
0,128
0,214
0,380
0,834
0,857
0,965
0,189
0,167
0,613
0,197
0,377
0,236
0,721
0,352
0,384
0,142
0,160
0,186
0,358
0,228
0,442
0,237
0,177
0,192
0,221
0,161
0,094
0,158
0,281
0,583
0,931
0,616
0,173
0,212
0,684
0,180
0,346
0,240
1,077
0,368
0,272
0,143
0,163
0,258
0,351
0,207
0,434
0,232
0,129
0,196
0,242
0,171
0,112
0,187
0,333
0,778
0,915
0,817
0,185
0,212
0,684
0,192
0,369
0,244
0,897
0,375
0,276
0,143
0,152
0,252
0,329
0,207
0,438
0,231
0,129
0,206
0,215
0,170
0,111
0,186
0,331
1,100
1,100
1,100
1,080
1,080
1,080
1,080
1,080
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,080
1,080
1,080
0,855
1,006
0,899
0,199
0,229
0,739
0,208
0,399
0,268
0,987
0,412
0,304
0,158
0,168
0,277
0,362
0,228
0,482
0,254
0,142
0,227
0,236
0,187
0,120
0,201
0,358
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0,915
1,077
0,962
0,213
0,245
0,790
0,222
0,426
0,287
1,056
0,441
0,325
0,169
0,179
0,296
0,388
0,244
0,516
0,272
0,152
0,243
0,253
0,200
0,129
0,215
0,383
0,232
0,128
0,856
0,428
0,128
0,285
0,897
0,396
0,354
0,370
0,278
0,278
0,278
0,089
0,079
0,440
0,832
0,089
0,086
0,254
0,185
0,421
0,094
0,260
0,140
0,131
0,041
0,610
0,610
0,610
0,390
0,110
0,260
0,187
0,114
Cmara plenum
Condensadores
Radiadores
Ducto A/A
Toldo de Techo
Tapacloster
Cedulacin de vidrio de puerta
Surtido de condensadores
Cedulacin de radiadores
Rejilla de A/A y cenicero
Ramal de 350
Fusilera
Clster
Control A/A
Motor Wipper
Hidrobag
Parrilla
Ducto A/A
Toldo de Techo
Tapacloster
Ventila ( Surtido por tarjeta)
Kit Columna de direccin
Kit Reservorio
Ramal de corneta ( Surtido por tarjeta)
Goma bota agua
Corneta o claxon ( Surtido por tarjeta)
Golpeadores ( Surtido por tarjeta)
Cilindros
Emblemas
Mdulos
Carcaza de tablero
Cedulacin de cartn de Puerta
Ramal de tablero
Molduras de Bagueta
Faldones
78
0,265
0,210
0,632
0,316
0,094
0,210
1,036
0,351
0,340
0,363
0,272
0,272
0,272
0,087
0,082
0,526
1,392
0,261
0,102
0,297
0,355
0,407
0,294
0,303
0,163
0,200
0,071
0,698
0,698
0,698
0,375
0,095
0,225
0,179
0,103
0,249
0,250
0,750
0,375
0,112
0,250
0,966
0,373
0,347
0,367
0,275
0,275
0,275
0,088
0,103
0,480
1,112
0,175
0,094
0,275
0,270
0,414
0,194
0,280
0,213
0,184
0,056
0,627
0,627
0,627
0,385
0,107
0,241
0,168
0,110
0,249
0,196
0,746
0,373
0,111
0,248
0,966
0,373
0,347
0,367
0,275
0,275
0,275
0,088
0,088
0,482
1,112
0,175
0,094
0,275
0,270
0,414
0,194
0,281
0,172
0,172
0,056
0,645
0,645
0,645
0,383
0,104
0,242
0,178
0,109
1,080
1,080
1,080
1,080
1,080
1,080
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,080
1,080
1,080
1,080
1,080
1,080
1,090
1,090
1,090
1,090
1,090
1,090
1,090
1,090
1,090
1,090
1,080
1,080
1,080
1,080
1,080
0,269
0,212
0,806
0,403
0,120
0,268
1,073
0,414
0,385
0,407
0,305
0,305
0,305
0,098
0,095
0,521
1,201
0,189
0,102
0,297
0,294
0,451
0,211
0,306
0,187
0,187
0,061
0,703
0,703
0,703
0,414
0,112
0,261
0,192
0,118
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0,287
0,226
0,862
0,431
0,129
0,287
1,148
0,443
0,412
0,435
0,327
0,327
0,327
0,105
0,102
0,557
1,285
0,202
0,109
0,318
0,315
0,483
0,226
0,328
0,201
0,200
0,065
0,752
0,752
0,752
0,443
0,120
0,280
0,206
0,126
0,136
TRS: Tiempo requerido para surtir todos los kit y cedulaciones para fabricar un F-350
0,117
0,122
0,125
1,080
0,135
7%
1
TRS
0,144
26,308
Cap. Requerida
Cant. Horas Turno
54,000 23,677 2,978
Observaciones_____________________________________________________________________________________________________________
79
Pasos
Elementos
1
Dirigirse hacia la zona donde se encuentra ubicado el montacargas
2
Verificar estado del montacargas
3
Diligenciar hoja de preuso
Verificar niveles de inventario de material en cada estacin de la lnea de
4
produccin
5
Surtido de partes por llamada
Tablero
Vidrio parabrisa
Aislante
Vidrio Trasero
Moldura Parabrisa
Toldo de techo
Vidrio de puerta
6
Trasladar las cajas hacia la zona de desechos
7
Trasladar las guacales hacia la zona de desechos
TRM: Tiempo requerido para surtir las partes por llamada para fabricar un F-350
minutos
T1
T2
T3
0,082 0,067 0,078
0,035 0,038 0,027
0,014 0,011 0,012
T.P
0,076
0,033
0,012
min.
Cv
TN
1,150 0,087
1,150 0,038
1,150 0,014
Tol
7%
7%
7%
F
1
1
1
minutos
TE
0,093
0,041
0,015
0,215 0,407
0,311
0,311
1,150 0,357 7%
0,382
0,654
0,672
0,110
0,049
0,066
0,158
0,296
0,003
0,002
0,832
0,594
0,218
0,050
0,095
0,132
0,271
0,003
0,002
0,832
0,616
0,162
0,051
0,095
0,142
0,271
0,006
0,002
1,120
1,120
1,120
1,120
1,120
1,100
1,100
1,150
1,150
1
1
1
1
1
1
1
1
1
TRM
0,997
0,738
0,195
0,062
0,114
0,167
0,319
0,008
0,003
3,134
1,010
0,582
0,159
0,055
0,124
0,136
0,247
0,003
0,001
0,932
0,690
0,182
0,057
0,106
0,156
0,298
0,007
0,003
7%
7%
7%
7%
7%
7%
7%
7%
7%
Cap. Requerida
Cant. Horas Turno
54,000 2,820 0,355
Observaciones:
___________________________________________________________________________________________________________________
80
Pasos
1
2
3
4
5
6
Elementos
Verificar niveles de inventario de material en cada estacin de la lnea de
produccin
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
Dirigirse hacia la estacin de trabajo.
Ubicar la facilidad en la zona donde se encuentran las piezas a trasegar
Abrir los empaques donde se encuentran las piezas a trasegar.
Trasiego de
Trasiego Hidrobag
Trasiego Ductos A/A
Trasiego Tapa Clster
Ordenar desechos en la paleta para que el montacarguista los retire
TRT: Tiempo requerido para trasegar todas las partes por llamada para fabricar un F-350
T1
minutos
T2
T3
T.P
Cv
min.
TN
Tol
minutos
TE
0,277 0,321
0,246
0,281
0,328
0,081 0,093
0,016 0,026
0,097
0,021
0,090
0,021
1,090 0,099 7%
1,090 0,023 7%
1
1
0,105
0,024
0,007 0,006
0,006
0,006
1,090 0,007 7%
0,007
0,002 0,002
0,002
0,002
1,090 0,002 7%
0,002
0,120
0,183
0,170
0,081
0,200
0,220
0,183
0,061
0,151
0,218
0,121
0,074
1,090
1,090
1,090
1,090
1
1
1
1
TRT
0,176
0,254
0,141
0,087
1,125
0,133
0,250
0,010
0,081
0,165
0,237
0,132
0,081
7%
7%
7%
7%
Cap. Requerida
Cant. Horas Turno
54,000 1,013 0,127
Observaciones:
___________________________________________________________________________________________________________________
81
CATLOGO CARGO
82
ELABORACION DE KITS
Pasos
1
2
3
4
5
6
7
Elementos
Verificar niveles de inventario de material en cada estacin de la lnea de
produccin.
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
Dirigirse hacia la estacin de trabajo.
Ubicar la facilidad en la zona donde se encuentran las piezas para armar
determinado kit
Tomar las cestas y ubicarlas en la facilidad
Abrir los empaques donde se encuentran las piezas a trasegar.
Proceder a armar el kit
Kits de Cocuyo de Techo
Kits de Grumer
Kits de Soporte de Asiento
Kit de Freno 815
Kit de Freno 1721
Kits de Cerradura (LD - LI)
Kit de complemento de Cerradura (LD - LI)
Kits de Columna de Direccin (815 - 1721)
Kits de Complemento de Cartn de Puerta (LD - LI)
Kits de Espejos Retrovisores (815 - 1721 / LD - LI)
Kits de Cinturn de Seguridad (LD - LI)
Kits Canaleta de Estribo (LD - LI)
Kits Cerradura Cabina
Pin de remolque 815
Pin de remolque 1721
Ordenar desechos en la paleta para que el montacarguista los retire
T1
minutos
T2
T3
T.P
Cv
min.
TN
83
0,277
0,321
0,246
0,281
1,070
0,301
7%
0,322
0,113
0,018
0,107
0,030
0,097
0,024
0,106
0,024
1,070
1,070
0,113
0,026
7%
7%
1
1
0,121
0,027
0,009
0,008
0,008
0,008
1,070
0,009
7%
0,010
0,003
0,081
0,003
0,081
0,003
0,061
0,003
0,074
1,070
1,070
0,003
0,080
7%
7%
1
1
0,004
0,085
1,456
0,666
0,455
1,595
1,883
0,184
0,787
0,810
0,989
0,735
0,488
0,376
0,207
0,144
0,176
0,042
0,875
1,003
0,515
1,439
1,645
0,283
0,745
0,675
1,166
0,741
0,696
0,345
0,214
0,168
0,181
0,028
0,977
0,771
0,536
1,517
1,764
0,794
0,766
0,810
1,021
0,850
0,592
0,422
0,211
0,153
0,169
0,029
1,103
0,813
0,502
1,517
1,764
0,420
0,766
0,765
1,059
0,775
0,592
0,381
0,211
0,155
0,175
0,033
1,060
1,060
1,060
1,120
1,120
1,120
1,120
1,080
1,120
1,120
1,060
1,030
1,030
1,030
1,030
1,070
1,169
0,862
0,532
1,699
1,976
0,471
0,858
0,826
1,186
0,868
0,628
0,392
0,217
0,160
0,181
0,035
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
TRK
1,251
0,922
0,569
1,818
2,114
0,504
0,918
0,884
1,269
0,929
0,671
0,420
0,232
0,171
0,193
0,038
13,472
Cap. Requerida
Cant. Horas Turno
15,000 3,368 0,424
TRK: Tiempo requerido para elaborar todos los kit para fabricar un Cargo
Tol
minutos
TE
CEDULACIONES
Pasos
1
2
3
4
5
6
7
8
Elementos
Verificar niveles de inventario de material en cada estacin de la lnea de
produccin.
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
Dirigirse hacia la estacin de trabajo.
Ubicar la facilidad en la zona donde se encuentran las piezas para realizar la
cedulacin correspondiente
Destapar los empaques donde se encuentran las piezas a trasegar.
Realizar la cedulacin
Cedulacin de Cmara Plenum y evaporadores
Trasiego de Toldo y Respaldo (815 - 1721)
Cedulacin de Vidrio de Puerta (LD - LI)
Cedulacin de Tapa Guantera
Cedulacin de Cartones de Puerta (LD - LI)
Trasladar hasta el terminal donde ser remolcada
Ordenar desechos en la paleta para que el montacarguista los retire
T1
minutos
T2
T3
T.P
Cv
min.
TN Tol
0,066
0,132
0,048
7%
1,092 0,144 7%
1,092 0,053 7%
0,021
1,092 0,023
0,741
7%
1,092 0,809 7%
1,280
0,412
0,250
0,110
0,540
0,010
0,020
2,270
0,391
0,227
0,187
0,516
0,011
0,040
1,100
1,100
1,100
1,100
1,060
1,092
1,092
3,120
0,375
0,230
0,160
0,480
0,012
0,037
2,410
0,387
0,200
0,290
0,527
0,010
0,062
1,092 0,073
2,497
0,430
0,249
0,205
0,547
0,012
0,044
7%
7%
7%
7%
7%
7%
7%
F
1
1
1
1
1
1
1
1
1
1
1
1
TRC
minutos
TE
0,078
0,155
0,057
0,025
0,865
2,672
0,461
0,267
0,220
0,585
0,012
0,047
5,441
Cap. Requerida
Cant. Horas Turno
15,000 1,360 0,171
Observaciones_____________________________________________________________________________________________________________
84
Pasos
1
2
5
Elementos
Verificar niveles de inventario de material en cada estacin de la lnea
de produccin.
Dirigirse hacia la estacin de trabajo donde debe recoger la facilidad.
Surtido de
Kit de freno
Kit de cerradura
Kit espejos retrovisores
Cedulacin Cmara y Evaporador
Cedulacin cartn pta Del/Tras.
Cedulacin Tapa Guantera
Kit cinturn de seguridad
Kit de cerradura de cabina
Kit Complemento de faldn
Goma de marco de puerta Est 24
Goma de vidrio trasero y compuerta Est. 2
Goma parabrisa Est. 34
Goma de ventila (Lder) Est. 22
Ventila corredera de vidrio (Lizq)
Deflector
Papel de agua puerta Est.36
Aislante calor
Ramal de piso
Respaldo
Motor Wipper
Ductos de A/A, cenicero e indicadores de gasolina
Ventila
Cedulacin vidrio de puerta
Ramal de piso
Respaldo
85
T1
minutos
T2
T3
T.P
Cv
min.
TN
Tol
minutos
TE
0,470
0,807
0,639
0,639
1,090
0,696
7%
0,745
0,984
1,164
1,076
1,075
1,090
1,171
7%
1,253
1,060
0,632
0,545
1,153
0,768
0,461
0,580
0,352
0,342
0,381
0,225
0,528
0,149
0,423
0,354
0,105
0,470
0,285
2,056
0,071
1,367
0,461
1,160
0,359
0,816
0,872
0,511
0,476
0,753
0,754
0,453
0,944
0,361
0,360
0,360
0,237
0,679
0,213
0,554
0,414
0,096
0,542
0,210
1,518
0,052
1,337
0,521
1,255
0,266
0,870
0,672
0,936
0,486
0,953
0,692
0,415
0,509
0,374
0,350
0,370
0,232
0,603
0,181
0,426
0,384
0,101
0,607
0,250
1,802
0,062
1,317
0,491
1,134
0,312
0,982
0,868
0,693
0,502
0,953
0,738
0,443
0,678
0,362
0,351
0,370
0,231
0,603
0,181
0,468
0,384
0,101
0,540
0,248
1,792
0,062
1,340
0,491
1,183
0,312
0,889
1,100
1,100
1,100
1,080
1,080
1,080
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,080
1,080
1,080
1,110
1,110
1,110
1,080
1,080
0,955
0,762
0,553
1,029
0,797
0,478
0,745
0,399
0,386
0,407
0,254
0,664
0,199
0,514
0,422
0,111
0,594
0,268
1,935
0,067
1,488
0,545
1,313
0,337
0,960
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1,022
0,816
0,591
1,101
0,853
0,512
0,798
0,426
0,413
0,436
0,272
0,710
0,213
0,550
0,452
0,118
0,635
0,287
2,071
0,071
1,592
0,583
1,405
0,361
1,028
0,126
0,757
0,327
0,343
0,520
0,036
0,684
0,442
Motor Wipper
Kit Columna de direccin
Soporte de cabina
Kit esponja y gomas
Antirruido
Golpeador
Etiquetas
Cedulacin de cartn de Puerta
TRS: Tiempo requerido para surtir todos los kit y cedulaciones para fabricar un Cargo
0,151
0,597
0,218
0,198
0,151
0,028
0,652
0,380
0,194
0,677
0,360
0,176
0,157
0,032
0,615
0,421
0,157
0,677
0,302
0,239
0,276
0,032
0,650
0,414
1,080
1,090
1,090
1,090
1,090
1,090
1,090
1,080
0,170
0,738
0,329
0,261
0,301
0,035
0,709
0,447
7%
7%
7%
7%
7%
7%
7%
7%
1
1
1
1
1
1
1
1
TRS
0,181
0,790
0,352
0,279
0,322
0,037
0,758
0,479
22,513
Cap. Requerida
Cant. Horas Turno
15,000 5,628 0,708
Observaciones____________________________________________________________________________________________________________
_
86
Pasos
Elementos
1
Dirigirse hacia la zona donde se encuentra ubicado el montacargas
2
Verificar estado del montacargas
3
Diligenciar hoja de preuso
Verificar niveles de inventario de material en cada estacin de la lnea de
4
produccin
5
Surtido de partes por llamada
Vidrio parabrisa
Alfombra piso tras/del
Vidrio Trasero
Ventila Techo
Vidrio de puerta
Ventila
Complemento de ventila
6
Trasladar las cajas hacia la zona de desechos
7
Trasladar las guacales hacia la zona de desechos
minutos
T1
T2
T3
0,082 0,067 0,078
0,035 0,038 0,027
0,014 0,011 0,012
T.P
0,076
0,033
0,012
min.
Cv
TN
1,150 0,087
1,150 0,038
1,150 0,014
Tol
7%
7%
7%
F
1
1
1
minutos
TE
0,093
0,041
0,015
0,215 0,407
0,311
0,311
1,150 0,357 7%
0,382
0,608
0,598
0,099
0,179
0,367
0,052
0,051
0,002
0,011
0,595
0,608
0,102
0,190
0,365
0,053
0,046
0,002
0,010
0,611
0,608
0,097
0,178
0,365
0,053
0,050
0,006
0,002
1,120
1,120
1,120
1,120
1,100
1,100
1,100
1,150
1,150
1
1
1
1
1
1
1
1
1
TRM
0,733
0,728
0,116
0,214
0,429
0,062
0,059
0,008
0,003
2,884
0,631
0,617
0,090
0,166
0,362
0,055
0,054
0,002
0,008
0,685
0,681
0,109
0,200
0,401
0,058
0,055
0,007
0,003
7%
7%
7%
7%
7%
7%
7%
7%
7%
TRM: Tiempo requerido para surtir las partes por llamada para fabricar un Cargo
Cant. Horas Turno
15,000 0,721 0,091
Observaciones:
___________________________________________________________________________________________________________________
87
Pasos
1
2
3
4
5
Elementos
Verificar niveles de inventario de material en cada estacin de la lnea de
produccin
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
Dirigirse hacia la estacin de trabajo.
Ubicar la facilidad en la zona donde se encuentran las piezas a trasegar
Abrir los empaques donde se encuentran las piezas a trasegar.
Trasiego Ramal de Piso
Trasiego Motor Wipper
Trasiego de Toldo y Respaldo (815 - 1721)
Ordenar desechos en la paleta para que el montacarguista los retire
T1
minutos
T2
T3
T.P
Cv
min.
TN Tol
minutos
TE
0,277 0,321
0,246
0,281
1,090 0,307 7%
0,328
0,081 0,093
0,016 0,026
0,097
0,021
0,090
0,021
1,090 0,099 7%
1,090 0,023 7%
1
1
0,105
0,024
0,007 0,006
0,006
0,006
1,090 0,007 7%
0,007
0,002
0,270
0,433
0,412
0,081
0,002
0,383
0,583
0,387
0,061
0,002
0,284
0,455
0,391
0,074
1,090
1,090
1,090
1,100
1,090
1
1
1
1
1
TRT
0,002
0,332
0,531
0,461
0,087
1,877
0,002
0,200
0,350
0,375
0,081
0,002
0,310
0,496
0,430
0,081
7%
7%
7%
7%
7%
TRT: Tiempo requerido para trasegar todas las partes por llamada para fabricar un Cargo
Cant. Horas Turno
15,000 0,469 0,059
Observaciones:
___________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________
88
89
Pasos
1
2
3
Elementos
Verificar niveles de inventario de material en cada estacin de la lnea de
produccin.
Dirigirse hacia la estacin de trabajo donde debe recoger la facilidad.
Surtido de
Elaboracin Kit de Columna de Direccin
Surtido Kit de Columna de Direccin
Base de paral
Ductos de A/A
Tapa columna de direccin
Clster
Tapacloster
Control de A/A
Guantera
Tapaductos
Botones de tapaciega
Abremaleta
Desempaante
Cedulacin Cmara plenum
Armado Soporte de tablero
Cedulacin Ramal de tablero (A1V - A4V - A5V)
Surtido Soporte de tablero
Surtido Cmara Plenum de zona cero a la lnea
Surtido Cmara plenum de galpn 3 a zona cero
Surtido de carcaza de tablero
Cmara plenum
Surtido de tablero desde monorriel a pasajeros
Surtido Carcaza de zona cero a monorriel
Carcaza de tablero
Ramal de tablero
T1
minutos
T2
T3
T.P
Cv
Tol
min.
TE
0,723 1,241
0,982
0,982
1,090
1,070 7%
1,145
1,513 1,790
1,654
1,652
1,090
1,801 7%
1,927
0,379
0,145
0,221
0,177
0,313
0,221
0,231
0,108
0,100
0,301
0,060
0,090
0,052
0,560
0,500
0,365
0,605
0,228
0,214
0,214
0,174
2,050
0,610
0,368
0,130
0,428
0,184
0,219
0,176
0,311
0,219
0,229
0,107
0,099
0,299
0,065
0,074
0,063
1,200
0,583
0,347
0,456
0,229
0,187
0,187
0,187
2,084
0,628
0,362
0,179
0,376
0,186
0,219
0,176
0,311
0,219
0,229
0,107
0,099
0,299
0,065
0,083
0,061
0,940
0,461
0,365
0,475
0,229
0,186
0,186
0,187
2,084
0,628
0,368
0,152
1,080
1,090
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,090
1,030
1,060
1,100
1,080
1,090
1,080
1,080
1,080
1,080
1,080
1,080
0,406
0,203
0,243
0,195
0,345
0,243
0,254
0,119
0,110
0,332
0,073
0,092
0,068
1,025
0,475
0,387
0,523
0,247
0,203
0,201
0,202
2,250
0,678
0,398
0,164
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
TR
0,434
0,217
0,260
0,209
0,369
0,260
0,272
0,127
0,118
0,355
0,078
0,099
0,073
1,096
0,508
0,414
0,559
0,265
0,217
0,215
0,216
2,408
0,725
0,426
0,175
13,167
0,320
0,230
0,217
0,175
0,308
0,217
0,227
0,106
0,099
0,296
0,071
0,085
0,068
1,060
0,300
0,382
0,365
0,230
0,158
0,158
0,199
2,117
0,645
0,375
0,146
Cap. Requerida
Cant. Horas Turno
67,000 14,703 1,849
90
min.
TN
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
16,00
Tiempo (min)
14,00
14,03
12,00
10,00
7,68
8,00
6,00
7,51
5,62 5,68 5,22
5,07
4,35
3,79
4,00
2,00
3,86
2,74
1,01
2,82
1,95
1,34 1,74
1,48
3,80
1,62
1,99
0,00
1
10
11
12
13
14
15
16
Operarios
T. Estandar Operaciones
Lineal (TKT)
91
17
18
19
20
21
22
10,00
8,83
8,00
6,00
4,00
3,16
2,40
2,00
2,00
0,58
2,12
3,52
3,14
2,95
1,90
2,95
2,57
1,88
1,82
2,26
2,11
1,32
0,51
0,49
0,00
1
10
11
12
13
14
15
16
Operarios
T. Estndar Operaciones
Lineal (Serie2)
92
17
18
19
20
21
22
35,00
31,80
30,00
25,00
20,00
15,00
10,00
5,35
5,00
2,74
0,88
2,20
3,59
1,69
0,86
2,43
0,27
0,22
0,58
10
2,47
3,39
1,64
2,43
3,58
1,57
1,78
17
18
0,76
0,48
19
20
1,79
0,55
0,00
1
11
12
13
14
15
16
Operarios
T. Estandar Operaciones
Lineal (TKT)
93
21
22
Tiempo (min)
(Fabricacion de un vehiculo)
8,00
7,00
6,00
5,00
4,00
3,00
2,00
1,00 0,43
0,00
3
7,12
3,13
2,22
1,10
0,51
0,41
0,26
0,43
10
12
15
16
0,22
0,22
17
18
19
0,60
0,56
20
22
Operarios
T. Estndar Operaciones
Lineal (TKT)
Nota: Las barras hacen referencia al tiempo estndar en minutos, que le toma a cada operario realizar todas las operaciones
para fabricar una Explorer, un F-350, un Cargo y un Fiesta Amazon, ya sean Kits, Cedulaciones, Surtido o Trasiego de
material.
94
9,00
Tiempo (hr)
8,00
7,00
6,00
5,00 4,09 4,69
4,00
3,00
2,00
6,70
6,42
5,12
5,44
7,95
5,76
5,09
5,05
4,51
4,25
2,23
7,87
7,65 7,21
3,94
2,90
3,27
3,05 2,92
2,67
2,33
1,00
0,00
1
10
11
12
13
14
15
16
17
18
19
20
Operarios
Hrs. efectivas laboradas/dia
Las barras representan el tiempo efectivo trabajado en un da de cada operario del rea de vestidura.
95
21
22
JORNADA LABORAL
9,5
570
30
10
530
53
477
7,95
Produccin
1 vehiculo
Mezcla Turnos
Explorer
0,173
34
5,878
F - 350
0,098
54
5,296
Cargo
0,097
15
1,452
Amazon
0,028
67
1,849
Turnos Total Requeridos 14,48
(+) Turno Nocturno
5,00
Total Operarios
19,48
(+) Ausentismo (3%)
0,58
(+) Lder Manufactura
2
(+) Eficiencia
2
24,06
Total Operarios
Requeridos
25
Catlogo
96
ANEXO C
97
ELABORACION DE KITS
Base datos de operaciones estndar
Pasos
1
2
3
4
5
T1
3,280
1,270
0,550
1,26
0,59
Elementos
Verificar niveles de inventario de material en cada estacin de la lnea de produccin
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
Tomar las cestas y ubicarlas en la facilidad
Abrir los empaques donde se encuentran las piezas a trasegar.
Ordenar desechos en la paleta para que el montacarguista los retire
Operario:
Catalogo
Operacin
Kit body mouth LI
Explorer
Kit body mouth LD
Kit body mouth 4x4 LD
Kit body mouth 4x4 LI
Kit body mouth 4x2 LI
350
Kit body mouth 4x2 LD
Kit ramales 4x4
Kit ramales 4x2
98
T1
12,670
12,670
17,500
17,500
21,020
21,020
Minutos
T2
9,300
15,060
14,390
14,390
20,160
20,160
T3
13,110
10,460
16,370
16,370
17,420
17,420
9,015
9,015
8,015
8,015
9,175
9,175
T2
3,430
1,430
1,460
3,17
1,25
T3
2,560
1,520
2,000
3,05
1,01
T,P
3,09
1,4
1,336
2,49
0,95
F
2
1
10
30
6
Operario:
Catalogo
Explorer
F-350
Cargo
Operacin
Protector de calor de escape
Tuberia llenado y soporte tanque gasolina
Barra estabilizadora delantera.
Terminales del cajetin
Ramales
Kit de manguera caliper y tornillo
Barra estabilizadora trasera
Protector y canister
Barra estabilizadora 4x4
Soporte de eje delantero 4x4
Soporte de barra estabilizadora 4x2
Manguera caliper 4x4
Protector de disco 4x2
Stop
Stop cargo 815
Soporte de ballesta C815
Soporte de silenciador C815
Arnes y filtro C815
Base de motor y manguera de freno C815
Arnes corto y filtro C1721
Arnes largo y filtro C1721
Valvulas freno/remolcador ballesta C1721
Soporte de amortiguadores C1721
Soporte de silenciadores C1721
Soporte de ballesta C1721
Stop de C1721
99
T1
40,420
40,420
39,390
28,630
39,390
16,130
16,130
5,200
28,630
28,630
28,630
28,630
28,630
13,400
28,200
28,200
15,320
15,320
28,200
32,750
32,750
32,750
32,750
32,750
32,750
32,750
Minutos
T2
11,100
28,470
28,470
39,390
18,510
18,510
27,360
9,080
40,420
40,420
39,390
27,360
39,390
13,520
31,590
25,130
29,330
29,330
25,130
31,070
31,070
31,070
31,070
31,070
31,070
31,070
T3
31,330
33,910
33,910
28,470
20,460
7,260
21,430
11,100
27,360
35,190
35,190
35,190
27,360
12,250
26,560
26,560
31,590
31,590
29,330
35,570
35,570
35,570
35,570
35,570
35,570
35,570
CEDULACIONES
Operaciones estndar
Pasos
1
2
3
4
Elementos
Verificar niveles de inventario de material en cada estacin de la lnea de produccin.
Destapar los empaques donde se encuentran las piezas a trasegar.
Ordenar desechos en la paleta para que el montacarguista los retire
Verificar lista de materiales de la cedula
T1
8,05
1,15
0,58
3,11
T2
5,31
3,101
1,23
3,25
T3
6,26
3,08
1,01
3,17
Operario:
Catalogo
Operacin
Cajetin de direccion
Barra estabilizadora
Explorer Cardan 4x2 8 cilindros (78A)
Cardan 4x4
Cardan 4x2 6 cilindros (76A)
Silenciador soporte de calor C815 largo/corto
Silenciador 1721 estandar
Cardan C1721 (17C, 18C)
Cuplon C1721 (18C)
Cargo
Cardan C815 (82V, 84V, 85V,87V)
Cuplon C815 estandar
Soporte de cabina C1721
Soporte de cabina C815
Cajetin de direccion 4x2, 4x4
Brazo Pickman 4x2, 4x4
Barra estabilizadora 4x2, 4x4
Barra de direccin 4x2
350
Cardan delantero 4x4
Cardan trasero 4x4
Cardan 4x2
Parachoque
100
T1
3,150
3,150
8,320
8,320
8,320
3,340
3,340
4,430
4,430
4,430
4,430
7,140
7,140
3,150
3,150
3,150
3,150
8,320
8,320
8,320
9,120
minutos
T2
T3
7,380 1,350
7,380 1,350
7,210 7,765
7,210 7,765
7,210 7,765
4,370 3,855
4,370 3,855
5,236 4,578
5,236 4,578
5,236 4,578
5,236 4,578
2,100 4,620
2,100 4,620
7,380 1,350
7,380 1,350
7,380 1,350
7,380 1,350
7,210 7,765
7,210 7,765
7,210 7,765
11,230 10,175
F1
5,000
6,000
6,000
5,000
F2
4
7
7
8
F3
3,000
9,000
9,000
7,000
FP
4,000
7,333
7,333
6,667
Operario:
Catalogo
F-350
T1
Operacin
5,400
Caliper 4x4 LD
5,400
Caliper 4x4 LI
3,130
Resonador
2,120
Silenciador
4,110
Ballesta 4x4
2,330
Eje 4x4 (39M,49M)
2,330
Barra de torsion 4x4 (39M, 49M)
Cedulacion de tren delantero
7,170
Soporte de transfer
7,170
Travesano
7,170
Soporte de ballesta
7,170
Complemento de soporte de transfer
7,170
Soporte de amortiguador LD 4x2
7,170
Soporte de amortiguador LI 4x2
7,170
Soporte de ballesta 4x2
Barra de direccion
6,060
Brazo radial LD
6,060
Brazo radial LI
6,060
Amortiguador delantero (4x4, 4x2)
6,060
Amortiguador trasero (4x4, 4x2)
6,060
Auxiliar de amortiguador 4x4
6,060
Espiral 4x2
6,060
Cedulacion conjunto de disco
Disco delantero 4x2 LI
4,150
Caliper 4x2 LI
4,150
Brazo radial 4x2 LI
4,150
Punta de eje LI
4,150
Disco delantero 4x2 LD
6,370
Caliper 4x2 LD
6,370
Brazo radial 4x2 LD
6,370
Punta de eje LD
6,370
101
minutos
T2
6,580
5,580
3,070
1,580
5,150
2,550
2,550
T3
5,560
5,560
3,220
1,850
4,630
2,110
2,110
6,070
6,070
6,070
6,070
6,070
6,070
6,070
5,130
5,130
5,130
5,130
5,130
5,130
5,130
6,580
6,580
6,580
6,580
6,580
6,580
6,580
6,320
6,320
6,320
6,320
6,320
6,320
6,320
5,120
5,120
5,120
5,120
6,020
6,020
6,020
6,020
5,460
5,460
5,460
5,460
5,740
5,740
5,740
5,740
Operario:
Catalogo
T1
Operacin
EJE DELANTERO LD
29,560
Meseta delantera
29,560
Meseta trasera
29,560
Disco trasero
29,560
Disco delantero
29,560
Amortiguadores 4x4
29,560
Amortiguadores 4x2
29,560
Lapices de disco trasero
EJE DELANTERO LI
29,410
Meseta delantera
29,410
Meseta trasera
29,410
Disco trasero
29,410
Disco delantero
29,410
Explorer Amortiguadores 4x4
29,410
Amortiguadores 4x2
29,410
Lapices de disco trasero
1,560
Silenciador y complemento parachoque
1,560
Tanque de gasolina (4x2)
1,560
Tanque de gasolina (4x4)
12,300
Protector (4X4)
7,560
Cardan
tubo de llenado y soporte de parachoque 7,570
1,230
tuberia de feno
Diferencial trasero (6 cilindros, 8
cilindros)
8,280
Tripoide (complemento del diferencial)
8,280
3,300
Eje delantero (6 cilindros, 8 cilindros)
3,300
Tripoide 6 cilindros, 8 cilindros)
102
minutos
T2
T3
29,460
29,460
29,460
29,460
29,460
29,460
29,460
29,485
29,485
29,485
29,485
29,485
29,485
29,485
28,040
28,040
28,040
28,040
28,040
28,040
28,040
4,530
4,530
4,530
15,260
8,012
6,583
1,352
28,725
28,725
28,725
28,725
28,725
28,725
28,725
3,480
3,480
3,480
13,780
7,492
7,596
1,478
6,380
6,380
5,440
5,440
6,330
6,330
4,180
4,180
Operario:
Catalogo
Cargo
Operacin
Tuberia de gasoil (17C/18C) LD
Soporte de cabina (87V, 85, 84V, 82V) LD
Soporte de estribo (87V, 85, 84V, 82V) LD
Soporte de guardafango (87V, 85, 84V, 82V) LD
Soporte de estribo (17C/18C) LD
Soporte de cabina (17C/18C) LD
Soporte de guardafango (17C/18C) LD
Soporte de cardan (18C)
Soporte de cabina (87V, 85, 84V, 82V) LI
Soporte de estribo (87V, 85, 84V, 82V) LI
Soporte de guardafango (87V, 85, 84V, 82V) LI
Soporte de estribo (17C/18C) LI
Soporte de cabina (17C/18C) LI
Soporte de guardafango (17C/18C) LI
Eje trasero (87V, 85V, 84V,82V)
Amortiguador delantero
Eje delantero (87V, 85V, 84V,82V)
Cajetin de direccion
Soporte de tanque
Barra estabilizadora
Eje delantero (17C/18C)
Eje trasero (17C/18C)
Ballestas traseras LD
Ballestas delanteras LD
Barra estabilizadora LD
Ballestas traseras LI
Ballestas delanteras LI
Barra estabilizadora LI
Tanques de aire
Soporte de tanque LI
103
T1
minutos
T2
T3
5,17
5,17
5,17
5,17
5,17
5,17
5,17
5,110
5,110
5,110
5,110
5,110
5,110
5,110
6,830
6,830
6,830
8,090
8,090
12,050
12,050
12,050
11,110
11,110
11,110
10,150
10,150
10,150
11,420
6,010
5,56
5,56
5,56
5,56
5,56
5,56
5,56
6,280
6,280
6,280
6,280
6,280
6,280
6,280
6,430
6,430
6,430
8,010
8,010
11,560
11,560
11,560
12,150
12,150
12,150
11,560
11,560
11,560
10,580
5,590
6,07
6,07
6,07
6,07
6,07
6,07
6,07
6,390
6,390
6,390
6,390
6,390
6,390
6,390
8,310
8,310
8,310
8,510
8,510
13,040
13,040
13,040
11,480
11,480
11,480
12,140
12,140
12,140
11,580
6,251
Pasos
1
2
4
5
6
7
Operaciones Estndar
Operacin
Verificar niveles de inventario de Material en cada estacin de la lnea de produccin.
Verificar estado del montacargas/remolcador
Diligenciar hoja de preuso
Atender ANDON
Surtido de material critico
Recolectar cestas vacias
Operario:
Catalogo
Operacin
Cajetin de direccion
Barra estabilizadora
Eje delantero
Tripoide
Silenciadores
Resonadores
Cardan
Explorer
Meseta delantera
Meseta trasera
Disco trasero
Disco delantero
Amortiguador 4x4
Amortiguador 4x2
Lapices de disco trasero
Cajetin de direccion
Barra estabilizadora
F- 350
Barra de direccion
Barra pickman 4x4, 4x2
Parachoque
T1
5,270
5,270
5,260
5,260
5,240
5,240
6,001
5,500
5,500
5,500
5,500
5,500
5,500
5,500
5,270
5,270
5,270
5,270
5,570
T1
T2
4,066 3,616
2,520 3,560
1,275 8,010
3,25
4,23
4,37
5,48
12,01 7,05
T3
4,400
3,870
1,090
4,01
6,01
8,42
Disco delantero LD
Caliper
Brazo radial
Punta de eje
Barra de direccion 39M, 49M
Brazo radial LD
Amortiguador
Auxiliar de amortiguador 4x4
Espiral 4x2
Tanque de gasolina
Soporte de transfer
Travesao 4x4
Soporte de ballesta
Complemento de Soporte de transfer
Soporte de amortiguador
Cardan 4X2
Eje delantero
Caliper 4x4 LD
Tuberia de llenado
Soporte de Ballesta 4x4
Soporte de Ballesta 4x2
minutos
T2
T3
4,230 5,250
4,230 5,250
5,480 5,370
5,480 5,370
5,430 5,330
5,430 5,330
6,120 6,060
6,500 6,001
6,500 6,001
6,500 6,001
6,500 6,001
6,500 6,001
6,500 6,001
6,500 6,001
4,230 5,250
4,230 5,250
4,230 5,250
4,230 5,250
5,280 5,080
104
Frecuencia
9
1
1
8
8
8
5,480
5,480
5,480
5,480
5,150
5,150
5,150
5,150
5,150
4,440
5,060
5,060
5,060
5,060
5,060
5,060
4,230
6,330
5,200
2,100
2,100
6,410
6,410
6,410
6,410
4,310
4,310
4,310
4,310
4,310
4,320
5,490
5,490
5,490
5,490
5,490
5,490
4,260
6,890
5,090
2,700
2,700
5,450
5,450
5,450
5,450
6,060
6,060
6,060
6,060
6,060
5,200
5,270
5,270
5,270
5,270
5,270
5,270
4,450
5,480
5,350
2,200
2,200
Operario:
Catalogo
T1
Operacin
Tanque de gasolina y protector de tanque 6,480
Tubo de llenado y soporte de parachoques 6,200
6,040
Diferencial trasero y complemento
5,190
Meseta delantera
5,190
Meseta trasera
Explorer
5,190
Disco trasero
5,190
Disco delantero
5,190
Amortiguadores (4x4, 4x2)
5,190
Lapices de disco trasero
5,450
Cardanes
5,300
Soporte de transfer
5,300
Travesano
5,300
Soporte de ballesta
5,300
Complemento de soporte de transfer
5,300
Soporte de amortiguador LI 4x2 (Meseta)
5,540
Silenciadores y resonadores
6,370
Disco delantero 4x2 LI
6,370
Caliper 4x2 LI
F 350
6,370
Brazo radial 4x2 LI
6,370
Punta de eje LI
6,240
Ballesta 4x4
7,260
Barra de direccion
7,260
Brazo radial 4x2 LD
7,260
Amortiguadores (4x4, 4x2)
7,260
Espiral 4x2
7,260
Auxiliar de amortiguador 4x4
4,090
Caliper 4x4 LI
Cargo
3,380
Soporte de chasis
minutos
T2
T3
5,010 6,440
7,190 6,290
5,300 5,670
4,250 8,520
4,250 8,520
4,250 8,520
4,250 8,520
4,250 8,520
4,250 8,520
5,300 5,370
7,260 6,280
7,260 6,280
7,260 6,280
7,260 6,280
7,260 6,280
5,480 6,190
7,190 7,020
7,190 7,020
7,190 7,020
7,190 7,020
7,300 6,770
6,530 6,890
6,530 6,890
6,530 6,890
6,530 6,890
6,530 6,890
5,230 4,670
4,040 5,370
Operario:
minutos
Catalogo Operacin
T1
T2
T3
Explorer Chasis
9,560 10,032 9,257
F-350
9,220 8,150 8,685
Chasis
Cargo
7,270 12,070 9,670
Chasis
105
Operario:
Catalogo
Operacin
Lapiz de barra estabilizadora
Goma barra delantera
Canister
Tuercas
Arandela Fija
CAM-RR SUSP ADJ
Manguera de Ventilacion Eje Tra
Tuerca Fija Lapiz Barra Est
Soporte Arnes de Remolque
RESORTE RETEN DEL.OMI
BLT-RR-SUSP-CAM ADJ
Explorer Aislante de amortiguador
Lainas Grises
Kits de:
Protector de calor y meseta
Tuberia llenado y soporte tanque gasolina
Barra estabilizadora
Terminales de cajetin
Manguera caliper y tornillo
Ramales
Body mount LD
Guaya de freno
Barra estabilizadora trasera
T1
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
minutos
T2
24,58
24,58
24,58
24,58
24,58
24,58
24,58
24,58
24,58
24,58
24,58
24,58
24,58
T3
20,5
20,5
20,5
20,5
20,5
20,5
20,5
20,5
20,5
20,5
20,5
20,5
20,5
35,430
35,430
35,430
35,430
35,430
35,430
3,390
10,250
30,520
26,070
30,520
26,070
26,070
26,070
26,070
5,510
8,370
26,070
30,852
32,900
30,520
30,520
30,520
30,520
4,410
9,310
28,290
35,430
35,430
35,430
35,430
30,520
30,520
26,070
26,070
32,700
32,700
30,520
30,520
Kits de:
F-350
Ramales 4x2
Ramales 4x4
Soporte de eje delantero 4x4
Protector y canister 4x4
106
35,430
35,430
35,430
35,430
6,150
6,150
26,070
26,070
26,070
26,070
4,091
4,091
30,520
30,520
30,520
30,520
4,130
4,130
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
16,45
24,58
24,58
24,58
12,130
12,130
12,130
12,130
24,58
24,58
24,58
24,58
24,58
24,58
24,58
24,58
24,58
24,58
24,58
24,58
24,58
24,58
24,58
20,5
20,5
20,5
13,040
13,040
13,040
13,040
20,5
20,5
20,5
20,5
20,5
20,5
20,5
20,5
20,5
20,5
20,5
20,5
20,5
20,5
20,5
Operario:
Catalogo
SP
Cargo
Operacin
T1
minutos
T2
T3
6,47
7,13
6,07
6,47
7,13
6,07
6,47
7,13
6,07
7,26
6,49
8,02
Irrajes (SP)
7,26
6,49
8,02
7,26
6,49
8,02
7,26
6,49
8,02
7,26
6,49
8,02
Tornillo portarepuesto
7,26
6,49
8,02
Tuerca portarepuesto
7,26
6,49
8,02
7,07
5,57
6,28
7,07
5,57
6,28
7,07
5,57
6,28
7,07
5,57
6,28
7,26
7,35
6,3
7,26
7,35
6,3
7,26
7,35
6,3
7,26
7,35
6,3
6,47
8,13
6,07
6,47
7,13
6,07
6,47
7,13
6,07
6,47
7,13
6,07
6,47
7,13
6,07
6,47
7,13
6,07
6,47
7,13
6,07
6,47
7,13
6,07
6,47
7,13
6,07
6,47
7,13
6,07
6,47
7,13
6,07
ZONA 0
LD
107
Operario:
Catalogo
Cargo
Operacin
Silenciadores soporte calor C815
Silenciador 1721 estandar
Cardan C1721 (17C, 18C)
Cuplon C1721 (18C)
Cardan C815 (82V, 84V, 85V,87V)
Cuplon C815 estandar
Soporte de cabina C1721
Soporte de cabina C815
Tuberia de gasoil (17C/18C) LD
Soporte de cabina LD
Soporte de estribo LD
Soporte de guardafango LD
Soporte de estribo (17C/18C) LD
Soporte de cabina (17C/18C) LD
Soporte de guardafango (17C/18C) LD
Soporte de cardan (18C)
Soporte de cabina LI
Soporte de estribo LI
T1
6,420
6,420
4,390
4,390
4,390
4,390
9,020
9,020
3,300
3,300
3,300
3,300
3,300
3,300
3,300
3,300
3,300
3,300
minutos
T2
7,840
7,840
9,240
9,240
9,240
9,240
10,030
10,030
5,420
5,420
5,420
5,420
5,420
5,420
5,420
5,420
5,420
5,420
Soporte de guardafango LI
Soporte de estribo (17C/18C) LI
Soporte de cabina (17C/18C) LI
Soporte de guardafango (17C/18C) LI
Eje trasero (87V, 85V, 84V,82V)
Amortiguador delantero
Eje delantero (87V, 85V, 84V,82V)
Cajetin de direccion
Soporte de tanque
Barra estabilizadora
Eje delantero (17C/18C)
Eje trasero (17C/18C)
Ballestas traseras LD
Ballestas delanteras LD
Barra estabilizadora LD
Ballestas traseras LI
Ballestas delanteras LI
Barra estabilizadora LI
Tanques de aire
Soporte de tanque LI
T3
6,580
6,580
6,815
6,815
6,815
6,815
8,596
8,596
4,580
4,580
4,580
4,580
4,580
4,580
4,580
4,580
4,580
4,580
108
3,300
3,300
3,300
3,300
6,580
6,580
6,580
8,520
8,520
7,490
7,490
7,490
9,960
9,960
9,960
9,960
9,960
9,960
9,510
5,090
5,420
5,420
5,420
5,420
7,120
7,120
7,120
7,895
7,895
9,150
9,150
9,150
10,235
10,235
10,235
10,235
10,235
10,235
9,476
4,210
4,580
4,580
4,580
4,580
6,756
6,756
6,756
7,074
7,074
8,320
8,320
8,320
9,751
9,751
9,751
9,751
9,751
9,751
8,593
4,650
Operario:
Catalogo
T1
Operacin
7,380
Kit body mouth LI
6,320
kit tubo de freno
7,030
Kit soporte de escape
Partes por llamadas
4,120
Tuerca de caucho
Lainas Grises
9,160
5,290
Caa de direccion
11,290
Arandela fija
Explorer Tuerca Fija Lapiz Barra Est
10,080
10,080
Protector Lapiz barra
11,290
BLT RR SUSP CAM ADJ
6,480
Protector de transf
6,120
Retenedor freno de emergencia
1,410
Guaya de freno de emergencia trasera
4,120
Tuberia de enfriamiento
9,120
Protector de Eje Trasero
6,350
Tuberia de Ventilacion 4x4
8,120
Kit body mouth 4x4 LI
F-350
8,120
Kit body mouth 4x2 LI
6,370
Kit de soporte de escape
9,220
Kit guardapolvo 4x2
7,500
Soporte de eje delantero 4x4
7,500
Kit de eje delantero 4x2
Kit de cana de direccion y tuberia
5,420
llenado
Partes por llamadas
BLT RET ASY-FRT SUSP
10,080
10,080
BRKT FRT AX BMPR TO FR RH
10,080
SHLD FRT SUSP LWR ARM HT LH
CONN ASY PWR STNG RTN LN HOS 10,080
1,300
Guaya de freno
10,080
Condensador Red Frec
6,120
Retenedor freno de emergencia
6,120
Manguera Caliper LD 4x4
5,170
Soporte de Goma
10,080
PWR STNG RTN LN HOS
10,080
BLT & RET ASY FRT SUSP
6,460
Tuerca de caucho
6,460
Ajustador Camber DEL
6,460
Condensador Red Frec
10,080
Aislante de Amortiguador
3,450
Tapon Grasero
minutos
T2
T3
7,310 7,340
6,560 6,440
12,150 8,550
3,520
10,010
4,460
6,070
9,160
9,160
6,070
5,390
5,170
1,300
3,520
9,160
6,230
7,340
7,340
12,150
4,200
10,080
5,280
9,080
10,010
10,010
9,080
5,330
7,150
1,350
4,200
9,150
6,300
9,050
9,050
8,550
109
9,160
8,220
8,220
9,190
6,020
6,020
6,230
5,500
9,140
9,140
9,140
9,140
1,420
9,140
5,170
5,170
5,400
9,140
9,140
8,160
8,160
8,160
9,140
4,560
10,010
10,010
10,010
10,010
1,350
10,010
7,150
7,150
5,250
10,010
10,010
8,210
8,210
8,210
10,010
5,120
Operaciones estndar
Pasos
Operacin
1
Verificar estado del montacargas
2
Diligenciar hoja de preuso
8
Recoger basura y depositar en rea de desechos
9
Descargue de tarjetas de ubicacin
10
Abastecer tanque de gas
Operario:
Catalogo
Explorer
Cargo
Operacin
T1
minutos
T2
T3
T1
5,110
2,140
1,290
12,140
40,130
T2
10,310
1,520
1,570
8,130
13,560
T3
Frecuencia
12,210
1
3,560
1
1,360
15
17,370
2
1
26,845
Amortiguador delantero
3,060
3,570
4,210
5,100
4,590
3,460
Cajetin de direccion
3,060
3,570
4,210
3,570
4,210
Cajetin de direccion
3,060
3,570
3,210
Soporte de tanque
3,060
Barra estabilizadora
3,060
3,570
3,210
Barra estabilizadora
3,060
3,570
4,210
5,100
4,590
3,460
3,060
3,570
3,210
Cardan 4x4
3,060
3,570
3,210
5,100
4,590
3,460
3,210
Ballestas traseras LD
5,100
4,590
3,460
Ballestas delanteras LD
5,100
4,590
3,460
Barra estabilizadora LD
3,060
3,570
4,210
Ballestas traseras LI
5,100
5,590
3,460
Ballestas delanteras LI
5,100
5,590
3,460
Barra estabilizadora LI
3,060
3,570
4,210
Tanques de aire
Soporte de tanque LI
3,060
3,570
4,210
3,060
3,570
4,210
3,060
3,570
4,210
3,060
3,570
4,210
3,060
3,570
4,210
3,060
3,570
4,210
3,060
3,570
4,210
2,560
2,360
Diferenciales traseros
3,060
3,570
Complemento
3,060
3,570
3,210
3,060
3,570
3,210
3,060
3,570
3,210
3,060
3,570
3,210
3,060
3,570
3,210
3,060
3,570
3,210
8,080
7,230
8,080
7,230
8,210
8,080
7,230
5,100
4,590
3,460
5,100
4,590
3,460
5,100
4,590
3,460
3,060
3,570
4,210
3,060
3,570
4,210
3,150
3,150
2,560
2,360
Cardan 4x2
3,150
2,560
2,360
Parachoque
5,100
5,590
4,460
350
110
Operario:
Catalogo
Materiales
EJE DELANTERO LD
Meseta delantera
Meseta trasera
Disco trasero
Disco delantero
Amortiguadores 4x4
Amortiguadores 4x2
Meseta delantera
Meseta trasera
Disco trasero
Disco delantero
Explorer Amortiguadores 4x4
Amortiguadores 4x2
Lapices de disco trasero
SILENCIADOR
COMPLEMENTO DE ESCAPE
TANQUE DE GASOLINA (4X2)
TANQUE DE GASOLINA (4X4)
PROTECTOR (4X4)
CARDAN
TUBO DE LLENADO
SOPORTE DE PARACHOQUE
TUBERIA DE FRENO
Caliper 4x4 LD
Caliper 4x4 LI
Resonador
Silenciador
F-350
Ballesta 4x4
Eje 4x4 (39M,49M)
Barra de torsion 4x4 (39M, 49M)
Soporte de transfer
T1
minutos
T2
T3
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
6,390
6,390
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
5,480
5,480
3,600
6,390
4,010
4,010
4,010
4,010
9,010
4,010
4,010
4,010
3,860
5,480
3,860
3,860
3,860
3,860
9,260
3,860
3,860
3,860
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
Cargo
111
Travesano
Soporte de ballesta
Complemento de soporte de transfer
Soporte de amortiguador LD 4x2
Soporte de amortiguador LI 4x2
Soporte de ballesta 4x2
Barra de direccion
Brazo radial LD
Brazo radial LI
Amortiguador delantero (4x4, 4x2)
Amortiguador trasero (4x4, 4x2)
Auxiliar de amortiguador 4x4
Espiral 4x2
Disco delantero 4x2 LI
Caliper 4x2 LI
Brazo radial 4x2 LI
Punta de eje LI
Disco delantero 4x2 LD
Caliper 4x2 LD
Brazo radial 4x2 LD
Punta de eje LD
Tuberia de gasoil (17C/18C) LD
Soporte de cabina LD
Soporte de estribo LD
Soporte de guardafango LD
Soporte de estribo (17C/18C) LD
Soporte de cabina (17C/18C) LD
Soporte de guardafango LD
Soporte de cardan (18C)
Soporte de cabina LI
Soporte de estribo LI
Soporte de guardafango LI
Soporte de estribo (17C/18C) LI
Soporte de cabina (17C/18C) LI
Soporte de guardafango LI
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
9,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
9,260
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
9,135
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
Pasos
1
2
Operario:
Catalogo
Operacin
Lapiz de barra estabilizadora
Goma barra delantera
Canister
Tuercas
Arandela Fija
CAM-RR SUSP ADJ
Explorer Manguera de Ventilacion Eje Tra
Tuerca Fija Lapiz Barra Est
Soporte Arnes de Remolque
RESORTE RETEN DEL.OMI
BLT-RR-SUSP-CAM ADJ
Aislante de amortiguador
Lainas Grises
Reten transversal delantero 4x2
Aislante tope
Conector de manguera
F-350
Ajustador camber del.
Reten U ARA-A
BLT RET ASY-FRT SUSP
minutos
T1
T2
T3
75,150 78,360 78,270
75,150 78,360 78,270
75,150 78,360 78,270
75,150 78,360 78,270
75,150 78,360 78,270
75,150 78,360 78,270
75,150 78,360 78,270
75,150 78,360 78,270
75,150 78,360 78,270
75,150 78,360 78,270
75,150 78,360 78,270
75,150 78,360 78,270
75,150 78,360 78,270
75,150 78,360 78,270
75,150 78,360 78,270
75,150 78,360 78,270
75,150 78,360 78,270
75,150 78,360 78,270
75,150 78,360 78,270
Cargo
112
T1
T2
T3
T.P
3,280 3,430 2,560 3,090
1,260 3,170 3,050 2,493
Tapon Grasera
Perno fija cardan
Aislante ESPRAL DEL.IN
Auto-created for upload process
Tuercas
NUT & RET M12X1.75X36.6X39.77
Separador de ballesta
Portaplaca delantera
Arandela punta de eje
Aislante
Acople 4x4
Guaya de freno
Reten
RET ASY-ENG RR SUPT
Soporte de ballesta trasero C815
Soporte de ballesta delantero C815
Soporte de ballesta delantera C1721
Soporte de ballesta trasera C1721
Amortiguadores 1721 delantera
Amortiguadores 1721 trasera
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
38,350
38,350
38,350
38,350
38,350
38,350
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
40,490
40,490
40,490
40,490
40,490
40,490
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
39,160
39,160
39,160
39,160
39,160
39,160
Operario:
16,470
13,350
14,530
16,470
13,350
14,530
16,470
13,350
14,530
16,470
13,350
14,530
16,470
13,350
14,530
24,080
16,470
13,350
14,530
24,080
16,470
13,350
14,530
22,010
24,080
16,470
13,350
14,530
24,360
22,010
24,080
16,470
13,350
14,530
24,360
22,010
24,080
16,470
13,350
14,530
24,360
22,010
24,080
16,470
13,350
14,530
24,360
22,010
24,080
16,470
13,350
14,530
24,360
22,010
24,080
16,470
13,350
14,530
24,360
22,010
24,080
16,470
13,350
14,530
24,360
22,010
24,080
16,470
13,350
14,530
24,360
22,010
24,080
16,470
13,350
14,530
24,360
22,010
24,080
1,400
1,450
1,530
16,470
13,350
14,530
T1
minutos
T2
T3
24,360
22,010
24,080
24,360
22,010
24,080
24,360
22,010
24,360
22,010
24,360
Catalogo
Cargo
Operacin
113
Operario:
Catalogo
Operacin
Caa de direccion
Protector Lapiz barra
Tuerca fija lapiz barra estabilizadora
Arandela fija
Explorer Tuberia de Ventilacion 4x4
Lainas grises
Protector de transf
Protector de Eje Trasero
Tuerca de caucho
Manguera Caliper LD 4x4
SHLD FRT SUSP LWR ARM HT LH
Soporte de Goma
tuberia de enfriamiento
PWR STNG RTN LN HOS
BLT & RET ASY FRT SUSP
F-350
Tuerca de caucho
Tapon Grasero
CONN ASY PWR STNG RTN LN HOS
Ajustador Camber DEL
Condensador Red Frec
BRKT FRT AX BMPR TO FR RH
Aislante de Amortiguador
Tren Delantero C-1721
Eje trasero C-1727
Amorituguador Largo C-1721
Cargo
Amoritiguador Corto C-1721
U BOLT-FRT SPG LARGO Y CORTO C-1721
Eje delantero C-815
Eje trasero C-815
114
T1
minutos
T2
T3
41,140
41,140
41,140
41,140
41,140
41,140
41,140
41,140
41,140
41,140
41,140
41,140
41,140
41,140
41,140
41,140
41,140
41,140
41,140
41,140
41,140
41,140
15,460
15,460
15,460
15,460
15,460
16,510
16,510
40,120
40,120
40,120
40,120
40,120
40,120
40,120
40,120
40,120
40,120
40,120
40,120
40,120
40,120
40,120
40,120
40,120
40,120
40,120
40,120
40,120
40,120
14,550
14,550
14,550
14,550
14,550
16,580
16,580
42,060
42,060
42,060
42,060
42,060
42,060
42,060
42,060
42,060
42,060
42,060
42,060
42,060
42,060
42,060
42,060
42,060
42,060
42,060
42,060
42,060
42,060
15,505
15,505
15,505
15,505
15,505
16,430
16,430
CATLOGO EXPLORER
115
ELABORACION DE KITS
Pasos
1
2
3
4
5
7
Elementos
Verificar niveles de inventario de material en cada estacin de la lnea de produccin
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
Tomar las cestas y ubicarlas en la facilidad
Abrir los empaques donde se encuentran las piezas a trasegar.
Ordenar desechos en la paleta para que el montacarguista los retire
Kits:
Protector de calor de escape
Tuberia de llenado y soporte tanque de gasolina
Barra estabilizadora delantera.
Terminales del cajetin
Ramales
Kit de manguera caliper y tornillo
Barra estabilizadora trasera
Soporte de escape (76A, 77A, 78A,7EA,U74,UEA)
Tubo de frenos
Kit body mouth LI
Kit body mouth LD
T1
3,280
1,270
0,550
1,260
0,590
minutos
T2
T3
3,430 2,560
1,430 1,520
1,460 2,000
3,170 3,050
1,250 1,010
T.P
3,090
1,407
1,337
2,493
0,950
Cv
1,090
1,090
1,090
1,090
1,090
min
min
TN
Tol
F
TE
3,368 7% 0,019 0,070
1,533 7% 0,010 0,016
1,457 7% 0,097 0,151
2,718 7% 0,291 0,847
1,036 7% 0,058 0,065
40,420
40,420
39,390
28,630
39,390
39,390
16,130
13,270
15,250
9,290
19,440
11,100
28,470
28,470
39,390
18,510
18,510
18,510
8,570
20,100
10,250
18,180
27,617
34,267
33,923
32,163
26,120
26,120
13,967
10,447
14,567
14,907
20,933
0,900
0,900
0,900
0,900
0,900
0,900
0,900
1,080
1,080
1,100
1,100
24,855
30,840
30,531
28,947
23,508
23,508
12,570
11,282
15,732
16,397
23,027
31,330
33,910
33,910
28,470
20,460
20,460
7,260
9,500
8,350
25,180
25,180
Cap. Requerida
Cant. Horas Turno
34
3,046 0,365
116
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,010
0,005
0,010
0,007
0,010
0,015
0,013
0,063
0,010
0,036
0,036
HRK
0,253
0,157
0,340
0,228
0,262
0,387
0,172
0,755
0,165
0,627
0,880
5,375
CEDULACIONES
Pasos
Elementos
1
Verificar niveles de inventario de material en cada estacin de la lnea de produccin.
2
Destapar los empaques donde se encuentran las piezas a trasegar.
3
Ordenar desechos en la paleta para que el montacarguista los retire
4
Verificar lista de materiales de la cedula
5
Cedulaciones:
Cajetin de direccion
Barra estabilizadora
Cardan 4x2 8 cilindros (78A)
Cardan 4x4
Cardan 4x2 6 cilindros (76A)
Meseta delantera
Meseta trasera
Disco trasero
Disco delantero
Amortiguadores 4x4
Amortiguadores 4x2
Lapices de disco trasero
Meseta delantera
Meseta trasera
Disco trasero
Disco delantero
Amortiguadores 4x4
Amortiguadores 4x2
Lapices de disco trasero
SILENCIADOR Y COMPLEMENTO DE ESCAPE
TUBERIA DE FRENO
Diferencial trasero (6 cilindros, 8 cilindros)
Tripoide (complemento del diferencial)
Eje delantero (6 cilindros, 8 cilindros)
117
T1
minutos
T2
T3
T.P
Cv
min
TN
7,129
2,664
1,025
3,463
Tol
min
TE
7%
7%
7%
7%
0,118
0,216
0,216
0,196
0,897
0,615
0,236
0,726
8,050
1,150
0,580
3,110
5,310
3,101
1,230
3,250
6,260
3,080
1,010
3,170
6,540
2,444
0,940
3,177
1,090
1,090
1,090
1,090
3,150
3,150
8,320
8,320
8,320
3,340
3,340
4,430
4,430
4,430
4,430
7,140
7,140
3,150
3,150
3,150
3,150
8,320
8,320
8,320
9,120
8,280
8,280
3,300
7,380
7,380
7,210
7,210
7,210
4,370
4,370
5,236
5,236
5,236
5,236
2,100
2,100
7,380
7,380
7,380
7,380
7,210
7,210
7,210
11,230
6,380
6,380
5,440
1,350
1,350
7,765
7,765
7,765
3,855
3,855
4,578
4,578
4,578
4,578
4,620
4,620
1,350
1,350
1,350
1,350
7,765
7,765
7,765
10,175
6,330
6,330
4,180
3,960
3,960
7,765
7,765
7,765
3,855
3,855
4,748
4,748
4,748
4,748
4,620
3,960
3,960
3,960
3,960
3,960
7,765
7,765
7,765
10,175
6,997
6,997
4,307
3,300 5,440
118
4,180
4,307
1,090
Cap. Requerida
Cant. Horas Turno
34
5,067 0,608
4,694
7% 0,100 0,502
TRC 8,942
Pasos
1
2
3
4
Elementos
Verificar niveles de inventario de material en cada estacin de la lnea de produccin.
Verificar estado del remolcador
Deligenciar hoja de preuso
Surtido de
T1
4,066
2,520
1,275
minutos
T2
T3
3,616
4,400
3,560
3,870
8,010
1,090
T.P
4,027
3,317
3,458
Cv
1,090
1,090
1,090
min
TN
4,390
3,615
3,770
Tol
7%
7%
7%
F
0,265
0,029
0,029
min
TE
1,024
0,119
0,119
Cajetin de direccion
Barra estabilizadora
Eje delantero
Tripoide
Silenciadores
Resonadores
Cardan
Meseta delantera
Meseta trasera
Disco trasero
Disco delantero
Amortiguador 4x4
Amortiguador 4x2
5,270
5,270
5,260
5,260
5,240
5,240
6,001
5,500
5,500
5,500
5,500
5,500
5,500
4,230
4,230
5,480
5,480
5,430
5,430
6,120
6,500
6,500
6,500
6,500
6,500
6,500
5,250
5,250
5,370
5,370
5,330
5,330
6,060
6,001
6,001
6,001
6,001
6,001
6,001
4,917
4,917
5,370
5,370
5,333
5,333
6,060
6,000
6,000
6,000
6,000
6,000
6,000
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
5,064
5,064
5,531
5,531
5,493
5,493
6,242
6,180
6,180
6,180
6,180
6,180
6,180
0,070
0,070
0,070
0,070
0,070
0,070
0,070
0,070
0,070
0,070
0,070
0,070
0,070
0,033
0,033
0,017
0,017
0,063
0,063
0,040
0,018
0,018
0,018
0,018
0,018
0,018
0,181
0,181
0,099
0,099
0,367
0,367
0,267
0,118
0,118
0,118
0,118
0,118
0,118
5,500
6,500
6,001
6,000
1,030
6,180
0,070
0,018
0,118
5,270
5,270
5,270
5,270
5,570
5,480
5,480
5,480
5,480
4,230
4,230
4,230
4,230
5,280
6,410
6,410
6,410
6,410
5,250
5,250
5,250
5,250
5,080
5,450
5,450
5,450
5,450
4,917
4,917
4,917
4,917
5,310
5,780
5,780
5,780
5,780
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
5,408
5,408
5,408
5,408
5,841
6,358
6,358
6,358
6,358
0,070
0,070
0,070
0,070
0,070
0,070
0,070
0,070
0,070
0,056
0,042
0,083
0,021
0,021
0,021
0,021
0,021
0,021
0,321
0,241
0,482
0,121
0,130
0,142
0,142
0,142
0,142
Cardanes
5,150
4,310
6,060
5,173
1,100
5,691
0,070
0,042
0,254
119
35,430
35,430
35,430
35,430
35,430
35,430
3,390
10,250
30,520
Partes por llamada
16,450
16,450
16,450
16,450
16,450
16,450
16,450
16,450
16,450
16,450
16,450
16,450
26,070
30,520
26,070
26,070
26,070
26,070
5,510
8,370
26,070
30,852
32,900
30,520
30,520
30,520
30,520
4,410
9,310
28,290
30,784
32,950
30,673
30,673
30,673
30,673
4,437
9,310
28,293
1,100
1,100
1,080
1,080
1,080
1,080
1,080
1,080
1,080
33,862
36,245
33,127
33,127
33,127
33,127
4,792
10,055
30,557
0,070
0,070
0,070
0,070
0,070
0,070
0,070
0,070
0,070
0,003
0,003
0,012
0,012
0,003
0,003
0,083
0,050
0,083
0,105
0,112
0,411
0,411
0,103
0,103
0,427
0,538
2,725
24,580
24,580
24,580
24,580
24,580
24,580
24,580
24,580
24,580
24,580
24,580
24,580
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,510
20,510
20,510
20,510
20,510
20,510
20,510
20,510
20,510
20,510
20,510
20,510
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
22,971
22,971
22,971
22,971
22,971
22,971
22,971
22,971
22,971
22,971
22,971
22,971
0,070
0,070
0,070
0,070
0,070
0,070
0,070
0,070
0,070
0,070
0,070
0,070
0,000
0,000
0,000
0,070
0,000
0,000
0,000
0,001
0,000
0,001
0,001
0,001
0,004
0,004
0,004
1,725
0,004
0,004
0,004
0,017
0,004
0,017
0,017
0,017
Lainas Grises
16,450
24,580
20,500
20,510
1,120
22,971
0,070
0,000
0,004
Chasis
Kit body mouth LI
kit tubo de freno
Kit soporte de escape (76A, 77A, 78A,7EA,U74,UEA)
9,560
10,032
9,257
9,616
1,080
10,386
0,070
0,250
2,778
35,430
35,430
35,430
26,070
30,520
26,070
30,852
32,900
30,520
30,784
32,950
30,673
1,110
1,110
1,080
34,170
36,575
33,127
0,070
0,070
0,070
0,000
0,000
0,000
0,003
0,003
0,012
3,520
10,010
4,460
6,070
9,160
9,160
6,070
4,200
10,080
5,280
9,080
10,010
10,010
9,080
3,947
9,750
5,010
8,813
9,750
9,750
8,813
1,090
1,090
1,090
1,090
1,090
1,090
1,090
4,302
10,628
5,461
9,607
10,628
10,628
9,607
7%
7%
7%
7%
7%
7%
7%
0,004
0,010
0,083
0,003
0,004
0,053
0,050
0,018
0,114
0,487
0,034
0,045
0,598
0,514
Body mount LD
Guaya de freno
Barra estabilizadora trasera
Lapiz de barra estabilizadora
Goma barra delantera
Canister
Tuercas
Arandela Fija
CAM-RR SUSP ADJ
Manguera de Ventilacion Eje Tra
Tuerca Fija Lapiz Barra Est
Soporte Arnes de Remolque
RESORTE RETEN DEL.OMI
BLT-RR-SUSP-CAM ADJ
Aislante de amortiguador
Tuerca de caucho
Lainas Grises
Caa de direccion
Arandela fija
Tuerca Fija Lapiz Barra Est
Protector Lapiz barra
BLT RR SUSP CAM ADJ
120
Protector de transf
Retenedor freno de emergencia
Guaya de freno de emergencia trasera
Tuberia de enfriamiento
Protector de Eje Trasero
6,480
6,120
1,410
4,120
9,120
5,390
5,170
1,300
3,520
9,160
5,330
7,150
1,350
4,200
9,150
5,733
6,147
1,353
3,947
9,143
1,090
1,090
1,090
1,090
1,090
6,249
6,700
1,475
4,302
9,966
7%
7%
7%
7%
7%
0,033
0,020
0,050
0,067
0,033
6,350
6,230
6,300
6,293
1,090
6,860
7%
0,050
0,367
HRC
18,610
Cap. Requerida
121
Cant.
Horas
Turno
34
10,545
1,266
0,223
0,143
0,079
0,307
0,355
Pasos
1
2
3
4
5
6
Elementos
Verificar estado del montacargas
Diligenciar hoja de preuso
Recoger basura y depositar en rea de desechos
Descargue de tarjetas de ubicacin
Abastecer tanque de gas
Surtido a la lnea
Cajetin de direccion
Barra estabilizadora
Cardan 4x2 8 cilindros (78A)
Cardan 4x4
Diferenciales traseros
Complemento
Eje delantero 6C (76A)
Eje delantero 8C (76A)
Complemento de eje 6C (tripoide)
Complemento de eje 8C (tripoide)
Cardan 4x2 6 cilindros (76A)
Meseta delantera
Meseta trasera
Disco trasero
Disco delantero
Amortiguadores 4x4
Amortiguadores 4x2
Meseta delantera
Meseta trasera
Disco trasero
Disco delantero
Amortiguadores 4x4
Amortiguadores 4x2
T1
5,110
2,140
1,290
12,140
40,130
minutos
T2
T3
10,310 12,210
1,520
3,560
1,570
1,360
8,130
17,370
13,560 26,845
T.P
9,210
2,407
1,407
12,547
26,845
3,060
3,060
3,060
3,060
3,060
3,060
3,060
3,060
3,060
3,060
3,060
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,570
3,570
3,570
3,570
3,570
3,570
3,570
3,570
3,570
3,570
3,570
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,280
3,280
3,280
3,280
3,280
3,280
3,280
3,280
3,280
3,280
3,280
3,503
3,503
3,503
3,503
3,503
3,503
3,503
3,503
3,503
3,503
3,503
3,503
122
3,210
3,210
3,210
3,210
3,210
3,210
3,210
3,210
3,210
3,210
3,210
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
Cv
1,100
1,100
1,100
1,100
1,100
min
TN
10,131
2,647
1,547
13,801
29,530
Tol
7%
7%
7%
7%
7%
F
0,029
0,029
0,441
0,059
0,029
min
TE
0,319
0,083
0,730
0,869
0,929
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,100
1,100
1,100
1,100
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
3,674
3,674
3,674
3,674
3,674
3,674
3,674
3,608
3,608
3,608
3,608
3,889
3,889
3,889
3,889
3,889
3,889
3,889
3,889
3,889
3,889
3,889
3,889
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,050
0,333
0,026
0,017
0,250
0,250
0,200
0,200
0,200
0,200
0,025
0,007
0,005
0,007
0,015
0,008
0,015
0,021
0,029
0,294
0,006
0,147
0,044
0,197
1,310
0,103
0,068
0,983
0,983
0,786
0,772
0,772
0,772
0,097
0,031
0,019
0,031
0,061
0,034
0,061
0,087
0,122
1,224
0,026
0,612
0,184
3,600
3,600
3,600
3,600
3,600
3,600
6,390
6,390
3,600
6,390
3,860
3,860
3,860
3,860
3,860
3,860
5,480
5,480
3,860
5,480
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,050
3,503
3,503
3,503
3,503
3,503
3,503
4,973
4,973
3,503
4,973
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
Cap. Requerida
Cant.
Horas Turno
34
6,472
0,777
123
3,889
3,889
3,889
3,889
3,889
3,889
5,520
5,520
3,889
5,520
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,110
0,009
0,147
0,147
0,025
0,015
0,001
0,021
0,015
0,001
HRC
0,459
0,038
0,612
0,612
0,102
0,061
0,009
0,124
0,061
0,009
11,421
T.P
Cv
min
TN
Pasos
Elementos
1
2
3
3,280
3,430
2,560
3,090
1,090
3,368
7% 0,400 1,442
1,260
3,170
3,050
2,493
1,090
2,718
7% 0,019 0,054
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
41,140
41,140
41,140
41,140
41,140
41,140
41,140
41,140
41,140
0,590
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
40,120
40,120
40,120
40,120
40,120
40,120
40,120
40,120
40,120
1,250
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
42,060
42,060
42,060
42,060
42,060
42,060
42,060
42,060
42,060
1,010
77,260
77,260
77,260
77,260
77,260
77,260
77,260
77,260
77,260
77,260
77,260
77,260
77,260
41,107
41,107
41,107
41,107
41,107
41,107
41,107
41,107
41,107
0,950
0,900
0,900
0,900
0,900
0,900
0,900
0,900
0,900
0,900
0,900
0,900
0,900
0,900
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,090
69,534
69,534
69,534
69,534
69,534
69,534
69,534
69,534
69,534
69,534
69,534
69,534
69,534
44,395
44,395
44,395
44,395
44,395
44,395
44,395
44,395
44,395
1,036
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
Cap. Requerida
Cant. Horas Turno
34
1,958 0,235
124
Tol
min
TE
T1
0,003
0,000
0,002
0,002
0,000
0,000
0,000
0,000
0,000
0,000
0,002
0,001
0,000
0,001
0,002
0,003
0,000
0,000
0,000
0,001
0,002
0,006
0,216
HRC
0,224
0,036
0,179
0,179
0,027
0,006
0,008
0,010
0,012
0,020
0,179
0,081
0,018
0,030
0,092
0,132
0,007
0,021
0,009
0,069
0,118
0,264
0,239
3,456
CATLOGO F - 350
125
ELABORACION DE KITS
Pasos
1
2
3
4
5
6
Elementos
Verificar niveles de inventario de material en cada estacin de la lnea de produccin
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
Tomar las cestas y ubicarlas en la facilidad
Abrir los empaques donde se encuentran las piezas a trasegar.
Ordenar desechos en la paleta para que el montacarguista los retire
Proceder a armar el kit
Protector y canister
Barra estabiliadora 4x4
Soporte de eje delantero 4x4
Soporte de barra estabilizadora 4x2
Manguera caliper 4x4
Protector de disco 4x2
Stop
Kit de eje 4X4
Kit de eje delantero 4x2
Kit guardapolvo 4x2
K it de cana de direccion y tuberia de llenado
Kit de soporte de escape (38M,39M,48 y 49M)
Kit body mouth 4x4 LD
Kit body mouth 4x4 LI
Kit body mouth 4x2 LI
Kit body mouth 4x2 LD
Kit ramales 4x4
Kit ramales 4x2
T1
3,280
1,270
0,550
1,260
0,590
minutos
T2
T3
3,430 2,560
1,430 1,520
1,460 2,000
3,170 3,050
1,250 1,010
T.P
3,090
1,407
1,337
2,493
0,950
Cv
1,090
1,090
1,090
1,090
1,090
min
min
TN
Tol
F
TE
3,368 7% 0,019 0,070
1,533 7% 0,010 0,016
1,457 7% 0,097 0,151
2,718 7% 0,291 0,847
1,036 7% 0,058 0,065
5,200
28,630
28,630
28,630
28,630
28,630
13,400
28,200
28,200
15,320
15,320
28,200
32,750
32,750
32,750
32,750
32,750
32,750
9,080
40,420
40,420
39,390
27,360
39,390
13,520
31,590
25,130
29,330
29,330
25,130
31,070
31,070
31,070
31,070
31,070
31,070
8,460
32,137
34,747
34,403
30,393
31,793
13,057
28,783
26,630
25,413
25,413
27,553
33,130
33,130
33,130
33,130
33,130
33,130
0,900
0,900
0,900
0,900
0,900
0,900
0,900
1,080
1,080
1,080
1,080
1,080
1,100
1,100
1,100
1,100
1,100
1,100
7,614
28,923
31,272
30,963
27,354
28,614
11,751
31,086
28,760
27,446
27,446
29,758
36,443
36,443
36,443
36,443
36,443
36,443
11,100
27,360
35,190
35,190
35,190
27,360
12,250
26,560
26,560
31,590
31,590
29,330
35,570
35,570
35,570
35,570
35,570
35,570
Cap. Requerida
Cant. Horas Turno
54
11,22 1,347
126
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,010
0,005
0,010
0,007
0,010
0,015
0,013
0,015
0,015
0,010
0,019
0,050
0,032
0,030
0,032
0,030
0,017
0,017
TRK
0,078
0,147
0,349
0,244
0,305
0,471
0,161
0,489
0,453
0,288
0,567
1,592
1,264
1,173
1,261
1,177
0,650
0,650
12,466
CEDULACIN DE PARTES
minutos
T2
T3
Pasos
Elementos
T1
1
2
3
4
5
8,050
1,150
0,580
3,110
5,310
3,101
1,230
3,250
3,150
3,150
3,150
3,150
8,320
8,320
8,320
9,120
5,400
5,400
3,130
2,120
4,110
2,330
2,330
7,170
7,170
7,170
7,170
7,170
7,170
7,170
7,170
6,060
6,060
6,060
7,380
7,380
7,380
7,380
7,210
7,210
7,210
11,230
6,580
5,580
3,070
1,580
5,150
2,550
2,550
6,070
6,070
6,070
6,070
6,070
6,070
6,070
6,070
6,580
6,580
6,580
127
T.P
Cv
min
TN
Tol
Min
TE
6,260
3,080
1,010
3,170
6,540
2,444
0,940
3,177
1,090
1,090
1,090
1,090
7,129
2,664
1,025
3,463
7%
7%
7%
7%
0,118
0,216
0,216
0,196
0,897
0,615
0,236
0,726
1,350
1,350
1,350
1,350
7,765
7,765
7,765
10,175
5,560
5,560
3,220
1,850
4,630
2,110
2,110
5,130
5,130
5,130
5,130
5,130
5,130
5,130
5,130
6,320
6,320
6,320
3,960
3,960
3,960
3,960
7,765
7,765
7,765
10,175
5,847
5,513
3,140
1,850
4,630
2,330
2,330
6,123
6,123
6,123
6,123
6,123
6,123
6,123
6,123
6,320
6,320
6,320
6,060
6,060
6,060
6,060
4,150
4,150
4,150
4,150
4,150
6,370
6,580
6,580
6,580
6,580
5,120
5,120
5,120
5,120
5,120
6,020
6,320
6,320
6,320
6,320
5,460
5,460
5,460
5,460
5,460
5,740
6,320
6,320
6,320
6,320
4,910
4,910
4,910
4,910
4,910
6,043
1,060
1,060
1,060
1,060
1,060
1,060
1,060
1,060
1,060
1,060
Cap. Requerida
Cant. Horas Turno
54
11,555 1,387
128
6,699
6,699
6,699
6,699
5,205
5,205
5,205
5,205
5,205
6,406
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,011
0,044
0,089
0,022
0,022
0,022
0,089
0,022
0,022
0,022
TRC
0,080
0,319
0,637
0,159
0,124
0,124
0,495
0,124
0,124
0,152
12,838
minutos
min
min
Elementos
T1
T2
T3
T.P
Cv
TN
Tol
TE
1
2
4,066
2,520
3,616
3,560
4,400
3,870
4,027
3,317
1,090
1,090
4,390
3,615
7%
7%
0,265
0,029
1,243
0,114
1,275
8,010
1,090
3,458
1,090
3,770
7%
0,029
0,119
Surtido de :
5,270
5,270
5,270
5,270
5,570
5,480
5,480
5,480
5,480
5,150
5,150
5,150
5,150
5,150
4,440
5,060
5,060
5,060
5,060
5,060
5,060
4,230
6,330
5,200
2,100
4,230
4,230
4,230
4,230
5,280
6,410
6,410
6,410
6,410
4,310
4,310
4,310
4,310
4,310
4,320
5,490
5,490
5,490
5,490
5,490
5,490
4,260
6,890
5,090
2,700
5,250
5,250
5,250
5,250
5,080
5,450
5,450
5,450
5,450
6,060
6,060
6,060
6,060
6,060
5,200
5,270
5,270
5,270
5,270
5,270
5,270
4,450
5,480
5,350
2,200
4,917
4,917
4,917
4,917
5,310
5,780
5,780
5,780
5,780
5,173
5,173
5,173
5,173
5,173
4,653
5,273
5,273
5,273
5,273
5,273
5,273
4,313
6,233
5,213
2,333
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
1,030
5,064
5,064
5,064
5,064
5,469
5,953
5,953
5,953
5,953
5,329
5,329
5,329
5,329
5,329
4,793
5,432
5,432
5,432
5,432
5,432
5,432
4,443
6,420
5,370
2,403
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,033
0,033
0,033
0,033
0,200
0,100
0,025
0,025
0,025
0,018
0,018
0,071
0,018
0,071
0,250
0,015
0,015
0,015
0,015
0,015
0,015
0,015
0,040
0,056
0,063
0,181
0,181
0,181
0,181
1,170
0,637
0,159
0,159
0,159
0,102
0,102
0,407
0,102
0,407
1,282
0,085
0,085
0,085
0,085
0,085
0,085
0,070
0,275
0,319
0,161
Pasos
Cajetin de direccion
Barra estabilizadora
Barra de direccion
Barra pickman 4x4, 4x2
Parachoque
Disco delantero LD
Caliper
Brazo radial
Punta de eje
Barra de direccion 39M, 49M
Brazo radial LD
Amortiguador
Auxiliar de amortiguador 4x4
Espiral 4x2
Tanque de gasolina
Soporte de transfer
Travesao 4x4
Soporte de ballesta
Complemento de Soporte de transfer
Soporte de amortiguador
Cardan 4X2
Eje delantero
Caliper 4x4 LD
Tuberia de llenado
Soporte 4x4
129
Soporte 4x2
2,100
2,700
2,200
2,333
1,030
2,403
7%
0,063
0,161
Soporte de transfer
Travesano
Soporte de ballesta
Complemento de soporte de transfer
Soporte de amortiguador LI 4x2 (Meseta)
Silenciadores y resonadores
Disco delantero 4x2 LI
Caliper 4x2 LI
Brazo radial 4x2 LI
Punta de eje LI
Ballesta 4x4
Barra de direccion
Brazo radial 4x2 LD
Amortiguadores (4x4, 4x2)
Espiral 4x2
Auxiliar de amortiguador 4x4
5,300
5,300
5,300
5,300
5,300
5,540
6,370
6,370
6,370
6,370
6,240
7,260
7,260
7,260
7,260
7,260
7,260
7,260
7,260
7,260
7,260
5,480
7,190
7,190
7,190
7,190
7,300
6,530
6,530
6,530
6,530
6,530
6,280
6,280
6,280
6,280
6,280
6,190
7,020
7,020
7,020
7,020
6,770
6,890
6,890
6,890
6,890
6,890
6,280
6,280
6,280
6,280
6,280
5,737
6,860
6,860
6,860
6,860
6,770
6,893
6,893
6,893
6,893
6,893
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
6,908
6,908
6,908
6,908
6,908
6,310
7,546
7,546
7,546
7,546
7,447
7,583
7,583
7,583
7,583
7,583
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,029
0,029
0,029
0,029
0,029
0,125
0,063
0,063
0,031
0,031
0,125
0,029
0,029
0,057
0,029
0,057
0,211
0,211
0,211
0,211
0,211
0,844
0,505
0,505
0,252
0,252
0,996
0,232
0,232
0,464
0,232
0,464
Caliper 4x4
4,090
5,230
4,670
4,663
1,100
5,130
7%
0,040
0,220
Ramales 4x2
Ramales 4x4
Soporte de eje delantero 4x4
Protector de canister 4x4
Barra estabilizadora 4x4
Barra estabilizadora 4x2
Protector de disco 4x2
Stop
Body mount LD 4x2
35,430
35,430
35,430
35,430
35,430
35,430
35,430
35,430
6,150
30,520
30,520
26,070
26,070
26,070
26,070
26,070
26,070
4,091
32,700
32,700
30,520
30,520
30,520
30,520
30,520
30,520
4,130
32,883
32,883
30,673
30,673
30,673
30,673
30,673
30,673
4,790
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
36,829
36,829
34,354
34,354
34,354
34,354
34,354
34,354
5,365
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,003
0,003
0,003
0,003
0,003
0,012
0,003
0,003
0,036
0,114
0,114
0,107
0,107
0,107
0,426
0,107
0,107
0,205
6,150
4,091
4,130
4,790
1,120
5,365
7%
0,036
0,205
16,450
16,450
16,450
16,450
16,450
16,450
24,580
24,580
24,580
12,130
12,130
12,130
20,500
20,500
20,500
13,040
13,040
13,040
20,510
20,510
20,510
13,873
13,873
13,873
1,120
1,120
1,120
1,120
1,120
1,120
22,971
22,971
22,971
15,538
15,538
15,538
7%
7%
7%
7%
7%
7%
0,001
0,003
0,000
0,001
0,001
0,001
0,017
0,066
0,004
0,011
0,011
0,011
130
16,450
16,450
16,450
16,450
16,450
16,450
16,450
16,450
16,450
16,450
16,450
16,450
16,450
16,450
16,450
12,130
24,580
24,580
24,580
24,580
24,580
24,580
24,580
24,580
24,580
24,580
24,580
24,580
24,580
24,580
13,040
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,500
13,873
20,510
20,510
20,510
20,510
20,510
20,510
20,510
20,510
20,510
20,510
20,510
20,510
20,510
20,510
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
15,538
22,971
22,971
22,971
22,971
22,971
22,971
22,971
22,971
22,971
22,971
22,971
22,971
22,971
22,971
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,001
0,001
0,001
0,001
0,001
0,003
0,001
0,002
0,008
0,001
0,001
0,000
0,001
0,000
0,001
0,011
0,017
0,017
0,017
0,017
0,066
0,017
0,037
0,203
0,017
0,017
0,004
0,017
0,004
0,017
16,450
24,580
20,500
20,510
1,120
22,971
7%
0,000
0,004
Chasis
9,220
8,150
8,685
8,685
1,080
9,380
7%
0,250
2,509
8,120
8,120
6,370
9,220
7,500
7,500
7,340
7,340
12,150
9,160
8,220
8,220
9,050
9,050
8,550
9,190
6,020
6,020
8,170
8,170
9,023
9,190
7,247
7,247
1,090
1,090
1,090
1,090
1,090
1,090
8,905
8,905
9,835
10,017
7,899
7,899
7%
7%
7%
7%
7%
7%
0,071
0,071
0,067
0,056
0,050
0,050
0,681
0,681
0,702
0,595
0,423
0,423
5,420
6,230
5,500
5,717
1,090
6,231
7%
0,063
0,417
10,080
10,080
10,080
10,080
1,300
10,080
6,120
6,120
5,170
10,080
9,140
9,140
9,140
9,140
1,420
9,140
5,170
5,170
5,400
9,140
10,010
10,010
10,010
10,010
1,350
10,010
7,150
7,150
5,250
10,010
9,743
9,743
9,743
9,743
1,357
9,743
6,147
6,147
5,273
9,743
1,090
1,090
1,090
1,090
1,090
1,090
1,090
1,090
1,090
1,090
10,620
10,620
10,620
10,620
1,479
10,620
6,700
6,700
5,748
10,620
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,635
0,635
0,587
0,568
0,675
0,900
0,621
0,600
0,720
0,831
7,219
7,219
6,670
6,459
1,068
10,227
4,450
4,301
4,428
9,441
131
10,080
6,460
6,460
6,460
10,080
9,140
8,160
8,160
8,160
9,140
10,010
8,210
8,210
8,210
10,010
9,743
7,610
7,610
7,610
9,743
1,090
1,090
1,090
1,090
1,090
10,620
8,295
8,295
8,295
10,620
7%
7%
7%
7%
7%
0,551
0,675
0,621
1,038
1,800
Tapon Grasero
3,450
4,560
5,120
4,377
1,090
4,771
7%
1,543
7,876
TRS
23,263
Cap. Requerida
132
Cant.
Horas
Turno
54
20,936
2,513
6,262
5,991
5,509
9,217
20,455
Pasos
Elementos
1
Dirigirse hacia la zona donde se encuentra ubicado el montacargas
2
Verificar estado del montacargas
3
Diligenciar hoja de preuso
4
5
133
T1
5,110
2,140
1,290
40,13
minutos
T2
T3
10,310 12,210
1,520 3,560
1,570 1,360
13,560 26,845
T.P
9,210
2,407
1,407
26,845
Cv
1,100
1,100
1,100
1,100
min
TN
10,131
2,647
1,547
29,530
Tol
7%
7%
7%
7%
F
0,029
0,029
0,441
0,029
Min
TE
0,319
0,083
0,730
0,929
3,060
3,060
3,060
3,060
3,060
3,150
3,150
5,100
4,010
4,010
4,010
4,010
9,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
3,570
3,570
3,570
3,570
3,570
2,560
2,560
5,590
3,860
3,860
3,860
3,860
9,260
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,613
3,613
3,613
3,613
3,613
2,690
2,690
5,050
4,007
4,007
4,007
4,007
7,473
4,007
4,007
4,007
4,007
4,007
4,007
4,007
4,007
4,007
4,007
4,007
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
4,047
4,047
4,047
4,047
4,047
3,013
3,013
5,656
4,447
4,447
4,447
4,447
8,295
4,447
4,447
4,447
4,447
4,447
4,447
4,447
4,447
4,447
4,447
4,447
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,033
0,005
0,033
0,019
0,022
0,022
0,033
0,083
0,056
0,056
0,024
0,012
0,025
0,250
0,083
0,029
0,038
0,021
0,004
0,013
0,013
0,021
0,019
0,014
0,144
0,022
0,144
0,080
0,094
0,070
0,107
0,504
0,264
0,264
0,116
0,056
0,222
1,190
0,397
0,136
0,183
0,099
0,020
0,063
0,063
0,099
0,088
0,068
4,210
4,210
4,210
4,210
4,210
2,360
2,360
4,460
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,010
4,010
4,010
4,010
9,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
4,010
Brazo radial LI
Amortiguador delantero (4x4, 4x2)
Amortiguador trasero (4x4, 4x2)
Auxiliar de amortiguador 4x4
Espiral 4x2
Disco delantero 4x2 LI
Caliper 4x2 LI
Brazo radial 4x2 LI
Punta de eje LI
Disco delantero 4x2 LD
Caliper 4x2 LD
Brazo radial 4x2 LD
Punta de eje LD
3,860
3,860
3,860
3,860
9,260
3,860
3,860
3,860
3,860
3,860
3,860
3,860
3,860
4,150
4,150
4,150
4,150
9,135
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,150
4,007
4,007
4,007
4,007
9,135
4,007
4,007
4,007
4,007
4,007
4,007
4,007
4,007
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
1,110
Cap. Requerida
Cant. Horas Turno
54
5,444 0,654
134
4,447
4,447
4,447
4,447
10,140
4,447
4,447
4,447
4,447
4,447
4,447
4,447
4,447
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,014
0,013
0,013
0,014
0,004
0,037
0,056
0,018
0,037
0,125
0,056
0,014
0,059
TRM
0,068
0,063
0,063
0,068
0,043
0,176
0,264
0,085
0,176
0,595
0,264
0,068
0,280
6,049
minutos
T2
T3
T.P
Cv
min
TN
Pasos
Elementos
1
2
6
3,280
1,260
3,430
3,170
2,560
3,050
3,090
2,493
1,090
1,090
3,368
2,718
7% 0,400 1,442
7% 0,019 0,054
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
75,150
38,350
38,350
38,350
38,350
38,350
38,350
41,140
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
78,360
40,490
40,490
40,490
40,490
40,490
40,490
40,120
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
78,270
39,160
39,160
39,160
39,160
39,160
39,160
42,060
77,260
77,260
77,260
77,260
77,260
77,260
77,260
77,260
77,260
77,260
77,260
77,260
77,260
77,260
77,260
77,260
77,260
77,260
77,260
77,260
39,333
39,333
39,333
39,333
39,333
39,333
41,107
0,900
0,900
0,900
0,900
0,900
0,900
0,900
0,900
0,900
0,900
0,900
0,900
0,900
0,900
0,900
0,900
0,900
0,900
0,900
0,900
1,080
1,080
1,080
1,080
1,080
1,080
1,080
69,534
69,534
69,534
69,534
69,534
69,534
69,534
69,534
69,534
69,534
69,534
69,534
69,534
69,534
69,534
69,534
69,534
69,534
69,534
69,534
42,480
42,480
42,480
42,480
42,480
42,480
44,395
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
135
Tol
min
TE
T1
0,000
0,006
0,000
0,001
0,000
0,001
0,007
0,000
0,000
0,000
0,002
0,001
0,002
0,002
0,000
0,002
0,003
0,000
0,000
0,001
0,001
0,000
0,001
0,001
0,000
0,001
0,003
0,029
0,463
0,010
0,108
0,011
0,108
0,552
0,012
0,022
0,013
0,129
0,065
0,173
0,112
0,030
0,179
0,244
0,022
0,018
0,048
0,066
0,016
0,053
0,026
0,010
0,040
0,132
41,140
41,140
41,140
41,140
41,140
41,140
0,590
Tapon Grasero
CONN ASY PWR STNG RTN LN HOS
Ajustador Camber DEL
Condensador Red Frec
BRKT FRT AX BMPR TO FR RH
Aislante de Amortiguador
Ordenar desechos en la paleta para que el montacarguista los retire
40,120
40,120
40,120
40,120
40,120
40,120
1,250
42,060
42,060
42,060
42,060
42,060
42,060
1,010
41,107
41,107
41,107
41,107
41,107
41,107
0,950
1,080
1,080
1,080
1,080
1,080
1,080
1,080
Cap. Requerida
Cant. Horas Turno
54
4,223 0,507
136
44,395
44,395
44,395
44,395
44,395
44,395
1,036
7%
7%
7%
7%
7%
7%
7%
0,001
0,000
0,001
0,001
0,002
0,001
0,216
TRT
0,041
0,015
0,059
0,041
0,076
0,034
0,239
4,692
137
ELABORACION DE KITS
Pasos
1
2
3
4
5
7
Elementos
Verificar niveles de inventario de material en cada estacin de la lnea de produccin
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
Tomar las cestas y ubicarlas en la facilidad
Abrir los empaques donde se encuentran las piezas a trasegar.
Ordenar desechos en la paleta para que el montacarguista los retire
Proceder a armar el kit
Stop cargo 815
Soporte de ballesta C815
Soporte de silenciador C815
Arnes y filtro C815
Base de motor y manguera de freno C815
Kit bandeja de bateria y caucho de repuesto C815
Kit stop de C815
Kit soporte de ballesta C815
Kit brazo y soporte de cabina C815
Kit base de motor y freno C815
Kit valvula de freno C815
Ordenar desechos en la paleta para que el montacarguista los retire
T1
3,280
1,270
0,550
1,260
0,590
minutos
T2
T3
3,430 2,560
1,430 1,520
1,460 2,000
3,170 3,050
1,250 1,010
T.P
3,090
1,407
1,337
2,493
0,950
Cv
1,090
1,090
1,090
1,090
1,090
min
min
TN
Tol
F
TE
3,368 7% 0,019 0,070
1,533 7% 0,010 0,016
1,457 7% 0,097 0,151
2,718 7% 0,291 0,847
1,036 7% 0,058 0,065
28,200
28,200
15,320
15,320
28,200
32,750
32,750
32,750
32,750
32,750
32,750
0,590
31,590
25,130
29,330
29,330
25,130
31,070
31,070
31,070
31,070
31,070
31,070
1,250
28,783
26,630
25,413
25,413
27,553
33,130
33,130
33,130
33,130
33,130
33,130
0,950
0,900
0,900
0,900
0,900
0,900
1,080
1,080
1,080
1,080
1,080
1,080
1,090
25,905
23,967
22,872
22,872
24,798
35,780
35,780
35,780
35,780
35,780
35,780
1,036
26,560
26,560
31,590
31,590
29,330
35,570
35,570
35,570
35,570
35,570
35,570
1,010
Cap. Requerida
Cant. Horas Turno
10
1,918 0,230
138
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,036
0,018
0,009
0,071
0,018
0,083
0,026
0,023
0,018
0,002
0,016
0,016
TRK
0,990
0,458
0,219
1,748
0,474
3,190
0,997
0,897
0,684
0,090
0,598
0,017
11,511
CEDULACIN DE PARTES
minutos
T2
T3
T.P
Cv
min
TN
Tol
min
TE
6,260
6,540
1,090
7,129
7%
0,118
0,897
3,101
1,230
3,250
3,080
1,010
3,170
2,444
0,940
3,177
1,090
1,090
1,090
2,664
1,025
3,463
7%
7%
7%
0,216
0,216
0,196
0,615
0,236
0,726
3,340
4,430
4,430
4,370
5,236
5,236
3,855
4,578
4,578
3,855
4,748
4,748
1,090
1,090
1,090
4,202
5,175
5,175
7%
7%
7%
1,067
0,267
0,267
4,796
1,477
1,477
7,140
2,100
4,620
4,620
1,090
5,036
7%
1,000
5,388
5,170 5,560
5,170 5,560
5,170 5,560
5,170 5,560
5,170 5,560
5,110 6,280
5,110 6,280
5,110 6,280
5,110 6,280
5,110 6,280
5,110 6,280
5,110 6,280
6,830 6,430
6,830 6,430
6,830 6,430
8,090 8,010
8,090 8,010
12,050 11,560
12,050 11,560
6,070
6,070
6,070
6,070
6,070
6,390
6,390
6,390
6,390
6,390
6,390
6,390
8,310
8,310
8,310
8,510
8,510
13,040
13,040
5,600
5,600
5,600
5,600
5,600
5,927
5,927
5,927
5,927
5,927
5,927
5,927
7,190
7,190
7,190
8,203
8,203
12,217
12,217
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
5,992
5,992
5,992
5,992
5,992
6,342
6,342
6,342
6,342
6,342
6,342
6,342
7,693
7,693
7,693
8,778
8,778
13,072
13,072
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,024
0,024
0,024
0,024
0,024
0,024
0,333
0,333
0,333
0,038
0,038
0,333
0,080
0,080
0,020
0,080
0,080
0,020
0,100
0,153
0,153
0,153
0,153
0,153
0,162
2,262
2,262
2,262
0,261
0,261
2,262
0,659
0,659
0,165
0,751
0,751
0,280
1,399
12,050 11,560
13,040
12,217
1,070
13,072
7%
1,000
TRC
13,987
Pasos
Elementos
T1
1
2
3
4
5
8,050
5,310
1,150
0,580
3,110
Cant.
10
139
Horas
7,459
Turno
0,895
44,756
minutos
T2
T3
T.P
Cv
min
TN
Tol
min
TE
Pasos
Elementos
T1
1
2
3
4
4,066
3,616
4,400
4,027
1,090
4,390
7%
0,265
1,024
2,520
1,275
3,560
8,010
3,870
1,090
3,317
3,458
1,090
1,090
3,615
3,770
7%
7%
0,029
0,029
0,114
0,119
Soporte de chasis
Silenciadores con soporte de calor C815 largo y corto
Cardan C815 (82V, 84V, 85V,87V)
Cuplon C815 estandar
Soporte de cabina C815
Soporte de cabina (87V, 85, 84V, 82V) LD
Soporte de estribo (87V, 85, 84V, 82V) LD
Soporte de guardafango (87V, 85, 84V, 82V) LD
Soporte de cabina (87V, 85, 84V, 82V) LI
Soporte de estribo (87V, 85, 84V, 82V) LI
Soporte de guardafango (87V, 85, 84V, 82V) LI
Eje trasero (87V, 85V, 84V,82V)
Amortiguador delantero
Eje delantero (87V, 85V, 84V,82V)
Cajetin de direccion
Soporte de tanque
Barra estabilizadora
Ballestas traseras LD
Ballestas delanteras LD
Barra estabilizadora LD
Ballestas traseras LI
Ballestas delanteras LI
Barra estabilizadora LI
3,380
4,040
5,370
4,263
1,100
4,690
7%
1,000
5,018
6,420
4,390
4,390
9,020
9,020
3,300
3,300
3,300
3,300
3,300
3,300
3,300
3,300
3,300
3,300
3,300
3,300
3,300
3,300
6,580
6,580
6,580
7,840
9,240
9,240
10,030
10,030
5,420
5,420
5,420
5,420
5,420
5,420
5,420
5,420
5,420
5,420
5,420
5,420
5,420
5,420
7,120
7,120
7,120
6,580
6,580
6,815
6,815
6,815
6,815
8,596
8,596
4,580
4,580
4,580
4,580
4,580
4,580
4,580
4,580
4,580
4,580
4,580
4,580
4,580
4,580
6,947
6,737
6,815
8,622
8,622
5,178
5,772
5,772
4,433
4,433
4,433
4,433
4,433
4,433
4,433
4,433
4,433
4,433
4,433
6,093
6,093
6,093
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
7,780
7,545
7,633
9,656
9,656
5,800
6,465
6,465
4,965
4,965
4,965
4,965
4,965
4,965
4,965
4,965
4,965
4,965
4,965
6,825
6,825
6,825
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,750
0,063
0,063
1,500
0,029
0,029
0,029
0,029
0,029
0,029
0,143
0,333
0,333
0,028
0,083
0,500
0,133
0,133
0,067
0,133
0,133
0,067
6,244
0,505
0,510
15,498
0,295
0,177
0,198
0,198
0,152
0,152
0,759
1,771
1,771
0,148
0,443
2,656
0,708
0,708
0,354
0,974
0,974
0,487
140
Tanques de aire
8,520
Soporte de tanque LI
Soporte de ballesta trasero (SP)
Irrajes (SP)
Tornillo de fijacion de ballesta ( SP PLL)
Tuerca de rueda C815
Tornillo portarepuesto
Tuerca portarepuesto
Arandela de ballesta trasera
Tuerca de fijacion de base ballesta
Tornillo fija topes de ballesta
Complemento de base y soporte de EJE DELANTERO C815
Complemento de base y soporte de EJE TRASERO C815
Complemento de tuberia del stma. De freno C815
Tuberia de freno C815
Tuberia de cobre de stma. De freno C815
Bases de Cardan C815 (PLL CH)
Kits de comp. De eje delantero C815 LD
Kits de comp. De eje delantero C815 LI
Kits de comp. De eje trasero C815 LD
Kits de comp. De eje trasero C815 LI
Guaya de tacometro de Cargo
Brazos de direccion C815
Manguera de croche C815
Manguera de freno C815 (82v y 84v)
Manguera de freno C815 (85v y 87v)
Kit de base de motor y freno C815
Kit soporte de ballesta C815
Kit brazo y soporte de cabina C815
Kit bandeja de baterias y caucho de repuesto C815
Kit Stop C815
Kit Stop C815
Kit de soporte de ballesta C815
Kit de silenciador C815
Kit de base de motor y manguera de freno C815
Kit arnes y filtro C815
5,090
4,210
18,350
18,350
18,350
18,350
18,350
18,350
18,350
18,350
18,350
7,070
7,070
7,070
7,070
6,470
6,470
6,470
6,470
6,470
6,470
6,470
6,470
7,260
7,260
7,260
4,460
4,460
4,460
4,460
4,460
4,140
4,140
4,140
4,140
4,140
19,560
19,560
19,560
19,560
19,560
19,560
19,560
19,560
19,560
5,570
5,570
5,570
5,570
8,130
7,130
7,130
7,130
7,130
7,130
7,130
7,130
6,490
6,490
6,490
6,390
6,390
6,390
6,390
6,390
6,220
6,220
6,220
6,220
6,220
141
7,895
6,756
7,724
1,120
8,651
7%
0,042
0,386
4,650
4,650
20,150
20,150
20,150
20,150
20,150
20,150
20,150
20,150
20,150
6,280
6,280
6,280
6,280
6,070
6,070
6,070
6,070
6,070
6,070
6,070
6,070
8,020
8,020
8,020
5,010
5,010
5,010
5,010
5,010
5,370
5,370
5,370
5,370
5,370
19,353
19,353
19,353
19,353
19,353
19,353
19,353
19,353
19,353
6,307
6,307
6,307
6,307
6,890
6,557
6,557
6,557
6,557
6,557
6,557
6,557
7,257
7,257
7,257
5,287
5,287
5,287
5,287
5,287
5,243
5,243
5,243
5,243
5,243
1,120
5,208
7%
0,083
0,464
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
20,902
20,902
20,902
20,902
20,902
20,902
20,902
20,902
20,902
6,811
6,811
6,811
6,811
7,441
7,081
7,081
7,081
7,081
7,081
7,081
7,081
7,837
7,837
7,837
5,710
5,710
5,710
5,710
5,710
5,663
5,663
5,663
5,663
5,663
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0%
7%
7%
7%
7%
7%
7%
0,015
0,002
0,002
0,001
0,001
0,001
0,001
0,001
0,001
0,031
0,031
0,031
0,031
0,050
0,050
0,042
0,042
0,021
0,021
0,021
0,021
0,021
0,021
0,021
0,040
0,100
0,067
0,100
0,040
0,067
0,063
0,156
0,156
0,104
0,329
0,049
0,044
0,026
0,026
0,022
0,022
0,026
0,020
0,228
0,228
0,228
0,228
0,398
0,379
0,316
0,316
0,158
0,158
0,158
0,158
0,175
0,175
0,175
0,244
0,611
0,407
0,611
0,244
0,404
0,379
0,947
0,947
0,631
4,140
6,220
5,370
5,243
1,080
5,663
7%
0,156
0,947
Chasis
7,270
12,070
9,670
9,670
1,080
10,444
7%
0,375
4,190
Atender ANDON
3,500
4,230
4,010
3,913
1,090
4,266
7%
0,037
0,171
5,370
5,010
5,240
5,207
1,090
5,675
7%
0,037
TRS
57,407
Cap. Requerida
Cant.
Horas Turno
10
9,568
1,149
142
0,227
Pasos
1
2
3
4
5
6
Elementos
Verificar estado del montacargas
Diligenciar hoja de preuso
Recoger basura y depositar en rea de desechos
Descargue de tarjetas de ubicacin
Abastecer tanque de gas
Surtido de partes a la linea
Silenciadores con soporte de calor C815 largo y corto
Silenciadores con soporte de calor C815 corto
Cardan C815 (82V, 84V, 85V,87V)
Cuplon C815 estandar
Eje trasero (87V, 85V, 84V,82V)
Amortiguador delantero
Eje delantero (87V, 85V, 84V,82V)
Cajetin de direccion
Soporte de tanque
Barra estabilizadora
Ballestas traseras LD
Ballestas delanteras LD
Barra estabilizadora LD
Ballestas traseras LI
Ballestas delanteras LI
Barra estabilizadora LI
Tanques de aire
Soporte de tanque LI
Soporte de cabina C815
Soporte de cabina (87V, 85, 84V, 82V) LD
Soporte de estribo (87V, 85, 84V, 82V) LD
Soporte de guardafango (87V, 85, 84V, 82V) LD
minutos
T1
T2
T3
T.P
5,110 10,310 12,210 9,210
2,140 1,520 3,560 2,407
1,290 1,570 1,360 1,407
12,140 8,130 17,370 12,547
40,130 13,560 26,845 26,845
Cv
1,090
1,090
1,090
1,090
1,090
min
TN
10,039
2,623
1,533
13,676
29,261
Tol
7%
7%
7%
7%
7%
F
0,029
0,029
0,441
0,059
0,029
min
TE
0,316
0,083
0,724
0,861
0,921
8,210
8,210
5,100
3,060
3,150
3,060
5,100
3,060
3,060
3,060
5,100
5,100
3,060
5,100
5,100
3,060
8,210
3,060
3,060
4,010
4,010
4,010
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,110
1,110
1,110
8,781
8,781
4,909
4,047
3,013
4,047
4,909
4,047
4,047
4,047
4,909
4,909
4,047
5,283
5,283
4,047
9,527
4,047
4,047
4,447
4,447
4,447
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,025
0,015
0,025
0,050
0,028
0,050
0,071
0,100
1,000
0,021
0,500
0,150
0,375
0,031
0,500
0,500
0,083
0,050
0,005
0,025
0,038
0,031
0,235
0,145
0,131
0,217
0,090
0,217
0,375
0,433
4,330
0,093
2,626
0,788
1,624
0,177
2,826
2,165
0,850
0,217
0,022
0,119
0,183
0,149
143
8,080
8,080
4,590
3,570
2,560
3,570
4,590
3,570
3,570
3,570
4,590
4,590
3,570
5,590
5,590
3,570
10,080
3,570
3,570
3,860
3,860
3,860
7,230
7,230
3,460
4,210
2,360
4,210
3,460
4,210
4,210
4,210
3,460
3,460
4,210
3,460
3,460
4,210
7,230
4,210
4,210
4,150
4,150
4,150
7,840
7,840
4,383
3,613
2,690
3,613
4,383
3,613
3,613
3,613
4,383
4,383
3,613
4,717
4,717
3,613
8,507
3,613
3,613
4,007
4,007
4,007
4,010
4,010
4,010
3,860
3,860
3,860
4,150
4,150
4,150
4,007
4,007
4,007
1,110
1,110
1,110
Cap. Requerida
Cant. Horas Turno
10
3,048 0,366
144
4,447
4,447
4,447
7% 0,021 0,099
7% 0,017 0,079
7% 0,021 0,099
TRM 18,287
T1
Elementos
minutos
T2
T3
Verificar niveles de inventario de material en cada estacin de la lnea de produccin 3,280 3,430
1,260 3,170
Abrir los empaques donde se encuentran las piezas a trasegar.
Trasego de Partes por llamadas
Soporte de ballesta trasero C815
38,350 40,490
Soporte de ballesta delantero C815
38,350 40,490
16,510 16,580
Eje delantero C-815
16,510 16,580
Eje trasero C-815
16,470 13,350
ballesta tope C-815
16,470 13,350
Valvula de freno C-815
16,470 13,350
Extension de Parachoque LI C815
16,470 13,350
BRKT RR SHK ABS UPR 2X1 LI C-815
16,470 13,350
Soporte AUX Ballesta 4x1 LI C-815
16,470 13,350
Extension de Parachoque LD C815
16,470 13,350
BRKT RR SHK ABS UPR 2X1 LD C-815
16,470 13,350
Soporte AUX Ballesta 4x1 LD C-815
16,470 13,350
BMPR ASY-RR AX TOPE 4X2 LI C815
16,470 13,350
BRKT ASY-RR SHOCK ABB-UPR LI C815
16,470 13,350
BRKT ASY-RR STAB BAR LI C815
16,470 13,350
BMPR ASY RR AXLE LI C815
16,470 13,350
BMPR ASY-RR AX TOPE 4X2 LD C815
16,470 13,350
BRKT ASY-RR SHOCK ABB-UPR LD C815
16,470 13,350
BRKT ASY-RR STAB BAR LDC815
16,470 13,350
TRY ASY-BAT LH C-815
16,470 13,350
BMPR ASY RR AXLE LD C815
1,400 1,450
Tuberia de freno C815
0,590 1,250
Ordenar desechos en la paleta para que el montacarguista los retire
145
T.P
Cv
min
TN
2,560
3,050
3,090
2,493
1,090
1,090
3,368
2,718
7% 0,400 1,442
7% 0,019 0,054
39,160
39,160
16,430
16,430
14,530
14,530
14,530
14,530
14,530
14,530
14,530
14,530
14,530
14,530
14,530
14,530
14,530
14,530
14,530
14,530
14,530
1,530
1,010
39,333
39,333
16,507
16,507
14,783
14,783
14,783
14,783
14,783
14,783
14,783
14,783
14,783
14,783
14,783
14,783
14,783
14,783
14,783
14,783
14,783
1,460
0,950
0,900
0,900
1,080
1,080
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,090
35,400
35,400
17,827
17,827
16,262
16,262
16,262
16,262
16,262
16,262
16,262
16,262
16,262
16,262
16,262
16,262
16,262
16,262
16,262
16,262
16,262
1,606
1,036
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
Cant.
10
Horas Turno
1,401 0,168
Tol
0,033
0,003
0,094
0,094
0,004
0,004
0,004
0,004
0,018
0,004
0,004
0,004
0,004
0,004
0,004
0,004
0,004
0,004
0,004
0,004
0,004
0,083
0,216
TRT
min
TE
1,263
0,126
1,788
1,788
0,078
0,078
0,078
0,078
0,312
0,078
0,078
0,078
0,078
0,078
0,078
0,078
0,078
0,078
0,078
0,078
0,078
0,143
0,239
8,404
146
ELABORACION DE KITS
T1
Pasos
Elementos
1
Verificar niveles de inventario de material en cada estacin de la lnea de produccin 3,280
1,270
2
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
0,550
3
Tomar las cestas y ubicarlas en la facilidad
1,260
4
Abrir los empaques donde se encuentran las piezas a trasegar.
0,590
5
Ordenar desechos en la paleta para que el montacarguista los retire
6
Proceder a armar el kit
4,679
Arnes corto y filtro C1721
4,679
Arnes largo y filtro C1721
4,679
Valvulas de freno y remolcador de ballesta C1721
4,679
Soporte de amortiguadores C1721
4,679
Soporte de silenciadores C1721
4,679
Soporte de ballesta C1721
4,679
Stop de C1721
3,860
Kit stop de C1721
1,937
Kit tuberia de aceite hidraulico C1721
3,860
Kit brazo y soporte de cabina C1721
3,240
Kit soporte guaya C1721
3,860
Kit valvula de freno y rebotadores de ballesta C1721
3,860
Kit soporte de amortiguadores de C1721
3,860
Kit soporte de ballesta C1721
minutos
T2
T3
3,430 2,560
1,430 1,520
1,460 2,000
3,170 3,050
1,250 1,010
T.P
3,090
1,407
1,337
2,493
0,950
Cv
1,090
1,090
1,090
1,090
1,090
min
TN
3,368
1,533
1,457
2,718
1,036
Tol
7%
7%
7%
7%
7%
F
0,019
0,010
0,097
0,291
0,058
min
TE
0,070
0,016
0,151
0,847
0,065
4,439
4,439
4,439
4,439
4,439
4,439
4,439
1,937
3,943
1,937
1,937
1,937
1,937
1,937
4,733
4,733
4,733
4,733
4,733
4,733
4,733
3,247
3,247
3,247
2,938
3,247
3,247
3,247
0,900
0,900
0,900
0,900
0,900
0,900
0,900
1,080
1,080
1,080
1,080
1,080
1,080
1,080
4,260
4,260
4,260
4,260
4,260
4,260
4,260
3,506
3,506
3,506
3,173
3,506
3,506
3,506
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,010
0,010
0,021
0,014
0,021
0,007
0,021
0,014
0,002
0,014
0,012
0,004
0,044
0,012
TRK
0,047
0,047
0,095
0,063
0,095
0,032
0,095
0,054
0,007
0,052
0,040
0,013
0,167
0,046
2,003
5,081
5,081
5,081
5,081
5,081
5,081
5,081
3,943
3,860
3,943
3,636
3,943
3,943
3,943
Cap. Requerida
Cant. Horas Turno
5
0,167 0,020
147
CEDULACIN DE PARTES
minutos
T2
T3
Pasos
Elementos
T1
1
2
3
4
6
8,050
5,310
1,150
0,580
3,110
3,101
1,230
3,250
3,340
4,430
4,430
7,140
5,170
5,170
5,170
5,170
5,110
5,110
5,110
6,830
8,090
8,090
12,050
12,050
12,050
11,110
11,110
11,110
10,150
10,150
10,150
4,370
5,236
5,236
2,100
5,560
5,560
5,560
5,560
6,280
6,280
6,280
6,430
8,010
8,010
11,560
11,560
11,560
12,150
12,150
12,150
11,560
11,560
11,560
148
T.P
Cv
min
TN
6,260
6,540
1,090
7,129
7% 0,118 0,897
3,080
1,010
3,170
2,444
0,940
3,177
1,090
1,090
1,090
2,664
1,025
3,463
7% 0,216 0,615
7% 0,216 0,236
7% 0,196 0,726
3,855
4,578
4,578
4,620
6,070
6,070
6,070
6,070
6,390
6,390
6,390
8,310
8,510
8,510
13,040
13,040
13,040
11,480
11,480
11,480
12,140
12,140
12,140
3,855
4,748
4,748
4,620
5,600
5,600
5,600
5,600
5,927
5,927
5,927
7,190
8,203
8,203
12,217
12,217
12,217
11,580
11,580
11,580
11,283
11,283
11,283
1,090
1,090
1,090
1,090
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
1,070
4,202
5,175
5,175
5,036
5,992
5,992
5,992
5,992
6,342
6,342
6,342
7,693
8,778
8,778
13,072
13,072
13,072
12,391
12,391
12,391
12,073
12,073
12,073
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
Tol
0,267
0,267
0,267
1,000
0,024
0,024
0,024
0,024
0,024
0,024
0,024
0,024
0,038
0,038
0,333
0,333
0,333
0,080
0,080
0,020
0,080
0,080
0,020
min
TE
1,199
1,477
1,477
5,388
0,153
0,153
0,153
0,153
0,162
0,162
0,162
0,196
0,361
0,361
4,662
4,662
4,662
1,061
1,061
0,265
1,033
1,033
0,258
Tanques de aire
Soporte de tanque LI
Cap. Requerida
Cant. Horas Turno
5
3,402 0,408
149
Pasos
1
2
3
4
5
6
7
T.P
Cv
min
TN
4,400
3,870
1,090
4,010
6,010
8,420
4,027
3,317
3,458
3,830
5,287
9,160
1,090
1,090
1,090
1,090
1,090
1,090
4,390
3,615
3,770
4,175
5,762
9,984
4,263
6,947
6,815
6,815
6,815
6,815
9,215
9,215
4,433
4,433
4,433
4,433
4,433
4,433
4,433
4,433
4,433
4,433
4,433
4,433
4,433
4,433
T1
Elementos
150
minutos
T2
T3
3,616
3,560
8,010
4,230
5,480
7,050
Tol
min
TE
7%
7%
7%
7%
7%
7%
0,087
0,010
0,010
0,078
0,078
0,078
0,410
0,038
0,039
0,347
0,479
0,830
6,580
6,580
6,580
8,520
8,520
18,350
18,350
18,350
18,350
18,350
18,350
7,260
7,260
7,260
7,260
6,470
6,470
6,470
6,470
6,470
6,470
6,470
6,470
6,470
6,470
6,470
6,470
6,470
6,470
7,260
7,260
4,140
4,140
4,140
4,140
Ballestas traseras LI
Ballestas delanteras LI
Barra estabilizadora LI
Tanques de aire
Soporte de tanque LI
Tuerca de rueda C1721
Tornillo de base ballesta del C1721
Tornillo de base ballesta trasera C1721
Arandela de ballesta trasera
Tuerca de fijacion de base ballesta
Tornillo fija topes de ballesta
Soporte de ballesta C1721 LD
Soporte de ballesta C1721 LI
Goma y soporte de cabina LD
Goma y soporte de cabina LI
Brazos de direccion C1721
Kits de comp. De eje delantero C1721 LD
Kits de comp. De eje delantero C1721 LI
Kits de comp. De eje trasero C1721 LD
Kits de comp. De eje trasero C1721 LI
Complemento kit eje delantero 1721
Manguera de freno C1721 (17v y 18v)
Manguera de diferencial C1721 (17v y 18v)
Manguera de freno C1721 (17v y 18v)
Manguera de croche C1721
Kit valvula de frenos y rebotadores de ballesta C1721
Kit de soporte de amortiguador C1721
Kit De soporte de guaya C1721
Kit tuberia de aceite hidraulico C1721
Kit brazo y soporte de cabina C1721
Kit Stop C1721
Kit Stop C1721
Kit de soporte de ballesta C1721
Kit valvulas de freno y rebotadores ballesta C1721
Kit soporte de amortiguador C1721
151
7,120
7,120
7,120
7,895
7,895
19,560
19,560
19,560
19,560
19,560
19,560
7,350
7,350
7,350
7,350
8,130
7,130
7,130
7,130
7,130
7,130
7,130
7,130
7,130
7,130
7,130
7,130
7,130
7,130
6,490
6,490
6,220
6,220
6,220
6,220
6,756
6,756
6,756
7,074
7,074
20,150
20,150
20,150
20,150
20,150
20,150
6,300
6,300
6,300
6,300
6,070
6,070
6,070
6,070
6,070
6,070
6,070
6,070
6,070
6,070
6,070
6,070
6,070
6,070
8,020
8,020
5,370
5,370
5,370
5,370
6,819
6,819
6,819
7,830
7,830
19,353
19,353
19,353
19,353
19,353
19,353
6,970
6,970
6,970
6,970
6,890
6,557
6,557
6,557
6,557
6,557
6,557
6,557
6,557
6,557
6,557
6,557
6,557
6,557
7,257
7,257
5,243
5,243
5,243
5,243
1,120
1,120
1,120
1,120
1,120
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
1,080
7,637
7,637
7,637
8,769
8,769
20,902
20,902
20,902
20,902
20,902
20,902
7,528
7,528
7,528
7,528
7,441
7,081
7,081
7,081
7,081
7,081
7,081
7,081
7,081
7,081
7,081
7,081
7,081
7,081
7,837
7,837
5,663
5,663
5,663
5,663
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,029
0,143
0,333
0,333
0,028
0,001
0,001
0,001
0,001
0,001
0,001
0,050
0,050
0,042
0,042
0,021
0,021
0,021
0,021
0,021
0,021
0,021
0,033
0,033
0,033
0,033
0,033
0,033
0,083
0,063
0,063
0,067
0,063
0,156
0,156
0,233
1,167
2,724
3,128
0,261
0,026
0,022
0,022
0,026
0,020
0,020
0,403
0,403
0,336
0,336
0,166
0,158
0,158
0,158
0,158
0,158
0,158
0,253
0,253
0,253
0,253
0,253
0,253
0,631
0,524
0,524
0,404
0,379
0,947
0,947
4,140 6,220
4,140 6,220
4,140 6,220
7,270 12,070
5,370
5,370
5,370
9,670
5,243
5,243
5,243
9,670
1,080 5,663
1,080 5,663
1,080 5,663
1,080 10,444
Cap. Requerida
Cant. Horas Turno
5
4,698 0,564
152
7%
7%
7%
7%
0,104
0,156
0,156
0,750
TRS
0,631
0,947
0,947
8,381
56,377
Pasos
1
2
3
4
5
6
Elementos
Verificar estado del montacargas
Diligenciar hoja de preuso
Recoger basura y depositar en rea de desechos
Descargue de tarjetas de ubicacin
Abastecer tanque de gas
Surtido de partes a la linea
Silenciador 1721 estandar
Cardan C1721 (17C, 18C)
Cuplon C1721 (18C)
Soporte de cabina C1721 LD
Amortiguador delantero
Cajetin de direccion
Soporte de tanque
Barra estabilizadora
Eje delantero (17C/18C)
Eje trasero (17C/18C)
Ballestas traseras LD
Ballestas delanteras LD
Barra estabilizadora LD
Ballestas traseras LI
Ballestas delanteras LI
Barra estabilizadora LI
Tanques de aire
Soporte de tanque LI
Tuberia de gasoil (17C/18C) LD
Soporte de estribo (17C/18C) LD
Soporte de cabina (17C/18C) LD
Soporte de guardafango (17C/18C) LD
Soporte de estribo (17C/18C) LI
minutos
T1
T2
T3
T.P
5,110 10,310 12,210 9,210
2,140 1,520 3,560 2,407
1,290 1,570 1,360 1,407
12,140 8,130 17,370 12,547
40,130 13,560 26,845 26,845
min
Cv
TN
Tol
F
1,090 10,039 7% 0,029
1,090 2,623 7% 0,029
1,090 1,533 7% 0,441
1,090 13,676 7% 0,029
1,090 29,261 7% 0,029
min
TE
0,316
0,083
0,724
0,430
0,921
8,210
5,100
5,100
3,060
3,060
3,060
3,060
3,060
5,100
5,100
5,100
5,100
3,060
5,100
5,100
3,060
8,210
3,060
4,010
4,010
4,010
4,010
4,010
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,110
1,110
1,110
1,110
1,110
0,470
0,525
0,292
0,433
0,619
0,866
8,660
0,186
5,253
1,576
3,940
0,328
4,330
5,652
0,942
0,433
0,102
0,619
0,476
1,713
0,257
1,713
0,952
153
8,080
4,590
4,590
3,570
3,570
3,570
3,570
3,570
4,590
4,590
4,590
4,590
3,570
5,590
5,590
3,570
10,080
3,570
3,860
3,860
3,860
3,860
3,860
7,230
3,460
3,460
4,210
4,210
4,210
4,210
4,210
3,460
3,460
3,460
3,460
4,210
3,460
3,460
4,210
7,230
4,210
4,150
4,150
4,150
4,150
4,150
7,840
4,383
4,383
3,613
3,613
3,613
3,613
3,613
4,383
4,383
4,383
4,383
3,613
4,717
4,717
3,613
8,507
3,613
4,007
4,007
4,007
4,007
4,007
8,781
4,909
4,909
4,047
4,047
4,047
4,047
4,047
4,909
4,909
4,909
4,909
4,047
5,283
5,283
4,047
9,527
4,047
4,447
4,447
4,447
4,447
4,447
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,050
0,100
0,056
0,100
0,143
0,200
2,000
0,043
1,000
0,300
0,750
0,063
1,000
1,000
0,167
0,100
0,010
0,143
0,100
0,360
0,054
0,360
0,200
4,010
4,010
3,860
3,860
4,150
4,150
4,007
4,007
1,110
1,110
Cap. Requerida
Cant. Horas Turno
5
3,548 0,426
154
4,447
4,447
7% 0,235 1,117
7% 0,235 1,117
TRM 42,571
T.P
Cv
min
TN
Pasos
Elementos
1
2
6
3,280
3,430
2,560
3,090
1,090
3,368
7% 0,400 1,442
1,260
3,170
3,050
2,493
1,090
2,718
7% 0,019 0,054
37,380
38,350
38,350
38,350
15,460
15,460
15,460
15,460
15,460
24,360
24,360
24,360
24,360
24,360
24,360
24,360
24,360
24,360
24,360
24,360
24,360
24,360
24,360
0,580
40,490
40,490
40,490
40,490
14,550
14,550
14,550
14,550
14,550
22,010
22,010
22,010
22,010
22,010
22,010
22,010
22,010
22,010
22,010
22,010
22,010
22,010
22,010
1,230
39,160
39,160
39,160
39,160
15,505
15,505
15,505
15,505
15,505
24,080
24,080
24,080
24,080
24,080
24,080
24,080
24,080
24,080
24,080
24,080
24,080
24,080
24,080
1,010
39,010
39,333
39,333
39,333
15,172
15,172
15,172
15,172
15,172
23,483
23,483
23,483
23,483
23,483
23,483
23,483
23,483
23,483
23,483
23,483
23,483
23,483
23,483
0,940
0,900
0,900
0,900
0,900
1,080
1,080
1,080
1,080
1,080
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,090
35,109
35,400
35,400
35,400
16,385
16,385
16,385
16,385
16,385
25,832
25,832
25,832
25,832
25,832
25,832
25,832
25,832
25,832
25,832
25,832
25,832
25,832
25,832
1,025
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
Cant.
5
Horas Turno
1,261 0,151
155
Tol
min
TE
T1
0,029
0,029
0,056
0,056
0,055
0,041
0,014
0,014
0,027
0,011
0,011
0,011
0,011
0,011
0,011
0,011
0,011
0,011
0,011
0,011
0,011
0,011
0,011
0,216
TRT
1,105
1,114
2,104
2,104
0,956
0,717
0,239
0,239
0,478
0,311
0,311
0,311
0,311
0,311
0,311
0,311
0,311
0,311
0,311
0,311
0,311
0,311
0,311
0,236
15,137
Tiempo (min)
15,58
8,66
3,93
3,05
8,02
4,04
2,66
2,39
1,29
0,00
1
6,84
4,58
2,12
0,00
6
4,57
10
0,00
0,00
11
12
13
14
15
16
Operarios
T. Estndar Operaciones
Lineal (TKT)
Nota: los tiempos estndar que se presentan en cero, hacen referencia a que el operario no tiene asignada ninguna operacin
dentro de este catlogo.
156
Tiempo (min)
13,75
9,81
8,54
7,09
6,91
6,17
6,88
4,16
6,25
5,54
5,40
4,24
3,98
3,67
1,17
0,00
0,00
0,00
0,00
11
12
0,00
1
10
13
14
15
16
Operarios
T. Estndar Operaciones
Lineal (TKT)
Nota: los tiempos estndar que se presentan en cero, hacen referencia a que el operario no tiene asignada ninguna operacin
dentro de este catlogo.
157
46,94
50,00
Tiempo (min)
40,00
36,53
35,50
29,14
30,00
17,56
20,00
10,03
10,00
5,28
5,42
1,70
1,70
0,00
0,00
0,40
4,19
0,00
0,73
0,00
0,00
1
10
11
12
13
14
15
16
Operarios
T. Estndar Operaciones
Lineal (TKT)
Nota: los tiempos estndar que se presentan en cero, hacen referencia a que el operario no tiene asignada ninguna operacin
dentro de este catlogo.
158
10,00
Tiempo (hr)
8,00
7,52
7,46
7,73
7,75
7,68
7,46
7,64
7,73
7,85
7,82
7,44
6,09
6,00
7,85
7,71 7,95
6,57
4,91
4,00
2,00
0,00
1
10
11
12
Operarios
Hrs. Efectivas Laboradas/da
159
13
14
15
16
Produccin
1 vehiculo
Mezcla
Turnos
Explorer
3,251
34
3,251
F - 350
6,408
54
6,408
Cargo
4,378
15
4,378
Turnos Total Requeridos 14,04
(+) Turno Nocturno
0,00
Total Operarios
14,04
(+) Ausentismo (3%)
0,42
(+) Lder Manufactura
1
(+) Eficiencia
1
16,46
Total Operarios
Requeridos
17
Catlogo
160
ANEXO D
161
F
T1
T2
T3
4,370 3,120 3,745 5
0,533 0,350 0,583 13
1,430 2,160 1,570 5
Operario:
minutos
Catalogo
Cargo
Operacin
Tanques gasoil 815
Tanques gasoil 1721 LD
Tanques gasoil 1721 LI
Soporte 1721
Flejes de tanque 815
Flejes de tanque 1721
Cooler radiador 1721
Radiador 815
Radiador 1721
Bombona de aire 1721
Soporte caucho repuesto 1721
Desempaque
162
T1
T2
T3
Uso
0,559
0,395
0,395
3,410
0,419
0,200
1,010
1,190
1,500
7,570
3,410
2,220
0,350
0,559
0,559
4,100
0,302
0,360
1,030
1,030
1,750
7,390
4,100
4,340
0,290
0,290
0,290
4,000
0,086
0,340
0,534
1,350
1,440
7,510
4,000
6,390
1
1
1
1
2
4
1
1
1
1
1
7
N Piezas/facilidad
T1
T2
T3
2
1
1
1
2
1
1
2
1
8
8
8
10
10
8
4
8
4
2
2
2
2
2
2
2
3
3
5
5
5
16
16
16
Prom.
Piezas
1,333
2
1,333
2
1,333
2
8,000
8
9,333
10
5,333
6
2,000
2
2,000
2
2,667
3
5,000
5
16,000
16
Operario:
minutos
Catlogo
Explorer
F-350
Cargo
Operacin
Complemento de Parachoque
Aislante
Moldura de piso
Moldura de asientos
Sensores
Base de Deflector
Empacadura Bajante
Molduras de Piso
Paqueteras
Kit de Bolsa
Llaves de rueda
Base de Asiento
Base y abrazadera de Tolva
Kit Llaves de rueda
Bandeja de Bateras
Base de Extintor
Kit Soporte de guardafango
Goma Estribo
Tapa Gas
Clic de Aire (tubera de aire)
Soporte de Motor 815
Filtros de Aire 1721
Complemento de Parachoque
Faros de Tolva
Varilla y gomas de capot
Bisagras de capot
T1
T2
T3
USO
3,460
1,180
8,280
8,280
1,180
1,180
1,180
8,280
8,280
4,090
4,090
4,040
3,460
4,040
4,040
4,040
4,040
4,040
8,280
8,280
1,180
4,090
3,460
3,460
3,460
3,460
3,763
2,950
8,040
8,040
1,062
1,062
1,062
8,040
8,040
4,437
4,437
3,720
3,763
3,720
3,720
3,720
3,720
3,720
8,040
8,040
1,062
4,437
3,763
3,763
3,763
3,763
3,622
1,062
8,170
8,170
2,950
2,950
2,950
8,170
8,170
2,390
2,390
3,983
3,622
3,983
3,983
3,983
3,983
3,983
8,170
8,170
2,950
2,390
3,622
3,622
3,622
3,622
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
163
N Piezas/facilidad
T1
T2
T3
17
16
12
10
16
12
12
18
25
10
16
25
20
18
25
20
18
25
20
18
25
20
27
25
20
27
25
23
29
12
23
29
12
15
14
20
10
14
12
15
14
20
15
14
20
15
14
20
15
14
20
15
14
20
20
20
25
30
30
25
10
9
12
4
4
4
10
14
12
10
14
12
10
14
12
10
14
12
Prom.
Piezas
15,000
12,667
18,333
17,000
21,000
21,000
21,000
24,000
24,000
21,333
21,333
16,333
12,000
16,333
16,333
16,333
16,333
16,333
21,667
28,333
10,333
4,000
12,000
12,000
12,000
12,000
%
pieza
15
13
19
17
21
21
21
24
24
22
22
17
12
17
17
17
17
17
22
29
11
4
12
12
12
12
0,200
0,149
0,141
0,126
0,241
0,241
0,241
0,178
0,178
0,458
0,458
0,167
0,160
0,167
0,167
0,167
0,167
0,167
0,163
0,215
0,126
0,083
0,160
0,160
0,160
0,160
Operario:
minutos
Catlogo
Explorer
F -350
Cargo
Operacin
Kit Moldura de piso
Kit Ductos de Aire 6cl y 8cl
Kit Aislante calor de escape
Deflector de radiador
Gomas punto rojo
Stop
Limpia parabrisas
Golpe de cerraduras
Platino de capot
Embudo de gasolina
Molduras de asiento
Deflector de aire 4x2
Moldura de Arco de rueda XLT
Molduras de piso 4x4 4x2
Soporte de ducto
Volantes
Ductos de Aire
Aislante calor
Palancas 4x4 4x2
Cubiertas de batera
Limpia parabrisas
Golpe de cerraduras
Cerradura de capot
Volante
Tapa volantes
Gomas gota de agua
Ductos de Aire
Base de motor
T1
T2
T3
USO
1,000
0,733
1,170
1,060
0,933
2,060
0,633
1,290
0,400
1,280
0,733
2,320
2,140
3,570
0,400
1,200
1,420
0,737
0,950
0,883
0,817
1,280
1,260
1,020
0,633
0,350
1,020
1,470
3,260
1,420
1,090
0,717
0,967
1,580
0,983
0,633
1,520
0,650
1,200
2,010
1,480
1,360
0,817
1,250
1,660
0,867
0,483
0,767
0,867
0,650
0,867
0,883
0,850
0,633
0,933
0,733
1,400
6,220
1,110
0,783
0,950
1,350
0,717
0,717
0,883
1,170
0,650
2,110
1,540
2,230
0,450
2,160
2,120
0,700
0,983
0,817
0,950
1,170
1,080
1,180
0,383
0,267
1,220
0,617
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
164
N Piezas/facilidad
T1
T2
T3
6
20
13
4
11
19
12
12
18
18
6
6
15
15
15
12
12
18
60
60
60
20
20
20
15
6
15
35
35
35
10
20
10
12
18
12
9
8
9
17
19
17
5
7
7
17
12
19
17
17
19
30
30
30
17
19
19
17
17
17
30
30
30
30
30
30
40
40
40
5
6
6
5
6
6
5
6
6
17
6
19
10
10
10
Prom.
Piezas
13,000
11,333
14,000
10,000
15,000
14,000
60,000
20,000
12,000
35,000
13,333
14,000
8,667
17,667
6,333
16,000
17,667
30,000
18,333
17,000
30,000
30,000
40,000
5,667
5,667
5,667
14,000
10,000
%
pieza
13
12
14
10
15
14
60
20
12
35
14
14
9
18
7
16
18
30
19
17
30
30
40
6
6
6
14
10
0,140
0,273
0,151
0,068
0,101
0,072
0,309
0,135
0,140
0,407
0,151
0,163
0,061
0,194
0,047
0,172
0,409
0,155
0,098
0,115
0,155
0,203
0,270
0,065
0,065
0,065
0,318
0,052
1,280
0,983
0,717
0,783
0,817
165
0,650
1,050
0,467
0,533
0,867
1,170
0,600
0,600
0,567
0,950
1
1
1
1
2
10
5
15
4
20
10
10
15
4
20
10
5
15
4
20
10,000
6,667
15,000
4,000
20,000
10
7
15
4
20
0,116
0,036
0,174
0,021
0,103
SURTIDO
Operaciones Estndar
Operacin
Verificar niveles de inventario de Material en cada estacin de la lnea de produccin.
Verificar estado del montacargas/remolcador
Diligenciar hoja de preuso
T1
T2
4,066 3,616
2,520 3,560
1,275 8,01
T3
4,400
3,870
1,09
F
5
1
1
Operario:
minutos
Catalogo
F-350
Cargo
Operacin
Buscar bajante G4
Buscar tanques gasoil 815 patio de gas
Buscar tanques gasoil 1721 patio de gas
Buscar soporte en G4 1721
Buscar flejes de tanque 815
Buscar flejes de tanque 1721
Buscar cooler radiador 1721
Busca Radiador 815
Busca Radiador 1721
Buscar bombona de aire 1721
Buscar bateras 1721 (patio motores)
Buscar Soporte caucho repuesto G4 C1721
Buscar Parachoque 815 G4
Trasladar los guacales hacia la zona de desechos
Gas
Retornable
166
T1
T2
T3
Uso
13,400
12,100
12,100
15,400
13,140
13,140
13,140
13,140
13,140
13,140
13,300
12,400
13,400
4,100
21,41
8,460
13,510
12,480
12,480
13,510
15,100
15,100
12,400
12,400
12,400
12,400
14,350
13,510
13,510
3,500
43,11
12,100
12,440
13,200
13,200
12,440
15,580
15,580
12,130
12,130
12,130
12,130
15,350
12,440
12,440
4,380
32,26
11,590
1
1
2
1
2
4
1
1
1
1
1
1
1
6
1
4
Pieza/
empaque
24
12
6
12
55
55
6
6
6
6
20
16
4
Operario:
minutos
Catlogo
Explorer
F - 350
Cargo
Operacin
Complemento de Parachoque (Zona 0 a subensamble)
Aislante
Moldura de piso
Moldura de asientos
Parachoques Del / Tras (subensamble a lnea)
Moldura Arco de Rueda (subensamble a lnea)
Bateras (jaula valores a lnea)
Sensores
Base de Deflector
Empacadura Bajante
Molduras de Piso
Paqueteras
Kit de Bolsa
Llaves de rueda
Bajantes (chasis a lnea)
Bateras (jaula valores a lnea)
Base de Asiento (surtido)
Base y abrazadera de Tolva (Zona subensamble)
Kit Llaves de rueda
Bandeja de Bateras
Base de Extintor
Kit Soporte de guardafango
Goma Estribo
Tapa Gas
Clic de Aire (tubera de aire)
Soporte de Motor 815
Filtros de Aire 1721
Complemento de Parachoque (Zona 0 a subensamble)
Faros de Tolva (Zona 0 a subensamble)
Varilla y gomas de capot
T1
T2
T3
USO
2,810
3,340
6,310
6,310
3,110
0,597
19,340
3,340
3,340
3,340
6,310
6,310
4,400
4,400
3,370
19,340
12,220
2,810
12,220
12,220
12,220
12,220
12,220
6,310
6,310
3,340
4,400
2,810
2,810
2,810
3,128
5,010
6,010
6,010
2,950
0,635
18,520
5,010
5,010
5,010
6,010
6,010
4,320
4,320
3,180
18,520
11,482
3,128
11,482
11,482
11,482
11,482
11,482
6,010
6,010
5,010
4,320
3,128
3,128
3,128
3,310
4,075
6,668
6,668
2,220
0,782
20,110
4,075
4,075
4,075
6,668
6,668
4,390
4,390
3,350
20,110
12,051
3,310
12,051
12,051
12,051
12,051
12,051
6,668
6,668
4,075
4,390
3,310
3,310
3,310
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
167
N Piezas/facilidad
T1
T2
T3
17
16
12
10
16
12
12
18
25
10
16
25
7
6
3
1
2
1
36
36
36
20
18
20
20
18
20
20
18
20
20
27
25
20
27
25
23
29
12
23
29
12
24
24
24
40
40
40
15
14
20
7
10
12
15
14
20
15
14
20
15
14
20
15
14
20
15
14
20
20
20
25
30
30
25
5
7
12
3
4
4
7
10
12
7
10
12
7
10
12
Prom.
Piezas
15,000
12,667
18,333
17,000
5,333
1,333
36,000
19,333
19,333
19,333
24,000
24,000
21,333
21,333
24,000
40,000
16,333
9,667
16,333
16,333
16,333
16,333
16,333
21,667
28,333
8,000
3,667
9,667
9,667
9,667
%
pieza
15
13
19
17
6
2
36
20
20
20
24
24
22
22
24
40
17
10
17
17
17
17
17
22
29
8
4
10
10
10
0,200
0,149
0,141
0,126
1,000
1,000
1,000
0,241
0,241
0,241
0,178
0,178
0,458
0,458
1,000
1,000
0,167
0,160
0,167
0,167
0,167
0,167
0,167
0,163
0,215
0,126
0,083
0,160
0,160
0,160
2,810
3,370
3,370
4,430
11,220
6,300
3,128
3,180
3,180
3,180
12,350
6,120
3,310
3,350
3,350
3,350
12,510
9,150
1
1
1
1
1
4
7
4
5
8
7
1
10
4
6
8
10
12
4
8
8
12
9,667
4,000
6,333
8,000
9,667
10
4
7
8
10
0,160
1,000
1,000
1,000
1,000
Operario:
minutos
Catlogo
Explorer
F -350
Operacin
Kit Moldura de piso
Kit Ductos de Aire 6cl y 8cl
Kit Aislante calor de escape
Deflector de radiador
Gomas punto rojo
Stop
Limpia parabrisas
Golpe de cerraduras
Platino de capot
Embudo de gasolina
Molduras de asiento
Deflector de aire 4x2
Moldura de Arco de rueda XLT
Molduras de piso 4x4 4x2
Soporte de ducto
Volantes
Ductos de Aire
Aislante calor
Palancas 4x4 4x2
Cubiertas de batera
T1
T2
T3
USO
2,370
2,070
2,370
3,070
3,070
3,590
3,590
3,070
2,050
2,050
2,370
2,050
3,070
2,370
3,070
2,370
2,070
3,590
3,590
3,070
2,240
1,240
2,240
2,110
2,110
3,290
3,290
2,110
2,580
2,580
2,240
2,580
2,110
2,240
2,110
2,240
1,240
3,290
3,290
2,110
2,420
2,220
2,420
3,050
3,050
4,540
4,540
3,050
2,020
2,020
2,420
2,020
3,050
2,420
3,050
2,420
2,220
4,540
4,540
3,050
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
168
N Piezas/facilidad
T1
T2
T3
6
20
13
4
11
19
12
12
18
18
6
6
15
15
15
12
12
18
60
60
60
20
20
20
15
6
15
35
35
35
10
20
10
12
18
12
9
8
9
17
19
17
5
7
7
17
12
19
17
17
19
30
30
30
17
19
19
17
17
17
Prom.
Piezas
13,000
11,333
14,000
10,000
15,000
14,000
60,000
20,000
12,000
35,000
13,333
14,000
8,667
17,667
6,333
16,000
17,667
30,000
18,333
17,000
%
pieza
13
12
14
10
15
14
60
20
12
35
14
14
9
18
7
16
18
30
19
17
0,140
0,273
0,151
0,068
0,101
0,072
0,309
0,135
0,140
0,407
0,151
0,163
0,061
0,194
0,047
0,172
0,409
0,155
0,098
0,115
Cargo
Limpia parabrisas
Golpe de cerraduras
Cerradura de capot
Volante
Tapa volantes
Gomas gota de agua
Ductos de Aire
Base de motor
Gomas de hule de radiador
Soporte y gomas de guardafango
Complemento pie de parachoque
Envoltura de batera
Limpia parabrisas
Tolva (subensamble a lnea)
Bateras 815 (jaula valores)
Capot 1721 (patio a zona subensamble)
Capot 1721 (subensamble a lnea)
Guardafangos 1721 (patio a zona subensamble)
Guardafangos 1721 (subensamble a lnea)
Llamadas de emergencia
3,590
3,070
3,070
2,370
2,370
2,370
2,070
3,590
2,050
3,590
2,050
3,590
3,590
3,250
19,340
5,100
3,250
6,300
5,320
1,450
3,290
2,110
2,110
2,240
2,240
2,240
1,240
3,290
2,580
3,290
2,580
3,290
3,290
2,100
18,520
5,210
2,100
5,580
4,450
1,030
4,540
3,050
3,050
2,420
2,420
2,420
2,220
4,540
2,020
4,540
2,020
4,540
4,540
4,100
20,110
4,580
4,100
5,380
5,120
1,240
2
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
6
30
30
40
5
5
5
17
10
10
5
15
4
20
4
30
4
4
5
5
30
30
40
6
6
6
6
10
10
10
15
4
20
4
30
4
4
5
5
30
30
40
6
6
6
19
10
10
5
15
4
20
4
30
4
4
5
5
30,000
30,000
40,000
5,667
5,667
5,667
14,000
10,000
10,000
6,667
15,000
4,000
20,000
4,000
30,000
4,000
4,000
5,000
5,000
30
30
40
6
6
6
14
10
10
7
15
4
20
4
30
4
4
5
5
0,155
0,203
0,270
0,065
0,065
0,065
0,318
0,052
0,116
0,036
0,174
0,021
0,103
0,500
1,000
1,000
0,500
1,000
1,000
Operario:
minutos
Catlogo
Explorer
Operacin
Alfombra de Piso XLT / EB (zona 0 a lnea)
Moldura Arco de rueda LD EB (subensamble a lnea)
Moldura Arco de rueda LI EB (subensamble a lnea)
Complemento de Alfombra XLT / EB (zona 0 a lnea)
Consola y tapa consola XLT / EB (zona 0 a lnea)
Colector de Aire XLT / EB (zona 0 a lnea)
T1
T2
T3
USO
1,590
3,810
3,920
0,933
4,230
1,490
2,510
4,280
3,260
0,617
4,260
2,200
2,150
4,150
3,654
0,700
3,710
1,200
1
1
1
1
1
1
169
N Piezas/facilidad
T1
T2
T3
11
13
12
10
10
10
10
10
10
41
40
41
14
12
14
14
11
14
Prom.
Piezas
12,000
10,000
10,000
40,667
13,333
13,000
%
pieza
12
10
10
41
14
13
0,400
1,000
1,000
0,289
1,000
0,394
F -350
Cargo
Todos
3,510
3,630
3,050
3,430
3,430
3,430
3,430
3,430
2,250
1,480
3,180
1,490
4,510
1,590
7,240
7,240
7,240
7,240
7,240
7,240
7,240
7,240
2,390
7,000
3,350
3,230
3,170
4,220
4,220
4,220
4,220
4,220
2,390
1,310
2,140
2,200
3,290
2,510
6,350
6,350
6,350
6,350
6,350
6,350
6,350
6,350
3,090
5,480
4,350
3,360
3,250
4,020
4,020
4,020
4,020
4,020
2,280
1,360
2,630
1,200
3,870
2,150
7,100
7,100
7,100
7,100
7,100
7,100
7,100
7,100
3,050
6,220
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
12
14
14
10
9
9
11
9
15
12
27
20
42
10
3
1
3
1
3
1
3
5
1
4
12
12
15
14
14
14
14
14
16
13
48
18
39
22
3
2
3
2
3
2
3
5
1
4
12
13
13
12
12
12
12
12
12
13
42
21
40
20
4
4
4
4
4
4
4
7
1
4
12,000
13,000
14,000
12,000
11,667
11,667
12,333
11,667
14,333
12,667
39,000
19,667
40,333
17,333
3,333
2,333
3,333
2,333
3,333
2,333
3,333
5,667
1,000
4,000
12
13
14
12
12
12
13
12
15
13
39
20
41
18
4
3
4
3
4
3
4
6
1
4
0,933
0,617
0,700
101
101
101
101,000
101
4,300
3,080
1,840
4,480
1,940
2,030
3,700 11,240
1,080 10,220
1,450 8,080
170
12
1,000
1,000
1,000
0,197
0,197
0,197
0,213
0,197
1,000
1,000
1,000
0,606
1,000
0,600
0,129
0,097
0,129
0,097
0,129
0,097
0,129
0,194
1,000
1,000
Operario:
minutos
Catlogo
Explorer
F -350
Cargo
Operacin
Alfombra de Piso XLT / EB
Moldura Arco de rueda LD EB
Moldura Arco de rueda LI EB
Complemento de Alfombra XLT / EB
Consola y tapa consola XLT / EB
Colector de Aire XLT / EB
Soporte caucho de repuesto XLT / EB
Estribo LD XLT / EB
Estribo LI XLT / EB
Moldura Tapa Gato
Moldura L LD XLT/EB
Moldura L LI XLT/EB
Moldura de compuerta
Aislante de Capot
Complemento de Parachoque
Parrilla
Gatos
Colector de Aire
Aislante de calor
Alfombra de piso
Deflector Parachoque 815
Deflector Parachoque 1721
Chapaleta LD 815
Chapaleta LD 1721
Chapaleta LI 815
Chapaleta LI 1721
Guardafango 815
Gatos 815/1721
T1
T2
T3
USO
24,430
22,210
22,210
8,470
24,430
24,430
22,210
22,210
22,210
22,210
22,210
22,210
22,210
22,210
22,210
24,430
11,420
24,430
24,430
24,430
24,430
24,430
24,430
24,430
24,430
24,430
24,430
24,430
15,590
20,120
20,120
11,420
38,460
38,460
15,590
15,590
15,590
15,590
15,590
15,590
15,590
15,590
20,120
11,420
8,470
38,460
38,460
38,460
38,460
38,460
38,460
38,460
38,460
38,460
38,460
38,460
20,010
21,360
21,360
10,340
31,445
31,445
8,470
8,470
8,470
19,100
19,100
19,100
19,100
19,100
11,420
18,320
10,340
31,445
31,445
31,445
31,445
31,445
31,445
31,445
31,445
31,445
31,445
31,445
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
171
N Piezas/facilidad
T1
T2
T3
14
9
12
10
10
10
10
10
10
41
40
41
14
9
14
14
9
14
12
12
12
13
6
6
13
6
6
13
9
12
23
14
12
23
14
12
11
9
12
13
11
12
16
12
12
13
9
13
42
38
40
21
12
20
40
36
40
9
22
20
3
2
4
3
2
4
3
2
4
3
2
4
3
2
4
3
2
4
3
2
4
6
4
7
Prom.
Piezas
11,667
10,000
10,000
40,667
12,333
12,333
12,000
8,333
8,333
11,333
16,333
16,333
10,667
12,000
13,333
11,667
40,000
17,667
38,667
17,000
3,000
3,000
3,000
3,000
3,000
3,000
3,000
5,667
%
pieza
12
10
10
41
13
13
12
9
9
12
17
17
11
12
14
12
40
18
39
17
3
3
3
3
3
3
3
6
0,085
0,087
0,087
0,357
0,092
0,092
0,121
0,091
0,091
0,121
0,172
0,172
0,111
0,121
0,122
0,085
0,348
0,127
0,275
0,120
0,021
0,021
0,021
0,021
0,021
0,021
0,021
0,042
CATLOGO EXPLORER
172
CEDULACIONES
Pasos
Elementos
1
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
Ubicar la facilidad en la zona donde se encuentran las piezas para realizar la
2
cedulacin correspondiente
3
Acomodar cestas vacas
*
Trasladar los guacales hacia la zona de desechos
Cedulacin de
Complemento de Parachoque
Aislante
Moldura de piso
Moldura de asientos
Kit Moldura de piso
Kit Ductos de Aire 6cl y 8cl
Kit Aislante calor de escape
Deflector de radiador
Gomas punto rojo
Stop
Limpia parabrisas
Golpe de cerraduras
Platino de capot
Embudo de gasolina
Molduras de asiento
Deflector de aire 4x2
Moldura de Arco de rueda XLT
minutos
T1
T2
T3
T.P
Cv
4,370 3,120 3,745 3,745 1,090
min.
minutos
TN Tol
TE
F
4,082 7% 0,049 0,212
0,533 7% 0,126
0,072
1,875 7% 0,049
3,953 7% 0,058
0,097
0,246
3,460
1,180
8,280
8,280
1,000
0,733
1,170
1,060
0,933
2,060
0,633
1,290
0,400
1,280
0,733
2,320
2,140
4,121
1,973
9,306
9,306
2,151
3,182
1,281
0,973
1,083
1,896
0,887
1,003
1,065
1,178
0,982
2,447
1,961
0,059
0,024
0,074
0,074
0,025
0,077
0,015
0,007
0,008
0,010
0,005
0,007
0,013
0,015
0,011
0,030
0,014
1,096
3,763
2,950
8,040
8,040
3,260
1,420
1,090
0,717
0,967
1,580
0,983
0,633
1,520
0,650
1,200
2,010
1,480
3,622
1,062
8,170
8,170
1,400
6,220
1,110
0,783
0,950
1,350
0,717
0,717
0,883
1,170
0,650
2,110
1,540
3,615
1,731
8,163
8,163
1,887
2,791
1,123
0,853
0,950
1,663
0,778
0,880
0,934
1,033
0,861
2,147
1,720
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
Cap. Requerida
Cant. Horas Turno
34
0,621 0,078
173
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,013
0,011
0,007
0,007
0,011
0,023
0,011
0,007
0,007
0,005
0,005
0,007
0,012
0,012
0,011
0,012
0,007
TRC
Pasos
1
2
3
*
*
*
minutos
T2
T3
min.
TN
T1
T.P
Cv
Elementos
Tol
F
Verificar niveles de inventario de Material en cada estacin de la lnea 4,066 3,616 4,400 4,027 1,090 4,390 7% 0,049
de produccin.
2,520 3,560 3,870 3,317 1,090 3,615 7% 0,010
Verificar estado del montacargas/remolcador
1,275 8,010 1,090 3,458 1,090 3,770 7% 0,010
Diligenciar hoja de preuso
21,410 43,110 32,260 32,260 0,990 31,937 7% 0,010
Gas
8,460 12,100 11,590 10,717 0,990 10,610 7% 0,039
Retornable de bateras
6,300 6,120 9,150 7,190 1,140 8,197 7% 0,039
Protectores de guardafango
0,933 0,617 0,700 0,750 1,100 0,825 7% 0,010
Triangulo de seguridad
Surtido de
2,810 3,128 3,310 3,083 1,140 3,514 7% 0,013
Complemento de Parachoque (Zona 0 a subensamble)
3,340 5,010 4,075 4,142 1,140 4,722 7% 0,011
Aislante
6,310 6,010 6,668 6,329 1,140 7,215 7% 0,007
Moldura de piso
6,310 6,010 6,668 6,329 1,140 7,215 7% 0,007
Moldura de asientos
3,110 2,950 2,220 2,760 1,140 3,146 7% 0,167
Parachoques Del / Tras (subensamble a lnea)
0,597 0,635 0,782 0,671 1,140 0,765 7% 0,500
Moldura Arco de Rueda (subensamble a lnea)
19,340 18,520 20,110 19,323 1,140 22,029 7% 0,028
Bateras (chasis a lnea)
2,370 2,240 2,420 2,343 1,140 2,671 7% 0,011
Kit Moldura de piso
2,070 1,240 2,220 1,843 1,140 2,101 7% 0,023
Kit Ductos de Aire 6cl y 8cl
2,370 2,240 2,420 2,343 1,140 2,671 7% 0,011
Kit Aislante calor de escape
3,070 2,110 3,050 2,743 1,140 3,127 7% 0,007
Deflector de radiador
3,070 2,110 3,050 2,743 1,140 3,127 7% 0,007
Gomas punto rojo
3,590 3,290 4,540 3,807 1,140 4,340 7% 0,010
Stop
3,590 3,290 4,540 3,807 1,140 4,340 7% 0,010
Limpia parabrisas
3,070 2,110 3,050 2,743 1,140 3,127 7% 0,007
Golpe de cerraduras
2,050 2,580 2,020 2,217 1,140 2,527 7% 0,012
Platino de capot
2,050 2,580 2,020 2,217 1,140 2,527 7% 0,012
Embudo de gasolina
2,370 2,240 2,420 2,343 1,140 2,671 7% 0,011
Molduras de asiento
2,050 2,580 2,020 2,217 1,140 2,527 7% 0,012
Deflector de aire 4x2
3,070 2,110 3,050 2,743 1,140 3,127 7% 0,007
Moldura de CRO de rueda XLT
1,590 2,510 2,150 2,083 1,100 2,292 7% 0,033
Alfombra de Piso XLT / EB (zona 0 a lnea)
174
minutos
TE
0,228
0,038
0,039
0,332
0,441
0,341
0,009
0,050
0,058
0,057
0,057
0,561
0,409
0,655
0,031
0,051
0,031
0,023
0,023
0,048
0,048
0,023
0,031
0,031
0,031
0,031
0,023
0,082
3,810
3,920
0,933
4,230
1,490
3,510
3,630
3,050
3,430
3,430
3,430
3,430
3,430
2,250
1,480
24,430
22,210
22,210
8,470
24,430
24,430
22,210
22,210
22,210
22,210
22,210
22,210
22,210
22,210
22,210
24,430
4,280
3,260
0,617
4,260
2,200
3,350
3,230
3,170
4,220
4,220
4,220
4,220
4,220
2,390
1,310
15,590
20,120
20,120
11,420
38,460
38,460
15,590
15,590
15,590
15,590
15,590
15,590
15,590
15,590
20,120
11,420
4,150
3,654
0,700
3,710
1,200
4,350
3,360
3,250
4,020
4,020
4,020
4,020
4,020
2,280
1,360
20,010
21,360
21,360
10,340
31,445
31,445
8,470
8,470
8,470
19,100
19,100
19,100
19,100
19,100
11,420
18,320
4,080
3,611
0,750
4,067
1,630
3,737
3,407
3,157
3,890
3,890
3,890
3,890
3,890
2,307
1,383
20,010
21,230
21,230
10,077
31,445
31,445
15,423
15,423
15,423
18,967
18,967
18,967
18,967
18,967
17,917
18,057
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,090
1,090
1,090
1,090
1,090
1,090
1,090
1,090
1,090
1,090
1,090
1,090
1,090
1,090
1,090
1,090
4,488
3,972
0,825
4,473
1,793
4,110
3,747
3,472
4,279
4,279
4,279
4,279
4,279
2,537
1,522
21,811
23,141
23,141
10,984
34,275
34,275
16,811
16,811
16,811
20,674
20,674
20,674
20,674
20,674
19,529
19,682
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,100
0,100
0,007
0,071
0,030
0,083
0,077
0,071
0,016
0,016
0,016
0,016
0,016
0,067
0,077
0,007
0,009
0,009
0,009
0,007
0,007
0,010
0,010
0,010
0,010
0,010
0,010
0,010
0,010
0,009
0,007
0,480
0,425
0,006
0,342
0,058
0,367
0,308
0,265
0,075
0,075
0,075
0,075
0,075
0,181
0,125
0,164
0,215
0,215
0,102
0,258
0,258
0,182
0,182
0,182
0,223
0,223
0,223
0,223
0,223
0,182
0,148
4,300 4,480
3,080 1,940
1,840 2,030
11,240 10,220
3,700
1,080
1,450
8,080
4,4533 1,100
4,899
7% 0,117
0,611
175
Llamadas de emergencia
1,240
los * representan operaciones que solo aplican a los operarios O. Ramrez, O. Gutirrez y N. Mercado
176
1,240
1,140
1,414
Cap. Requerida
Cant. Horas Turno
34
6,363 0,800
7% 0,058
0,611
0,088
TRS
11,229
CATLOGO F - 350
177
CEDULACION
Pasos
Elementos
1
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
Ubicar la facilidad en la zona donde se encuentran las piezas para realizar
2
la cedulacin correspondiente
3
Acomodar cestas vacas
4
Trasladar los guacales hacia la zona de desechos
Cedulacin de
Sensores
Base de Deflector
Empacadura Bajante
Molduras de Piso
Paqueteras
Kit de Bolsa
Llaves de rueda
Molduras de piso 4x4 4x2
Soporte de ducto
Volantes
Ductos de Aire
Aislante calor
Palancas 4x4 4x2
Cubiertas de batera
Limpia parabrisas
Golpe de cerraduras
Cerradura de capot
minutos
T1
T2
T3
T.P
Cv
4,370 3,120 3,745 3,745 1,090
min.
minutos
TN Tol
TE
F
4,082 7% 0,049 0,212
0,533 7% 0,126
0,072
1,875 7% 0,049
3,953 7% 0,058
0,097
0,246
1,18
1,18
1,18
8,28
8,28
4,09
4,09
3,57
0,4
1,2
1,42
0,737
0,95
0,883
0,817
1,28
1,26
1,973
1,973
1,973
9,306
9,306
4,148
4,148
2,721
0,633
1,752
1,976
0,876
0,918
0,937
1,001
1,178
1,219
0,024
0,024
0,024
0,074
0,074
0,092
0,092
0,031
0,005
0,020
0,048
0,005
0,005
0,007
0,006
0,009
0,009
1,177
1,062
1,062
1,062
8,04
8,04
4,437
4,437
1,36
0,817
1,25
1,66
0,867
0,483
0,767
0,867
0,65
0,867
2,95
2,95
2,95
8,17
8,17
2,39
2,39
2,23
0,45
2,16
2,12
0,7
0,983
0,817
0,95
1,17
1,08
1,731
1,731
1,731
8,163
8,163
3,639
3,639
2,387
0,556
1,537
1,733
0,768
0,805
0,822
0,878
1,033
1,069
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
Cap. Requerida
Cant. Horas Turno
54
1,059 0,133
178
0%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,011
0,011
0,011
0,007
0,007
0,021
0,021
0,011
0,007
0,011
0,023
0,005
0,005
0,007
0,005
0,007
0,007
TRC
Pasos
1
2
3
*
*
*
Elementos
Verificar niveles de inventario de Material en cada estacin de
la lnea de produccin.
Verificar estado del montacargas/remolcador
Diligenciar hoja de preuso
Gas
Retornable de bateras
Protectores de guardafango
Triangulo de seguridad
Surtido de
Buscar bajante G4
Bajantes (partes por llamada)
Sensores
Base de Deflector
Empacadura Bajante
Molduras de Piso
Paqueteras
Kit de Bolsa
Llaves de rueda
Bajantes (chasis a lnea)
Bateras (jaula valores a lnea)
Molduras de piso 4x4 4x2
Soporte de ducto
Volantes
Ductos de Aire
Aislante calor
Palancas 4x4 4x2
Cubiertas de batera
Limpia parabrisas
Golpe de cerraduras
Cerradura de capot
Gatos (zona 0 a lnea)
T.P
Cv
min.
TN
Tol
4,027
1,090
4,390
7% 0,049
0,228
1,090
1,090
0,990
0,990
1,140
1,100
3,615
3,770
31,937
10,610
8,197
0,825
7%
7%
7%
7%
7%
7%
0,010
0,010
0,010
0,039
0,039
0,010
0,038
0,039
0,332
0,441
0,341
0,009
0,990
0,990
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,100
12,986
1,795
4,722
4,722
4,722
7,215
7,215
4,982
4,982
3,762
22,029
2,671
3,127
2,671
2,101
4,340
4,340
3,127
4,340
3,127
3,127
2,915
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,042
0,042
0,012
0,012
0,012
0,007
0,007
0,021
0,021
0,042
0,025
0,011
0,007
0,011
0,023
0,005
0,005
0,007
0,01
0,007
0,007
0,026
0,579
0,080
0,061
0,061
0,061
0,057
0,057
0,111
0,111
0,168
0,589
0,031
0,023
0,031
0,051
0,024
0,024
0,023
0,048
0,023
0,023
0,080
T1
4,066
minutos
T2
T3
3,616
179
4,400
minutos
TE
4,300 4,480
3,080 1,940
Llamadas de Emergencia (maana)
1,840 2,030
11,240 10,220
Llamadas de Emergencia (tarde)
Llamadas de emergencia
1,450 1,030
1,100
1,100
1,100
1,090
1,090
1,090
1,090
1,793
4,279
2,292
10,984
34,275
34,275
34,275
7%
7%
7%
7%
7%
7%
7%
0,03
0,024
0,033
0,009
0,007
0,007
0,007
0,058
0,112
0,082
0,102
0,258
0,258
0,258
3,700
1,080
1,450
8,080
4,453
1,1
4,899
7% 0,117
0,611
1,240
1,240
1,140
1,414
7% 0,058
0,611
0,088
TRS
6,179
Cap. Requerida
Cant. Horas Turno
54
5,561 0,699
180
181
CEDULACIONES
Pasos
Elementos
1
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
Ubicar la facilidad en la zona donde se encuentran las piezas para realizar la
2
cedulacin correspondiente
3
Acomodar cestas vacas
*
Trasladar los guacales hacia la zona de desechos
Cedulacin de
Desempaque
Tanques gasoil 815
Flejes de tanque 815
Radiador 815
Base de Asiento
Base y abrazadera de Tolva
Kit Llaves de rueda
Bandeja de Bateras
Base de Extintor
Kit Soporte de guardafango
Goma Estribo
Tapa Gas
Clic de Aire ( tubera de aire)
Soporte de Motor 815
Complemento de Parachoque
Faros de Tolva
Varilla y gomas de capot
Bisagras de capot
Volante
Tapa volantes
Gomas gota de agua
Ductos de Aire
Base de motor
Gomas de hule de radiador
Soporte y gomas de guardafango
182
minutos
T1
T2
T3
T.P
Cv
4,370 3,120 3,745 3,745 1,090
min.
minutos
TN Tol
TE
F
4,082 7% 0,049 0,212
0,533 7% 0,126
0,072
1,875 7% 0,049
3,953 7% 0,039
0,097
0,164
2,220
0,559
0,419
1,190
4,040
3,460
4,040
4,040
4,040
4,040
4,040
8,280
8,280
1,180
3,460
3,460
3,460
3,460
1,020
0,633
0,350
1,020
1,470
1,280
0,983
4,274
0,396
0,266
1,178
4,462
4,121
4,462
4,462
4,462
4,462
4,462
9,306
9,306
1,973
4,121
4,121
4,121
4,121
1,172
0,709
0,475
1,206
1,072
1,178
1,001
0,207
0,141
0,038
0,420
0,047
0,059
0,047
0,047
0,047
0,047
0,047
0,074
0,074
0,024
0,059
0,059
0,059
0,059
0,013
0,008
0,005
0,029
0,006
0,015
0,006
4,340
0,350
0,302
1,030
3,720
3,763
3,720
3,720
3,720
3,720
3,720
8,040
8,040
1,062
3,763
3,763
3,763
3,763
0,883
0,850
0,633
0,933
0,733
0,650
1,050
6,390
0,290
0,086
1,350
3,983
3,622
3,983
3,983
3,983
3,983
3,983
8,170
8,170
2,950
3,622
3,622
3,622
3,622
1,180
0,383
0,267
1,220
0,617
1,170
0,600
4,317
0,400
0,269
1,190
3,914
3,615
3,914
3,914
3,914
3,914
3,914
8,163
8,163
1,731
3,615
3,615
3,615
3,615
1,028
0,622
0,417
1,058
0,940
1,033
0,878
0,990
0,990
0,990
0,990
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,045
0,333
0,133
0,333
0,010
0,013
0,010
0,010
0,010
0,010
0,010
0,007
0,007
0,011
0,013
0,013
0,013
0,013
0,011
0,011
0,011
0,023
0,005
0,012
0,005
0,678 7% 0,012
0,716 7% 0,005
1,001 7% 0,005
TRC
Cap. Requerida
Cant. Horas Turno
10
0,367 0,046
183
0,008
0,004
0,006
2,199
Pasos
1
2
3
*
*
*
Elementos
Verificar niveles de inventario de Material en cada estacin de la
lnea de produccin.
Verificar estado del montacargas/remolcador
Diligenciar hoja de preuso
Gas
Retornable de bateras
Protectores de guardafango
Triangulo de seguridad
Surtido de
Buscar tanques gasoil 815 patio de gas
Buscar flejes de tanque 815
Busca Radiador 815
Buscar Parachoque 815 G4
Base de Asiento (surtido)
Base y abrazadera de Tolva (Zona subensamble)
Kit Llaves de rueda
Bandeja de Bateras
Base de Extintor
Kit Soporte de guardafango
Goma Estribo
Tapa Gas
Clic de Aire ( tubera de aire)
Soporte de Motor 815
Complemento de Parachoque (Zona 0 a subensamble)
Faros de Tolva (Zona 0 a subensamble)
Varilla y gomas de capot
Bisagras de capot (Zona 0 a subensamble)
Parachoques 815 (chasis a lnea)
Tanques (chasis a lnea)
Base y chapaleta de Guardafango G4
Volante
T.P
Cv
min.
TN
Tol
4,027
1,090
4,390
7% 0,049
0,228
0,038
0,039
0,221
0,294
0,227
0,006
12,100
13,140
13,140
13,400
12,220
2,810
12,220
12,220
12,220
12,220
12,220
6,310
6,310
3,340
2,810
2,810
2,810
2,810
3,370
3,370
11,220
2,370
0,556
0,281
1,108
0,868
0,143
0,060
0,143
0,143
0,143
0,143
0,143
0,057
0,057
0,080
0,060
0,060
0,060
0,060
1,006
0,575
0,734
0,031
T1
4,066
184
minutos
T2
T3
3,616
12,480
15,100
12,400
13,510
11,482
3,128
11,482
11,482
11,482
11,482
11,482
6,010
6,010
5,010
3,128
3,128
3,128
3,128
3,180
3,180
12,350
2,240
4,400
13,200
15,580
12,130
12,440
12,051
3,310
12,051
12,051
12,051
12,051
12,051
6,668
6,668
4,075
3,310
3,310
3,310
3,310
3,350
3,350
12,510
2,420
12,593
14,607
12,557
13,117
11,918
3,083
11,918
11,918
11,918
11,918
11,918
6,329
6,329
4,142
3,083
3,083
3,083
3,083
3,300
3,300
12,027
2,343
0,990
0,990
0,990
0,990
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
12,467
14,461
12,431
12,986
13,586
3,514
13,586
13,586
13,586
13,586
13,586
7,215
7,215
4,722
3,514
3,514
3,514
3,514
3,762
3,762
13,710
2,671
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,042
0,018
0,083
0,063
0,010
0,016
0,010
0,010
0,010
0,010
0,010
0,007
0,007
0,016
0,016
0,016
0,016
0,016
0,250
0,143
0,050
0,011
minutos
TE
2,240
2,240
1,240
3,290
2,580
3,290
2,580
3,290
3,290
2,100
18,520
6,350
6,350
6,350
6,350
6,350
5,480
38,460
38,460
38,460
38,460
38,460
2,420
2,420
2,220
4,540
2,020
4,540
2,020
4,540
4,540
4,100
20,110
7,100
7,100
7,100
7,100
7,100
6,220
31,445
31,445
31,445
31,445
31,445
2,343
2,343
1,843
3,807
2,217
3,807
2,217
3,807
3,807
3,150
19,323
6,897
6,897
6,897
6,897
6,897
6,233
31,445
31,445
31,445
31,445
31,445
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,100
1,100
1,100
1,100
1,100
1,100
1,090
1,090
1,090
1,090
1,090
2,671
2,671
2,101
4,340
2,527
4,340
2,527
4,340
4,340
3,591
22,029
7,586
7,586
7,586
7,586
7,586
6,857
34,275
34,275
34,275
34,275
34,275
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,011
0,011
0,023
0,005
0,012
0,005
0,012
0,005
0,010
0,125
0,033
0,032
0,032
0,032
0,032
0,022
0,167
0,007
0,007
0,007
0,007
0,005
0,031
0,031
0,051
0,024
0,031
0,024
0,031
0,024
0,048
0,480
0,786
0,262
0,262
0,262
0,262
0,175
1,223
0,258
0,258
0,258
0,258
0,172
4,300 4,480
3,080 1,940
Llamadas de Emergencia (maana)
1,840 2,030
11,240 10,220
llamadas de Emergencia (tarde)
Llamadas de emergencia
1,450 1,030
3,700
1,080
1,450
8,080
4,453
1,100
4,899
7% 0,117
0,611
1,240
1,240
1,140
1,414
7% 0,058
0,611
0,088
TRS
14,083
Tapa volantes
Gomas gota de agua
Ductos de Aire
Base de motor
Gomas de hule de radiador
Soporte y gomas de guardafango
Complemento pie de parachoque
Envoltura de batera
Limpia parabrisas
Tolva (subensamble a lnea)
Bateras 815 (jaula valores)
Deflector Parachoque (zona 0 a lnea)
Chapaleta LD (zona 0 a lnea)
Chapaleta LI (zona 0 a lnea)
Guardafango 815 (zona 0 a lnea)
Gatos (zona 0 a lnea)
Tolva y capot (subensamble a lnea)
Deflector Parachoque 815 G4
Chapaleta LD 815 G4
Chapaleta LI 815 G4
Guardafango 815 G4
Gatos G4
2,370
2,370
2,070
3,590
2,050
3,590
2,050
3,590
3,590
3,250
19,340
7,240
7,240
7,240
7,240
7,240
7,000
24,430
24,430
24,430
24,430
24,430
Cap. Requerida
Cant. Horas Turno
10
2,347 0,295
185
186
CEDULACIONES
Pasos
Elementos
1
Chequear en el PVS la produccin del da, la mezcla y tomar nota.
Ubicar la facilidad en la zona donde se encuentran las piezas para realizar la
2
cedulacin correspondiente
3
Acomodar cestas vacas
*
Trasladar los guacales hacia la zona de desechos
Cedulacin de
Desempaque
Tanques gasoil 1721 LD
Tanques gasoil 1721 LI
Soporte 1721
Flejes de tanque 1721
Cooler radiador 1721
Radiador 1721
Bombona de aire 1721
Soporte caucho repuesto
Base de Asiento
Base y abrazadera de Tolva
Kit Llaves de rueda
Bandeja de Bateras
Base de Extintor
Kit Soporte de guardafango
Goma Estribo
Tapa Gas
Clic de Aire (tubera de aire)
Filtros de Aire 1721
Complemento de Parachoque
Faros de Tolva
Varilla y gomas de capot
Bisagras de capot
Volante
Tapa volantes
187
minutos
T1
T2
T3
T.P
Cv
4,370 3,120 3,745 3,745 1,090
min.
minutos
TN Tol
TE
F
4,082 7% 0,049 0,212
0,533 7% 0,126
0,072
1,875 7% 0,049
3,953 7% 0,019
0,097
0,082
2,220
0,395
0,395
3,410
0,200
1,010
1,500
7,570
3,410
4,040
3,460
4,040
4,040
4,040
4,040
4,040
8,280
8,280
4,090
3,460
3,460
3,460
3,460
1,020
0,633
4,274
0,411
0,411
3,798
0,297
0,849
1,548
7,415
3,798
4,462
4,121
4,462
4,462
4,462
4,462
4,462
9,306
9,306
4,148
4,121
4,121
4,121
4,121
1,172
0,709
0,104
0,073
0,073
0,169
0,071
0,151
0,184
0,529
0,085
0,047
0,059
0,047
0,047
0,047
0,047
0,047
0,074
0,074
0,092
0,059
0,059
0,059
0,059
0,013
0,008
4,340
0,559
0,559
4,100
0,360
1,030
1,750
7,390
4,100
3,720
3,763
3,720
3,720
3,720
3,720
3,720
8,040
8,040
4,437
3,763
3,763
3,763
3,763
0,883
0,850
6,390
0,290
0,290
4,000
0,340
0,534
1,440
7,510
4,000
3,983
3,622
3,983
3,983
3,983
3,983
3,983
8,170
8,170
2,390
3,622
3,622
3,622
3,622
1,180
0,383
4,317
0,415
0,415
3,837
0,300
0,858
1,563
7,490
3,837
3,914
3,615
3,914
3,914
3,914
3,914
3,914
8,163
8,163
3,639
3,615
3,615
3,615
3,615
1,028
0,622
0,990
0,990
0,990
0,990
0,990
0,990
0,990
0,990
0,990
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,023
0,167
0,167
0,042
0,222
0,167
0,111
0,067
0,021
0,010
0,013
0,010
0,010
0,010
0,010
0,010
0,007
0,007
0,021
0,013
0,013
0,013
0,013
0,011
0,011
0,350
1,020
1,470
1,280
0,983
0,717
0,783
0,817
0,633
0,933
0,733
0,650
1,050
0,467
0,533
0,867
0,267
1,220
0,617
1,170
0,600
0,600
0,567
0,950
0,417
1,058
0,940
1,033
0,878
0,595
0,628
0,878
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
0,475
1,206
1,072
1,178
1,001
0,678
0,716
1,001
Cap. Requerida
Cant. Horas Turno
5
0,235 0,030
188
7%
7%
7%
7%
7%
7%
7%
7%
0,011
0,023
0,005
0,012
0,005
0,012
0,005
0,005
TRC
0,005
0,029
0,006
0,015
0,006
0,008
0,004
0,006
2,818
Pasos
1
2
3
*
*
*
Elementos
Verificar niveles de inventario de Material en cada estacin de la
lnea de produccin.
Verificar estado del montacargas/remolcador
Diligenciar hoja de preuso
Gas
Retornable de bateras
Protectores de guardafango
Triangulo de seguridad
Surtido de
Buscar tanques gasoil 1721 patio de gas
Buscar soporte en G4 1721
Buscar flejes de tanque 1721
Buscar cooler radiador 1721
Busca Radiador 1721
Buscar bombona de aire 1721
Buscar bateras 1721 (patio motores)
Buscar Soporte caucho repuesto G4 C1721
Base de Asiento (surtido)
Base y abrazadera de Tolva (Zona subensamble)
Kit Llaves de rueda
Bandeja de Bateras
Base de Extintor
Kit Soporte de guardafango
Goma Estribo
Tapa Gas
Clic de Aire (tubera de aire)
Filtros de Aire 1721
Complemento de Parachoque (Zona 0 a subensamble)
Faros de Tolva (Zona 0 a subensamble)
Varilla y gomas de capot
Bisagras de capot (Zona 0 a subensamble)
Tanques (chasis a lnea)
Soporte parachoque 1721 (chasis a lnea)
T.P
Cv
min.
TN
Tol
4,027
1,090
4,390
7% 0,049
0,228
0,038
0,039
0,111
0,147
0,114
0,003
12,100
15,400
13,140
13,140
13,140
13,140
13,300
12,400
12,220
2,810
12,220
12,220
12,220
12,220
12,220
6,310
6,310
4,400
2,810
2,810
2,810
2,810
3,370
4,430
0,990
0,990
0,990
0,990
0,990
0,990
0,990
0,990
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
2,223
0,608
0,563
1,108
1,108
1,108
0,380
0,423
0,143
0,060
0,143
0,143
0,143
0,143
0,143
0,057
0,057
0,111
0,060
0,060
0,060
0,060
0,575
0,557
4,066
189
3,616
12,480
13,510
15,100
12,400
12,400
12,400
14,350
13,510
11,482
3,128
11,482
11,482
11,482
11,482
11,482
6,010
6,010
4,320
3,128
3,128
3,128
3,128
3,180
3,180
4,400
13,200
12,440
15,580
12,130
12,130
12,130
15,350
12,440
12,051
3,310
12,051
12,051
12,051
12,051
12,051
6,668
6,668
4,390
3,310
3,310
3,310
3,310
3,350
3,350
12,593
13,783
14,607
12,557
12,557
12,557
14,333
12,783
11,918
3,083
11,918
11,918
11,918
11,918
11,918
6,329
6,329
4,370
3,083
3,083
3,083
3,083
3,300
3,653
12,467
13,646
14,461
12,431
12,431
12,431
14,190
12,656
13,586
3,514
13,586
13,586
13,586
13,586
13,586
7,215
7,215
4,982
3,514
3,514
3,514
3,514
3,762
4,165
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,167
0,042
0,036
0,083
0,083
0,083
0,025
0,031
0,010
0,016
0,010
0,010
0,010
0,010
0,010
0,007
0,007
0,021
0,016
0,016
0,016
0,016
0,143
0,125
minutos
TE
12,350
2,240
2,240
2,240
1,240
3,290
2,580
3,290
2,580
3,290
3,290
2,100
5,210
2,100
5,580
4,450
6,350
6,350
6,350
6,350
3,090
5,480
38,460
38,460
38,460
38,460
12,510
2,420
2,420
2,420
2,220
4,540
2,020
4,540
2,020
4,540
4,540
4,100
4,580
4,100
5,380
5,120
7,100
7,100
7,100
7,100
3,050
6,220
31,445
31,445
31,445
31,445
12,027
2,343
2,343
2,343
1,843
3,807
2,217
3,807
2,217
3,807
3,807
3,150
4,963
3,150
5,753
4,963
6,897
6,897
6,897
6,897
2,843
6,233
31,445
31,445
31,445
31,445
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,140
1,100
1,100
1,100
1,100
1,100
1,100
1,090
1,090
1,090
1,090
13,710
2,671
2,671
2,671
2,101
4,340
2,527
4,340
2,527
4,340
4,340
3,591
5,658
3,591
6,559
5,658
7,586
7,586
7,586
7,586
3,128
6,857
34,275
34,275
34,275
34,275
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
7%
0,050
0,011
0,011
0,011
0,023
0,005
0,012
0,005
0,012
0,005
0,010
0,125
0,250
0,125
0,200
0,200
0,032
0,032
0,032
0,011
1,000
0,083
0,007
0,007
0,007
0,002
0,734
0,031
0,031
0,031
0,051
0,024
0,031
0,024
0,031
0,024
0,048
0,480
1,514
0,480
1,404
1,211
0,262
0,262
0,262
0,087
3,347
0,611
0,258
0,258
0,258
0,086
4,300 4,480
3,080 1,940
Llamadas de Emergencia (maana)
1,840 2,030
11,240 10,220
llamadas de Emergencia (tarde)
Llamadas de emergencia
1,450 1,030
3,700
1,080
1,450
8,080
4,453
1,100
4,899
7% 0,117
0,611
1,240
1,240
1,140
1,414
7% 0,058
TRS
0,611
0,088
23,864
11,220
2,370
2,370
2,370
2,070
3,590
2,050
3,590
2,050
3,590
3,590
3,250
5,100
3,250
6,300
5,320
7,240
7,240
7,240
7,240
2,390
7,000
24,430
24,430
24,430
24,430
190
ESTANDARD PART
Esta seccin hace parte del rea de Lnea Final y se encuentra ajustada bajo el sistema de reaprovisionamiento de Partes por Tarjeta,
explicado en el informe.
Cantidad potes por lnea
Vestidura
1235
Chasis
1673
lnea Final
861
Total
3769
Prod. actual camiones
103
Cantidad potes/camin
37
36,59223301
Cantidad cajas/semana
60
Cant cajas/da Cant cajas/camin
12
0,116504854
Llenado de Potes
Operario: rea Chasis
Operacin
ordenar potes vacos en la carreta
llenado de potes
colocar potes llenos en la carreta
Botar basura
T1
7,140
30,600
4,170
0,800
Cant
Prom.
Potes
Cv
potes
T1 T2 T3
17,500 13,530 12,723 60 45 40 48,333 49 1,010
60,600 19,320 36,840 85 45 16 48,667 49 1,010
4,360 6,360 4,963 45 45 66 52,000 52 1,010
0,410 0,510 0,573
3
1,010
T2
T3
TP
TN
12,851
37,208
5,013
0,579
TP/pote Tol
0,262
0,759
0,096
0,193
7%
7%
7%
7%
TE
0,755
0,755
0,712
0,029
TRSP
0,212
0,614
0,073
0,006
0,905
TE
0,902
1,609
1,609
0,029
TRSP
0,041
1,798
0,091
0,008
1,938
T1
1,190
11,110
1,250
0,850
Cant
Prom.
Potes
Cv
potes
T1 T2 T3
1,580 2,250 1,673 30 45 48 41,000 41 1,030
33,440 25,410 23,320 13 35 19 22,333 23 1,030
1,200 1,100 1,183 13 35 19 22,333 23 1,030
0,800 0,700 0,783
3
1,010
T2
T3
TP
191
TN
1,724
24,020
1,219
0,791
TP/pote Tol
0,042
1,044
0,053
0,264
7%
7%
7%
7%
Cant Potes
T1 T2 T3
51,000 34,350 43,410 42,920 85 45 120
0,367 1,310 5,400 2,359 2 4 24
7,370 8,146 8,020 7,845 19 21 19
18,360 20,300 20,160 19,607 19 21 19
2,420 8,200 9,150 6,590 25 22 16
15,300 30,260 9,120 18,227 40 25 10
Prom.
potes
83,333 84
10,000 10
19,667 20
19,667 20
21,000 21
25,000 25
Cant Potes
T1 T2 T3
47,160 71,400 81,000 66,520 85 80 120
1,050 1,400 0,767 1,072 3 5
2
7,370 8,146 8,020 7,845 19 21 19
18,360 20,300 20,160 19,607 19 21 19
7,200 5,540 8,430 7,057 42 22 46
15,300 30,260 9,120 18,227 40 25 10
Prom.
potes
95,000 95
3,333 4
19,667 20
19,667 20
36,667 37
25,000 25
T1
T2
T3
TP
Cv
TN
1,080
1,080
1,080
1,080
1,080
1,080
46,354
2,548
8,473
21,175
7,117
19,685
Cv
TN
1,050
1,050
1,050
1,050
1,050
1,050
69,846
1,126
8,238
20,587
7,410
19,138
TP/pote Tol
0,552
0,255
0,424
1,059
0,339
0,787
7%
7%
7%
7%
7%
7%
TE
0,440
3,700
0,006
0,006
1,762
1,480
TRSP
0,260
1,009
0,003
0,007
0,639
1,247
3,164
TE
0,389
9,250
0,006
0,006
1,000
1,480
TRSP
0,306
2,786
0,003
0,006
0,214
1,212
4,528
T1
T2
T3
TP
192
TP/pote Tol
0,735
0,281
0,412
1,029
0,200
0,766
7%
7%
7%
7%
7%
7%
T1
T2
T3
Cv TP Tol
F
TN
Te
44,090 47,310 43,570 0,930 45 7% 0,010 41,841 0,4347
60,080 52,310 51,430 0,930 55 7% 0,010 50,784 0,5276
43,580 40,250 42,360 0,930 42 7% 0,010 39,119 0,4064
7,230 7,090 9,260 0,930 8 7%
14,340 10,060 9,300 0,930 11 7%
0,250 1,180 1,380 0,930 1 7%
20,300 21,020 18,060 0,930 20 7%
26,45 14,56
20,5 0,930 21 7%
10,060 21,290 16,070 0,930 16 7%
0,058
0,058
0,058
0,010
0,010
0,010
7,310
10,447
0,871
18,408
19,068
14,700
TRSP
0,4556
0,6512
0,0543
0,1912
0,1981
0,1527
3,072
Operario:
Operacin
Chequeo material critico (fsico)
Chequeo material critico (lnea)
Chequeo y actualizacin material critico
(sistema)
Surtido de material a la carreta
Surtido de material de la carreta a los rack
Ubicar facilidad
Elaboracin de Reporte de Critico
Entrega de Reporte
Subir Tarjetas
T1
T2
T3
Cv TP Tol
F
TN
Te
44,090 43,310 43,570 0,97 44 7% 0,010 42,347 0,4399
52,590 52,310 51,430 0,97 52 7% 0,010 50,547 0,5251
43,580 40,250 42,360 0,97
9
9
1
23
23
16
7%
7%
7%
7%
7%
7%
Cap. Requerida
Cant Horas Turno
103 28,800 3,623
0,058
0,058
0,058
0,010
0,010
0,010
9,027
8,669
0,909
22,210
22,336
15,332
TRSP
0,5627
0,5403
0,0566
0,2307
0,232
0,1593
3,1705
TRSPT 16,776
Tiempo(min)
(fabricacin de un vehculo)
16,000
14,000
12,000
10,000
8,000
6,000
4,000
2,000
0,000
14,030
4,550
2,221
3,105
3,511
1,436
Operarios
T. Estandar de las operaciones
194
Lineal (TKT)
Tiempo (min)
8,830
8,000
6,000
4,000
2,364
2,708
1,217
2,000
1,866
1,182
0,000
1
Operarios
T. Estandar de las operaciones
195
Lineal (TKT)
35,000
31,800
28,000
21,000
14,287
14,000
9,500
8,069
10,032
7,000
2,371
0,000
1
Operarios
T. Estandar de las operaciones
196
Lineal (TKT)
Tiempo (horas)
10,000
8,000
6,000
7,950
5,768
5,930
5,780
3,448
3,254
4,000
2,000
0,000
1
Operarios
Horas trabajadas por dia
197
tiempo (min)
10,000
7,773
8,000
5,431
6,000
5,443
10
11
3,326
4,000
2,000
5,273
1,553
0,000
6
9
Operarios
198
tiempo (min)
10,000
7,950
8,000
6,000
4,000
2,000
0,000
6
8
operarios
199
Produccin
1 vehculo
Mezcla
Turnos
Explorer
0,061
34
2,074
F - 350
0,051
54
2,732
815
0,069
10
0,693
Cargo
1721
0,091
5
0,456
Turnos Total Requeridos
5,95
(+) Turno Nocturno
6,00
(+) CAI
2,00
Catlogo
(+) Eficiencia
1,00
(+) Administradores MP
0,00
Total Operarios
14,95
0,45
(+) Eficiencia
Total Operarios
Requeridos
16,40
17
200