Material inspection requirements Storage, Handling, and Preservation B A10 The manufacturer's storage, handling and preservation instructions to be followed. Schedule Q, Att, IV, Sec 5. A9 A8 Verify that the contractor or it's Saudi Aramco approved third party inspector performed the quality activities at the supplier and sub-supplier locations.
Material inspection requirements Storage, Handling, and Preservation B A10 The manufacturer's storage, handling and preservation instructions to be followed. Schedule Q, Att, IV, Sec 5. A9 A8 Verify that the contractor or it's Saudi Aramco approved third party inspector performed the quality activities at the supplier and sub-supplier locations.
Material inspection requirements Storage, Handling, and Preservation B A10 The manufacturer's storage, handling and preservation instructions to be followed. Schedule Q, Att, IV, Sec 5. A9 A8 Verify that the contractor or it's Saudi Aramco approved third party inspector performed the quality activities at the supplier and sub-supplier locations.
B A10 The manufacturer's storage, handling and preservation instructions to be followed. Schedule Q, Att, IV, Sec 5. A9 A8 Verify that the contractor or it's Saudi Aramco approved third party inspector performed the quality activities at the supplier and sub-supplier locations as required by the inspection level assigned for the materials and equipment identified in SAER-1972 Inspection Requirements. Schedule Q Attachment llI Sec 1.2 A7 Traceability - Instrumentation materials shall be traceable from the manufacturer and supplier through delivery, storage, fabrication, erection, installation, repair, modification and use. Schedule "Q" Attachment lV Sec. 3.3 A6 QC Before Installation - Instrumentation materials shall conform to all applicable requirements, standards, and specifications prior to release to be used as part of the work. Schedule "Q" Attachment lV Sec 7.1 A5 Free of Damage - Instrumentation materials shall be free of damage. All Incoming material shall be visually inspected for damage and conformance to all applicable inspection releases with Material Test Report (MTR). Schedule "Q" Attachment lV Sec 7.1 Schedule "G" Sec. 4.1 A4 As Designed - Instrumentation materials shall be in accordance with the Saudi Aramco-approved project-specific design drawings, diagrams, schedules, lists, databases, and associated documents. Schedule "G" Sec. 4.1 A3 New and Unused - Instrumentation materials shall be new and unused. A2 Identification - Instrumentation materials shall be identified by using tags, stamps, color coding, stencils or labels. The location and method of identification shall not affect the function or quality of the materials. Schedule "Q" Attachment lV Sec. 3.2 A1 Review Quality Documentation for Material Receiving. Schedule Q, Att, IV, Sec. 3.1. FAIL N/A RE-INSP DATE ITEM No. ACCEPTANCE CRITERIA REFERENCE PASS SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - August 2004) SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR Pressure Switches -Material Receiving. SAIC-J-6202 1-Oct-05 INST PLANT NO. EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO. TRAVEL TIME SAUDI ARAMCO USE ONLY SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED? SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL A Document Review and Certification B1 Purchase Order and Instrument specification sheet criteria shall be confirmed and compared with instrument stainless steel tags / labels and nameplates, and shipment checked for damage, prior to acceptance of the shipment Schedule Q, Att IV, Sec. 7.1. SAES-J -002, Sec. 7 B2 Verify that all the instruments are from technically acceptable vendors B3 Pressure switches containing electrical contacts shall be specified to meet electrical area classification (hermetically sealed is preferred). [PIP PCCPR001, Sec.5.2.1 J uly 1997] SAES-J -200, Sec.1 B4 Process switches shall be selected to operate in a range that allows switch actuation to take place above the midpoint to ensure greatest accuracy. [PIP PCCPR001, Sec.5.2.2 J uly 1997] SAES-J -200, Sec.1 Page 1 of 2 B5 Pressure switches containing open (arc producing ) contacts shall not be connected directly to flammable or explosive process fluids. [PIP PCCPR001, Sec.5.2.4 J uly 1997] SAES-J -200, Sec.1 B11 Switch actuation, as the result of increasing or decreasing pressure must be specified. SAES-J -200, Sec.5.2.9 B10 Electric switch contacts shall be snap acting, single-pole, double-throw (SPDT) as a minimum. The contact rating shall be sufficient to operate solenoids, relays, or other devices as specified in the data sheet without the need for additional or interposing relays. Hermetically sealed switch contacts are preferable. SAES-J -200, Sec. 5.2.8 B9 Materials selection for pressure device wetted parts shall be type 304 or 316 stainless steel with TFE gaskets, unless other materials are required by process [PIP PCCPR001 Sec 4.6, J uly 1997] SAES-J -200, Sec 1 B7 B8 As a minimum, all pressure devices shall be specified with over-range protection to 1-1/2 times the maximum system operating pressure. [PIP PCCPR001 Sec 4.3] SAES-J -200, Sec 1 The instruments should comply with a minimum -maximum range of 10C to 35C in indoor Air conditioned or a range of 0C to 55C in outdoor sheltered and to a range of 0C to 65C in outdoor unsheltered conditions SAES-J -003, Sec.8.1 4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization Work Verified Saudi Aramco with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the PMT Representative T&I Witnessed Name, Title, Department, Company, Initials and Date: Test Performed Successfully and Results are Acceptable: Name, Initials and Date: 5. Remarks: For general Instrumentation requirements please see SAIC-J-6017 Contractor / Third-Party QC Record Reviewed ITEM No. ACCEPTANCE CRITERIA REFERENCE REFERENCE DOCUMENTS: B6 Pressure switch deadband shall be compatible with the application. (when the process runs close to the switch setting, a large deadband may prevent the switch from resetting after the trip has cleared) [PIP PCCPR001, Sec.5.2.5 J uly 1997] SAES-J -200, Sec.1 PASS FAIL N/A RE-INSP DATE 1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID). 2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling). 1. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), J uly 1993 NOTES: 6. PIP PCCPR001, Pressure Measurement Criteria, J uly 1997 4. SAES-J -003-Instrumentation Basic Design, 31 May, 2004 3. SAES-J -002,Technically acceptable instruments, 29 Feb 2004. 5. SAES-J -200, Pressure, 31 May.2003.. 2. Schedule Q -- Quality Requirements (Pro Forma Contract), November 2003 3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified Work Verified T&I Witnessed QC Record Reviewed QC Inspector PID Representative indicates compliance with appropriate standards or performance in a specified manner. Technician Performing Test* Name, Initials and Date: Witnessed Test Work / Rework May Proceed Name, Initials and Date: Name, Organization, Initials and Date: T&I Witnessed QC Supervisor Proponent and Others SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - August 2004) SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR Pressure Switches - Material Receiving. SAIC-J-6202 1-Oct-05 INST QC Record Reviewed Work Verified Name, Sign and Date: Quality Record Approved: Page 2 of 2