Vous êtes sur la page 1sur 20

17 Dorset Square, London, NW1 6QB

T: +44 (0)207 871 2300 E: info@experimentus.com www.experimentus.com










Test Maturity Model integrated (TMMi)
Survey results

How Mature Are Companies Software Quality Management Processes In
Todays Market?

2011 update







Listen | Challenge | Understand | Interpret | Create

TMMi Survey Results - White Paper - 2011 update v1.0 2 Copyright 2011 Experimentus Ltd


TMMi Survey Results - White Paper - 2011 update v1.0 3 Copyright 2011 Experimentus Ltd
Table of Contents

Executive Summary .......................................................................................................................... 4
Notable Results ............................................................................................................................. 4
Areas for Concern ......................................................................................................................... 4
Conclusion ..................................................................................................................................... 5
Background ....................................................................................................................................... 6
About TMMi ................................................................................................................................... 6
The Survey .................................................................................................................................... 7
The Practice areas of TMMi Level 2 in detail ..................................................................................... 9
Overall rating ................................................................................................................................. 9
Test Policy and Strategy .............................................................................................................. 10
Test Design and Execution .......................................................................................................... 11
Test Planning .............................................................................................................................. 13
Test Environment ........................................................................................................................ 14
Test Monitoring and Control ......................................................................................................... 15
Conclusion ................................................................................................................................... 16
Industry Overview ........................................................................................................................... 17
Appendix 1 ...................................................................................................................................... 18
Background to the TMMi Model and the TMMi Foundation .......................................................... 18







Copyright 2011 Experimentus Ltd. This document and any information herein are confidential and copyright property of Experimentus
Ltd and without infringement neither the whole nor any extract may be disclosed, loaned, copied or used for manufacturing, provision of
services or other purposes whatsoever without prior written consent. No liability is accepted for loss or damages from any cause
whatsoever from the use of the document. Experimentus Ltd retain the right to alter the document at any time unless a written statement
to the contrary has been appended.

TMMi Survey Results - White Paper - 2011 update v1.0 4 Copyright 2011 Experimentus Ltd

Executive Summary
There is very little data that exists on the maturity of testing practices throughout the software
quality life cycle in the Industry and lots of people refer to the maturity with a level of certainty not
backed up by any real data. In 2009 Experimentus established a survey for this very purpose.
Two years on from that first survey, data is still being collected. This document reflects the up to
date view of organisation test maturity based upon the industry standard Test Maturity Model
integrated (TMMi) see www.tmmifoundation.org.
Of the 100 plus companies, across 9 industry sectors, who responded:
In 2009 72.5% of the respondents were at TMMi Level 1 heading for Level 2,
meaning they are working in a chaotic, hero-based way but starting to build project-
based processes. However, the 2010 survey sees that change in the right direction;
now only 63% are at TMMi Level 1 heading for Level 2, showing a reduction of13%.
In 2009 27.5% were at TMMi Level 2 heading towards Level 3, meaning they have
some established project based process and are moving towards implementing
process at an organisational level. For the 2010 survey we have seen a growth in
the average maturity of test process to 37% now achieving Level 2 and heading for
Level 3, showing an overall improvement of 35%.
As in our 2009 survey, unfortunately none of the 2010 respondents reached Level 3
although many have improved what they do and are therefore moving closer to
achieving this.
0% 20% 40% 60% 80%
TMMi Level 1
TMMi Level 2
72.5%
27.5%
63.0%
37.0%
2010/2009 Maturity accross respondents
2010
2009

Notable Results
The results suggest software testers are still consistent at designing and planning testing, but
they continue to be not so good at setting goals, monitoring tests and managing the plans.
Combine this with not being consistent in how testing is estimated and it should come as no
surprise that testing is still seen as a bottleneck to delivery.
Meanwhile, test environments are well planned and reflect production-like test environments
fairly consistently for the later stages of testing (e.g. acceptance testing). While this will always be
a difficult area to manage, the importance is clearly recognised.
Areas for Concern
It is still surprising that metrics continues to be a major weakness in the management of software
quality and testing. The marked drop in the numbers who have metrics in place has now shifted to
organisations now revisiting this (as a result of not getting the right metrics in the first place or the
data was not consistent in its meaning). Thus affecting the measurements and therefore the
For the 2010
survey we have
seen a growth in
the average
maturity of test
process to 37%
now achieving
Level 2 and
heading for Level
3, showing an
overall
improvement of
35%

TMMi Survey Results - White Paper - 2011 update v1.0 5 Copyright 2011 Experimentus Ltd

decisions which can be made as a result. This leaves many organisations without the means to
manage properly, control and improve what is undoubtedly a large proportion of the project costs.
Conclusion
It is not as though testing and software quality management is a new discipline in the software
development lifecycle, where appropriate good practices not being developed to cope with new
processes. Far from it - It is perhaps a damning indictment of the industry that after all these years
we can consistently design and plan testing, but have no thought or regard for effectively
measuring the success and efficiency of this activity (which, combined with the costs of rework,
forms a significant proportion of project costs).
The ambition of testing to be recognised as a profession will never be realised unless there is
measurement in place to manage and report on activities to assist in creating roadmaps for self-
improvement and the delivery of better quality software on time and within budget.
Management also have a considerable amount of hidden costs in the development lifecycle
which, without the right metrics, they cannot hope to understand or control. It does raise the
question as to why any organisation would want to run without consistent, meaningful and
actionable metrics, especially when this can lead to self-improvement.
Overall, the trend towards better management of software quality and testing is improving and
over time will dramatically reduce what are currently hidden costs. The questions still to be
answered are:
How quickly will the industry adopt appropriate good practices?
and
With the current state of immaturity, where can you turn to get good appropriate
practices?
Until recently the TMMi model had covered Maturity Levels 2 and 3 (Managed and Defined) and
with the release of Levels 4 and 5 covering Management and Measurement and Optimisation,
the TMMi model provides a valuable source for appropriate good practices. The use of the model
has already been established by both service providers and clients to great success, with
dedicated testing practices and even government departments beginning to benefit from its use
and in some cases looking to be certified as a way of differentiating their capability from that of
their competitors.
Overall the trend
towards better
management of
software quality
and testing is
improving and
over time will
dramatically
reduce what are
currently hidden
costs

TMMi Survey Results - White Paper - 2011 update v1.0 6 Copyright 2011 Experimentus Ltd

Background
In December 2010, the TMMi Foundation published the full TMMi model from Level 1 to 5, with
the requirements for organisations and individuals to have their assessment method for the TMMi
Model reviewed and accredited. At the same time they provided guidance on what is required to
attain Accredited Assessor status.
This release was a significant achievement for the TMMi Foundation, marking the beginning of an
industry-wide roadmap for implementing software quality management into the application
development lifecycle. Their roots go back to 2004 when a small group of quality process
improvement enthusiasts from around Europe met for the first time and decided it would make
sense to develop and support a single, non-commercial test improvement model. Since then,
there have been a growing number of supporters who acknowledge the positive difference the
TMMi model makes to the delivery of increased quality and reduced costs.
In September 2008, Experimentus became the first company to have an accredited assessment
method, accredited Assessors and Lead Assessors in the UK. After receiving its accreditation,
Experimentus conducted a survey to understand the maturity of the software quality processes
across the IT industry. Over 100 respondents, from many different industries, completed the
survey. It was decided that as the survey had been well received and as there is little other data
available about the maturity of the software testing industry that the survey would be updated.
This paper details the results of the 2010 survey and reflects the changes that have been taking
place within software quality management and test practices of organisations over the last two
years.
About TMMi
In the same way as the CMMI (Capability Maturity Model Integrated) process model is split over 5
Levels, the following diagram depicts the 5 Levels of the TMMi model.
Chaotic process
Dependent on heroes
No understanding of the cost of quality
LEVEL 1: INITIAL
Test policy and strategy
Test planning
Test monitoring and control
Test design and execution
Test environment
LEVEL 2: MANAGED
Test organisation
Test training programme
Test life cycle and integration
Non-functional testing
Peer reviews
LEVEL 3: DEFINED
Test measurement
Software quality evaluation
Advanced peer reviews
LEVEL 4: MANAGEMENT & MEASUREMENT
Defect prevention
Test process optimisation
Quality control
LEVEL 5: OPTIMISATION




TMMi Survey Results - White Paper - 2011 update v1.0 7 Copyright 2011 Experimentus Ltd


Each maturity level of the model is made up of a series of components (see diagram below).
At the top we have the Maturity Level which indicates an organisations, projects or teams level
of maturity. The Maturity Level is made up of a series of Process Areas (such as Test Policy and
Strategy). These are the areas in which goals need to be achieved to verify a Maturity Level has
been reached.

Each Process Area contains Generic and Specific Goals and Specific Practices, which in turn
provide the details required to implement the Process Area. So, for example, under the Test
Policy and Strategy Process Area there are the following supporting Practices:
Specific Goal - Establish a test policy
Specific Practice 1.1 Define test goals
Specific Practice 1.2 Define the test policy
Specific Practice 1.3 Distribute the test policy to stakeholders

Each Process Area is looked at in terms not only of its existence but also its deployment and the
effectiveness of that deployment.

Please refer to Appendix 1 for more background to the TMMi model.
The Survey
The survey was designed to align major testing activities with Process Areas analysed in a TMMi
assessment, with the purpose of providing a survey indicating the alignment of current testing
practices to this industry standard. The initial survey took place during the last quarter of 2008
and closed in February 2009 and the second survey was closed in November 2010, with each
respondent asked to review a series of statements and to answer the statement with one of
following responses:
Strongly agree that the process in question is in place and well established


TMMi Survey Results - White Paper - 2011 update v1.0 8 Copyright 2011 Experimentus Ltd

Slightly agree that the process in question existed but is not deployed
successfully
Slightly disagree that the process was in an embryonic stage
Strongly disagree no process existed
No opinion/Dont know

For the purposes of this report, any person who answered with a No opinion/Dont know
response has been removed from the graphs, therefore the total % may not always equal 100%.
We would like to thank all of those who took the time to complete the survey and hope the report
is useful in initially understanding how they compare to their peers.

TMMi Survey Results - White Paper - 2011 update v1.0 9 Copyright 2011 Experimentus Ltd

The Practice areas of TMMi Level 2 in detail
Overall rating
The following chart reflects a 35% increase in Level 2 maturity for all respondents since the
survey results published in March 2009. However no one has yet reached Level 3.
0% 20% 40% 60% 80%
TMMi Level 1
TMMi Level 2
72.5%
27.5%
63.0%
37.0%
2010/2009 Maturity accross respondents
2010
2009

What does being in TMMi Level 1 mean?
TMMi Level 1 reflects that there is little or no standardisation of process. The delivery of good
testing and software quality management depends on people who know what they are doing (they
may all be doing something different and not able to understand each others approach) and the
classic hero culture of the 24 hour test team who are indispensable. The problems arise when a
system matter experts knowledge is not accessible by others or they are no longer available. The
impact to the business can be great, resulting not only in delays, but increased risks and costs,
many examples of which have been well publicised.
What does TMMi Level 2 mean?
TMMi Level 2 reflects that for our 2010 survey 37% of the surveyed respondents have some
processes in place, in all of the five Process Areas on which this level focuses. These are:
1. Test Policy and Strategy
2. Test Design and Execution
3. Test Planning
4. Test Environment
5. Test Monitoring and Control

The small percentage of people with Level 2 is surprising, considering the number of industry
sectors in the survey who have mission-critical applications.

Looking at the results across
the 9 industry sectors who
responded, we saw a swing in
respondents from the 2009
survey to more IT support-
driven respondents, which we
believe is related to the growth
in test outsourcing and the
subsequent need for IT
support services to ensure
they are as mature as possible
to remain efficient and effective
Industry Sectors
TMMi Level 2
TMMi Level 1

TMMi Survey Results - White Paper - 2011 update v1.0 10 Copyright 2011 Experimentus Ltd

for their clients. For this survey the finance respondents, although at a lower volume than the last
survey, do seem to be showing growing maturity in their test process.
Test Policy and Strategy
This Process Area looks at how well established is the organisational view of software testing,
specifically looking at the two key organisational test documents, test policy and test strategy and
how they are deployed and understood.
A test policy has been established and agreed by the stakeholders and is aligned to
business quality policies.

A test policy is the
executive sign-off that
confirms the goals and
objectives of testing in
an organisation and
ensures that the
objectives of the testing
area is aligned with the
needs of the business
and clearly understood
and agreed by all. So if
getting to market quickly
is the business
objective, then testing
would be directed to
enable speed to market. Matching test and business objectives makes sense in order to better
serve the business.
Survey results explained: 2010 sees an increase in those working with an established test
policy from 25% in 2009 to 29%. However, 71% are working without any commitment from
executive management that what they are doing is aligned to the needs of the business.
Experimentus view: It is key that executive sponsorship for testing is obtained if it is to be taken
seriously, hence the need for a test policy. It is good news that more companies do generate test
policies but it is still very disappointing that 43% have a policy that has not been deployed, only
1% less than 2009. Working under a clear policy to deliver better quality outcomes combined with
the resultant efficiency savings is now seen to be gaining some momentum. Typical reasons for
not deploying a test policy include: the value of having a test policy not being clearly understood
by senior management; the test community having not clearly articulated the benefits to
management; that policies are generated but perhaps fall into misuse because they are poorly
written, understood and communicated. It seems pointless to put the effort into obtaining
executive authorisation and then not using that in a more open way.
Effective policies sponsored by the business typically deliver efficiency and productivity savings.
An organisation-wide or programme-wide test strategy has been established and
deployed.
The role of a test strategy is to define the detail of how testing will be implemented, either for an
organisation, programme of work or project. At the organisational level it may be more of a
framework of process and controls from which projects can select, dependent on risk and
development approach.
0% 10% 20% 30% 40% 50%
no process exists
embryonic stage
exists but is not deployed
successfully
well established
15%
13%
44%
25%
12%
14%
43%
29%
A test policy has been established
2010
2009
It is key that
executive
sponsorship for
testing is
obtained if it is to
be taken
seriously

TMMi Survey Results - White Paper - 2011 update v1.0 11 Copyright 2011 Experimentus Ltd

At the programme and
project level it is used to
specify how testing will be
carried out, thus ensuring
that at all levels of the
organisation, a common,
and more importantly, a
reusable process is
deployed. This ensures
that each tester is able to
work in a consistent,
repeatable manner, with
any process improvements
made being reflected
throughout the targeted
area.
Survey Results explained: Disappointingly, the results for fully deployed test strategies have
dropped to 29% for this survey from 33% in 2009. In contrast the amount of organisations that
have a test strategy but have yet to fully deploy it has gone up from 35% to 39% - perhaps
indicating that some existing test strategies are falling into non-use or are in the process of being
revised.
Experimentus view: With less than a third of respondents operating with an effective test
strategy, as we highlighted in 2009 it raises the question, how effective is the testing, and what
value is it adding to the organisation? These organisations are running tests, but are they focused
on the objectives of the project, or merely what the tester believes should be done? Working
without a test strategy is like using a map in the dark; you might get to where you want, but you
will probably get lost on the way, take a lot longer and spend a lot more time and money than you
planned!
These results are surprising because most testers will say they work to a strategy, but this does
not seem to be qualified by the results. For those who do, it is not clear where they get their
focus, if they do not have any test policy.
Test Design and Execution
This Process Area looks at the approach to the design of test, how well tests are executed
against the software under test and how well defects are managed and tracked to a satisfactory
solution.
Test scripts are developed, documented and prioritised.

Test scripts describe the
tests that will be run to
prove that the software
under test meets its
quality targets. Prioritising
and documenting these
scripts ensures that the
risks at release are lower,
while the quality of the
delivery is high.
Result: The very positive
news is that the volume of organisations that document and prioritise their test scripts has grown
from 53% to 57%, with no one saying that they do not do any prioritisation or documentation.
With less than a
third of
respondents
operating with an
effective Test
Strategy it raises
the question,
how effective is
the testing, and
what value is it
adding to the
organisation?
We still see the
production of test
scripts as more
important than
having a test
strategy or
policy, so no
goals, just tests!
0% 10% 20% 30% 40%
no process exists
embryonic stage
exists but is not deployed
successfully
well established
17%
13%
35%
33%
16%
14%
39%
29%
Organisation/programme-wide test strategy
has been established and deployed
2010
2009

TMMi Survey Results - White Paper - 2011 update v1.0 12 Copyright 2011 Experimentus Ltd

Experimentus view: It is still very surprising that as an industry we still see the production of test
scripts as more important than having a test strategy or policy (so, no goals, just tests). It is not all
negative as the results for this statement are better overall, with no one suggesting that they do
not document or prioritise test scripts being a big step forward. There is no excuse not to
document tests. All development methods expect documented test scripts whether structured,
iterative or agile (albeit some may be produced to record the test that took place rather than as
the test to be executed exploratory testing for example).
A Test Approach based on identified risks is established and agreed upon.

The test approach sits
below the test strategy in
the test documentation
hierarchy (or can form
part of the test strategy)
and confirms the detail of
how testing will actually
be implemented for a
project or program e.g.
templates as well as
process. This enables a
tactical approach to
dealing with risks.
Result: A small increase from 2009 from 35% to 37% of respondents actively using a risk
process when defining their test approach.
A more positive result is seen if we look at those in the strongly disagree category (who do not
use risk at all) with a large decrease from 13% to 4%.
Experimentus view: With risk assessment forming an important cornerstone to testing and with
the amount of conferences focussed on risk-based testing, it is encouraging that there is an
increased awareness and use of risk-based testing, but surprising that this statement did not get
significantly better results. Our experience reflects these results in that many organisations
struggle to get a repeatable risk process established.
Incidents found during testing are reported using an incident classification scheme and
managed using a documented procedure.
Incident classification
relates to the process
by which the priority
and severity of defects
is defined. The incident
process governs how
defects progress from
identification through to
classification. This
enables strategies to be
developed to reduce
the amount of incidents
and thereby costs and
time of re-work.
Result: This result has
remained constant between surveys at 73%. However, those who have now got a procedure
significantly increase from 10% to 24%.
0% 10% 20% 30% 40%
no process exists
embryonic stage
exists but is not deployed
successfully
well established
13%
13%
38%
35%
4%
12%
39%
37%
A test approach, based on identified risks
agreed
2010
2009
0% 20% 40% 60% 80%
no process exists
embryonic stage
exists but is not deployed
successfully
well established
8%
6%
10%
73%
4%
0%
24%
73%
Incident classification scheme and process
implemented
2010
2009
It is encouraging
that there is an
increased
awareness and
use of risk based
testing

TMMi Survey Results - White Paper - 2011 update v1.0 13 Copyright 2011 Experimentus Ltd

The Experimentus view: Incident management continues to show it is the most intuitive process
within the testing lifecycle. It is the one thing that the test industry can be proud it does well! This
is not surprising but we cannot say whether the incidents are consistently classified, meaningful
and actionable.
Test Planning
This Process Area looks at the processes of the test plan development including estimating.
A Test Plan is established and maintained as the basis for managing testing and
communication to stakeholders.
A test plan is the
document that defines
what the day to day
activity on a testing
project is. To be useful it
needs to be updated as
the project/programme
changes. It plays a large
part in ensuring that
testing starts and
completes on time and
that risks and any
delays are identified
early.
Result: Another maturity increase from 54% to 57% who are now documenting their plans and
maintaining the plan once agreed.
The Experimentus view: Although the numbers have improved from 2009 there are still many
test projects working without a plan, this is not good. Not having a plan is like getting lost and
trying to get home with a blank sheet of paper; you do not know where you are or when you will
arrive at your destination!
An approach to test estimation based on a repeatable process and/or historical data is in
place.
A mature organisation
bases its estimation on
the time, people and
environments required
to deliver the test
project on a common
repeatable process.
This ensures that as
actual post release data
becomes known, the
estimating data can be
refined to provide more
and more accurate
estimates in the future.
Result: A significant increase on the last survey with a massive increase from 17% in 2009 to
39% in 2010 of those who are now using a repeatable estimation process.
The Experimentus view: This is the best result of the 2010 survey and indicates a big step
forward for software test planning, and a better understanding of the value of a repeatable
process for estimating. A good, well-understood, repeatable estimation process ensures that
0% 10% 20% 30% 40% 50% 60%
no process exists
embryonic stage
exists but is not deployed
successfully
well established
8%
8%
27%
54%
0%
8%
35%
57%
A test plan is established and maintained
2010
2009
0% 10% 20% 30% 40%
no process exists
embryonic stage
exists but is not deployed
successfully
well established
13%
33%
33%
17%
10%
22%
27%
39%
Test estimation based on a repeatable process is
used
2010
2009
A massive
increase from
17% in 2009, to
33% in 2010 who
are now using a
repeatable
estimation
process
Incident
Management
continues to
show it is the
most intuitive
process in the
testing lifecycle.
It is the one thing
that the test
industry can be
proud it does well

TMMi Survey Results - White Paper - 2011 update v1.0 14 Copyright 2011 Experimentus Ltd

software testing planning will be better validated and have a significantly better chance of
obtaining the budget it requires.
Test Environment
This Process Area looks at how well-planned and implemented are the test environments.
Test environments are specified early and their availability is ensured on time in projects.
Understanding the test
environment requirements
early enough and in
sufficient detail, enables
costs to be built in early to
a project plan, thus
providing early visibility to
the business. The details
of any new environments
should be provided by the
technical architects with
the test team deciding
when they are needed
and how they are to be
delivered (phased or all
together). Over time, this will ensure efficiency and accuracy of test environments with associated
costs which have been planned for.
Result: The number of respondents who specify their test environments early has dropped from
40% in 2009 to 37% in 2010, but the number with a process not yet deployed for this area has
gone up by nearly 10%, which is a positive sign.
The Experimentus view: Test environments are an area often blamed for delays in testing due to
poor construction or generally not getting what is requested. The drop in the number planned
early and available and working on time is perhaps a signal of the fact that as testers we need to
recognise - that sometimes we are not as effective as we should be at defining the environments
we require and getting them booked and implemented in time!
For later test stages (e.g. system or acceptance testing), the test environment is as real
life as possible.
For the later stages in
testing, to ensure that the
software will work in
production, it is crucial
that the test environment
replicates the production
environment as far as
software/hardware and
configuration is
concerned. It may be
smaller than a production
environment in terms of
data, but not so small that
it will not react in the
same way. Increased
risks in deployment are mitigated by understanding the relationship between this and the live
environment.
0% 10% 20% 30% 40% 50%
no process exists
embryonic stage
exists but is not deployed
successfully
well established
8%
17%
33%
40%
6%
16%
41%
37%
Test environments are specified early and their
availability is ensured
2010
2009
0% 10% 20% 30% 40% 50% 60%
no process exists
embryonic stage
exists but is not deployed
successfully
well established
4%
13%
25%
56%
4%
10%
29%
55%
For later test stages the test environment is as
real life as possible
2010
2009
Test
Environments is
an area often
blamed for
delays in testing

TMMi Survey Results - White Paper - 2011 update v1.0 15 Copyright 2011 Experimentus Ltd

Result: Very little change from the 2009 results, with 55% of test environments reflecting real life.
The Experimentus view: It continues to be a good sign that the system and user acceptance
test phases do use production like environments. Good environments and data ensure that the
outcome of the test execution, positive or negative, can be believed. This will continue to be a
challenge for organisations with complex systems and is perhaps reflected in the increases seen
in more test approaches which are based on risk.
Test Monitoring and Control
This Process Area is focussed on the collection and use of metrics to report progress and identify
possible improvements to the process.
A set of goal oriented test process performance indicators have been established and
deployed.
For testing to measure
whether or not it is effective,
it needs to set itself some
performance indicators such
as achieving a certain level
of Defect Detection
Percentage (DDP). You
cannot manage what you do
not measure.
Result: A significant drop
from 2009s results, from
30% to 14%. With a
significant increase in those
that have a set of
performance indicators but
have not yet implemented them fully.
The Experimentus view: In our opinion this is not only the worst result of the entire survey, but
the industry seems to have moved backwards in its use of metrics. The increase in those
organisations that have indicators, but have not implemented them fully, may be a refection of the
goals originally set up not providing the right level of meaningful and actionable measurement.
Organisations may therefore be revisiting their performance indicators, which is seen in the
increase from 25% to 49%. Interestingly there is a decrease of around 50% in organisations that
previously did not have test goals, reflecting an increased take up of performance indicators by
the more immature organisations.
Progress of testing is monitored against the Test Plan.
We saw in Test
Planning that it is
important to keep the
plan up to date. It is
equally important to
measure actual activity
against planned activity.
Any slippage can then be
identified and managed
before it creates any real
issues.
Result: A significant
increase from 42% in
2009 to 59% in 2010 of
0% 10% 20% 30% 40% 50%
Dont have test goals
Dont think we have test goals
Might have test goals
Have test goals
25%
17%
25%
29%
14%
22%
49%
14%
A set of goal oriented test process performance
indicators has been established and deployed
2010
2009
0% 10% 20% 30% 40% 50% 60%
no process exists
embryonic stage
exists but is not deployed
successfully
well established
8%
13%
35%
42%
4%
8%
29%
59%
Progress of testing is monitored against the Test
Plan
2010
2009
In our opinion,
this is not only
the worst result
of the entire
survey, but as an
industry we seem
to have moved
backwards in our
use of metrics

TMMi Survey Results - White Paper - 2011 update v1.0 16 Copyright 2011 Experimentus Ltd

those who do track progress against the agreed plan.
The Experimentus view: It is very encouraging to see test organisations getting better at
progress monitoring. It is still a long way from good, but it is improving. A project that does not
monitor its progress has no clue where it is or when it will finish!
Conclusion
The survey results show that we are improving as an industry with the overall maturity of testing
increasing over the two year period since the last survey. The signs are that this will continue as
more and more companies realise the benefits that improvements to software quality
management and test processes can bring.
The signs from the survey are encouraging from those organisations that were previously the
least mature, making positive improvements to the way they work, with more mature
organisations looking to and using testing efficiency as a way of meeting current budget restraint.
There seems to be a more focussed, professional attitude which needs data to substantiate
current activities and to measure improvements made.
In the last 2 years a lot of economic and political change has taken place that is driving down the
budget available for IT. This has focus, and will continue to focus, everyone on being more
efficient or effective at what they do. There is of course the alternative where process and
methods just get ignored in the haste to save money. This as will be obvious to anyone reading
this, leads to inflated costs, at less quality delivered than expected and often delivered late - all
those things which the business regularly bring up as areas for improvement.
The improvement in maturity overall is heading in the right direction and it is expected that as
software quality and testing come under increasing pressure in the coming year that the rate of
increase will be greater year on year to reflect both economic and competitive advantage.


TMMi Survey Results - White Paper - 2011 update v1.0 17 Copyright 2011 Experimentus Ltd

Industry Overview
The challenge we see for the industry is to increase the rate of maturity of software quality
management and test processes, to enable testing to be clearly labelled as a profession within
the application life cycle. The ambition of testing to be recognised as a profession will never be
realised unless there is measurement in place to manage and report on activities which assist in
creating roadmaps for self improvement and the delivery of better quality software on time and in
budget.
Management also have a considerable amount of hidden costs in the development lifecycle
which, without metrics, they cannot hope to understand or control. It does raise the question as to
why any organisation would want to run without consistent, meaningful and actionable metrics.
Particularly now that the TMMi Foundation has completed the development of the full TMMi model
by adding Maturity Levels 4 and 5 covering Management and Measurement and Optimisation,
there is no reason why the rate of improvement of maturity cannot be increased further. The
spread of appropriate good practices into software quality management and test processes can
only be a good thing, raising the professionalism of testing and managements capability to
manage.
We certainly expect the growth in the maturity of testing to continue. We propose that in order to
maximise the benefits of improvements, the industry must focus in the areas of goal setting and
metrics/reporting as an established practice, to demonstrate to the business the value provided
and progress made, as well as delivering input into determining the roadmap for further
improvements to meet the challenges in the coming years. The short-term implication of this will
be to bring into sharp focus the wasted cost and effort which exist hidden in the development
lifecycle.
Experimentus has seen a number of trends in the industry which reflect an increase in the desire
to improve the way we manage software quality and testing:
System Integrators and specialist test companies are under increasing pressure from
their clients and prospects to demonstrate their real commitment to delivering and
improving quality. We are now increasingly being asked to certify their processes
against good appropriate practices in order for them to provide competitive and
demonstrable differentiation
Organisations who are still suffering from the same problems they have had for some
years, now are under increasing pressure from the business to solve those problems so
that they can better compete
The move from would like to to must regarding increasing efficiency and savings
while maintain or enhancing the quality of deliverables
For International organisations, test and quality management capability assessments
are on the increase to provide frameworks for the better management and delivery of
quality and identify hidden costs
Now that the full TMMi model has been published and with the anticipated increase in the number
of accredited assessors, there is every reason and opportunity for organisations to achieve and
increase their rate of maturity, improve quality and eliminate those hidden costs.
It is also interesting to note that the number of people joining the TMMi Foundation have
increased dramatically with the model gradually being adopted by many organisations.
The spread of
appropriate good
practices into
software quality
management and
test processes
can only be a
good thing

TMMi Survey Results - White Paper - 2011 update v1.0 18 Copyright 2011 Experimentus Ltd

Appendix 1
Background to the TMMi Model and the TMMi Foundation
The Test Maturity Model integrated (TMMi) has been developed to complement the existing CMMI (Capability Maturity
Model Integrated) framework and to specifically deal in detail with software quality.
It provides a structured presentation of maturity levels, allowing for standard TMMi assessments and certification, enabling
a consistent deployment of the standards and the collection of industry metrics.
TMMi has a rapidly growing uptake across Europe, Asia and the USA and owes its popularity to being the only
independent test process measurement method.
The independent TMMi Foundation initiative (www.tmmifoundation.org) has been established with the sole intent of
developing the TMMi standard.
The TMMi Foundation provides:
A standard, staged TMMi model that can be used in isolation or in support of other process improvement models.
TMMi Assessment Method Application Requirements (TAMAR) for TMMi in accordance with ISO15504 and the
process to certify commercial assessment methods against the standard model.
Certification and training/examination process, procedures and standards for formal, public accreditation of
Assessors and Lead Assessors and the on-going management.
An independently managed data repository to support TMMi assessment method accreditation, assessor and
assessment certification/validation and validated assessment data and certificates.




TMMi Survey Results - White Paper - 2011 update v1.0 19 Copyright 2011 Experimentus Ltd




TMMi Survey Results - White Paper - 2011 update v1.0 20 Copyright 2011 Experimentus Ltd







LISTEN
We actively listen to our clients enterprise
computing issues and challenges, giving careful
consideration to their individual requirements.

CHALLENGE
Focussed on consistently improving operational
efficiencies and providing confidence to make
risk-management decisions, we pioneer new
ways to challenge our clients thinking.

UNDERSTAND
Our proven expertise and broad understanding is
based on over 25 years of consultancy, analysis
and testing of large enterprise applications.

INTERPRET
Our unique analytical approach and
commitment ensures that our clients
requirements are translated into first class
deliverables with measurable results
and productivity gains.

CREATE
We create superior quality solutions that
deliver not only innovation, but help our
clients to reduce cost, mitigate risk
and enhance revenue.








Experimentus Ltd
17a Dorset Square
London
NW1 6QB

Tel:+44 (0)207 871 2300
Web:info@experimentus.com

www.experimentus.com