Cagbc LEED CI v1.

0 Calculations

Section
Credit

Category
Equati
Sustainable Sites on prep: Teeceeetee

Impervious Area ( m2) = Surface Area X Runoff Coefficient


SSc 1B Stormwater Management Rate & Quantity SS1 Impervious Area by type of surface

SS2 Impervious %
% Impervious Area calculation = Total Impervious Area ( m2)
Total Site Area ( m2)

1 .D Heat Island Reduction/Non Roof SS3 Shade of Impervious areas Shade % Shaded Impervious Area ( m2)
= Total Impervious Area ( m2)

1 .E Heat Island Reduction/ Roof Total roof area≤ (area of SRI roof x 1.33) + ( area of vegetated roof x 2)]

1 G/H Water Efficient Irrigation SS4 Landscape Coefficient Klandscape = KSpecies x KDensity x Kmicroclimate

SS5 Evapotranspiratin Rate per Region ETL (mm)


= ET0 (mm) x Klandscape

SS6 Total Potable Water Applied (L) TPWA (L) = Area (m2) X ETL (mm)
IE (Irrigation Efficiency)

SS10 Rainwater Volume Collected Rainwater Volume ( L) = Collection area (m2) X Collection Efficiency ( %) X Average Rainfall (mm)

1I Innovative WasteWater Technology SS7 Sewage Volume Sewage Volume Generate (L) = Uses X Duration (mins or flushes) X Water Volume ( L)
Use ( mins or flushe)

(Male Occup X Male Sewage Volume Generated) L (Female Occup X Female Sewage Volume
SS8 Daily Sewage Generation Daily Sewage Generation ( L/day) = + Generated) L

SS9 Annual Sewage Generation Annual Sewage Generation (L) = Daily sewage Genration ( L/day) X Workdays

1J Water Use Reduction 20% or 30% Daily Water Use Daily Water Use ( L/day) = (Male Occup X Male Water Use )L + (Female Occup X Female Water USe) L

Total Annual Water Use Volume Annual Water Use (L) = Daily Water use ( L/day) X Workdays - Grey/Storm Water Reuse
=
1 .K OnSite Renewable Energy SS11 Renewable Energy % Renewable Energy = REC/ DEC

2 Development Density
SS12 Development Density Development Density ( m2/ heactare) = Building are ( m2) / Property Area ( Hectare)

SS13 Density Radius ( m) Density Radius ( m) = 3x √(propety area ( hectares) x 10 000 m2/hectare)

3 .2 Alternate Transportation SS14 Full Time Employee FTE = Worker Hours ( hrs) /8

SS15 Secure Bicycle Spaces Bicycle Spaces = FTE of Tenant Occupants X 5%

SS16 Showering Facilities for Bucycle user Showering Facilities = Bicycle Spaces / 8

prep Teeceetee 11/6/2009


Cagbc LEED CI v1.0 Calculations
Water Efficiency prep: Teeceeetee

Wec 1 Water Reduction Use Daily Water Use Daily Water Use ( L/day) = (Male Occup X Male Water Use )L + (Female Occup X Female Water USe) L

Total Annual Water Use Volume Annual Water Use (L) = Daily Water use ( L/day) X Workdays - Grey/Storm Water Reuse

Energy and Atmosphere


EA1 Installed Lighting Power Installed Interior Lighting Power = (Qunatiy by type of Luminaires) X Rated Wattage by Type Luminaire (watts)
Eac 1 .1 Optimize Energy Performance: Lighting Power
Interior Lighting Power Allowance
EA2
using Building Area Method
Interior Lighting Power Allowance (watts) = Gross Lighted Floor Area ( m2) X Building area Type Lighting Power Allowance (Watts/m2)

Interior Lighting Power Allowance


EA3
using Space by SPace Method
Interior Lighting Power Allowance (watts) = Space Floor Area ( m2) X Space Type Lighting Power Allowance (Watts/m2)

Lighting Power Reduction Achieved Lighting Power reduction achieved


EA4
(watts) (watts)
= Interior Lighitng Power Allowance(watts) - Installed Interior Lighitng Power ( watts)

Lighitng Power rReduction Achieved


EA5
(%) Lighitng Power redcutgions achieved (%) = Lighting Power reduction achieved (watts)
Lighting Power Allowance (watts)

1.3 .3 EA6 %Annual HVAC ECR Baseline Reduction (ECBHVAC - DEC HVAC)
= (EBC hvac) x (Project Area / Total Segment Area)
Optimize Energy Performance -HVAC
EA6 %Annual HVAC ECR Alternative Reduction (A- EBC HVAC - DEC HVAC)
Baseline
= (A- EBC hvac)
∑Total Power in Project ( No of total ∑Energy star Power ( total energy star items x
1.4 .4 Equipment and Appliances Item and its Rated Power Number items in Project Number of Energy Star Items
items x rated power) rated power)

% Energy Star Rated Power = ∑Energy star Power ( total energy star items x rated power)
∑Total Power in Project ( No of total items x rated power)

4 Green Power

Indoor Enviromental Quality thresholds

Eqc 8 .1&.2 Daylight EQ1 Daylight Factor = Window Window area (m2) X Atcutal T vis)
Window Height Factor X Geometry X Floor Area (m2) Min T vis

Eqc 8 .1&.2 Daylight 8 .3 Views

prep Teeceetee 11/6/2009


Cagbc LEED CI v1.0 Calculations
Materials and Resources material credits total cost same for MR 3,4,5,6 thresholds
MRc 1 .2&.3 Building Reuse MR1 Interior Non-Structural Component (Total Retained Components Area m²)
Determination of Maintained Area
Reuse (%)
= Larger of Prior 40%, 60%, 80%
Completed Design Area
Condition or

2 .1&.2 Construction Wate Management MR2 Recycled Waste


Recycling Rate (%) = Recycled 50%, 75%, 95%
Diversion rate Waste + Garbage
Replacement Value of Reused Furniture
and Furnishings

Replacement Value of Reused Furniture and


3 .3 Resource Reuse: Furniture and Furnishings MR3 Salvage Rate for Furnishing and Furnishings
Furniture
Salvaging Rate (%) = Total Value of New and Reused Furniture and
5%, 10%, 15%
Furnishings
Replacement Value of Reused Furniture and
4 .1&.2 Recycled Content MR4 Salvage Rate for Furnishing and Furnishings
Furniture
Salvaging Rate (%) = Total Value of New and Reused Furniture and
10%, 20%, 30%
Furnishings

Material Weight (kg) x Recycled Content (%)


MR5
Assembly Recycled Content Assembly Recycled Content (%) = 10%, 20%, 30%
Total Weight

Portland Cement Content of Base Mix - Portland


MR6 Percentage Portland Cement Percentage Portland Cement Reduction Cement Content inActual SCM Mix ) x 100 x2
Reduction (%)
= 10%, 20%, 30%
Portland Cement Content of Base Mix

Rapidly Renewable Material Portion Cost ($)


6 Rapidly Renewable Materials MR7 5%, 10%
Rapidly Renewable Material Portion Rapidly Renewable Material Portion (%) =
Total Project Material Cost ($)

FSC Certified Wood Material Portion ($)


7 Certified Wood MR8 50%, 95%
Certified Wood Material Portion Certified Wood Material Portion (%) =
Total New Wood Material Cost ($)

MRc 1 .2&.3 Building Reuse 40%, 60%, (EP 80%) Area


MRc 2 .1&.2 Construction Wate Management 50%, 75%, (EP 95%) Volume or Weight
MRc 3 .1&.2 Resource Reuse: 5% or 10% (EP 15%) of Net Construction Material Cost = Total Material Cost- MEP -Div 12
Resource Reuse: Furniture and
MRc 3 .3 Furnishings 30 % (EP 60%) of Division 12 Total = Salvaged FF /Div 12

10% or 20% (EP 30%)of Net Construction Material Cost = Total Material Cost- MEP -Mr 3.1, 3.2, 3.3 + Div 12
MRc 4 .1&.2 Recycled Content

MRc 5 .1&.2 Regional Material 20% (40%) or 10% (20%)of Net Construction Material Cost = Total Material Cost- MEP + Div 12

MRc 6 Rapidly Renewable Materials 5% (EP 10%) of Total Construction Material Cost = Total Material Cost- MEP -Mr 3.1, 3.2,+ Div 12
MRc 7 Certified Wood 50% (95%) of Total wood Cost = Total Wood Cost - MEP -Wood Mr 3.1, 3.2, 3.3 - Mr 4.1 post-consumer wood