Académique Documents
Professionnel Documents
Culture Documents
APPLICATION FOR PERMIT TO ERECT TEMPORARY BUILDINGS [Regulation 4 of the Building Control (Temporary Buildings) Regulations (Cap 29, Rg 5)] [Regulation 4]
Date: To: 20/03/2014 Building and Construction Authority Commissioner of Building Control Building and Construction Authority 5 Maxwell Road #02-00 Tower Block, MND Complex Singapore 069110 Website : http://www.bca.gov.sg
Instructions
1. Please refer to the Explanatory Notes before completing this form. 2. This form is to be digitally signed by the Applicant and/or the Qualified Person. 3. This form may take you 2-4 mins to complete.
Particulars Of Application
Describe Temporary Buildings PROPOSED CONTINUED USE OF TEMPORARY EVENTS CONCIERGE BOOTH (TICKETCUBE)
Location Description
For a period of
Months
from 24/11/2012
to 30/03/2014
Section I
Name NRIC No Firm Name UEN Designation Address
Telephone No. Extension No. Handphone No. Pager No. Fax No. Email Address Add Delete
temporary building granted with temporary Written Permission by the Competent Authority (URA) for a period not exceeding 36 months. I. 2. I/We have engaged Mr CHAN YEW LIANG as the Professional Engineer (Civil / Structural Engineer) and authorised him to act on my behalf.
Section II
Name
67487744
Section II
Fax No. Email Address
(c)
Section III
III. 1
Submission Checklist
($10/-per month or part thereof) Payer's Detail :Name Company's Name Email
*Note: Receipt will be emailed to the recipient. If there is no valid email address, please leave all fields under "Payer's Detail" blank.
Three sets of plans of the proposed temporary building(s) with a site plan included in each set. One set of structural details and calculations. Notice of Grant of Temporary Written Permission together with a set of plans approved by the Competent Authority (URA) under the Planning Act (Cap 232). III.2 Notification of appointment/authorisation form such as BCA-LU-NAPPQP01 or appropriate. is attached. had been submitted previously on