HOW TO USE THIS TEMPLATE:

Introduction
The template reflects the steps set out in the PRINCE2 Method and is
designed to prompt the Project Manager and help in the creation of the Work
Package. The information for the Work Package will be found within the
Controls Section of the PRINCE2 Manual. There is also a Product
Description for the Work Package at Appendix A of the PRINCE2 Manual.
Loading the file
This template has been produced using Microsoft Word 97. To use it, load up
the file directly from the directory and starting from page 1 follow the prompts
(in [...] brackets).
Deleting the [....] text
When the template is complete, the whole Work Package document can be
printed and approved.
Prior to printing, you should delete all [....] prompt text.
Saving the Work Package document under its own name
Save the Work Package document by selecting the SAVE-AS command;
this will avoid overwriting the standard template. You must specify your own
Project Directory.
Once your Work Package Document is completed check the document
against the following Quality Criteria:
Is the required Work Package clearly defined and understood by the
assigned resource?
Is there a Product Description for the required product(s) with clearly
identifiedand acceptable quality criteria?
Does the Product Description match up with the other Work Package
documentation?
Are standards for the work agreed?
Are the defined standards in line with those applied to similar products?
Have all necessary interfaces been defined?
Do the reporting arrangements include the provision for exception
reporting?
Is there agreement between the Project Manager and the recipient on
exactly what is to be done?
Is there agreement on the constraints, including effort, cost and
targets?
Are the dates and effort in line with those shown in the Stage Plan?
Are reporting arrangements defined?
Is any requirement for independent attendance at, and participation in,
quality checking defined?
PROJECT DOCUMENTATION
WORK PACKAGE
Project:
Release:
Date:
Team/Person
Authorised:
PRINCE2
Author:
Owner:
Insert Project Name
Work Package
Date: 22 March 2010
Client:
Document Ref:
Version No:
Page 2
Insert Project Name
Work Package
Date: 22 March 2010
1 Work Package History
1.1 Document Location
This document is only valid on the day it was printed.
The source of the document will be found on the project's PC in location
1.2 Revision History
Date of this revision:
Date of Next revision:
Revision
date
Previous
revision
date
Summary of Changes Changes marked
First issue
1.3 Approvals
This document requires the following approvals.
Signed approval forms are filed in the Management section of the project files.
Name Signature Title Date of
Issue
Version
1.4 Distribution
This document has been distributed to:
Name Title Date of
Issue
Version
Page 3
Insert Project Name
Work Package
Date: 22 March 2010
2 Table of Contents
Page
1 Work Package History 1
1.1 Document Location 1
1.2 Revision History
1.3 Approvals
1.4 Distribution
2 Table of Contents
3 Purpose
4 Work Package Description
5 Product Description(s)
6 Techniques/Processes/Procedures
7 Interfaces
8 Quality Checking Method
9 Configuration Management Requirements
10 Stage Plan Extract
11 Agreements
12 Sign-Off Requirements
13 Work Return Arrangements
14 Completion
15 Constraints
16 Independent Quality Checking Arrangements
17 Reporting
18 Problem Handling and Escalation
Page 4
Insert Project Name
Work Package
Date: 22 March 2010
Work Package
3 Purpose
[A Work Package is a set of information about one or more required products collated by
the Project Manager to pass responsibility for work or delivery formally to a Team
Manager or team member]
4 Work Package Description
5 Product Description(s)
[Each with clearly identified and acceptable quality criteria]
6 Techniques/Processes/Procedures
[State which are to be used]
7 Interfaces
[Interfaces to be maintained during the work and satisfied by the work]
8 Quality Checking Method
[State which are to be used]
9 Configuration Management Requirements
[Identify the individual sub-products of the final product. Identify those products that will
be required in order to produce other products]
10 Stage Plan Extracts
[Include the extract form the Stage Plan that the products relate to]
11 Agreements
[Joint agreement on effort, cost, start and end dates]
Page 5
Insert Project Name
Work Package
Date: 22 March 2010
12 Sign-Off Requirements
[State who will be responsible for sign-off for completed products]
13 Work Return Arrangements
[For the return of products on completion]
14 Completion
[State how completion is to be advised]
15 Constraints
[Any constraints to be observed]
16 Independent Quality Checking Arrangements
17 Reporting
[State the arrangements for reporting progress including method and frequency]
18 Problem Handling and Escalation
[Risk identification and what to do when they do occur]