Kerry
Maurice Falvey B.E. Mech MIEI Maurice@nilan.ie Mobile: 087 9798361 25th Oct 2013
www.nilanireland.ie
PHPP Verification
www.nilanireland.ie
Build Details
Timber Frame construction Style: Tradition design on rural exposed site in Co. Kerry. TFA 167m2 Ground Floor = 0.061w/m2K Walls = 0.113 w/m2K Roof = 0.073 w/m2K Windows = 0.80 w/m2K Air Tightness Test = 0.56ACH N50 (Q50 0.0215 ACH for DEAP) Thermal bridge free design. Space Heating & Hot Water Nilan Compact P and backup with 2KW geothermal heat pump add on module Zoned under-floor system with weather compensated controls. Ducting via Nilan NILAir ducting delivering supplying air at floor level. There was No STOVE installed in this house 4.28m2 of Solar Thermal Flat Panels with 300Ltr pre-heat cylinder
www.nilanireland.ie
NILAir Ducting
www.nilanireland.ie
Construction Detail
www.nilanireland.ie
www.nilanireland.ie
www.nilanireland.ie
www.nilanireland.ie
By-Pass Valve Close, Passive Heat Recovery in Air Heating Activated & DHW in production
www.nilanireland.ie
System Schematic
www.nilanireland.ie
www.nilanireland.ie
Graph: Living Room Temp in Green, Intake Air in Blue, Supply Air in Red
www.nilanireland.ie
Graph: Living Room Temp in Green, Intake Air in Blue, Supply Air in Red
March 2012
March 2013
www.nilanireland.ie
www.nilanireland.ie
Compressor On-RED
www.nilanireland.ie
Compressor On-RED
Exhaust Air produces Domestic Hot Water above +50degC all year
www.nilanireland.ie
back up immersion heater was not used and note; where was no stove installed
www.nilanireland.ie
back up immersion heater was not used and note; where is no stove installed
www.nilanireland.ie
(PHPP) Actual June 2011 May 2012 Specific Primary Energy Demand 50.03 KWh/m2/a
(DHW, Heating, Cooling, Auxiliary Electricity)
(PHPP) Actual June 2012 May 2013 Specific Primary Energy Demand 65.52 KWh/m2/a
(DHW, Heating, Cooling, Auxiliary Electricity)