SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - August 2004)
Electrical wiring connections correct
Schedule Q,
Att. IV, Sec.6.1.
A11 Instructional manuals
Schedule Q,
Att. IV, Sec.6.1.
A10 Mounting brackets
Schedule Q,
Att. IV, Sec.6.1.
A6 Electrical Safety Execution identification
Schedule Q,
Att. IV, Sec.6.1.
ITEM
No.
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS
A1 Instrument checked against data sheet.
A2
A3 Instrument checked for damage
Schedule Q,
Att. IV, Sec.6.1.
Tag number correct
A5
Shipping stoppers removed and reinstalled after calibration wherever
applicable
A4
A8 Flow direction identification
A9 Accessories checked
Schedule Q,
Att. IV, Sec.6.1.
A7
Pneumatic wiring connections correct
SAUDI ARAMCO TEST REPORT
SATR NUMBER DATE APPROVED QR NUMBER
1-Oct-05 INST
WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR
SATR-J-6511
PLANT NO. EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
TRAVEL TIME
SAUDI ARAMCO USE ONLY
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
A12 Non conformity with spec if any
Schedule Q,
Att. IV, Sec.6.1.
Instrument Loop Outputs- Motor Operated Valve Test
PROJ ECT TITLE
A Calibration Inspection- Visual and Dimensional Checks
Page 1 of 4
E4
E5
H Motor insulation Resistance (If applicable)
F
D
D1
ITEM
No.
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE
E
E1 Manufacture's Test Variables if any to be highlighted
PASS FAIL N/A RE-TEST DATE
SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO TEST REPORT
SATR NUMBER DATE APPROVED QR NUMBER
PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR
Instrument Loop Outputs- Motor Operated Valve Test SATR-J-6511 1-Oct-05 INST
B1
G RESULTS
Resistance Meg.
Ohms
Temp Deg.
Celsius
Resistance Meg.
Ohms
Result
acceptable
Test Equipment serial numbers : (a) Digital multimeter
Limit Switches checked and operating correctly YES NO
Manufacture's Test Variables if any to be highlighted
Post installation checks
Manufacturer's test routines to be followed and calibration's to be confirmed within tolerance limits
Test Procedures
Manufacture's special Test Procedures if any, to be confirmed and verified including the following:
(a) Insure that the valve is correct according to instrument specification.
(b) Ensure that the valve is upright and supported prior to carrying out test.
(c) Ensure that no sand or foreign material is in the body of the valve.
(d) Using the Hand wheel, fully close and open the valve.
(e) Check all switches when valve stem is in the open and closed position.
(f) Disconnect all wiring and replace cover tightly
(g) Then place calibration tag, which shall be a blue colour, on valve.
(h) Sign off calibration sheet
(j) Instrument calibrations will be repeated where necessary during pre-commissioning or at any other stage where deficiencies are to be
rectified
Note- The Valve may be checked at its lay down location
During Pre-Commissioning the following tests will be performed
(a) The motor will be powered up and operation of motor will be confirmed.
(b) The hand, off, auto switch function is correct.
(c) In local control mode the open ,close and stop push button functionality will be checked.
(d) The valve will reach its closed position on the torque limit switch setting
(e) Position indication lamps will be checked for correct operation.
(f) Opening and closing time will be noted and recorded.
C General Test Routines
MOV is in accordance with spec. sheet YES NO
Valve stroke was checked and correct YES NO
C1
E2
E3
Test Report
Motor winding to
Ground
Results Rejected
Page 2 of 4
ITEM
No.
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO TEST REPORT
SATR NUMBER DATE APPROVED QR NUMBER
PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR
Instrument Loop Outputs- Motor Operated Valve Test SATR-J-6511 1-Oct-05 INST
6. SAEP-1638 Site Acceptance Test Plan, 30 April, 2002
1. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), J uly 1993
2. Schedule Q Attachment IV, Control of Monitoring and measuring devices Sec 6 & 7. (Pro Forma Contract), November 2003
3. SAES-J -700, Control Valves, 31 August 2004
4. SAEP-16- Project Execution Guide for Process Automation Systems,31 May 2003
N CONCLUSIONS
M10 Valve remote indication checked OPEN CLOSE
5. SAEP-1636 Installation and Checkout Plan , 28 February, 2005
M8 Remote operation checked OPEN CLOSE
M9 Valve local indication checked OPEN CLOSE
NOTES:
M4
M5 Valve limit switch set OPEN CLOSE
M6 Valve Torque switch set OPEN CLOSE
M7 Valve Operating time
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products
or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified
Notes
a. Indicate in 1 report all instruments of a skid tested and passed
b. Rejected items should be listed in another report, unless they were corrected within the calibration period.
c. Instruments repaired shall be indicated "Repaired and Accepted" in the test report.
After successful completion of each calibration, the instrument shall be marked with a colored label bearing date of the calibration and the initials of
the witnessing party The color code shall be as follows:
Blue- Pre Calibration Tested.
Yellow - Installed & Pressure Tested.
Green- cables or tubing tested.
Red- Loop Check completed.
8. 34-SAMSS Electric Motor Operated Valve Actuators, 31 December , 2003
Earthing as per the detail drawing
Completion Results M
M1
Valve moment free
M3 Cable terminations complete and checked
O: REFERENCE DOCUMENTS
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
7 34-SAMSS-711, Control Valves -General Services, 31 March 2003
M2
Equipment undamaged.
Page 3 of 4
ITEM
No.
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO TEST REPORT
SATR NUMBER DATE APPROVED QR NUMBER
PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR
Instrument Loop Outputs- Motor Operated Valve Test SATR-J-6511 1-Oct-05 INST
PMT Representative
T&I Witnessed QC Record Reviewed
Technician Performing Test*
Name, Title, Department,
Company, Initials and
Date:
Test Performed Successfully and Results are Acceptable:
Name, Initials and Date:
Work Verified
QC Inspector PID Representative
QC Record Reviewed
Contractor / Third-Party Saudi Aramco
with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
Work Verified
indicates compliance with appropriate standards or performance in a specified manner.
Work Verified
Name, Sign and Date:
Quality Record Approved:
Name, Organization,
Initials and Date:
T&I Witnessed
QC Supervisor Proponent and Others
Y =YES N =NO F =FAILED *Person Responsible for Implementation of Test and Analysis of Results
Name, Initials and Date:
Witnessed Test Work / Rework May Proceed
Name, Initials and Date:
T&I Witnessed
QC Record Reviewed
Page 4 of 4