Vous êtes sur la page 1sur 5

TABLE OF CONTENTS

1. SCOPE ......................................................................................................................................3
2. DEFINITIONS ........................................................................................................................3
3.REFERENCES ........................................................................................................................3
4.RESPONSIBILITIES ...........................................................................................................3
5. PERSONNEL QUALIFICATIONS ..................................................................................4
6.EQUIPMENT..........................................................................................................................4
7. PROCEDURE.........................................................................................................................4
8. SAFETY....................................................................................................................................5
9. DOCUMENTATION AND REPORTING OF TEST RESULTS .............................5
1. SCOPE
This procedure is to establ ish ferri te content in weldents and clad la!ers of austeni ti c
and duple" stainless steels. This procedure sets forth the ini u re#ui reents to be
obser$ed for ferri te easureent b! usin% Fisher &nstruent ' s odel FE(&TSCOPE )P*+.
This instruent shall be suitabl e for ferri te content easureent in weld etal and clad
la!ers of austeni ti c and duple" stainless steels.
,. -EF&N&T&ONS
FCM. Ferrite Content )easureent
NDT . Non -estructi $e Testin%
QAM. /ualit! Assurance )ana%er
Unit of Measurement . 0nit used for easureent displa!. &n ferri te content
easureent1 the coon uni ts of easureent are point count ferri te 2Fe 34 or ferri te
nubers 2FN4.
Measuri ng Object . Ob5ect on which the easureents are perfored to deteri ne the
ferri te content.
Calibrati on standards (ferri te standards) . Ob5ects with the sae attri butes as the
easuri n% ob5ect with 6nown ferri te contents. The ferri te content of the calibrati on
standards shall be easured with an e"treel ! accurate test ethod.
Calibrati on standard set . The calibrati on standard set used for the calibrati on of the
FE(&TSCOPE )P*+ consists of a base and three calibrati on standards of different 6nown
ferri te contents.
Normalisati on . Ad5ustents of the easuri n% instruent to a new 7ero $alue.
*. (EFE(ENCES
Latest re$isions of the followi n% docuents shall be referred to in con5uncti on with this
procedure.
Codes and Standards
ANS&8A9S A:.,) 8 A:., 21;;<4. Standard procedures for calibrati n% a%neti c
instruents to easure the delta ferri te content of austeni tic and duple" ferri te=
austeni ti c stainless steel weld etal
-raft re$ision of &SO >,:; ? 1;>@ 2E4 and && ? C ? +,* ? ;: weldi n% ? deteri nati on of
ferri te nuber in austeni tic and duple" ferri te austeni te Cr=Ni stainless steel weld etal1
&&9 docuent && 1,A; ? ;@ 2&&=C=+*:= ;@4
AST) B:;;. Standard test ethod for easureent of coatin% thic6ness b! a%neti c
ethod. non= a%neti c coatin%s on a%neti c base etals
TC !nternal Document at i on
TC(=/)S. /ualit! Assurance S!stes )anual
TC(=BSE. TC( Safet! )anual
TC( 9ritten Practice for traini n%1 #ualificati on1 and certificati on of N-T personnel
:. (ESPONS&B&L&T&ES
TC( site in char%e shall be responsi bl e for the control1 coordi nati on and -ocuentati on
of all ites tested for FC) as per the schedul e recei $ed fro client. TC( site in char%e
will ensure effecti $e couni cati on is ai ntai ned with the client with respect to the
assi%ned FC) Testin% pro5ect.
The N-T Controll er dele%ated for the control and coordinati on of N-T acti $i ti es shall
issue the FC) &nspector with a dail! wri tten list of aterials read! for inspecti on.
The FC) &nspector shall be responsible for conducti n% and reporti n% the results of
inspection is accordance with this present Procedure.
@. PE(SONNEL /0AL&F&CAT&ONS
Onl! trained personnel shall underta6e the operati on and interpretati on of recorded
resul ts to ensure that both the procedure and the wor6 are ipl eented correctl ! in
order to identi f ! 8 $erif! the noi nal ateri al coposi ti ons.
The followi n% %uideli nes shall be used for the efficient and safe FC) operati ons.
TC( Personnel. Selected on the basis of pre$i ous wor6 e"peri ence.
Crew coposi ti on is noral l ! coposed of a Site= in= char%e1 and one or ore
FC) technicians.
The custoer will be pro$i ded opportuni t ! to re$iew the e"perience details of
FC) technicians.
A. E/0&P)ENT
Fis"er !nstrument # s model F$!TSCO%$ M%&'
The e#ui pent used to easure the ferri te content shall be FE(&TSCOPE )P*+ which
shall %i$e di%i tal read out of the $alue either in 3 Fe or FN. This instruent uses the
a%neti c induction test ethod whereb! the ferri te content shall be obtai ned fro the
a%neti c pereabi l i t !.
<. P(OCE-0(E
A. S0(FACE (E/0&(E)ENTS
The ob5ect on which the ferri te content shall be easured shall be %round flat and free
of %rease1 dirt etc. Sooth polished surface for testi n% id ore preferabl e. There shall
not be an! ite or the li6e near the ob5ect1 which shall interfere with the a%neti c
characteristi cs of the instruent.
B. CAL&B(AT&ON
Before start of the actual easureent on the ob5ect1 switch on the instruent and the
noral isati on and calibrati on shall be perfored usin% the base and the calibrati on
standards set as per the anufacturers' e#uipent anual.
C. )ETBO-
i. The probe shall be placed $ertical l ! on the surface of the easuri n% ob5ect to
perfor the easureent.
ii. The easureent shall be perfored withi n the reference area.
iii. On obser$ati on of readi n% as it appears in the displa!1 the probe can be shifted
to ne"t area of interest as re#uired.
i$. The probe shall be lifted at least @+ 2,C4 fro the easuri n% ob5ect between
readin%s.
-. )EAS0(E)ENT FACTO(S
The followi n% factors affect the ferri te content easureent with the FE(&TSCOPE )P*+
instruent.
a4 Cur$ature of the easuri n% ob5ect
b4 Thic6ness of the easuri n% ob5ect
c4 La!er thic6ness
d4 -istance of the easuri n% position to the ed%e.
E. CO((ECT&ON FACTO(
The effect of these factors shall be corrected b! ul ti pl !i n% the easured ferri te
content with the correspondi n% correction factors. The e#uipent operation anual
describes in detail the situati ons1 which warrants the applicati on of correction factors.
>. SAFETD
Onl! trained personnel shall use this instruent. Care ust be ta6en when clibi n% on
scaffol di n%s.
;. -OC0)ENTAT&ON AN- (EPO(T&NE OF TEST (ES0LTS
Each e"ai nati on or sur$e! shall be reported in the attached for. An a$era%e of three
or fi$e readi n%s dependi n% on the Client's re#uireent shall be reported as 3 Fe or FN
for that particular reference ob5ect.

Vous aimerez peut-être aussi