Objective
COREN Registered Engineer /Seasoned Project Manager whose experience spans through
Oil and Gas sector and pipeline construction, structural fabrication and internal piping, with a
outstanding technical skills backed-up with proven ability to building strong relationships with
external and internal customers alike. Good project management/Design skills to deliver
Project within budget time and scope
Project/Design
Experience















LASWAMO - Design of Sanitary Sewer Network For Anthony Mende and Enviroment,
Lagos State (4.12km2)
LASWAMO - Design of Gravity Sanitary Sewer Network for Agbowa Housing Estate,
Ikorodu Lagos
LASWAMO - Design of Vacuum Sanitary Sewer Network for Anthony Mende and
Environment, Lagos Nigeria
Fabrication and Installation of IRF Water Buffer Storage Tank
Fabrication and Installation of ETP Laid down Aeration Piping
Fabrication and Installation of Compressed Air Piping Network
Installation of 6 Nrs of 10 bar Air Compressor and 2 Nrs of 40 Bar Air Compressor and
Dryers
PZ Wilmer Ikorodu Physical Refinery and Dry Fractionation Plant
PZ Wilmer Ikorodu CPO Tanks Fabrication and Installations
Guinness Nigeria- Fabrication and Installation of Spent Grain Silos
International Brewries- General piping works and equipment Installation with Thermal
Insulation.
Tempo Paper Pulp and Packaging Limited- Equipment Installation and Structural

































Fabrication.
Food And Agro and Allied Industries Ltd- Various utility piping and complete
Installation of Malt extract Plant with Thermal Insulation.
Food And Agro and Allied Industries Ltd- Fabrication and Installation of 1000 CUM
Water Storage Tank and associated Piping
Food And Agro and Allied Industries Ltd- Fabrication and Installation of Worth and
Mash Kettle
Food And Agro and Allied Industries Ltd- Fabrication and Installation of Chimney,
Spent Grain Silos
Sona Breweries Ltd- Fabrication and Installation of 2nrs Spent Grain Silos.
PZ Cussions- Fabrication and Installation of 5nrs Crude Palm Oil Tanks (2million
Litters)
Nigeria Foundry Ltd- Fabrication and installation of 2 nos 100 Cum Overhead
Braithwaite Tanks and 1nr of 200 CUM Water Storage Tank, 12m by 18m High Bill
Board,
FMA Uk- Mash Cooker Replacement, Nexus Blending and DPVs Integration Project
Guinness Benin Brewery
FMA Uk- HMS Transfer Project Guinness Ogba Brewery
Honey Well Superfine- Fabrication, Installation and testing of 250m Internal Gas
Pipeline for gas Generators.
Honey Well Superfine- Fabrication, Installation and testing of 49m Internal Gas
Pipeline for gas Generators.
FMA Uk- DAL and ODBB Upgrade- Gns Benin Brewery
Gaslink Nig Ltd- Fabrication, Installation and testing of 48m spurline to oksweet
factory
7up Nigeria Ltd Dismantling and Re installation, commissioning of Pet Production
Line
Chellarms Nig Ltd Tank Farm Piping Fabrication, Testing and Installations.
Gaslink Nig Ltd- PRMS Upgrade for Epesok Paper Mills
Gaslink Nig Ltd- PRMS Upgrade Pioneer
Gaslink Nig Ltd- PRMS Upgrade for 7up Nig Ltd
Gaslink Nig Ltd- Fabrication, Installation and testing of 720m spurline to Dangote Salt

































Chellarams: 3D Models of Liquid Transfer section-internal piping-using PDMS 11.0
PZ Cussions - Spray Tower Project (Piping fabrication, installation, testing and
commissioning, Hot insulation, equipment installation)- 30 km of internal piping.
PZ Cussions - Spray Tower Project (Spray Tower Tank Fabrication and Installation)
PZ Cussions - Spray Tower Project (Piping fabrication, installation and testing of 4km
gas line.
GEA Brewery - Installation of Pneumatic Grist Conveying Line.
Guinness Nigeria - Fabrication of access platforms for LV Platforms 24m access
Guinness Nigeria - Fabrication of access platforms for Condensate Collecting Tank
Guinness Nigeria - Fabrication of access platforms for Heat Exchanger
Guinness Nigeria - Fabrication of access platforms for CIP Stations
July 2012 Till Date Hansataj Nigeria Limited
Exec Director/Project Manager January 2012 Till Date
Endorse and Review outcome of the survey (site visit) and technical feasibility.
Reviews the project execution plan and work method statement before approval by
the M.D.
Endorse and Review passage of all necessary documents to the user departments e.g.
the work method statement, the work schedule, the work break-down structure.
Review the resources mobilization checklist and approve as appropriate.
Endorse all documents needed from initiation of the project by the project engineer
at the project site, e.g. scope statement with its diagram, the daily work diary, weekly
man hour report, the daily attendance register, site material requisition, a copy of for
each activity or process to be carried out and work instructions register e.t.c.
Proffer immediate solution to all reported challenges that are beyond the capabilities
of the SPE, PE and other site personnel.
Present project performance report of all sites: - showing planned activities
(budgeted time and cost, over-run, Quality and other issues, labour, equipment
damage, material.) against the actual and explaining why the disparity and its impact
on the % gross profit.

































Conduct site inspection at each project location at least three times in a week to
ensure our internal procedures, clients scope have not derailed and processes, tests
are carried out according to international standards.
Approve all project requisitions be it from the site or Head office.
Document the additional job and job change form, carries the Commercial Manager
along and reports to the MD.
Co-ordinate the problem solving sessions for all clients complaints, quality non-
conformances and keeps the documents.
Head the committee for correction and the corrective actions.
Initiate action on recommendations of the Root Cause Analysis.
Endorse all as-built diagrams, AFC, all transmittal and ensures they sent to client
and necessary copies kept.
Sign off close-out reports and all other relevant correspondences are written and
dispatched accordingly
November 2009 June 2012 Aklab Nigeria Limited
Member Management Committee Nov 2011 June 2012
Project Manager/Snr Proj Engr June 2009 Till Date
Assist all project engineers in charge to carry out proper survey, determine the
technical feasibility of all projects and eventual scoping with its attendant
documentation and documents.
Draw and documents a project execution plan and work method statement which is
reviewed by the Project Manager and approved by the M.D.
Review and document the work breakdown structure, work schedule and the budget
drawn by the project engineer and forwards to the PM, CM and/or M.D. as the case
may be for approval.
Ensure that all necessary documents are passed to the user departments e.g. the work
method statement, the work schedule, the work break-down structure.
Issue a checklist to ensure that adequate, approved, functional, reliable and right

































machines (equipment and tools), materials and men are mobilized for that particular
project.
Ensure that all documents needed from inception of the project by the project
engineer at the project site are issued e.g. scope statement with its diagram, the daily
work diary, weekly man hour report, the daily attendance register, site material
requisition, a copy of procedure for each activity or process to be carried out and
work instructions register e.t.c.
Proffer immediate solution to all site challenges reported by the project engineer and
document them. He escalates those he cannot solve to the PM and/or the MD
immediately.
Write a weekly report to the PM and copies the M.D. on the weekly actual usage of
materials, men and work done in comparison with the planned, with respect to the
work schedule, the difference and the reasons for it.
Track project performance of all sites:-the actual project time, project cost, cost over-
runs, all sources of down- time and computes it with respect to the work schedule
and budget.
Conduct site inspection at each project location at least three times in a week to
ensure compliance with the scope and conducts a project review meeting with
project engineer, foremen and supervisors.
Assist in proffering solution to all clients complaints, quality non-conformances and
documents them.
Assist PM in documentation of the additional job and job change form, carries the
Commercial Manager and the MD along.
Ensures the documentation of the correction and the corrective actions.
Co-ordinate the filling of the Root Cause Analysis Form and ensures a copy is given
to the QA/QC Engineer for record keeping.
Ensure all as-built diagrams are signed and all transmittal sent to client and
necessary copies kept.
Ensure close-out reports and all other relevant correspondences are written and






























dispatched accordingly.
Review and authorises the number of his contract staff as the project progresses.
Effect deployment of permanent project staff as the project progresses.
Project Engineer Nov 2009 May 2011
See to Customers Job satisfaction and Improvement
Prepare and Monitor work Procedure/Method Statement
Development of Time Baseline Schedule and project charter.
Prepare project execution plan.
Ensure compliance with Quality Standards as detailed in quality assurance
Manual.
Supervise project execution according to detailed design and specification.
Supervise welding and fitting according to standard codes and specs, API 1104,
ASME, DEP, (BS31.8 for gas transmission lines) API 5l, BS 31.4 e.t.c
Supervise technical team/Project Engineers in carrying out fabrication and
installation works as per client specification.
Supervise testing, pre commissioning and commissioning work scope
Generate project status report. Close out reports, As built drawings e.t.c
Pipeline Integrity Management
April 2008 October 2009 Guaranty Trust Bank Plc
Teller Captain/Vault Custodian/Customer information Services Officer
Vetting and opening of account packages.
Customer data update within the approved turnaround time.
Debit cards, master cards and cheque requisition.
Confirmation of references for other banks.
Customer care services.
ATM Dispense Error Reversal
Supervision of Tellers within the approved bank's turnaround time.
General Banking Operations.
Cash Swap Management with other banks.
Effective Vault cash ,STC and Safe custody management.

Daily reconciliation and proofs of Ledgers.
E business and cards services
Settlements of arbiter claims
Batch Payment System
April. 2006 March 2008 InterGlobal Procurement Engineering Services Ltd.
1. Otumara Gas Lift Compression Facility Lease Project (SPDC-West)
2. Oguta Gas Lift Compression Facility Lease Project (SPDC-East)
3. Manufacture and Installation of Furmaseal Clamps on 8 Oil Riser at IME and
EDIKAN Drilling Platform Project (EPNL-East)
Assistant Engineer (Project/Planning/Operations)
Participate in Project Management Decision Making.
Milestone proposal.
Designing, modeling and running of MTO list.
Reporting of Project Progress Status and Progress Measurement and Project Minutes of
Meeting (MOM).
Invoicing and Follow ups, Tender and Prequalification Packaging.
Perfect orientation of the use of file system in keeping track record of Correspondences,
Timesheets, Daily And Monthly Reports, Invoices And Daily Invoices, Cashes Requests,
Materials Requisition Forms, Purchasing Orders (P.Os), Payments Advice . etc.
Assists in Materials Procurements/Handling relating to the project interface and office uses.
Assists the project/planning engineer in following up the project activities, planning schedules,
cost estimates, weighting system and reporting.
Monitor and maintenance records of personnels activities; timesheets, crew changes and
funds required for daily activities.
Creating, maintaining and updating of project cost Databases, Sub-Contractors Databases.
E.t.c
Preparations of Operations Monthly Reports.
Updating of Overall Work Schedule and Responsibility Schedule.
Subcontract Management.


April 2004 Oct. 2004 Fawel Engineering Services Warri, Delta State
Internship Student
Automobile Engine Block maintenance and overhauling.
Change out of CP Pump to Robot Electrical Pump in Aviesere Flow Station.
Spools and Flow lines Installations.
Offloading and On-loading operations using Cranes.
Health, Safety and Environmental Management System (HSE-MS)
July 2003 Onaniyi Comroniks Engineering Services
Starlite Area, Ogbomoso, Oyo State
Internship Student
Machining Operations
Fabrication and Welding
Automobile Engine Cylinders Reconditioning (Boring and Re-sleeving).

20022005 Vicamod Computer CollegeOgbomoso, Oyo State.
Computer Operator and Desktop Publishing Trainer
Desktop Publishing Training.
Software Installations.
Troubleshooting.

Education 19992005 Ladoke Akintola University of Technology, Ogbomoso, Oyo State
B.Tech. Mechanical Engineering. 2
nd
Class (Hons) Upper Division
1995 1998 The School of Science, Ogbomoso, Oyo State
Senior Secondary School Certificate
1992 1994 Anglican Grammar School, Ogbomoso, Oyo State.
Junior Secondary School Certificate.
1986 1992 A.U.D Primary School, Agbogbo, Iwo, Osun State.

Competencies AVEVA certified PDMS PIPE and EQUIPMENT Designer, Proficiency in Microsoft Office
environment, Ms Project, Primavera Project Planner, Ms-Visio 2003, CorelDraw,
AutoCAD, Project Planning and Scheduling e. t c.
Workshop/Trainings



Long Hall Consulting Certification course on Project Management Prince II
Aveva Certification course on Plant Design Management System (PDMS Pipping v 11.6
(July 2007).
Anti money laundering Training-June 2009
Combating Financing of Terrorism-July 2009
Effective Project Management Training- April 2010
Time Management - June 2010
Habit of highly effective Managers - August 2010
Awards

Employee of the Year Award 2009
Project Engineer of the Year award 2010
Most committed and dedicated Project Engineer Award 2011
Leadership Skills

Interests

Member Management Committee Nov 2011 Till Date
Citizenship and Leadership Training Centre (CLTC), Apapa, Lagos
President, NYSC Poultry CD Group (2006)
Reading, Traveling, Scouting and Sporting
Professional Corporate Member, Nigerian Society of Engineers
Affiliation Member, Nigerian Institution of Mechanical Engineers (NIMECHE)
Member, National Fire Protection Association (NFPA)
Alumni-International Member, National Society of Black Engineers. (NSBE)
Member, International Association of Planning Engineers (IAPE)
Member, Nigeria Institute of Management (MNIM)

Vous aimerez peut-être aussi