SCOTT LIGGETT, PE DIRECTOR OF PUBLIC PROJECTS & FACILITIES/CHIEF ENGINEER
MAY 12, 2014
Health, Safety, Welfare Projects
Ward 1 Sewer Projects $ 3,400,000 Roadway Improvements $30,750,000 Fire Station 2 Replacement $ 3,000,000
Lifestyle/Recreation Projects
Island Recreational Center Expansion $ 6,905,000 Arts Center of the Carolinas Rehabilitation and Restoration $ 5,000,000 Multi-use Pathways $ 6,250,000 Recreation Facility Rehabilitation and Restoration $ 5,000,000
Total $60,305,000
2
CANDIDATE PROJECTS TOWN OF HILTON HEAD ISLAND
THE ISLAND ECONOMY IS PRIMARILY DRIVEN BY TOURISM AND REAL ESTATE WITH VISITORS ANNUALLY CONTRIBUTING MORE THAN $1 BILLION DOLLARS TO THE ECONOMY.
Other sources of funding? Yes, but considered overly burdensome to property owners.
Will the project create revenue? Yes, via development/redevelopment opportunities
Maintenance/personnel costs? Provided by HHPSD via user fees on a cost-of-service basis.
Create jobs? Yes
Help Beaufort County as a whole? Yes
Cost/Benefit Study? No
3 WARD ONE SEWER PROJECTS
Description: Expansion of sewer line network within the Hilton Head Public Service District.
Estimated Cost - $3,400,000
Benefits: Enhanced protection of public and environmental health, marketability of affected properties.
Other sources of funding? Federal ? SCDOT ?
Will the project create revenue? No
Maintenance/personnel costs? Provided by SCDOT
Create jobs? Short term design/construction. Long term enhancements across all facets of HHI economy.
Help Beaufort County as a whole? Yes
Cost/Benefit Study? No
4 US 278 ENTRY CORRIDOR IMPROVEMENTS BLUFFTON PARKWAY PHASE 5A TO SQUIRE POPE ROAD
Description: US 278 Ingress/Egress improvements at Pinckney Island NWR and Jenkins Island and concept development, analysis, design, permitting and land acquisition for causeway improvements, Bowers and Graves Bridge replacement and potential roadway expansion and realignment.
Estimated Cost 23,500,000
Benefits: In the short term enhanced safety, access and efficiency for more than 50,000 vehicles/day. In the long term necessary replacement of public infrastructure which is approaching the end of its useful design life.
Other sources of funding? Yes, through Towns CIP. May necessitate bond issue or millage increase. SCDOT ??
Will the project create revenue? No. But has positive financial impact as a result of reduced delay/congestion for motorists.
Maintenance/personnel costs? To be borne by SCDOT.
Create jobs? Short term design/construction.
Help Beaufort County as a whole? Yes
Cost/Benefit Study? No
5 WM. HILTON PARKWAY / SQUIRE POPE ROAD INTERSECTION IMPROVEMENTS
Description: Construction of a third westbound through lane at signalized intersection. Intended to be made part of the project endorsed by voters in 2006. Only signalized intersection between Cross Island Parkway and Highway 170 with less than 3 through lanes.
Estimated Cost - $500,000
Benefits: Enhanced safety and efficiency for approximately 50,000 vehicles/day that move through the intersection. 6
Other sources of funding? Yes, for Town owned roads through CIP or operating budget. May necessitate bond issue or millage increase. SCDOT ??
Will the project create revenue? No
Maintenance/personnel costs? To be borne by road owner, Town or SCDOT respectively.
Create jobs? Short term construction.
Help Beaufort County as a whole? Yes
Cost/Benefit Study? No
7 ROADWAY RESURFACING AND PAVING
Description: Resurfacing of State and Town owned paved roads, paving of Lawton Beach Subdivision Roads, (South Forest Beach).
Estimated Cost - $5,500,000
Benefits: Maintains expected level of service, enhanced safety and efficiency of movement for motoring public.
8
Other sources of funding? Yes, through Towns CIP. May necessitate bond issue or millage increase.
Will the project create revenue? Yes, indirectly through engine of adjacent public/private land use.
Maintenance/personnel costs? To be borne by Town, SCDOT or private interests.
Create jobs? Short term design and construction. Long term positive impact associated with successful redevelopment
Help Beaufort County as a whole? Yes
Cost/Benefit Study? No
9 WM. HILTON PARKWAY / SHELTER COVE TOWN CENTER IMPROVEMENTS
Description: Intersection improvements at Wm. Hilton Parkway / Shelter Cove Lane (3 locations). Involves potential signalization, turning lanes median improvements and pedestrian /bicycle connectivity.
Estimated Cost $1,250,000
Benefits: Enhanced safety, access and efficiency for motoring public and patrons of the redevelopment. Will serve marquis public event space Shelter Cove Park.
Other sources of funding? Yes, through Towns CIP. May necessitate bond issue or millage increase.
Will the project create revenue? No
Maintenance/personnel costs? To be borne by Town.
Create jobs? No
Help Beaufort County as a whole? Yes
Cost/Benefit Study? No, but need identified via approved Fire Rescue Masterplan
10 FIRE STATION #2 (SEA PINES) REPLACEMENT
Description: Replacement of 30+ year old Fire Station which serves Sea Pines Resort.
Estimated Cost - $3,000,000
Benefits: Ensures long term adequacy of public safety and emergency response to Sea Pines Resort.
Other sources of funding? Yes, via Towns CIP. May necessitate bond issue or millage increase.
Will the project create revenue? Yes
Maintenance/personnel costs? To be borne by Town/Island Recreation Association.
Create jobs? Yes
Help Beaufort County as a whole? Yes
Cost/Benefit Study? No
11 ISLAND RECREATION CENTER EXPANSION
Description: Construction of a new gymnasium, expanded parking, office and changing room renovations, plus enclosure for existing pool. Replacement of 3 basketball courts and ROTC drill field displaced by improvements.
Estimated Cost - $6,905,000
Benefits: Current facility has outlived its useful life. Allows for the provision of adequate recreational opportunities programs for the current population/demographics. 12
Other sources of funding? Yes, through Towns CIP. May necessitate bond issue or millage increase.
Will the project create revenue? Yes
Maintenance/personnel costs? To be borne by Arts Center.
Create jobs? Yes
Help Beaufort County as a whole? Yes
Cost/Benefit Study? No
13 ARTS CENTER OF THE CAROLINAS REHABILITATION AND RESTORATION
Description: Deferred maintenance on existing Arts Center Building (HVAC, mechanical systems, roof) Completion of future needs assessments and studies.
Estimated Cost - $5,000,000
Benefits: Arts and Cultural activities are of significant importance. This includes festivals, community activities and events, programming, personal participation, and facilities. There is a desire to see Hilton Head Island as a destination for premiere arts and cultural experiences. The priority should be cultural development for residents, while benefiting visitors and tourists.
Other sources of funding? Yes, via the Towns CIP. May necessitate bond issue or millage increase.
Will the project create revenue? No
Maintenance/personnel costs? To be borne by Town.
Create jobs? Short term design/construction. Long term indirect
Help Beaufort County as a whole? Yes
Cost/Benefit Study? No
14 MULTI USE PATHWAYS
Description: Construction of approximately 6.9 miles of multi use pathways on Hilton Head Island. Would expand the Islands pathway network providing continuous facilities along Wm. Hilton Parkway to the Graves Bridge. Augments and provides connectivity to the Towns almost 60 mile pathway network.
Estimated Cost - $6,250,000
Benefits: Expansion of award winning pathway program. Provides enhanced recreational and commuter facilities. Encourages healthy life-style, provides added attraction for visitors.
15
Other sources of funding? Yes, via Towns CIP or operating budget. May necessitate bond issue or millage increase. County ??
Will the project create revenue? Yes
Maintenance/personnel costs? To be borne by Town and County
Create jobs? Short term
Help Beaufort County as a whole? Yes
Cost/Benefit Study? No
16 RECREATIONAL FACILITY REHABILITATION AND RESTORATION
Description: Building, parking, field enhancements Crossings Park, Chaplin Park and Barker Field.
Estimated Cost - $5,000,000
Benefits: Allows for improved programming and enhanced use of aging public recreational facilities.
17
Health, Safety, Welfare Projects
Ward 1 Sewer Projects $ 3,400,000 Roadway Improvements $30,750,000 Fire Station 2 Replacement $ 3,000,000
Lifestyle/Recreation Projects
Island Recreational Center Expansion $ 6,905,000 Arts Center of the Carolinas Rehabilitation and Restoration $ 5,000,000 Multi-use Pathways $ 6,250,000 Recreation Facility Rehabilitation and Restoration $ 5,000,000
Total $60,305,000
18
CANDIDATE PROJECTS TOWN OF HILTON HEAD ISLAND
THE ISLAND ECONOMY IS PRIMARILY DRIVEN BY TOURISM AND REAL ESTATE WITH VISITORS ANNUALLY CONTRIBUTING MORE THAN $1 BILLION DOLLARS TO THE ECONOMY.