HISTORICAL PRODUCTIONS ANALYSIS, DECLINE ANALYSIS AND INCREMENTAL
CALCULATION OF CHEMICAL INJECTION TANJUNG FIELD ZONE C.
1. Productions Analysis

1.1. Historical Productions Data Before Injection









Figure I-1.
Historical Production of Zone C Before Chemical Injection

From the figure above show that average oil rate of Zone C is 80 bbl/day on last production
before chemicals injection, the oil cut is decline slowly from 0.14 until 0.04 on november
2012, and the water cut also increase until 96.48 % was reached on november 2012.
















Figure I-2.
Historical Production of Well T-027 Before Chemical Injection



Menara Kadin Indonesia Lt. 26 Suite E Telephone : 021 - 5274714
Jl. HR. Rasuna Said Kav. X-5, No. 2 3 Fax : 021 - 5274761
Jakarta 12950 Web : www.indospec.com

Oil rate of well T-027 is 13.09 bbl/day on november 2012 , the oil cut is decline slowly until
reached 0.03 on november 2012, and water cut before chemical injection is 96.50 %.











Figure I-3.
Historical Production of Well T-060 Before Chemical Injection

Oil rate of well T-060 is 0.15 bbl/day on november , the oil cut is decline until reached 0.01
on november 2012, and water cut before chemical injection is 98.56 %.











Figure I-4.
Historical Production of Well T-062R Before Chemical Injection


Menara Kadin Indonesia Lt. 26 Suite E Telephone : 021 - 5274714
Jl. HR. Rasuna Said Kav. X-5, No. 2 3 Fax : 021 - 5274761
Jakarta 12950 Web : www.indospec.com


Oil rate of well T-062R is 21.12 bbl/day, the oil cut is decline slowly until reached 0.04 on
november 2012, and water cut before chemical injection is 96.01 %.











Figure I-5.
Historical Production of Well T-121 Before Chemical Injection

Oil rate of well T-121 is 33.92 bbl/day, the oil cut is decline slowly until reached 0.03 on
november 2012, and water cut before chemical injection is 96.69 %.

1.2. Historical Production Data After Chemical Injection











Figure I-6.
Historical Production of Zone C After Chemical Injection


Menara Kadin Indonesia Lt. 26 Suite E Telephone : 021 - 5274714
Jl. HR. Rasuna Said Kav. X-5, No. 2 3 Fax : 021 - 5274761
Jakarta 12950 Web : www.indospec.com

From the figure above show that surfactant + NaCl + Alkaline injection is start on december
2012, effect of chemical injection is monitor in well T-027, T-060, T-062R and also in well
T-121. Chemical injection is caused oil cut is increase from 0.04 to 4.5 (4.45 %) during two
month after chemical injection and slowly decrease until 3.4 during one year monitoring.
The chemical injection effect is also caused dynamic fluid level increase during two month
after chemical injection and decrease significantly on february until june, after that the
dynamic fluid level was increased from july until march with average value 730 m. There no
significant effect of chemical injection on water cut, before injection the water cut is 96.48
and after chemical injection water cut decreased just only 0.0012 % or 96.60 in value.











Figure I-7.
Historical Production of Well T-027 After Chemical Injection

Chemical injection effect on well T-027 is show in figure I-7, from the figure is also show
that chemical injection effect caused oil cut was increased 3 %, the oil cut of well T-027
before chemical injection is 0.03 % and after chemical injection the oil cut is increased until
3.2 %. Another effect of chemical injection is show on dynamic fluid level was significantly
increased (on the above figure is show on black line).












Menara Kadin Indonesia Lt. 26 Suite E Telephone : 021 - 5274714
Jl. HR. Rasuna Said Kav. X-5, No. 2 3 Fax : 021 - 5274761
Jakarta 12950 Web : www.indospec.com











Figure I-8.
Historical Production of Well T-060 After Chemical Injection

Chemical injection effect on well T-060 is show in figure I-8, from the above figure is also
show that chemical injection effect caused oil cut was increased 1.15 %, the oil cut of well
T-060 before chemical injection is 0.15 % and after chemical injection the oil cut is
increased until 1.3 %. Another effect of chemical injection is show on dynamic fluid level
was significantly increased (on the above figure is show on black line).










Figure I-9.
Historical Production of Well T-062R After Chemical Injection



Menara Kadin Indonesia Lt. 26 Suite E Telephone : 021 - 5274714
Jl. HR. Rasuna Said Kav. X-5, No. 2 3 Fax : 021 - 5274761
Jakarta 12950 Web : www.indospec.com

In the figure above show that chemical injection effect on well T-062R, chemical injection
effect caused oil cut was increased 3.96% on two month after injection, slowly decrease to
1.96% until november 2013 and increase until 3.95% during december until march. The
dynamic fluid level is also increased on two month after chemical injection and slowly
decrease during february until march.













Figure I-10.
Historical Production of Well T-121 After Chemical Injection

In the figure above show that chemical injection effect on well T-121, chemical injection
effect caused oil cut was increased 5.07% on two month after injection, slowly decrease to
2%-3.5% .The dynamic fluid level is also increased on two month after chemical injection
and slowly decrease during february until march.














Menara Kadin Indonesia Lt. 26 Suite E Telephone : 021 - 5274714
Jl. HR. Rasuna Said Kav. X-5, No. 2 3 Fax : 021 - 5274761
Jakarta 12950 Web : www.indospec.com

2. Chan's Diagnostic Analysis












Figure I-11.
Chan's Diagnostic Analysis for Well T-027

Chan's diagnostic analysis conducted to analyze production problem in each monitoring
well, in figure above show that in well T-027 have near wellbore water channeling, plot
between WOR and WOR derivative versus cumulative days of production resemble with
near wellbore water channeling that analyzed by Chan's.










Figure I-12.
Chan's Diagnostic Analysis for Well T-060


Menara Kadin Indonesia Lt. 26 Suite E Telephone : 021 - 5274714
Jl. HR. Rasuna Said Kav. X-5, No. 2 3 Fax : 021 - 5274761
Jakarta 12950 Web : www.indospec.com

Chan's diagnostic analysis conducted to analyze production problem in well T-060 have
near wellbore water channeling, plot between WOR and WOR derivative versus cumulative
days of production resemble with near wellbore water channeling that analyzed by Chan's.











Figure I-13.
Chan's Diagnostic Analysis for Well T-062R











Figure I-14.
Chan's Diagnostic Analysis for Well T-121



Menara Kadin Indonesia Lt. 26 Suite E Telephone : 021 - 5274714
Jl. HR. Rasuna Said Kav. X-5, No. 2 3 Fax : 021 - 5274761
Jakarta 12950 Web : www.indospec.com


3. IFT Analysis











Figure I-15.
Average IFT in Mixer











Figure I-16.
Average IFT in Monitor Well






Menara Kadin Indonesia Lt. 26 Suite E Telephone : 021 - 5274714
Jl. HR. Rasuna Said Kav. X-5, No. 2 3 Fax : 021 - 5274761
Jakarta 12950 Web : www.indospec.com



3. Decline Analysis Pattern (T-027, T-060, T-062R, T-121) Zone C












Figure I-17.
Historical Production of Zone C (Pattern Only)

3.1 Chi-Square Test Analysis
Base on Chi-Square Test analysis decline for Zone C show that the type of decline is
Hyperbolic with b = 0.5 and decline rate (Di = 0.03235). So the Base Line is calculate with
hyperbolic type.










b
i
bDit
q
q
1
1



Menara Kadin Indonesia Lt. 26 Suite E Telephone : 021 - 5274714
Jl. HR. Rasuna Said Kav. X-5, No. 2 3 Fax : 021 - 5274761
Jakarta 12950 Web : www.indospec.com



Table I-1.
Base Line Calculation for Zone C

b 0,5 SKENARIO 1
Di 0,032358595 BASE CASE
t DAY Q Before Q FORECAST
Okt-12 1.827,54
1 Nop-12 2.048,43
2 Des-12 1.922,03
3 Jan-13 1.863,17
4 Feb-13 1.806,97
5 Mar-13 1.753,28
6 Apr-13 1.701,95
7 Mei-13 1.652,84
8 Jun-13 1.605,83
9 Jul-13 1.560,79
10 Agust-13 1.517,62
11 Sep-13 1.476,22
12 Okt-13 1.436,49
13 Nop-13 1.398,34
14 Des-13 1.361,69
15 Jan-14 1.326,46
16 Feb-14 1.292,59
17 Mar-14 1.259,99
18 Apr-14 1.228,61
19 Mei-14 1.198,39
20 Jun-14 1.169,27
21 Jul-14 1.141,20
22 Agust-14 1.114,13
23 Sep-14 1.088,01
24 Okt-14 1.062,80
25 Nop-14 1.038,45
26 Des-14 1.014,94





Menara Kadin Indonesia Lt. 26 Suite E Telephone : 021 - 5274714
Jl. HR. Rasuna Said Kav. X-5, No. 2 3 Fax : 021 - 5274761
Jakarta 12950 Web : www.indospec.com












Figure I-18.
Base Line of Zone C Base on Chi-Square Test

3.2. Forecasting of Chemical Flood Injection.

Table I-2.
Historical Production Data After Chemical Injection

Date Qo (bbl)
Des-12 2.478,76
Jan-13 2.430,60
Feb-13 1.072,72
Mar-13 1.269,32
Apr-13 1.306,87
Mei-13 1.347,95
Jun-13 1.461,98
Jul-13 1.461,85
Agust-13 1.275,18
Sep-13 1.154,36
Okt-13 1.187,89
Nop-13 1.122,74
Des-13 1.858,40
Jan-14 2.053,07
Feb-14 1.523,07


Menara Kadin Indonesia Lt. 26 Suite E Telephone : 021 - 5274714
Jl. HR. Rasuna Said Kav. X-5, No. 2 3 Fax : 021 - 5274761
Jakarta 12950 Web : www.indospec.com















Figure I-19.
Actual Data Production Vs Base Line
























Menara Kadin Indonesia Lt. 26 Suite E Telephone : 021 - 5274714
Jl. HR. Rasuna Said Kav. X-5, No. 2 3 Fax : 021 - 5274761
Jakarta 12950 Web : www.indospec.com




3.3. Incremental Calculation.

INCREMENTAL CALCULATIONS
MONTH
BASE
LINE
SURFACTANT INCREMENTAL
BOPM BOPM BOPM
Des-12 1.922,03 2.478,76 556,73
Jan-13 1.863,17 2.430,60 567,43
Feb-13 1.806,97 1.072,72 -734,25
Mar-13 1.753,28 1.269,32 -483,96
Apr-13 1.701,95 1.306,87 -395,08
Mei-13 1.652,84 1.347,95 -304,89
Jun-13 1.605,83 1.461,98 -143,84
Jul-13 1.560,79 1.461,85 -98,94
Agust-13 1.517,62 1.275,18 -242,44
Sep-13 1.476,22 1.154,36 -321,86
Okt-13 1.436,49 1.187,89 -248,59
Nop-13 1.398,34 1.122,74 -275,60
Des-13 1.361,69 1.858,40 496,71
Jan-14 1.326,46 2.053,07 726,60
Feb-14 1.292,59 1.523,07 230,49

TOTAL -671,49