1. There are three scenarios for creating master recipes: creating a new recipe, assigning a material to an existing recipe, or assigning a material to another existing recipe when the material can be produced in multiple ways.
2. The process involves transactions to create the master recipe (C201), bill of material (CS01), and production version (C202) with minor variations depending on the scenario.
3. The last two steps, creating the bill of material and validating the production version, are the same for all scenarios.
1. There are three scenarios for creating master recipes: creating a new recipe, assigning a material to an existing recipe, or assigning a material to another existing recipe when the material can be produced in multiple ways.
2. The process involves transactions to create the master recipe (C201), bill of material (CS01), and production version (C202) with minor variations depending on the scenario.
3. The last two steps, creating the bill of material and validating the production version, are the same for all scenarios.
1. There are three scenarios for creating master recipes: creating a new recipe, assigning a material to an existing recipe, or assigning a material to another existing recipe when the material can be produced in multiple ways.
2. The process involves transactions to create the master recipe (C201), bill of material (CS01), and production version (C202) with minor variations depending on the scenario.
3. The last two steps, creating the bill of material and validating the production version, are the same for all scenarios.
This document has been created to describe the different scenarios regarding creation of Master Recipes. When creating a Master Recipe for a new material two different scenarios exist: 1. New Master Recipe has to be created 2. Material has to be assigned to existing Master Recipe No matter which scenario is relevant it!s a "#step procedure where the last 2 steps are the same in both cases. The procedure involves the following transactions: $cenario 1 $cenario 2 $tep 1 $tep 2 $tep " %inall& a third scenario could occur. ' Master Recipe alread& exists for an existing material but this material can also be produced using another Master Recipe. This scenario is almost li(e scenario 2 except that it has to be done in a slightl& different wa&. $cenario " $tep 1 $tep 2 $tep " $tep ) *age 1 of 1" +2,1 +2,2 +$,1 +22" +2,2 +reate *roduction version -via +2,2. +reate /ill of Material -via +2,2. 0alidate *rod. 0ersion -+22". EUG
%or detailed description of transaction +2,1 +2,2 and +$,1 and how to created the *roduction version see 123 +2,14Maintain4Master4Recipe. Scenario 1 Create Master Recipe for new material 5n the following $cenario 1 is described. Step 1: Transaction C201 Create Master Recipe There is a little difference in the first screen depending on the Master Recipe should be created in a new or an existing Recipe group. 'fter the first screen is filled out the procedure is the same. The example illustrated is for a new Recipe 3roup. The first step if the recipe is created in an existing Recipe group is shown afterwards. New Recipe Group 5f it!s a new Recipe 3roup the Recipe group field must be left blan(. *ress 61nter7 and fill out the recipe header screen *age 2 of 1" EUG
*ress 61nter7 and fill out the 8peration screen $ave the Master Recipe. *age " of 1" EUG
Step 2: Transaction CS01 Create Bill of Material 5t is possible to create /ill of Materials -/oM. used for either production or costing. 5f onl& a production /oM is created this is automaticall& used for costing whereas a costing /oM can onl& be used for costing. The /oM 2sage controls whether it!s a costing or production /oM -1 9 *roduction : 9 costing.. *ress 61nter7 and fill out the components *ress to go to the header data and fill out the base ;uantit&. *age ) of 1" EUG
$ave the /ill of Material. Step : C22 Create !ro"uction #ersion To connect the Master Recipe and /ill of Material the *roduction version need to be created. The numbering for the first production version used for a production /oM for a specific material must be ,,,1 if a second is created it must be ,,,2 etc. 5f a production version is created for a costing /oM it must alwa&s have the number ,<<<. *age = of 1" EUG
'fter pressing 61nter7 press the button to create the production version. *ress to save the production version $elect the production version and do a consistenc& chec( b& pressing to get a green light $ave the production version. The Master Recipe is read& for use. *age : of 1" EUG
E$istin% Recipe Group 5f it!s an existing Recipe 3roup the Recipe group field must be filled out with the group number. >ereafter the procedure is as described above. Note: The Recipe number defaulted in the next screen is now 2 since number 1 alread& exists. Scenario 2 & Create Master Recipe for a new material usin% material assi%nment 5n the following $cenario 2 is described. 8nl& the first step is described. %or step 2 and " see description for scenario 1. Step 1: C202 'ssi%n material to e$istin% Master Recipe 1nter Recipe 3roup and press 61nter7. *age ? of 1" EUG
3o to the Recipe header b& pressing from the 8perations screen. *age @ of 1" EUG
*ress the button and enter the material to be assigned. $ave the Master Recipe. +ontinue with step 2 and step " described under scenario 1. Scenario & Create Master Recipe for an e$istin% material usin% material assi%nment 5n the following scenario " is described. ' Master Recipe and /ill of Material alread& exists for the material but now the material can also be produced in another wa& b& use of another Master Recipe. 5n this case +$,1 can!t be used. 5nstead the /ill of Material and *roduction version are created b& use of +2,2. Step 1: C202 'ssi%n material to e$istin% Master Recipe 1nter Recipe 3roup and press 61nter7. *age < of 1" EUG
3o to the Recipe header b& pressing from the 8perations screen. *ress the button and enter the material to be assigned. *age 1, of 1" EUG
Step 2: C202 Create !ro"uction #ersion *ress 61nter7 and double#clic( on the material entered to create the *roduction version. *roduction version number ,,,= is created and the production version points to /ill of Material number = -which is not &et created.. This action corresponds to what is normall& done in +22". Step : C202 Create Bill of Material *ress . *age 11 of 1" EUG
Then press and double clic( on the Recipe. *ress and double clic( on the relevant material to create the /ill of Material. *ress 61nter7 and fill out the component screen. When done press to return to the Master Recipe. $ave the Master Recipe. *age 12 of 1" EUG
Step (: C22 )ali"ate !ro"uction #ersion $elect the relevant production version and press . $ave the production version. *age 1" of 1"