1. Put on safety hat always when you are on rig site.

2. Hold safety meeting before any special operation.



3. Keep working place clean and tidy, dont block the walkway.

. Put on safety belt when you are working on a high place, and ha!e your tools secured.
!
". #i!e standard signal and gesture when direct a crane or forklift.
" # $% &' ()
$. %se safety guide line while loading or unloading big si&e or hea!y loads.
*$+ ,- . ! /
'. (heck the sling or wire rope line before use.
0 +# &'
). *ll handrails should be in place, in good shape and tighten.
12 3 45 6789
+. (heck the eye wash table and ,(-* each shift change.
:;< =>?@ABC
1.. ,et a sign board and inform the driller when you do something repairing.

D EF GH
11, Hot work and cold work need to inform the foreman on duty, only can start the work after got the
foremans permission.
I J+KL D G < MNOPQ RSTU V
12, all flammable and harmful material should be stored separately and identified clearly.

12WX@2YZ[ \ ]^ _
13. /ear ear plug while working in or around generator house.
NL` +ab c
1. (heck the fire e0tinguisher monthly and recorded.
de JC

1", shut down the engine and cut off the power first should the engine house on fire.

fgL`hJ iKL j k
1$. *ll e1uipment, warehouse, li!ing room should be grounded.
12 `l` ;m
1'. 2ach sling and wire rope should ha!e a uni1ue identified mark on it, and checked monthly.

dfn# 2o - de
1). 3ull o0ygen bottles should be stored separately with empty ones, and be shield.

\ ]^p q
1+. 4o obstacle around escape line and the touchdown place should be clear and soft.

rs t U2uv.wm x y .
2.. *ll personal include the third party should be know the location of safe brief area. *nd how to react
should emergency situation appears.

12z {|} ~ -5 N
21. /e ha!e two safe brief area. 5ne at the entrance of rig site, another at the e0it.

2 f N f N

22. -e ware of H2,, we are drilling through H2, bearing formation.

H2,

H2,
m
23. /e ha!e H2, and flammable gas detecting system on rig site. 6he sensors are located at shale shake,
cellar, wellhead, and rig floor.

2
H2,
@X ! N $ $@ ?

2. /hen the H2, comes out of hole under 1.ppm, the amber light will be on but the horn silence. /hen
the H2, goes more than 2.ppm, the warning horn will sound and the amber light will be on at the same
time.


H2,
N
1.ppm

H2,

2.ppm


2". 6he driller is authori&ed to shut in the well when situation indicates.
fg H 2
2$. *ll personal on rig site should go 1uickly to the safe brief area up the windy when H2, alarm sounds.

H2,
12z P
2'. *ll personal should report to tool pusher upon enterer the rig site

12z fg <
2). /hen conduct fire drill the members on duty are di!ided into two groups, fire team and back up team.

<z \ J @S
2+. 5nce somewhere set on fire, find out the fire source and the reason, and report to foreman
immediately, then take proper way to put out fire.

fgwJ i Jk@J M RS- -~ J
3.. 4e!er use water to put out fire when power didnt cut off.

kj U' J
31. *ll personal should take training and get necessary certificated before taking the 7ob.
12z OI-
32. /e will conduct function test first after -5P set up. 6hen pressure test pipe rams, annular, choke
manifold, inner -5P, chock line and kill line separately.

C Si VU S $U$ $ $ $
\
33. 8nner -5P include inside -5P, full open !al!e, upper Kelly cock, and Kelly cock.

{| $ $~ 3
3. 2ach !al!e in choke manifold should be labeled with its normal position.

- o - 5
3". Pressure test didnt go more than ob7ects each time.
fU



3$. 2ach ob7ects no matter rams, annular, inner -5P, or H(9, plate !al!e must pass high pressure
:2"..psi; and low pressure :3..psi; test.

df $U$ $ $

2"..psi
@
3..psi

3'. 6he low pressure will hold stably for "mins, the high pressure will hold stably for 1.mins.


"
\
1.
\
3). /e use clean water to perform pressure testing.
'

3+. * pressure test chart will be needed with e0plaining on it and handed in foreman.

V\: M
.. /e need to set a plug in casing head in order to change the pipe rams.

N C
1. 6he pressure test table plays an important role, so we must keep it in good condition always.

? *'

2. *ll plate !al!e are float seal, so after you close a !al!e, be sure back 1uarter of turn.

12 1 Sf8
1<


3. (heck the hydraulic control line fre1uently= no leaks in system.

! V ! y
. 6he four>way control handle should be either in open or in close but in neutral. ,o people can easily
know the -5Ps working situation.
5G ) p 5 p 5 p5
zf>4U
-5P
-

". /hat is the different between H2, drill and -5P drill? H2,

-5P
-N
$. 6here are two mainly different, 3irst the signal, H2, gi!ing off amber light and sound, but the -5P
using rig air horn

,econd, people going to safe brief area when H2,, but to mud mi0ing tank when -5P.

2 i
H2,
'
-5P
&' ?z 5
H2,
<*\z
-5P
<*\z ,
'. How long do we will arrange a self safety inspection?
Vf
). /e will hold a self safety inspection about a month.
* de f
+, #as cylinders should be stored in upright position.
]^
".. 8solate o0ygen cylinder from acetylene cylinder in store area by $.$ meters.

]^ N
$


"1, *@@ gas cylinders should be marked, secured, and shield.
12 2 $ 9$
"2. Power cables to trailers from light plant suspended or otherwise protected from !ehicle traffic.

L`P `- + !
"3. Protecti!e co!ers on all lights.
o 2
". *-( fire e0tinguisher in or outside each trailer.
` 2 - JCZ
"". ,moke alarm present and functioning in each room.
` 2 C
"$. 2lectrical 7unction bo0es identified and kept in closed position.
; 2
"'. 2lectrical outlet labeled, !oltage identified.
k
"). 2lectrical cords, plugs, receptacles etc in good condition.
12 $ $ y " "
"+. *ll pressure gauges in good condition and reliable.
12- $
$.. 3ans and belts guarded.
$ 2 #
$1. *ll connections of pressure hose safely secured.
- ;5
$2, 3loors and e1uipment free of oil or grease.
?@ y
$3. Aoghouse housekeeping acceptable, no accumulations that present a ha&ard.

<` s y .
$. 4oise ha&ard sign in place= hearing protection pro!ided and used by workers.

N2 -m~2 Y E c'z&' $ $
$". BH8#H C5@6*#2>%,2 45 /*629D sign posted in generator house.

`
B
'
D
EF
$$, 2mergency lighting should be installed in ,(9 room


`
$', 4on>conducti!e mats placed on floor in ,(9 room.
`
$). (52 fire e0tinguisher a!ailable in ,(9 room.
`
(52
JCZ

$+. ,hear blind<blind rams control guarded.
j $)2 #
'., -5P elastomers stored in air conditioned room. -5P
]^N `
'1, /ear goggles, apron, and rubber #lo!ers when adding materials into mud.

[ $ $ )
'2, Eotors on mud tank are e0plosion>proof,
- L-
'3, 6he -5P stack should be properly turn buckled, and make it tighten and centered.

C ' &
', (ellar protected from workers falling into it.
z
'", C>door closed or chained when not in use.
* &' +'
'$, 3loor openings co!ered when not in use.
?- &'
''. /alkways and work area unobstructed, and clean.
@ 2uv. %
'). Handles for Kelly cocks and stabbing !al!e in easily accessible place.

~ 3)@ ^NWP-m~ &
'+. Arillers controls ade1uately labeled and guarded.
H ? E 2
).. ,wi!el used on tugger line.

)1. Ea0imum allowable casing pressure posted at remote chocke control panel.

o*Q
)2. *ll drill procedure posted on wall of doghouse.
12 ! N <`
)3. /orkers stand out of the way when rolling, loading, or unloading pipe.

@ z "N V~R
). 3ire hose not used for any other purpose than fighting fires, drills, or testing.

# J$ $ RU ' '

)". Hand held power tools ha!e auto>shutoff de!ices.
) L$ 2 KL
)$. Pneumatic power tools are secured to the air line to pre!ent accidental disconnection.

R 2 z (
)'. 4o welding or cutting on load handling tools or e1uipment.
%,-+ U V &
)), ,uper sacks handling system certified and inspected regularly.

*'# ! V 8 8(
)+. ,afety instruction gi!en to all personnel entering location.

-z V~)-*
+., 2mployees should know location of stretcher and blankets.
+ @, N ) *
+1. *ll working surfaces higher than feet ha!e standard handrails.
)p

2 ( 3
+2. /indsocks or streamers !isible from anywhere on the location.

- -UP +./ !
+3. 3lare ignition system a!ailable and in good condition.
J U