Académique Documents
Professionnel Documents
Culture Documents
SECTION A-A
A
1000.770
EXPANTION JOINT
3
0
0
3
0
0
0
5
0
0
FLOW
1
1
0
0
1
6
8
9
8
0
0
3
6
2
0
4
0
0
0
999.800
1
2
5
0
3
5
0
0
4
7
7
0
EXPANTION JOINT
TRASH RACK
1000x1000 SILT REMOVAL GATE
PLAN
A
.3000
R/F CONCRETE PAVING AT GROUNDLEVEL
6
0
0
8
0
0
7
5
0
1000
1
0
0
0
2
5
0
1
6
0
0
5
0
0
0
998
20
1000
Amount
617,573.11
62,062.00
611,397.38
280,989.10
2,644,641.20
2,177,774.69
670,536.00
102,300.00
6,751,382.24
7,650.00
904,500.00
66,330.00
400,000.00
400,000.00
15,297,135.72
764,856.79
16,061,992.51
Capacity of Forbay
Flow - Q(m3/s) = 8
Pipe diameter = 1.53 m
Appo. water level (minimum) above penstock pipe = 2.3 m
Time of capacity required turbine operation = 0.45 min
Capacity of FORBAY tank = 216 m3
Dimention of Forbay (Effective Area)
Length = 20 m
Height above the water = 2.1 m
Width = 4 m
Volume = 168 m3
Sedimantation tank
OPTION 2
Width - (m ) 6
Length - (m) 12.2
Height -(m) 1.2
Sedimentation tank capacity 65.88 m3
233.88 m3
Canal capacity 0 m
0.6 m
3.6 m
0 m3
SPILL = <8000>
6
0
SECTION A-A
A
1000.770
EXPANTION JOINT
3
0
0
3
0
0
0
5
0
0
FLOW
1
1
0
0
1
6
8
9
8
0
0
3
6
2
0
4
0
0
0
999.800
1
2
5
0
3
5
0
0
4
7
7
0
EXPANTION JOINT
TRASH RACK
1000x1000 SILT REMOVAL GATE
PLAN
A
.3000
R/F CONCRETE PAVING AT GROUNDLEVEL
6
0
0
8
0
0
7
5
0
1000
1
0
0
0
2
5
0
1
6
0
0
5
0
0
0
998
20
1000
( to prevent vortex forming)
160 187 212
253