Vous êtes sur la page 1sur 5

Natural Pitch References

Kestrel (Contractors) Ltd are firmly established as one of the UKs most prominent sports pitch contractors, specialising in natural and artificial turf surfaces. Kestrel work in conjunction with a number of main contractors, architects, local authorities and consultants to produce high quality sports facilities.

Football Surfaces (Stadiums)

Brighton & Hove Albion FC

Construction of fibre elastic stadium pitch including drainage, gravel carpet, upper and lower rootzone, wall to wall irrigation and under soil heating system.

Millennium Stadium

Complete returf of pitch prior to FA cup final

Leigh Sports Village

Construction of a fibre reinforced stadium pitch for combined football / rugby usage including wall to wall irrigation and under soil heating system

Chelsea FC

Complete returf of Stamford Bridge

Shrewsbury FC

Construction of a fibre reinforced stadium pitch for combined football / rugby usage including wall to wall irrigation

Southampton FC

Complete returf of St Marys prior to testimonial Design and construction of 2no soil based stadium pitches including irrigation systems

AFC Totton and Totton & Ealing FC

Walsall FC

Complete returf and upgrade of Bescot Stadium pitch

Fulham FC

Pitch upgrading and on-going renovation works at Craven Cottage Drainage and on-going stadium renovation works at the Memorial Ground Pitch upgrading and on-going renovation works at The New Den

Bristol City FC

Millwall FC

Bournemouth FC

Complete returf and upgrade of Dean Court Stadium pitch

www.kestrelcontractors.co.uk

Info@kestrelcontractors.co.uk

Natural Pitch References

Kestrel (Contractors) Ltd are firmly established as one of the UKs most prominent sports pitch contractors, specialising in (Training natural and artificial turf surfaces. Football Surfaces Facilities) Kestrel work in conjunction with a number of main contractors, architects, local authorities and consultants to produce high quality sports facilities. Construction of new training facilities at Marchwood including first team, Southampton FC reserve and academy pitches

Reading FC

Design and construction of Arborfield training ground including first team, reserve and academy pitches On-going training ground improvement works including drainage installation, grading and end of season renovations Major training ground improvement works including primary and secondary drainage installation, installation of irrigation system and 3G artificial training pitches

Bristol City FC

Barnet FC

Chelsea FC

Construction of academy pitches as part of Phase 1 of Cobham training ground upgrade

Fulham FC

Training ground upgrade including drainage improvements and ongoing renovation works

Sundorne Sports Village

Design and construction of 12no football pitches with varying specifications including fully automated irrigation system and 3G artificial training surface

Millwall FC

Training ground upgrade including drainage improvements and ongoing renovation works

Thame FC

Construction of new first team pitch and training facilities including irrigation system and 3G artificial surface

Eversley Sports Association

Construction of 7 new football pitches and a cricket square as part of new sports development

Trinity Playing Fields

Construction and drainage of 5 new football pitches and a cricket square as part of a land remediation project

www.kestrelcontractors.co.uk

Info@kestrelcontractors.co.uk

Natural Pitch References

Rugby Surfaces

Exeter Chiefs RFC

Design and construction of a new stadium pitch including wall to wall irrigation system and 2 training pitches as part of club relocation to Sandy Park Farm

University of Surrey

Construction of 10 football and rugby pitches and a cricket square as part of creation of the Surrey Sports Park

Orford Park

Design and construction of 4 rugby pitches on contaminated site including necessary remediation, earthworks, drainage installation, sand amelioration and a 3G training surface

Harlequins Rugby Football Club

Drainage system installation and end of season renovation works at The Stoop

Basingstoke Rugby Football Club

Construction of new 1st XI pitch including comprehensive drainage system and sand amelioration

Woodside Playing Fields

Design and installation of a comprehensive new land drainage system to existing rugby pitches and cricket outfield as part of recreation ground upgrade

Richmond Rugby Football Club

Renovation works including koro off of existing surface, re-grading and sand amelioration of surface

Hastings and Bexhill Rugby Football Club

Installation of new drainage system as part of on-going improvement works

Farnham Rugby Club

Construction of new match and training pitches including earthworks, drainage and automated irrigation systems as part of club relocation and leisure development

London Welsh Rugby Football Club

Various end of season renovation works

Broadstreet Rugby Football Club

Installation of new drainage system as part of on-going improvement works

www.kestrelcontractors.co.uk

Info@kestrelcontractors.co.uk

Natural Pitch References

Equestrian Surfaces

Dubai Polo Club

Design and construction of a full size professional standard polo field including extensive earthworks, a 7.5m litre reservoir, drainage system and finishing works

Les Lions Polo Club

Design and construction of a full size professional standard polo field including extensive earthworks, drainage system and finishing works

Kempton park Racecourse

Improvements to the existing track as part of redevelopment programme, scope included earthworks and installation of 25,000m2 of sports turf

Four Quarters Polo Club

On-going renovation works

Billingbear Polo Club

Construction of stick and ball area and on-going renovation works

Newcastle & Sedgefield Racecourses

Installation of primary and secondary land drainage systems as part of on-going improvement works

Golf Courses Clandon Park Golf Course Design and construction of 18 hole golf course including earthworks, drainage, tee, green and bunker construction including grow in and initial maintenance

Carden Park (Jack Nicklaus Course)

Design and construction of 18 hole golf course including earthworks, drainage, tee, green and bunker construction including grow in and initial maintenance

East Berkshire Golf Club

Installation of comprehensive primary drainage system to fairways

Malden Golf Club

Greens construction works including shaping, drainage and finishing works

West Hill Golf Course

Complete refurbishment of bunkers

www.kestrelcontractors.co.uk

Info@kestrelcontractors.co.uk

Natural Pitch References

Cricket Surfaces

Wokingham Cricket Club

Design and construction of 2 new full spec cricket squares and outfields as part of club re-location

Glamorgan County Cricket Club

Renovations to main square at the SWALEC stadium, drainage improvements and turfing of outfield prior to first ashes test match

Eversley Sports Association

Full construction of surrey loam cricket square

Hampton School

Construction and renovation works carried out on 5 of the schools cricket squares

University of Surrey

Full construction of surrey loam cricket square

Kempton Park Cricket Club

Koro off and regarding of surface to improve tolerances and remove saddles on bowlers run ups

Cranleigh School

Full construction of surrey loam cricket square

Totteridge Cricket Club

Reconstruction of existing cricket square to improve levels and consistency

Ruislip Academy

Full construction of surrey loam cricket square

Live Projects

Southampton FC

Design and construction of new first Xi and training pitches at Marchwood training ground

Wixams Development

Design and construction of new first Xi and 3G training pitch as part of Phase 2 of Wixams Housing development, Bedford

Barn Elms

Renovation of existing playing fields including level improvements, renovation, turfing and drainage works to 13 existing pitches

www.kestrelcontractors.co.uk

Info@kestrelcontractors.co.uk

Vous aimerez peut-être aussi