Vous êtes sur la page 1sur 23

evsm.

com 2000-2013
eVSM Quick Manufacturing Tutorial
In this tutorial, you will learn to draw the map shown below, complete with
calculations, and a chart
Estimate Time: 20 minutes
Update: 28-Jun-2013
Start eVSM Step 1:
On your Desktop, click
the Start eVSM icon.
1
Click to enable
macros.
Click this button to
avoid the security
notice in future.
3
4
If you see a message like this,
you must Enable macros.
2
evsm.com 2000-2013
Step 2: Make sure eVSM started OK
Save your drawing file. Its
a good idea to save the
file in a new empty folder.
2
eVSM Toolbar must be available. If you do not see it,
check help at http://www.evsm.com/v6/nobuttons.
1
Quick eVSM stencils are on
the right. For this tutorial, you
will use the Quick Mfg LT
stencil.
4
This is the main eVSM
stencil, showing the eVSM
version number.
3
7
Day
Hr
5
Wk
Day
Time Center
Customer
Center
Drag out the two red
icons first. This is
very important!
1
Align all new
shapes to the grid
as you drop them.
2
Enter available hours per day
here. This is actual work hours
after subtracting break time.
3
Enter customer
demand here.
4
When you drop your first shape
from Quick Mfg LT, the
Manufacturing Data shape will
appear automatically.
5
Initiate a Quick Manufacturing map Step 3:
all
Customer
Customer
Demand
Item
Day
100
A020
Outside
Center
Inventory
Center
Activity
Center
The green shapes are called
Centers. Use the centers to
represent the flow.
Align all new shapes
to the grid as you
drop them.
Align the Inventory and
Activity centers so the VA and
NVA time shapes form a
continuous stepped timeline.
7
Day
Hr
5
Wk
Day
Draw the Flow Step 4:
1
2
3
all
Customer
Customer
Demand
Item
Day
100
A050
1
Process
Activity Lead
Time
Day x.xx
A060
1
Type
Inventory Item xx
A070
Day Auto
1
Process
Qty Per Cycle Item 1
Cycle Time Min x.xx
1
A080
Min Auto
Complete as shown
below, including
annotation and data
values.
Enter Data Step 5:
7
Day
Hr
5
Wk
Day
1
1
Derby Framemakers
Activity Lead
Time
Day 2
A100
1
Plain Frames
Inventory Item 200
A110
Day Auto
1
Prepare
Qty Per Cycle Item 1
Cycle Time Min 20
1
A120
Min Auto
1
Clean Frames
Inventory Item 100
A130
Day Auto
1
Paint
Qty Per Cycle Item 20
Cycle Time Day 2.00
1
A140
Min Auto
1
Finished Goods
Inventory Item 120
A150
Day Auto
1
Package
Qty Per Cycle Item 1
Cycle Time Min 8
1
A160
Min Auto
1
Packing Cases
Inventory Item 100
A170
Day Auto
all
Customer
Customer
Demand
Item
Day
100
A180
If text does not fit, avoid re-
sizing eVSM shapes. Instead,
make the font smaller.
2
Double-click and
change Min to Day.
3
Do not change any blue
Auto values. These will get
calculated automatically later.
4
Resize Page Step 6:
When you run out of space on
the drawing page, DO NOT
resize eVSM shapes.
1
Instead make the drawing
page bigger. Do not use the
Page Setup menu to resize
the page.
Hold the Ctrl key down on the
keyboard and grab/move any
edge of the page to resize it.
2 3
Do not worry about how big
the page gets and do not
worry about printing.
4
evsm.com 2000-2013
7
Day
Hr
5
Wk
Day
1
Derby Framemakers
Activity Lead
Time
Day 2
A100
1
Plain Frames
Inventory Item 200
A110
Day Auto
1
Prepare
Qty Per Cycle Item 1
Cycle Time Min 20
1
A120
Min Auto
1
Clean Frames
Inventory Item 100
A130
Day Auto
1
Paint
Qty Per Cycle Item 20
Cycle Time Day 2.00
1
A140
Min Auto
1
Finished Goods
Inventory Item 120
A150
Day Auto
1
Package
Qty Per Cycle Item 1
Cycle Time Min 8
1
A160
Min Auto
1
Packing Cases
Inventory Item 100
A170
Day Auto
all
Customer
Customer
Demand
Item
Day
100
A180
Draw the arrows from the
Main stencil on left
Glue all arrows
at both ends
Use the right mouse button
menu of the arrows to turn
into a Push arrow
Add Arrows from main stencil Step 7:
1
2
3
7
Day
Hr
5
Wk
Day
1
Derby Framemakers
Activity Lead
Time
Day 2
A120
1
Plain Frames
Inventory Item 200
A130
Day Auto
1
Prepare
Qty Per Cycle Item 1
Cycle Time Min 20
1
A140
Min Auto
1
Clean Frames
Inventory Item 100
A150
Day Auto
1
Paint
Qty Per Cycle Item 20
Cycle Time Day 2.00
1
A160
Min Auto
1
Finished Goods
Inventory Item 120
A170
Day Auto
1
Package
Qty Per Cycle Item 1
Cycle Time Min 8
1
A180
Min Auto
1
Packing Cases
Inventory Item 100
A190
Day Auto
all
Customer
Customer
Demand
Item
Day
100
A200
Drag out the Time
Summary. Note, all fields
are Auto, so they will be
calculated automatically
Glue transport
shape to arrow
Use the right mouse
button menu to turn off
Framing and switch into
a Train icon
Transport
Shapes
Add Transport shapes and the Time Summary Step 8:
1
2
3
1
Time Summary
Takt Time
Min
Item
Auto
Total Value
Added
Min Auto
Lead Time Day Auto
Value Added
Percent
% Auto
Z010
Transport
Shapes
Time
Summary
7
Day
Hr
5
Wk
Day
1
Derby Framemakers
Activity Lead
Time
Day 2
A110
1
Plain Frames
Inventory Item 200
A120
Day 2.00
1
Prepare
Qty Per Cycle Item 1
Cycle Time Min 20
1
A130
Min 20.00
1
Clean Frames
Inventory Item 100
A140
Day 1.00
1
Paint
Qty Per Cycle Item 20
Cycle Time Day 2
1
A150
Min 840.00
1
Finished Goods
Inventory Item 120
A160
Day 1.20
1
Package
Qty Per Cycle Item 1
Cycle Time Min 8
1
A170
Min 8.00
1
Packing Cases
Inventory Item 100
A180
Day 1.00
all
Customer
Customer
Demand
Item
Day
100
A190
1
Time Summary
Takt Time
Min
Item
4.20
Total Value
Added
Min 868.00
Lead Time Day 9.27
Value Added
Percent
% 22.30
Z200
Click the Solve
button to calculate
When complete, note that
all blue values show
calculated results
Perform Calculations Step 9:
1
3
If you see any error
messages, please read
and follow instructions
2
7
Day
Hr
5
Wk
Day
1
Derby Framemakers
Activity Lead
Time
Day 2
A110
1
Plain Frames
Inventory Item 200
A120
Day 2.00
1
Prepare
Qty Per Cycle Item 1
Cycle Time Min 20
1
A130
Min 20.00
1
Clean Frames
Inventory Item 100
A140
Day 1.00
1
Paint
Qty Per Cycle Item 20
Cycle Time Day 2
1
A150
Min 840.00
1
Finished Goods
Inventory Item 120
A160
Day 1.20
1
Package
Qty Per Cycle Item 1
Cycle Time Min 8
1
A170
Min 8.00
1
Packing Cases
Inventory Item 100
A180
Day 1.00
all
Customer
Customer
Demand
Item
Day
100
A190
1
Time Summary
Takt Time
Min
Item
4.20
Total Value
Added
Min 868.00
Lead Time Day 9.27
Value Added
Percent
% 22.30
Z200
Use the right mouse
button menu of chart icon
and select Plot Chart
Drag out CT/TT
Chart icon
CT / TT
Chart
1
2
Cycle Time / Takt Time Chart
M
i
n
/
I
t
e
m
0
5
10
15
20
25
30
35
40
45
A130 A150 A170
Cycle Time Per Unit
Legend
Activity Takt Time
Here is the chart. Note how
it shows insufficient
capacity in all activities.
3
Add Cycle Time / Takt Time Chart Step 10:
CT/TT
Chart
Cycle Time / Takt Time Chart
M
i
n
/
I
t
e
m
0
1
2
3
4
5
6
7
8
9
A130 A150 A170
Cycle Time Per Unit
Legend
Activity Takt Time
7
Day
Hr
5
Wk
Day
1
Derby Framemakers
Activity Lead
Time
Day 2
A110
1
Plain Frames
Inventory Item 200
A120
Day 2
1
Prepare
Qty Per Cycle Item 1
Cycle Time Min 20
1
The Preparation team
actually has 3 stations
and works 2 shifts.
A130
Min 20
1
Clean Frames
Inventory Item 100
A140
Day 1
1
Paint
Qty Per Cycle Item 20
Cycle Time Day 2
1
A150
Min 840
1
Finished Goods
Inventory Item 120
A160
Day 1.2
1
Package
Qty Per Cycle Item 1
Cycle Time Min 8
1
A170
Min 8
1
Packing Cases
Inventory Item 100
A180
Day 1
all
Customer
Customer
Demand
Item
Day
100
A190
Step 11: Try Add-on Calculations
Activity
Stations
Activity Time
1
Add an Activity Time add-on
and set it to actual work hours
per day for this activity.
3
Run Solve and
note the changes in
the chart.
4
Stations Stn 3 Stations Stn 9 Stations Stn 2
Activity Time
Hr
Day
14
1
Time Summary
Takt Time
Min
Item
4.20
Total Value
Added
Min 868.00
Lead Time Day 9.27
Value Added
Percent
% 22.30
Add the Activity Stations add-ons.
Be sure to glue the add-ons to the
Activity Centers.
2
Z010
Cycle Time / Takt Time Chart
M
i
n
/
I
t
e
m
0
1
2
3
4
5
6
7
8
9
A130 A150 A170
Cycle Time Per Unit
Legend
Activity Takt Time
7
Day
Hr
5
Wk
Day
1
Derby Framemakers
Activity Lead
Time
Day 2
A110
1
Plain Frames
Inventory Item 200
A120
Day 2
1
Prepare
Qty Per Cycle Item 1
Cycle Time Min 20
1
A130
Min 20
1
Clean Frames
Inventory Item 100
A140
Day 1
1
Paint
Qty Per Cycle Item 20
Cycle Time Day 2
1
A150
Min 840
1
Finished Goods
Inventory Item 120
A160
Day 1.2
1
Package
Qty Per Cycle Item 1
Cycle Time Min 8
1
A170
Min 8
1
Packing Cases
Inventory Item 100
A180
Day 1
all
Customer
Customer
Demand
Item
Day
100
A190
Stations Stn 3 Stations Stn 9 Stations Stn 2
Activity Time
Hr
Day
14
1
Time Summary
Takt Time
Min
Item
4.20
Total Value
Added
Min 868.00
Lead Time Day 9.27
Value Added
Percent
% 22.30
Z200
Note how all these yellow add-on names start
with the word Activity. Yellow Add-ons that
follow a green Center can only be used with
that Center. So, these Activity.. add-ons can
be used only with the Activity Center.
3
To get Help on Quick eVSM
icons, select the icon, then click
the iQ button in the eVSM
toolbar.
1
Step 12: Icon Help
See the pop-up help on the
drawing page. When done,
delete the help pop-up.
2
Cycle Time / Takt Time Chart
M
i
n
/
I
t
e
m
0
1
2
3
4
5
6
7
8
9
A130 A150 A170
Cycle Time Per Unit
Legend
Activity Takt Time
7
Day
Hr
5
Wk
Day
1
Derby Framemakers
Activity Lead
Time
Day 2
A110
1
Plain Frames
Inventory Item 200
A120
Day 2
1
Prepare
Qty Per Cycle Item 1
Cycle Time Min 20
1
A130
Min 20
1
Clean Frames
Inventory Item 100
A140
Day 1
1
Paint
Qty Per Cycle Item 20
Cycle Time Day 2
1
A150
Min 840
1
Finished Goods
Inventory Item 120
A160
Day 1.2
1
Package
Qty Per Cycle Item 1
Cycle Time Min 8
1
A170
Min 8
1
Packing Cases
Inventory Item 100
A180
Day 1
all
Customer
Customer
Demand
Item
Day
100
A190
Stations Stn 3 Stations Stn 9 Stations Stn 2
Activity Time
Hr
Day
14
1
Time Summary
Takt Time
Min
Item
4.20
Total Value
Added
Min 868.00
Lead Time Day 9.27
Value Added
Percent
% 22.30
Z200
Step 13: Multi-path Modeling
What if this value stream has
parallel paths, one for painting
and one for enameling?
1
Delete the chart to create space
to draw the parallel path.
2
7
Day
Hr
5
Wk
Day
1
Derby Framemakers
Activity Lead
Time
Day 2
A130
1
Plain Frames
Inventory Item 200
A140
Day 2
1
Prepare
Qty Per Cycle Item 1
Cycle Time Min 20
1
A150
Min 20
1
Clean Frames
Inventory Item 100
A160
Day 1
1
Paint
Qty Per Cycle Item 20
Cycle Time Day 2
1
A170
Min 840
1
Finished Goods
Inventory Item 120
A180
Day 1.2
1
Package
Qty Per Cycle Item 1
Cycle Time Min 8
1
A190
Min 8
1
Packing Cases
Inventory Item 100
A200
Day 1
all
Customer
Customer
Demand
Item
Day
100
A210
The time summary is no longer
correct, since it is showing the
sum of both paths.
Stations Stn 3 Stations Stn 9 Stations Stn 2
Activity Time
Hr
Day
14
1
Time Summary
Takt Time
Min
Item
4.2
Total Value
Added
Min 2128.00
Lead Time Day 12.77
Value Added
Percent
% 39.69
Z200
Draw the
Enamel path
1
Activity
Center
Inventory
Center
3
These Path Locator tags can be used to specify
paths. You can manually change these. You can
add new ones with copy/paste or from the main
stencil on left. Another way to specify paths is with
Sequence arrows and the Auto Path function. You
can try this in the next step.
4
Activity
Stations
Step 14: Multi-path Modeling
1
Clean Frames
Inventory Item 50
A240
Day 0.50
1
Enamel
Qty Per Cycle Item 15
Cycle Time Day 3
1
A250
Min 1260.00
Stations Stn 3
Change unit to Day
and run Solve
2
7
Day
Hr
5
Wk
Day
1
Derby Framemakers
Activity Lead
Time
Day 2
A130
1
Plain Frames
Inventory Item 200
A140
Day 2
1
Prepare
Qty Per Cycle Item 1
Cycle Time Min 20
1
A150
Min 20
1
Clean Frames
Inventory Item 100
A160
Day 1
1
Paint
Qty Per Cycle Item 20
Cycle Time Day 2
1
A170
Min 840
1
Finished Goods
Inventory Item 120
A180
Day 1.2
1
Package
Qty Per Cycle Item 1
Cycle Time Min 8
1
A190
Min 8
1
Packing Cases
Inventory Item 100
A200
Day 1
all
Customer
Customer
Demand
Item
Day
100
A210
Stations Stn 3 Stations Stn 9 Stations Stn 2
Activity Time
Hr
Day
14
1
Time Summary
Takt Time
Min
Item
4.2
Total Value
Added
Min 2128.00
Lead Time Day 12.77
Value Added
Percent
% 39.69
Z200
1
Clean Frames
Inventory Item 50
A230
Day 0.50
1
Enamel
Qty Per Cycle Item 15
Cycle Time Day 3
1
A240
Min 1260.00
Stations Stn 3
1
Clean Frames
Day 0.50
Inventory Item 50
A110
1
Enamel
Min 3.00
Qty Per Cycle Item 15
Cycle Time Day 3
1
A120
Stations Stn 3
Hold down the Ctrl key
and select the green
shapes in the order
shown here.
1
A
Click the Sequence
button.
2
B
C E G
D F H
I
Step 15: Sequence Arrows
7
Day
Hr
5
Wk
Day
1
Derby Framemakers
Activity Lead
Time
Day 2
A130
1
Plain Frames
Inventory Item 200
A140
Day 2
1
Prepare
Qty Per Cycle Item 1
Cycle Time Min 20
1
A150
Min 20
1
Clean Frames
Inventory Item 100
A160
Day 1
1
Paint
Qty Per Cycle Item 20
Cycle Time Day 2
1
A170
Min 840
1
Finished Goods
Inventory Item 120
A180
Day 1.2
1
Package
Qty Per Cycle Item 1
Cycle Time Min 8
1
A190
Min 8
1
Packing Cases
Inventory Item 100
A200
Day 1
all
Customer
Customer
Demand
Item
Day
100
A210
Stations Stn 3 Stations Stn 9 Stations Stn 2
Activity Time
Hr
Day
14
1
Time Summary
Takt Time
Min
Item
4.2
Total Value
Added
Min 2128.00
Lead Time Day 12.77
Value Added
Percent
% 39.69
Z200
1
Clean Frames
Inventory Item 50
A230
Day 0.50
1
Enamel
Qty Per Cycle Item 15
Cycle Time Day 3
1
A240
Min 1260.00
Stations Stn 3
1
Clean Frames
Day 0.50
Inventory Item 50
A250
1
Enamel
Min 3.00
Qty Per Cycle Item 15
Cycle Time Day 3
1
A260
Stations Stn 3
A
B
C
E
G
F H
I
For the second path, start again, hold
the Ctrl key and select the green
shapes A to I in the order shown.
Then click the Sequence button.
2
These Sequence
arrows show the
first path.
1
Step 16: Sequence Arrows for Second Path
D
7
Day
Hr
5
Wk
Day
Derby Framemakers
Activity Lead
Time
Day 2
A010
Plain Frames
Inventory Item 200
A020
Day 2
Prepare
Qty Per Cycle Item 1
Cycle Time Min 20
1
A030
Min 20
Clean Frames
Inventory Item 100
A040
Day 1
Paint
Qty Per Cycle Item 20
Cycle Time Day 2
1
A050
Min 840
Finished Goods
Inventory Item 120
A080
Day 1.2
Package
Qty Per Cycle Item 1
Cycle Time Min 8
1
A090
Min 8
Packing Cases
Inventory Item 100
A100
Day 1
Customer
Customer
Demand
Item
Day
100
A110
Stations Stn 3 Stations Stn 9 Stations Stn 2
Activity Time
Hr
Day
14
1
Time Summary
Takt Time
Min
Item
4.2
Total Value
Added
Min 2128.00
Lead Time Day 12.77
Value Added
Percent
% 39.69
A140
1
Clean Frames
Inventory Item 50
A150
Day 0.50
1
Enamel
Qty Per Cycle Item 15
Cycle Time Day 3
1
A160
Min 1260.00
Stations Stn 3
Clean Frames
Day 0.50
Inventory Item 50
A060
Enamel
Min 3.00
Qty Per Cycle Item 15
Cycle Time Day 3
1
A070
Stations Stn 3
Sequence arrow visibility
can be switched On/Off
with this button. Try it.
3
Step 17: Use Auto Path to Generate Path IDs based on Sequence Arrows
Click Auto Path to
automatically generate
Path Locator tags based
on Sequence arrows.
2
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
C
E
G
F
D
Both paths are now represented
with Sequence arrows. Note that
you could have achieved the
same result for the second path
by selecting C-D-E-F
1
7
Day
Hr
5
Wk
Day
Derby Framemakers
Activity Lead
Time
Day 2
A010
Plain Frames
Inventory Item 200
A020
Day 2
Prepare
Qty Per Cycle Item 1
Cycle Time Min 20
1
A030
Min 20
Clean Frames
Inventory Item 100
A040
Day 1
Paint
Qty Per Cycle Item 20
Cycle Time Day 2
1
A050
Min 840
Finished Goods
Inventory Item 120
A080
Day 1.2
Package
Qty Per Cycle Item 1
Cycle Time Min 8
1
A090
Min 8
Packing Cases
Inventory Item 100
A100
Day 1
Customer
Customer
Demand
Item
Day
100
A110
Stations Stn 3 Stations Stn 9 Stations Stn 2
Activity Time
Hr
Day
14
1
Time Summary
Takt Time
Min
Item
4.2
Total Value
Added
Min 868.00
Lead Time Day 9.27
Value Added
Percent
% 22.30
A140
1
Clean Frames
A150
1
Enamel
A160
Clean Frames
A170
Enamel
A180
2
2
Clean Frames
Day 0.5
Inventory Item 50
A060
Enamel
Min 1260
Qty Per Cycle Item 15
Cycle Time Day 3
1
A070
Stations Stn 3
Note how some centers
are on path 1 only and
some on both.
1
This summary is
for path 1.
2
Double-click to change
path number to 2 and
click Solve button in
toolbar.
4
Drag out a second
Summary Center.
3
Step 18: Time Summary by Path
2
Time Summary
Takt Time
Min
Item
4.20
Total Value
Added
Min 1288.00
Lead Time Day 9.77
Value Added
Percent
% 31.40
A190
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
Time
Summary
7
Day
Hr
5
Wk
Day
Derby Framemakers
Activity Lead
Time
Day 2
A010
Plain Frames
Inventory Item 200
A020
Day 2
Prepare
Qty Per Cycle Item 1
Cycle Time Min 20
1
A030
Min 20
Clean Frames
Inventory Item 100
A040
Day 1.18
Paint
Qty Per Cycle Item 20
Cycle Time Day 2
1
A050
Min 840
Finished Goods
Inventory Item 120
A080
Day 1.2
Package
Qty Per Cycle Item 1
Cycle Time Min 8
1
A090
Min 8
Packing Cases
Inventory Item 100
A100
Day 1
Customer
Customer
Demand
Item
Day
100
A110
Stations Stn 3 Stations Stn 9 Stations Stn 2
Activity Time
Hr
Day
14
1
Time Summary
Takt Time
Min
Item
4.2
Total Value
Added
Min 868
Lead Time Day 9.27
Value Added
Percent
% 21.89
A140
1
Clean Frames
A150
1
Enamel
A160
Clean Frames
A170
Enamel
A180
2
2
Clean Frames
Day 3.33
Inventory Item 50
A060
Enamel
Min 1260
Qty Per Cycle Item 15
Cycle Time Day 3
1
A070
Stations Stn 3
2
Time Summary
Takt Time
Min
Item
4.2
Total Value
Added
Min 1288
Lead Time Day 9.77
Value Added
Percent
% 24.34
A190
The totals are still
incorrect. They assume
100% product flow on
both paths.
Activity
Demand %
Inventory
Demand %
Step 19: Demand % for Each Path
1
Solve again and
study the results.
3
Demand
Percent
% 85
Demand
Percent
% 85
Demand
Percent
% 15
Demand
Percent
% 15
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
Use the Demand % add-
ons to specify actual
demand at each center.
2
2
7
Day
Hr
5
Wk
Day
Derby Framemakers
Activity Lead
Time
Day 2
A140
Plain Frames
Inventory Item 200
A150
Day 2
Prepare
Qty Per Cycle Item 1
Cycle Time Min 20
1
A160
Min 20
Clean Frames
Inventory Item 100
A170
Day 1.18
Paint
Qty Per Cycle Item 20
Cycle Time Day 2
1
A180
Min 840
Finished Goods
Inventory Item 120
A190
Day 1.2
Package
Qty Per Cycle Item 1
Cycle Time Min 8
1
A200
Min 8
Packing Cases
Inventory Item 100
A210
Day 1
Customer
Customer
Demand
Item
Day
100
A220
Stations Stn 3 Stations Stn 9 Stations Stn 2
Activity Time
Hr
Day
14
1
Time Summary
Takt Time
Min
Item
4.2
Total Value
Added
Min 868
Lead Time Day 9.44
Value Added
Percent
% 21.89
A230
1
Clean Frames
A240
1
Enamel
A250
Clean Frames
A260
Enamel
A270
2
2
Clean Frames
Day 3.33
Inventory Item 50
A280
Enamel
Min 1260
Qty Per Cycle Item 15
Cycle Time Day 3
1
A290
Stations Stn 3
2
Time Summary
Takt Time
Min
Item
4.2
Total Value
Added
Min 1288
Lead Time Day 12.60
Value Added
Percent
% 24.34
A300
Demand
Percent
% 85
Demand
Percent
% 85
Demand
Percent
% 85
Demand
Percent
% 15
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
Clean Frames
Day 3.33
Inventory Item 50
A110
Enamel
Min 1260.00
Qty Per Cycle Item 15
Cycle Time Day 3.00
1
A120
Stations Stn 3
Demand
Percent
% 15
Demand
Percent
% 15
Step 20: Miscellaneous
Explore the right-mouse-button
menus on the Path Locator tags.
Try highlighting all centers on the
selected path.
2
Highlight Path Activities
Remove Path Highlights
Select Path Shapes
Title Block
2
2
Add Title Block
1
DESCRIPTION
Paint Shop Current State
FILENAME
MFGLTTUTORIAL.VSD
REVISED
6/28/2013
TITLE
Deerfield Crafters
DATE
6/28/2013
Built with eVSM Quick Mfg Stencil
7
Day
Hr
5
Wk
Day
Derby Framemakers
Activity Lead
Time
Day 2
A140
Plain Frames
Inventory Item 200
A150
Day 2
Prepare
Qty Per Cycle Item 1
Cycle Time Min 20
1
A160
Min 20
Clean Frames
Inventory Item 100
A170
Day 1.18
Paint
Qty Per Cycle Item 20
Cycle Time Day 2
1
A180
Min 840
Finished Goods
Inventory Item 120
A190
Day 1.2
Package
Qty Per Cycle Item 1
Cycle Time Min 8
1
A200
Min 8
Packing Cases
Inventory Item 100
A210
Day 1
Customer
Customer
Demand
Item
Day
100
A220
Stations Stn 3 Stations Stn 9 Stations Stn 2
Activity Time
Hr
Day
14
1
Time Summary
Takt Time
Min
Item
4.2
Total Value
Added
Min 868
Lead Time Day 9.44
Value Added
Percent
% 21.89
A230
1
Clean Frames
A240
1
Enamel
A250
Clean Frames
A260
2
Clean Frames
Day 3.33
Inventory Item 50
A280
Qty Per Cycle Item 15
Cycle Time Day 3
Stations Stn 3
2
Time Summary
Takt Time
Min
Item
4.2
Total Value
Added
Min 1288
Lead Time Day 12.60
Value Added
Percent
% 24.34
A300
Demand
Percent
% 85
Demand
Percent
% 85
Demand
Percent
% 15
Demand
Percent
% 15
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
DESCRIPTION
Paint Shop Current State
FILENAME
MFGLTTUTORIAL.VSD
REVISED
6/28/2013
TITLE
Deerfield Crafters
DATE
6/28/2013
Built with eVSM Quick Mfg Stencil
Use the right mouse button
menu of chart icon and select
Plot Ladder Chart
Drag out Lead
Time Chart icon
2
1
Step 21: Plot Lead Time Chart
Here is the Lead Time chart
showing the two paths.
3
Lead Time Summary
Day
0 2 4 6 8 10 12 14
A140
Derby
Framemakers
A150
Plain Frames
A170
Clean Frames
A180
Paint
A190
Finished
Goods
A210
Packing Cases
PATH 1
9.45
A140
Derby
Framemakers
A150
Plain Frames
A190
Finished
Goods
A210
Packing Cases
A280
Clean Frames
A290
Enamel
PATH 2
12.60
Activity Lead Time
Legend
Non Value Added
Value Added
Cycle Time / Takt Time Chart
M
i
n
/
I
t
e
m
0
5
10
15
20
25
30
A160 A180 A200 A250
Cycle Time Per Unit
Legend
Activity Takt Time
Here is the final CT/TT chart.
4
Lead
Time
all
1. Align shapes to the grid
2. Avoid re-sizing eVSM shapes
3. Glue everything possible
4. Do not Group eVSM shapes
5. Re-size page with Ctrl+Drag, not Page Setup
6. Use a mouse, even with a laptop
evsm.com 2000-2013
eVSM Quick Manufacturing Tips
Next Steps...
Explore example maps at http://www.evsm.com/examples

Vous aimerez peut-être aussi