GOVERMENT OF RAJASTHAN

WATER RESOURCES DEPARTMENT GARARDA IRRIGATION PROJECT


NAME OF WORK:- CONSTRUCTION OF SYPHON AQUEDUCT AT R.D.
A

CANAL DATA
Discharge
1.326
Bed width
1.72
water Side slope
1.5
F.S.D.
0.86
Free Board
0.50
Bed slope
1 in 5000
1in
C.B.L.
270.95
F.S.L.
271.81
T.B.L.
272.31
Span
2.60
M.W.D.
1.36

cumec
m
:1
m
m
m
m
m
m
m

B DRAIN DATA :Catment area of Nalla.


Nalla Bed
(N.S.L) 271.07 m

25485

DATA FOR AQUEDUCT


1.3261 cumec
3.01
m
vertical
0.86
m
0.50
m
5000
271
m
271.81 m
272.31
m
2.60
m
1.36
m

0.30 sqkm
271.07 m

0.12 Sq mile

1 Hydraulic Design :Flood discharge as per dicken's formula.


3/2
Q
= CxA
3/4
Q
=
1800 x(
0.12 )
Q
=
360.5 cusec
Q
=
10.2 Cumec
Say
= 11.00 cumec
Area required for opening
Assume Valocity of nalla limited to 3.00 meter/ sec.
A = Q/V
=
11.00 / 3.00
=
3.667 sqm
say
Assume box size = 2.00 x 2.00 meter
Area of box =
4
sqm
Nos. of opening required =
4
/
4
=
1
nos
Note:-

(A)Box culvert design as per I.R.C. SP-20


(I)
Abutment wall thickness
(Iii) Top slab thickness
(IV) Bottom slab thickness

2 DESIGN OF TROUGH :Design Constants:-

For HYSD Bars

=
=
=

0.45 m
0.25 m
0.25 m

Concrete M-20

4 sqm

m of L.M.C. OF GIP

for water side force


= 2000 Kg/cm2
2
=
70 Kg/cm

sst =
scbc =
m

=
k=

13
m*c

m*c+sst
j=1-k/3 =
1 R=1/2xc x j x k
=
0.5 x

wt. of concrete =
wt of water =
13 x
13 x

70
70

0.313 /

70 x

0.90 x

2000

3
2400 Kg/cm
3
1000 Kg/cm

= 0.313
=

0.90

0.313 =

9.80

3 DESIGN OF VERTICAL WALL:Max.depth of water =

Adopt wall thickness =


20.00 cm
1.36 m
span = 2.60 m
3
1000 x 1.36 ^
BM=WH^3/6
=
BM
=
= 419.2 kgm
6
Effective depth
419.2 x 100
=
= 6.54 cm
Rxb
required =
9.80 x 100
The wall trough is to be designed as a beam having a span of
=
2.60 m
between supports Hence thickness should be equal to span/30
span
100
2.60 x
=
= 8.67 cm
Say 9.00
cm
30
30
But providing thickness"D"= 20 cm
cover =
5
cm Effective
15 cm
Steel required
419.24 x 100
Ast = BMx100/sstxjxD=
= 1.56 cm2
2000 x
0.90 x 15
But minimum steel to be
100 x
20 x 0.3
=
0.3 % of x section area =
= 6.00 cm2
provided
100
3.14xdia2
3.14 x 10 x 10
using 10 mm bars =
A =
=
= 0.79 cm2
4
x
100
4 x 100
spacing =A/Ast =
0.79 x 100
/
6.00 = 13.08 cm
Hence Provided 10 mm bars @
13 cm c/c
minimum steel to be provided for
distribution

0.3

30
-

10

Area of distribution steel


required

0.24 % of x section area

Steel of Each face

4.9
2
A

0.1 (
45

10

100 x

0.24

20
100

x 0.24

mm bars

4.9 cm2

2.43 cm2

2
= 3.14xdia
=
3.14 x
8
4 x100
4 x
spacing =A/Ast =
0.50 x 100
/
2.43 = 20.69 cm
Hence Provided
8
mm bars @ 20 cm c/c Each face
mm F @
Also provided 2 leged shear strirrups
8
300
mm c/c

using

x 8
100

= 0.50 cm2

4 Design of Horizontal slabe :2


20 cm cover =
5
cm
Effct. Thickness = 15 cm
Total width of slab =bw+2x wall thickness = BW+ 2xwall thicknes
= 3.41 m
Effective width of slab = BW+ wall thickness
= 3.21 m

Adopt thickness of slab "T" =

Loading

Load of water column = mwd x


1000 =
Wt of slab = wt of concrete x Area of slab =
Max. possible segging moment

Effective depth
Rxb
required =
But providing thickness =

1.36 x
2500 x

WL2
1860 x
=
8
2396 x 100
=
9.80 x 100
20 cm
cover =
=

1000
1
x
0.2
Total load
3.21 x 3.21
8

=
=
=

1360
500
1860

2396

= 15.63 cm
5

cm

<

Effective depth =

kg/m2
kg/m2
kg/m2
Kg-m
20

cm
cm

15

Steel required
Ast = BMx100/sstxjxD=
But minimum steel to be
provided

2000 x

2395.70 x 100
0.90 x 15

8.91 cm2

20 x 0.3
= 6.00 cm2
100
3.14xdia2
3.14 x 12 x 12
using 12 mm bars =
A =
=
= 1.13 cm2
4
x
100
4 x 100
spacing =A/Ast =
1.13 x 100
/ 8.91 = 12.68 cm
Hence Provided
12 mm bars @ 12 cm c/c half the bars will be bent up at to check the
hogging moment developed
minimum steel to be provided for
0.1 (
20
10 )
=
0.3 =
0.27 %
distribution
45
10
Area of distribution steel
100 x
20 x 0.27
=
0.27 % of x section area =
= 5.43 cm2
required
100
5.43
Steel of Each face
=
= 2.71 cm2
2
2
using
8
mm bars
A
= 3.14xdia
=
3.14 x
8 x 8
= 0.50 cm2
4 x100
4 x 100
spacing =A/Ast =
0.50 x 100
/
2.71 = 18.51 cm
Hence Provided
8
mm bars @ 18 cm c/c Each face
=

0.3 % of x section area

100 x

Nos.

3.01

0.20
o

o
2 x

Distibution steel
8 mm F @ 20

0.20

12 mm F bars

8 mm2 ledge stirrups@ 30 c/c

F.B.

0.50

FSL

271.81

10 mm F bars@ 26 c/c

1.36

0.2

10 mm F bars@ 13 c/c

FSD

0.86

12 mm F bars@ 24 c/c
12 mm F bars@ 12
8 mm F bars@ 18

CBL
o

270.95

0.65
o

o
o

Trough Reinforcement Detail

main bars
12mm F 85 c/c

150

150
o

o
o

160

300
416

Distribution bars
10mm F 250 c/c
1688

240

2000
1960

300

2.00 m span
Cut off wall

Retaining wall

f.b.
fsd

0.50
0.86

1.72
u/s section

2:1

0.45

2:1

Canal

Nalla

2.00
4.00

3.30

0.30

1.00

2.00
0.40

d/s section
1.00

1.72

fsd
f.b.

0.86
0.50

0.20

0.20

0.20

3.01
H.F.L.

Nalla level

1: 1
0.90

1.00

2.00

0.45

272.07

271.07

3.00

0.20 TBL

272.31

FSL

271.81

CBL

0.20

270.95

H.F.L.

272.07

Nalla level

S/R

0.25
3 :1
c.c.m-15

0.30

0.30

2.00

3.00

0.25

2.00
0.30
5.30

R.L.

268.70

R.L.

268.45

R.L.

268.15

7.01

Cut off
wall M20

0
0.2

7.30

0.30

Cut off wall


2.92

1.50

2.00

1.20

1.00

2 :1

0.30

2.00

0.30

0.30

Retaining wall

(f)

(a)
(f)

0.25

( j)

(b)

7.20

(g)

(g)

(d)

(d)

(c)
2

(c)

(j)

(j)

(e)

(e)

(g)

(h)

(j)

(i)

(g)

0.25
0.45

2.00

Detail of Reinforcement for box culvert

0.45

NAME OF WORK:-unflume Glacis Fall at R.D.


Sno.
Item
1 Earth work in excavation including loading
unloading disposal and dressing of
excavated area within inial lead of 50m and
lift upto 1.5m in dry or moist including
drsssing of excaveted area ,dewatering
wherever required and all applicable taxes
Hard soil mixed with kanker/
U/S cut off wall
Glacis
Cistern portion
d/s cut off

DETAIL
100

m of R.M.C. Bardha
L

1
2
1
1

x
x
x
x

26.20
4.90
8.14
26.20

x 0.70 x 2.80
x 1.60 x 2.80
x 25.90 x 2.80
x 0.70 x 1.30

=
=
=
=
total

2 Cement Concrete in (1:3:6) M10 well mixed


and laid in position complete including all
leads of all construction material Including
Curing and finishing having well graded
broken stone aggregate of maximum size
U/S cut off wall
Glacis
Cistern portion
d/s cut off

1
2
2
1

x
x
x
x

26.20
4.90
8.14
26.20

x 0.70 x
x 1.60 x
x 25.90 x
x 1.45 x

0.30
0.30
0.30
0.30

= 5.50
= 4.70
= 126.49
= 11.40
total
148.09
cum 4

1
2
2
1
2

x
x
x
x
x

26.20
0.40 x 0.80
4.90 x 1.30 x 0.80
8.14 x 1.30 x 0.80
26.20
0.40 x 0.80
0.60 x 1.30 x 0.80
total

4 R.R. Stone masonry (using R.R stones


where 75% stone to be not less than 15 cm
in size in any direction and weighing not less
than 23 kg.) for superstructure including
curing all leads of construction materials &
all taxes and with initial lift /de lift of 5 m from
G.L.etc complete .In cement sand mortar 1:5
wing wall U/S &d/s

51.35
43.90 2
590.28
23.84
709.38
cum

3 R.R. Stone masonry (using R.R stones


where 75% stone to be not less than 15 cm
in size in any direction and weighing not less
than 23 kg.) for Foundation including
curing all leads of construction materials &
all taxes and with initial lift /de lift of 5 m from
G.L.etc complete .In cement sand mortar 1:5

u/s cut off


Glacis
cistern portion
d/s cut off
wing wall D/S

qty Sno
1

= 8.38
= 10.19
= 16.93 6
= 8.38
= 1.25
45.14
cum
7

2 x 1.50 + 0.60 x
2

+ 0.4 x 1.70 = 1.43

Glacis

2 x 4.90 x

1.30 +

0.4

x 1.70 + 2.10 =

cistern portion

2 x 8.14 x 1.30 + 0.40 x 2.10

d/s cut off

2 x 1.50 + 0.60 x 1.30 + 0.40 x 2.10 = 3.75


2
2
total
34.23 9

= 29.06

5 Cement Concrete in (1:2:4) M15 well mixed


and laid in position complete including all
leads of all construction material Including
Curing and finishing having well graded
broken stone aggregate of maximum size
upto 20mm

u/s bed
Crest
Glacis
cistern bed

1 x 0.40 x 23.00 x 0.20


1 x 0.90 + 0.60 x 23.00 x 0.60
2
1 x 4.47 x 23.00 x 0.60 + 1.10
2
1 x 2.20 x 23.00 x 1.00
1 x 2.20 x 23.00 x 0.90
1 x 2.10 x 23.00 x 0.80
1 x 2.00 x 23.00 x 0.50

= 1.84
= 10.35
= 87.43
=
=
=
=
total

50.60
45.54
38.64
23.00
257.40
cum

6 Plaster in cement sand mortar (1:4) including


raking of joint ,smooth finishing with & curing
etc. including all leads of all construction
matarial complete of thickness ; 20mm
wing wall face
Crest
Glacis

2 x 1.90 x 1.70
2 x 0.90 x 1.70
2 x 4.00 x 1.70 + 2.10

= 6.46
= 3.06
= 15.20

cistern

1 x 6.50 x 2.10
1 x 2.00 x 2.10 + 1.40

= 13.65
= 3.50
total

41.87
sqm

7 Flush and ruled pointing om stone masonry


including raking of joint and curing etc.
complete including of all leads of all
construction materials in cement mortar 1:3
wing wall out side
side wall out side
8 Providing and laying cement concrete
copping in (1:2:4) with maximum size of
cresher broken aggregate upto 20mm
including shuttering etc with all leads of
material complete in all respect.in thickness

4 x 1.90 x 0.85
2 x 13.44 x 1.05

= 6.5
= 28.2
total
34.68
sqm

Providing and laying cement concrete


copping in (1:2:4) with maximum size of
cresher broken aggregate upto 20mm
including shuttering etc with all leads of
material complete in all respect.in thickness
wing wall
side wall

4 x 1.90 x
1 x 13.44 x

0.4
0.4

9 Rehandling of excaveted matrial inlcuding


loading unloading and dressing within inial
lead of 50 m and lift 1.5 m with cost of
dewatering wherever required and all as per item no 1
applicable taxes and lavies etc. complete in

= 3.04
= 5.38
total
8.42
sqm

709.38
cum

ABSTRACT OF COST
NAME OF WORK:-unflume Glacis Fall at R.D.
100
Item
QTY
Earth work in excavation including loading unloading
disposal and dressing of excavated area within inial lead
of 50m and lift upto 1.5m in dry or moist including
drsssing of excaveted area ,dewatering wherever
required and all applicable taxes and levies etc. 709.38
complete in all respect
Hard soil mixed with kanker/ boulders,morrum
(Rate as per irrigation BSR2006Ch 5/1c)
Cement Concrete in (1:3:6) M10 well mixed and laid in
position complete including all leads of all construction
material Including Curing and finishing having well
graded broken stone aggregate of maximum size upto
20mm
(Rate as per irrigation BSR2006Ch 7/6d)
R.R. Stone masonry (using R.R stones where 75%
stone to be not less than 15 cm in size in any direction
and weighing not less than 23 kg.) for Foundation
including curing all leads of construction materials & all
taxes and with initial lift /de lift of 5 m from G.L.etc
complete .In cement sand mortar 1:5
(Rate as per irrigation BSR2006Ch 8/2e)

m of R.M.C. Bardha
Rate
Unit

Amount

34.00

cum

24119.00

148.09

1650.00

cum

244349.00

45.14

1270.00

cum

57328.00

34.23

37.00

cum

1267.00

257.40

1973.00

cum

507851.00

41.87

67.00

sqm

2805.00

34.68

45.00

sqm

1561.00

Masonry in superstructure for Dam and other works.


(Rate as per irrigation BSR2006Ch 8/13a)
Cement Concrete in (1:2:4) M15 well mixed and laid in
position complete including all leads of all construction
material Including Curing and finishing having well
graded broken stone aggregate of maximum size upto
20mm
(Rate as per irrigation BSR2006Ch 7/5d)
Plaster in cement sand mortar (1:4) including raking of
joint ,smooth finishing with & curing etc. including all
leads of all construction matarial complete of thickness,
20mm
(Rate as per irrigation BSR2006Ch 9/4b)
Flush and ruled pointing om stone masonry including
raking of joint and curing etc. complete including of all
leads of all construction materials in cement mortar 1:3

(Rate as per irrigation BSR2006Ch 9/15)

Providing and laying cement concrete copping in (1:2:4)


with maximum size of cresher broken aggregate upto
20mm including shuttering etc with all leads of material
complete in all respect.in thickness of 50 mm
(Rate as per irrigation BSR2006Ch 12/17a)
Rehandling of excaveted matrial inlcuding loading
unloading and dressing within inial lead of 50 m and lift
1.5 m with cost of dewatering wherever required and all
applicable taxes and lavies etc. complete in all respect
(Rate as per irrigation BSR2006Ch 5/8c)

8.42

146.00

sqm

1229.00

709.38

23.00

cum

16316.00

total
2 %contengency
Say RS

8.74

856825.00
17137.00
873962.00
Lacs

Detail of reinforcement
Bars /type
A Trough
Main verticl wall
distribution
shear strirrup
Hanch

Fmm

length of
cc

10
8
8
10

1.61
2.90
2.90
2.90

/ space = number x row x length total lengh @ wt /mt.

/ 0.13 =
/ 0.2 =
/ 0.3 =
/ 0.3 =

=
=
=
=

13
16
11
11

x
x
x
x

2
4
2
2

x 1.4 =
x 7.9 =
x 3 =
x 0.7 =

36
506
66
15

@
@
@
@

0.616
0.394
0.394
0.616
Total

total
wt(kg)
22.00
200.00
26.00
9.00
257
Kg

Reinforcement required for Barrel 2.00 x2.00 m

Bar mark

Shape of Bar

(As per I.R.C.SP- 20)


Opening 2000 X 2000
Bar Dia Spacing

Length of bar

Length of
No of bars
concrete

row of
bars

total
length

weight/met
er (kg)

total
weight
(kg)

10

140

2x75+2420=

2570

7010

52

133.64

0.616

83

12

130

2x75+2420=

2570

7010

55

141.35

0.887

126

10

140

2x710+2420=

3840

7010

52

399.36

0.616

247

10

200

2x75+2420=

2570

7010

37

190.18

0.616

118

10

95

710+710=

1420

7010

75

213

0.616

132

140

710+710=

1420

7010

52

147.68

0.394

59

150

2x200+750=

1150

7010

48

220.8

0.394

88

10

160

2x75+2420=

2570

7010

45

115.65

0.616

72

10

140

2x75+2420=

2570

7010

52

133.64

0.616

83

10

200

7010

2001

12

672.96

0.616

415

Total

1214
kg

Hunch 150 x 150


T1 =

250

T2 = 250

L1 =

2250

L2 = 2250

Reinforcement required for Barrel 3.00 x 3.00 m


(As per I.R.C.SP- 20)
Opening 3000 x 3000
Bar mark

Shape of Bar
Bar Dia Spacing

Length of bar

Length of
No of bars
structure

row of
bars

total
length

weight/met
er (kg)

total
weight
(kg)

10

190

2x75+3720=

3870

7010

37

143.19

0.616

89

12

120

2x75+3720=

3870

7010

59

228.33

0.887

203

12

190

2x1110+3520=

5740

7010

37

424.76

0.887

377

10

200

2x75+3520=

3670

7010

36

264.24

0.616

163

10

95

1110+1110=

2220

7010

74

328.56

0.616

203

190

710+710=

2220

7010

37

164.28

0.394

65

150

2x200+800=

1200

7010

47

225.6

0.394

89

10

150

2x75+3720=

3870

7010

47

181.89

0.616

113

10

190

2x75+3720=

3870

7010

37

143.19

0.616

89

10

200

3300

17

953.36

0.616

588

Total

1687

7010

Hunch 150 x 150


T1 =

400

T2 = 300

L1 =

3400

L2 = 3300

kg

Reinforcement required for Barrel 4.00 x 4.00 m


(As per I.R.C.SP- 20)
Bar mark

Opening 4000 X 4000

Shape of Bar

Bar Dia Spacing

Length of bar

Length of
No of bars
structure

row of
bars

total
length

weight/met
er (kg)

total
weight
(kg)

10

155

2x75+4820=

4970

7010

46

228.62

0.616

141

16

155

2x75+4820=

4970

7010

46

228.62

1.578

361

12

155

2x1410+4620=

7440

7010

46

684.48

0.887

608

10

200

2x75+4620=

4770

7010

36

343.44

0.616

212

16

155

1410+1410=

2820

7010

46

259.44

1.578

410

10

155

1410+1410=

2820

7010

46

259.44

0.616

160

150

2x200+850=

1250

7010

47

235

0.394

93

12

155

2x75+4820=

4970

7010

46

228.62

0.887

203

10

155

2x75+4820=

4970

7010

46

228.62

0.616

141

10

200

4450

23

1289.84

0.616

795

Total

3124

7010

Hunch 150 x 150


T1 =

450

T2 = 350

L1 =

4450

L2 = 4350

kg

Reinforcement required for Barrel 5.00 x 5.00 m


(As per I.R.C.SP- 20)
Bar mark

Opening 3000 X 3000

Shape of Bar

Bar Dia Spacing

Length of bar

Length of
No of bars
structure

row of
bars

total
length

weight/met
er (kg)

total
weight
(kg)

10

160

2x75+5920=

6070

7010

44

267.08

0.616

165

16

160

2x75+5920=

6070

7010

44

267.08

1.578

422

16

160

2x1710+5720=

9140

7010

44

804.32

1.578

1269

12

200

2x75+5720

5870

7010

36

422.64

0.887

376

16

160

1710+1710=

3420

7010

44

300.96

1.578

475

10

160

1710+1710=

3420

7010

44

300.96

0.616

186

150

2x200+900=

1300

7010

47

244.4

0.394

97

16

160

2x75+5920

6070

7010

44

267.08

1.578

422

12

160

2x75+5920

2570

7010

44

113.08

0.887

101

10

200

5500

28

1570.24

0.616

968

Total

3894

7010

Hunch 150 x 150


T1 =

500

T2 = 400

L1 =

5500

L2 = 5400

kg

Reinforcement required for Barrel 2.00 x2.00 m


(As per I.R.C.SP- 20)
Opening 2000 X 2000
Bar mark

Shape of Bar
Bar Dia Spacing

Length of bar

Length of
No of bars
concrete

row of
bars

total
length

weight/met
er (kg)

total
weight
(kg)

10

140

2x75+2420=

2570

7010

52

133.64

0.616

83

12

130

2x75+2420=

2570

7010

55

141.35

0.887

126

10

140

2x710+2420=

3840

7010

52

399.36

0.616

247

10

200

2x75+2420=

2570

7010

37

190.18

0.616

118

10

95

710+710=

1420

7010

75

213

0.616

132

140

710+710=

1420

7010

52

147.68

0.394

59

150

2x200+750=

1150

7010

48

220.8

0.394

88

10

160

2x75+2420=

2570

7010

45

115.65

0.616

72

10

140

2x75+2420=

2570

7010

52

133.64

0.616

83

10

200

7010

2250

13

729.04

0.616

450

Total

1249

Hunch 150 x 150


T1 =

250

T2 = 250

L1 =

2250

L2 = 2250

kg

o
o

o
o

210

o
o

Distribution bars
10mm F 250 c/c
1688

150

150

86 nos main bars


12mm F 85 c/c

150

150

450

450

7500
6600
Wearing coat 75mm thick

62 nos main bars


Distribution bars
12mm F 120 c/c
8mm F 160 c/c
1256

o
o

o
o

240

o
o

o
o

o
o

Cross section of culvert

Distribution bars
10mm F 175 c/c

o
o

o
o

o
o

300

o
o

o
o

o
o

71 nos main bars


16mm F 105 c/c
o

220

3000
2810

Distribution bars
12mm F 200 c/c
3330

o
o

300
506

300

150

2000
1960

2.00 m span

150

300
416

1.50 m span

150

150

2508

300

160

60 nos main bars


16mm F 125 c/c

1500
1575

130

300
375

300

o
o

3.00 m span

o
o

o
o

o
o

370

o
o

o
o

o
o

o
o

4000
3650

290

300
590

o
o

300

4.00 m span
53 nos main bars
20mm F 140 c/c

Distribution bars
12mm F 175 c/c

o
o

o
o

o
o

430

1
4
5
6

o
o

o
o

o
o

o
o

400

4840
o

400
890

400

NOTES:-

5000
4570

320

400
790

150

o
o

Distribution bars
12mm F 150 c/c

150

150

150

4040

65 nos main bars


20mm F 115 c/c

o
o

o
o

o
o

o
o

480
6000
5360

o
o

o
o

o
o

o
o

o
o

o
o

400

5.00 m span
6.00 m span
Concrete:- M-25
2 Steel:- HSDY as per IS-1786
3 Cover:- 20mmat bottom & 40mm at side
In 1.5M, 2.0M &3.0M span only one Bar is to be crankedin each side in four bars in all other span crank alternative bars.
All bars cranked one end onlythese are placed with crank on left side and right side alternatively
Surface steel at top longitudinal -10mm @300mm c/c length a shown in sketh & transverse -10mm @300c/c all through out in logitudinal

provided steel in the Zone where main steel is not available plus 150mm on either side

93 nos main bars


20mm F 90 c/c

Distribution bars
12mm F 125 c/c

o
o

o
o

o
o

o
o

o
o

600

o
o

o
o

o
o

o
o

o
o

8000
7280

520

400
1120

150

150
o

6680

o
o

400

8.00 m span
62 nos main bars
25mm F 120 c/c

Distribution bars
12mm F 110 c/c

F
150

150

8400

670

400
1260

Area & weight of tor Bar

750
10000
8990

6 0.283
8 0.503

0.40

10 0.785

0.617 0.786

12 1.131

0.888 0.785

14 1.539

1.208 0.785

16 2.011

1.578 0.785

400

18 2.545
20 3.142

10.00 m span

wt/m Factore
0.222 0.784

2.0

0.785

0.786

2.466 0.785

22 3.801

2.98

25 4.909

3.854 0.785

0.784

28 6.157

4.83

0.784

32 8.04

6.31

0.784

36 10.17

7.98

0.784

40 12.56

9.85

0.784

50 19.64

15.40 0.784

n logitudinal