INSTALLATION PROCEDURE


Methods in preparation of Foundation

Installation of Column onto Foundation

Column & Beam Installation

Installation of Steel Staircase

Roof Installation

Floor Installation

Column & Beam Cladding Installation

Wall Panel & Ceiling Installation

SP Board & External Wall (ALC) Installation

Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
2

INSTALLATION PROCEDURE


Methods in preparation of Foundation:

1) Foundation bolts in Concrete Slabs. (Fig 1.1)


2) Bolts in Concrete Columns. (Fig 1.2)



#Length and size of bolts used depends on weight of complete structure

A) Installation of Column onto foundation:
Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
3


1) Level check for individual connection. (Fig 1.3)


(Fig 1.3)



2) Installation of Individual Column onto foundation bolts. (Fig 1.4)



(Fig 1.4)


Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
4


3) Tightening using proper torque wrench sets. (Fig 1.5)

(Fig 1.5)




B) Column & Beam Installation:

1) Connection plates for Column to Beam. (Fig 1.6)

(Fig 1.6)





Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
5


2) Connection of Beam to Column using HSB M16 Bolt & Nut c/w washer.

(Fig 1.7)
4) Connection plates for Column to Column.

(Fig 1.8)

5) Connection of Top Span Columns using HSB M16 Bolt & Nut c/w washer.
(Fig 1.9)
#Tightening usingproper torque wrench sets. Refer to individual Data for Torque Strength.
Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
6


C) Installation of Steel Staircase:

1) Installation of brackets for stair.


(Fig 2.0)




2) Connection of Step Board.



(Fig 2.1)




Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
7


3) Installation of stairs landing. (Fig 2.2)


4) Repeat steps to get the other half section of stairs. (Fig.2.3)



5) Tightening of all bolts and nuts. (Fig 2.4)


Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
8


D) Roof Installation:
1) Set Roof Pattern ( Z PURLIN). (Fig 2.5 )



2) Laying of Aluminum Foil follow by Rock Wool (12kg/ m3) respectively. (Fig 2.7)












Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
9

3) Assemble of Facial Board. (Fig 2.6 )


4) Place roof panels in order & fasten by using 32mm Hexagon Head Self Drilling
Screw. (Fig 2.8)



5) Place Ridge Capping in order & fasten with Bind Rivets. ( All physical holes
drilled must be covered by application of Roof Silicone). (Fig 2.9)

Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
10


E) Floor Installation:
1) Floor support Beams. (Fig 3.0)




2) Assemble Floor Frame System (C PURLIN) and fasten with Bolts & Nuts
c/w washer accordance to diagram.(Step 1). (Fig 3.1)









Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
11





3) Assemble Floor Frame System (C PURLIN) and fasten with Bolts & Nuts
c/w washer accordance to diagram.(Step 2). (Fig 3.2)
.



4) Application of GX-adhesive 282 to the surface before laying of besta board (Fig 3.3)







Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
12


5) Installation of lower layer Besta Floor Board . (Fig 3.4)
Securing of besta Board using screws against C purlin
Apply next layer of GX-adhesive ready to install next upper layer of besta floor board.






6) Installation of upper layer of besta board. (Fig 3.5)







Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
13


F) Column & Beam Cladding Installation:
1)
2) Column Cladding Steps. (Depends on Individual Countries Requirements, exposed
Steel Columns to be covered with MGO Board for Fire Proofing Purpose). (Fig 3.6)






3) Installation of Column Web using 18mm Besta Board. (1m spacing between).
(Fig 3.7)






Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
14


7) Covering of expose Steel Column using 12mm Besta Board and fasten with 25mm
(using pneumatic air gun) nails. (Fig 3.8)








4) Beam Cladding. Using similar installation methods. (Fig 3.9)






Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
15


G) Wall Panel & Ceiling Installation:

1) Partition Walls and Ceiling can commence/start once completion of floor
boards, Column and Beam Cladding are in place. (Fig 4.0)





2) Lay U Stud (Top & Bottom) and fasten with 3omm Hexagon Head Nut Self drilling
screw. (each screw distance 500mm between). (Fig 4.1)


#Internal wall U-Stud 50*50*0.6mm
#External wall- U-Stud 75*50*0.6mm


Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
16


3) Laying of Aluminum U-stud (Distance 600mm between) & fasten together using
Metal Splitter Tool (Hand Tool). (Fig 4.2)



#Internal wall C KEEL 50*50*0.6mm
#External wall- C KEEL 75*50*0.6mm

4) Mount 10mm Besta Board wall using 22mm self embedding Head self drill
screw to fasten Besta Board to Wall Frame. (Fig 4.3)




Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
17

5) Before mounting adjacent Besta Board, applies Contact Adhesive (GX-Adhesive
282) to the gap to bond the 2 board together. (Fig 4.4)



6) Before install opposite Besta Board, put Rock Wool (40kg/m3) into wall Frame.
(Internal Wall use 50mm thick (40kg/m3) Rock Wool and External Wall use 75mm thick
(40kg/m3) Rock Wool ). (Fig 4.5)



Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
18


7) Seal gap and screw holes using GX-Fix 269 Putty (apply 2 layers) (Fig 4.6)



8) Then smooth the uneven surface with sandpaper for finishing. (Fig 4.7)










Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
19

9) Ceiling Boards are mounted to bottom of floor frames (C PURLIN) and fasten
with 22mm self embedding head self drill screw. (Fig 4.8)

10) Before mounting adjacent Besta Board, applies Contact Adhesive (GX-Adhesive
282) to the gap to bond the 2 board together. (Fig 4.9)

11) Seal gap and screw holes using U-Fix 269 Putty (apply 2 layers) then smooth the
uneven surface with sandpaper for finishing. (Fig 5.0)
Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
20

H) SP Planks & External wall (ALC panel) Installation:
12) Steel beams spread strips tapping nail links. (Rubber Strip) (Fig 5.1)

13) Install SP Planks. step 1 ( Fig 5.2)

14) Install next SP Planks. step 2 ( Fig 5.3)

Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
21

15) Insert poly foam in between SP Planks ( Fig 5.4)

16) Filling up gaps with mortar,. ( Fig 5.4)

17) Install mounting brackets. ( Fig 5.4)


Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
22

18) Install holding brackets. ( Fig 5.4)

19) Installation of ALC panel. (STEP 1) ( Fig 5.4)

20) Installation of ALC panels by insertion of screws at side. (STEP 2) ( Fig 5.4)


Wel l & Abl e I nt er nat i onal Pt e.Lt d installation procedure 07 2009
23


21) Installation of rebar at top layer floor. ( Fig 5.4)

22) Placing of concrete onto floor. ( Fig 5.4)

23) Tiles finishing. ( Fig 5.4)