1. If factory increases working hours/ day. For example: if factory works 10 hours
instead of 8 hours factory will produce more pieces than earlier. Now production
will be = 10X100X10 pieces = 10,000 Pieces/day
2. If total no. of machine capacity is increased. For example 120 machines is used
instead of 100 machines then current production will be =10 X120X8 pieces = 9,600
Pieces /day
3. Increased operators production rate (productivity). Through training program or
skill development operators production rate improved by 10% i.e. 11 pieces
production per hour. Factorys current production will be = 11 X 100 X 8 = 8,800
Pieces /Day. Operator's production rate can be improved though use of advanced
machines.
1
2
3
Before (units)
Like
After (units)
10,000
9,600
8,800
http://www.onlineclothingstudy.com/2011/12/3-ways-to-improve-your-garment.html
3/30/2014
Related Articles:
How to calculate production capacity of a factory?
What is Line Planning?
Like
Like
Tw eet
Follow @clothingstudy
Add a comment...
Also post on Facebook
Comment
Prasanta Sarkar
Follow
Simple Guides to
Keep Sewing Floors
Clean
Recommended by
Newer Post
Home
Older Post
http://www.onlineclothingstudy.com/2011/12/3-ways-to-improve-your-garment.html
2/3
3/30/2014
Show res ul ts
Votes s o fa r: 196
Da ys l eft to vote: 13
Garment Factory
Garment Export
Production Line
Garment Industry
Home I About I Reports & Case Studies I Submit articles I Contact us I Fashion Institutes I Books
Copyright onlineclothingstudy.com. All Rights Reserved.
http://www.onlineclothingstudy.com/2011/12/3-ways-to-improve-your-garment.html
3/3