Project (o.: 11-)30)4 C*V*L
X3.3 +,-./% /F +,0S1&,+,(- for -emporar# Facilitie
%ecription and %efinition of Poition in t2e 3ill of 4"antitie X4.3
L*S- /F C/(-,(-
0. General
For 3ill of 4"antitie X4.3 5 -emporar# Facilitie
41. Temporary Facilities Contractor
42. Temporary Facilities for the Employer and/or Owner
/ar/www/apps/conersion/tmp/scratch!1/2"1#20$01.doc
Project: FLS Standard 3.000 tpd X3.3 - Page: $ of 14
Greenfield Cement Plant Verion: !an"ar# $01$
%& Congo &e'.: 0 - %ate: 0$ !an $011
Project (o.: 11-)30)4 C*V*L
00. G,(,&0L
The %eneral lay&o't drawin%s hae (een prepared to indicate the e)tent of all the %eneral* ciil*
('ildin% and str'ct'ral steel wor+s. ,oweer* these drawin%s are meant for %iin% a %eneral
idea of the e)tent of the wor+ inoled in the pro-ect only.
.t sho'ld (e emphasised that /'antities listed in the correspondin% 0ill of 1'antities are
preliminary and will as s'ch (e appro)imate only. 2ome /'antities may also not (e applica(le
in the final pro-ect and will in s'ch cases not (e paya(le. The e)act /'antities can (e
esta(lished only when the final and detailed drawin%s are ela(orated.
The Tender shall* howeer* (e (ased on the /'antities indicated in the 0ill of 1'antities which
are prior to the drawin%s.
0efore e)ec'tion of the 3or+s* detailed drawin%s will (e ela(orated actiity (y actiity and
final theoretical 4ET /'antities will (e hae to (e a%reed (ased on meas'res from the detailed
drawin%s with no allowance for waste* (rea+a%e* oerlaps* etc* if the rate is not to (e %ien as
5'mp 2'm.
The 'nit prices in the 0ill of 1'antities shall incl'de the costs of all delieries and wor+s
pertainin% to the position* s'ch as* ('t not limited to* (asic materials* accessories*
prefa(rication* scaffoldin%* shorin%* formwor+* transport* waste* preparation* all intermediate
meas'res* and final treatments necessary to delier a complete prod'ct.
For f'rther re/'irements reference is %ien to the section G1 6 7ream(le to 2'mmary of
7rices.
The 'nit prices shall f'rther incl'de costs of all tests specified in standards* codes of practice*
contract doc'ments and normal accordin% to local practice.
.t sho'ld (e stressed that the 'nit prices /'oted are alid for all similar wor+ in other
departments* een if the wor+ in /'estion in the present tender doc'ments is estimated at nil.
3here seeral operations/cost are specified for wor+s meas'red in 5'mp 2'm* no
meas'rement will (e made and the rate shall (e deem to incl'de all serices* s'pplies*
actiities etc. re/'ired for the final prod'ct.
7ositions left 'n&priced shall (e deemed incl'ded in 'nit prices for other positions.
.t sho'ld (e stressed that no other system of meas'rement that the one descri(ed in this
pream(le will (e accepted.
/ar/www/apps/conersion/tmp/scratch!1/2"1#20$01.doc
Project: FLS Standard 3.000 tpd X3.3 - Page: 3 of 14
Greenfield Cement Plant Verion: !an"ar# $01$
%& Congo &e'.: 0 - %ate: 0$ !an $011
Project (o.: 11-)30)4 C*V*L
For 3ill of 4"antitie X4.3 - -emporar# Facilitie
Pleae refer to decription ection X1.3 alo for pecific re6"irement to rele'ant poition
for t2e act"al project.
41. -,+P/&0&7 F0C*L*-*,S for C/(-&0C-/&
This section comprises the complete temporary installations and facilities needed (y the
Contractor for the performance of his scope of the wor+.
The Contractor8s stora%e areas and constr'ction areas shall (e proided with temporary
fencin%* li%htin%* %'ardin% etc.
9ll areas 'sed for temporary site facilities shall (e made %ood 'pon completion of the
s'(contract to the satisfaction of the Employer and the Owner.
The Contractor shall hae incl'ded in this %ro'p all needed costs for mo(ilisation*
demo(ilisation* r'nnin%* mana%in%* etc. not incl'ded elsewhere in l'mp s'ms and 'nit
prices.
:ependin% on the Contractor8s set&'p of his site and site r'nnin% he may not need all the
(elow price&items* on the other hand the Contractor may add other cost items if he finds it
needed.
41.010 ,ta8li2ment Cot 9for Contractor: 5 ot2er t2an 41.011 and 41.01$:
This position shall incl'de all esta(lishment wor+* site preparation of stora%e areas and
access roads* r'nnin%* maintenance and demolition costs not incl'ded in the releant
positions listed (elow. The cost shall incl'de r'nnin% and demolition cost.
To (e meas'red as a 5'mp 2'm.
41.011 ,ta8li2ment Cot 5 camp for Contractor; Staff:
This position shall incl'de all releant cost for the accommodation of the Contractors
2taff not incl'ded in other releant positions. The cost shall incl'de r'nnin% and
demolition cost.
To (e meas'red as a 5'mp 2'm.
41.01$ ,ta8li2ment Cot 5 camp for Contractor; <or=er:
This position shall incl'de all releant cost for the accommodation of the Contractors
2taff not incl'ded in other releant positions. The cost shall incl'de r'nnin% and
demolition cost.
/ar/www/apps/conersion/tmp/scratch!1/2"1#20$01.doc
Project: FLS Standard 3.000 tpd X3.3 - Page: 4 of 14
Greenfield Cement Plant Verion: !an"ar# $01$
%& Congo &e'.: 0 - %ate: 0$ !an $011
Project (o.: 11-)30)4 C*V*L
To (e meas'red as a 5'mp 2'm.
41.110 /ffice 9for Contractor:> "ppl# and erection
This position incl'des the costs of s'pply and erection of the Contractor8s offices
incl'din% all facilities. The Contractor m'st determine the re/'ired space* form* /'ality
etc. of s'ch facility himself.
To (e meas'red as a 5'mp 2'm.
41.1$0 /ffice> r"nning and maintenance
This position incl'des the costs of r'nnin% and maintenance of the offices mentioned
'nder pos. 41.110.
To (e meas'red as a 5'mp 2'm.
41.130 /ffice> demolition
This position incl'des the cost of demolition and remoal of the offices mentioned 'nder
pos. 41.110.
To (e meas'red as a 5'mp 2'm.
41.$00 Storage 9for Contractor:> "ppl# and erection
This position incl'des the cost of s'pply and erection of the Contractor8s stora%e areas*
plant yards* roads* fences etc. incl'din% all facilities. . The Contractor m'st determine the
re/'ired space* form* /'ality etc. of s'ch facility himself.
2tora%e areas for the e/'ipment* materials etc. s'pplied (y the Employer to the Contractor
are to (e incl'ded 'nder the releant positions 'nder 2ection 42.
To (e meas'red as a 5'mp 2'm.
41.$10 Storage> r"nning and maintenance
This position incl'des the cost of r'nnin% and maintenance of the Contractor8s stora%e
areas* plant yards* roads* fences* etc. mentioned 'nder pos. 41.200.
To (e meas'red as a 5'mp 2'm.
41.$$0 Storage> demolition
This position incl'des the cost of demolition and remoal of the Contractor8s stora%e
areas* plant yards* roads* fences* etc. mentioned 'nder pos. 41.200
To (e meas'red as a 5'mp 2'm.
/ar/www/apps/conersion/tmp/scratch!1/2"1#20$01.doc
Project: FLS Standard 3.000 tpd X3.3 - Page: ? of 14
Greenfield Cement Plant Verion: !an"ar# $01$
%& Congo &e'.: 0 - %ate: 0$ !an $011
Project (o.: 11-)30)4 C*V*L
41.300 @or=2op 9for Contractor:> "ppl# and erection
This position incl'des the costs of s'pply and erection of the Contractor8s wor+shops*
sheds* etc. incl'din% all facilities. The Contractor m'st determine the re/'ired space*
form* /'ality etc. of s'ch facility himself.
To (e meas'red as a 5'mp 2'm.
41.310 @or=2op> r"nning and maintenance
This position incl'des the costs of r'nnin% and maintenance of the wor+shops* sheds* etc.
mentioned 'nder pos. 41."00.
To (e meas'red as a 5'mp 2'm.
41.3$0 @or=2op> demolition
This position incl'des the costs of demolition and remoal of the wor+shops* sheds* etc.
mentioned 'nder pos. 41."00.
To (e meas'red as a 5'mp 2'm.
41.400 La8orator# 9for Contractor:> "ppl# and erection
This position incl'des the costs of s'pply and erection of a la(oratory ('ildin% incl.
weather station and f'lly e/'ipped for analysin% and testin% of soil* concrete* materials
etc. in accordance with the contract.
Geotechnical field testin% to (e incl'ded 'nder this position.
The Contractor may also chose to 'se o'tside /'alified facilities and/or parties s'(-ect to
prior approal of those (y the Employer 6 refer to section ;1.".
To (e meas'red as a 5'mp 2'm.
41.410 La8orator#> r"nning and maintenance
This position incl'des the cost of r'nnin% and maintenance of the la(oratory* mentioned
'nder pos. 41.400.
To (e meas'red as a 5'mp 2'm.
41.4$0 La8orator#> demolition
This position incl'des the cost of demolition and remoal of the la(oratory* mentioned
'nder pos. 41.400.
/ar/www/apps/conersion/tmp/scratch!1/2"1#20$01.doc
Project: FLS Standard 3.000 tpd X3.3 - Page: A of 14
Greenfield Cement Plant Verion: !an"ar# $01$
%& Congo &e'.: 0 - %ate: 0$ !an $011
Project (o.: 11-)30)4 C*V*L
To (e meas'red as a 5'mp 2'm.
41.?00 Po<er 9for Contractor:> "ppl# and erection
This position incl'des the cost of s'pply and erection of the Contractor8s li%htin% and
power s'pply for the e)ec'tion of the 3or+s* incl. all distri('tion ca(les* poles*
transformers* meters* %enerators <if needed=* etc.
Costs for esta(lishin% a new connection to local power %rid sho'ld (e incl'ded.
To (e meas'red as a 5'mp 2'm.
41.?10 Po<er> r"nning and maintenance
This position incl'des the cost of r'nnin% and maintenance of the Contractor8s li%htin%
and power for the wor+s* incl. all distri('tion ca(les* poles* %enerators <if needed=*
transformers* meters etc. mentioned 'nder pos. 41.$00.
Costs for the power cons'med (y the Contractor sho'ld (e incl'ded.
To (e meas'red as a 5'mp 2'm.
41.?$0 Po<er> demolition
This position incl'des the costs of r'nnin% and remoal of the Contractor8s li%htin% and
power for the wor+s. incl. all distri('tion ca(les* poles* %enerators <if needed=*
transformers* meters etc. mentioned 'nder pos. 41.$00.
To (e meas'red as a 5'mp 2'm.
41.??0 @ater 9for Contractor:> "ppl# and erection
This position incl'des the costs of s'pply and erection of water installation for the wor+s
incl. tan+s* distri('tion system* meters* etc.
Costs for esta(lishin% a new connection to local water system sho'ld (e incl'ded.
To (e meas'red as a 5'mp 2'm.
41.?A0 @ater> r"nning and maintenance
This position incl'des the costs of r'nnin% and maintenance of water installation for the
wor+s incl. tan+ distri('tion system* meters* etc. mentioned 'nder pos.41.$$0.
Costs for water cons'med sho'ld (e incl'ded.
To (e meas'red as a 5'mp 2'm.
/ar/www/apps/conersion/tmp/scratch!1/2"1#20$01.doc
Project: FLS Standard 3.000 tpd X3.3 - Page: ) of 14
Greenfield Cement Plant Verion: !an"ar# $01$
%& Congo &e'.: 0 - %ate: 0$ !an $011
Project (o.: 11-)30)4 C*V*L
41.?)0 @ater %emolition
This position incl'des the cost of demolition and remoal of water installation for the
wor+s inc. tan+s* distri('tion system* meters* etc. mentioned 'nder pos. 41.$$0.
To (e meas'red as a 5'mp 2'm.
41.A00 Site drainage
This position coers the cost of ma+in% all temporary site draina%e d'rin% the
constr'ction period incl'din% c'rrent maintenance and ma+in% %ood at completion.
To (e meas'red as a 5'mp 2'm.
41.A10 Contr"ction road
This position coers the cost of ma+in% all temporary site roads incl'din% c'rrent
maintenance and ma+in% %ood at completion.
The cost shall coer maintenance of roads (oth inside and o'tside the site also if dama%ed
(y the 'se of the Contractor.
To (e meas'red as a 5'mp 2'm.
41.B00 S"r'e#ing <or=
This position coers the cost of all necessary s'reyin% wor+s <(ein% settin% o't* leels*
topo%raphy etc.= d'rin% constr'ction period.
To (e meas'red as a 5'mp 2'm.
41.B10 %a# and nig2t <atc2ing
This position coers the cost of all necessary day and ni%ht watchin% d'rin% the
constr'ction period.
To (e meas'red as a 5'mp 2'm
41.C10 Special preca"tion mo'ing for load
This position coers the cost of ma+in% all necessary reinforcement and preca'tions
related to roads* (rid%es* c'lerts etc. for moin% heay loads to the stora%e areas* from
the stora%e areas to the site and internally on the site to the point of erection.
/ar/www/apps/conersion/tmp/scratch!1/2"1#20$01.doc
Project: FLS Standard 3.000 tpd X3.3 - Page: B of 14
Greenfield Cement Plant Verion: !an"ar# $01$
%& Congo &e'.: 0 - %ate: 0$ !an $011
Project (o.: 11-)30)4 C*V*L
The cost of special e/'ipment is to (e incl'ded elsewhere.
To (e meas'red as a 5'mp 2'm
/ar/www/apps/conersion/tmp/scratch!1/2"1#20$01.doc
Project: FLS Standard 3.000 tpd X3.3 - Page: C of 14
Greenfield Cement Plant Verion: !an"ar# $01$
%& Congo &e'.: 0 - %ate: 0$ !an $011
Project (o.: 11-)30)4 C*V*L
4$. -emporar# Site Facilitie for t2e ,mplo#er and /<ner.
Pleae refer to ection X1.3 alo for pecific re6"irement to rele'ant poition for t2e act"al
project.
4$.010 /ffice 9for ,mplo#er:> "ppl# and erection
This position incl'des the costs of s'pply and erection of an office ('ildin% for the
Employer* incl'din% f'rnit're and appliances* and all electrical* sewera%e and sanitary
installations* heatin% and air&conditionin%* proisions for telephone and telefa) <for
n'm(er of lines refer to ;1." with minim'm 1 international=* etc.
To (e meas'red as a 5'mp 2'm.
4$.0$0 /ffice> r"nning and maintenance
This position incl'des costs of r'nnin% and maintenance incl. s'pply of electricity and
water* cleanin% and attendance for the Employer8s site staff for the offices mentioned
'nder pos. 42.010.
To (e meas'red in >onths.
4$.030 /ffice> demolition
This position incl'des costs of demolition and remoal of the offices mentioned 'nder
pos. 42.010.

To (e meas'red as a 5'mp 2'm.
4$.0?0 /ffice ca8in 9for ,mplo#er:> "ppl# and erection
This position incl'des costs of s'pply and erection of an office ca(in for the Employer*
incl'din% f'rnit're and appliances* and all electrical* heatin% and air&conditionin%*
proisions for telephone <min 1 international ? 1 local= etc.
To (e meas'red as a 5'mp 2'm per 'nit.
4$.0A0 /ffice ca8in> r"nning and maintenance
This position incl'des costs of r'nnin% and maintenance incl. s'pply of electricity*
cleanin% and attendance for the Employer8s site staff for the office ca(ins mentioned
'nder pos. 42.0$0.
To (e meas'red in >onths.
4$.0)0 /ffice ca8in> demolition
/ar/www/apps/conersion/tmp/scratch!1/2"1#20$01.doc
Project: FLS Standard 3.000 tpd X3.3 - Page: 10 of 14
Greenfield Cement Plant Verion: !an"ar# $01$
%& Congo &e'.: 0 - %ate: 0$ !an $011
Project (o.: 11-)30)4 C*V*L
This position incl'des costs of demolition and remoal of the offices mentioned 'nder
pos. 42.0$0.

To (e meas'red as a 5'mp 2'm per 'nit.
4$.100 /<ner; /ffice 9if ,mplo#er "ppl#:> "ppl# and erection
This position incl'des costs of s'pply and erection of an office ('ildin% for the Owner*
incl'din% f'rnit're and appliances* and all electrical* sewera%e and sanitary installations*
heatin% and air&conditionin%* proisions for telephone and facsimile lines <for n'm(er of
lines refer to section ;1."=* etc.
To (e meas'red as a 5'mp 2'm.
4$.110 /<ner; /ffice> r"nning and maintenance
This position incl'des costs of r'nnin% and maintenance incl. 2'pply of electricity and
water* cleanin% and attendance for Owners site staff for the offices mentioned 'nder pos.
42.100.
To (e meas'red in >onths.
4$.1$0 /<ner /ffice> demolition
This position incl'des costs of demolition and remoal of the offices mentioned 'nder
pos. 42.100.

To (e meas'red as a 5'mp 2'm.
4$.1?0 Canteen 9for ,mplo#er:> "ppl# and erection
This position incl'des costs of s'pply and erection of a canteen ('ildin% for F52*
incl'din% f'rnit're and appliances* and all electrical* sewera%e and sanitary installations*
heatin% and air&conditionin% etc.
To (e meas'red as a 5'mp 2'm.
4$.1A0 Canteen> r"nning and maintenance
This position incl'des costs of r'nnin% and maintenance incl. 2'pply of electricity and
water* cleanin% and attendance for the ('ildin% mentioned 'nder pos. 42.1$0.
To (e meas'red in >onths.
4$.1)0 Canteen> demolition
/ar/www/apps/conersion/tmp/scratch!1/2"1#20$01.doc
Project: FLS Standard 3.000 tpd X3.3 - Page: 11 of 14
Greenfield Cement Plant Verion: !an"ar# $01$
%& Congo &e'.: 0 - %ate: 0$ !an $011
Project (o.: 11-)30)4 C*V*L
This position incl'des costs of demolition and remoal of the offices mentioned 'nder
pos. 42.1$0.

To (e meas'red as a 5'mp 2'm.
4$.$00 /ffice for Storage 9for ,mplo#er:> "ppl# and erection
This position incl'des the costs of s'pply and erection of an office ('ildin% for the
2tora%e 9rea for the Employers s'pplies* incl'din% f'rnit're and appliances* and all
electrical* sewera%e and sanitary installations* heatin% and air&conditionin%* proisions for
telephone and telefa) <for n'm(er of lines refer to ;1." with minim'm 1 international=*
etc.
To (e meas'red as a 5'mp 2'm.
4$.$10 /ffice for Storage> r"nning and maintenance
This position incl'des costs of r'nnin% and maintenance incl. s'pply of electricity and
water* cleanin% and attendance for the Employer8s site staff for the offices mentioned
'nder pos. 42.200.
To (e meas'red in >onths.
4$.$$0 /ffice for Storage> demolition
This position incl'des costs of demolition and remoal of the offices mentioned 'nder
pos. 42.200.

To (e meas'red as a 5'mp 2'm.
4$.$40 /pen Fenced Storage 0rea 9for ,mplo#er "pplie:> "ppl# and erection
This position incl'des costs of s'pply and constr'ction of an open stora%e area for the
machinery and other parts s'pplied (y the Employer* incl. roads* fences* %ates* li%htin%*
draina%e* sleepers* etc.

To (e meas'red as a 5'mp 2'm.
4$.$?0 /pen Fenced Storage 0rea> r"nning and maintenance
This position incl'des costs of r'nnin%* operatin% and maintenance incl'din% s'pply of
electricity* %'ardin%* etc.* for the stora%e mentioned 'nder pos. 42.240.

To (e meas'red in >onths.
4$.$A0 /pen Fenced Storage 0rea> demolition
/ar/www/apps/conersion/tmp/scratch!1/2"1#20$01.doc
Project: FLS Standard 3.000 tpd X3.3 - Page: 1$ of 14
Greenfield Cement Plant Verion: !an"ar# $01$
%& Congo &e'.: 0 - %ate: 0$ !an $011
Project (o.: 11-)30)4 C*V*L
This position incl'des costs of demolition and remoal of the stora%e mentioned 'nder
pos. 42.240.

To (e meas'red as a 5'mp 2'm.
4$.$)0 /pen 1nfenced Storage 0rea 9for ,mplo#er "pplie:> "ppl# and erection
This position incl'des costs of s'pply and constr'ction of an open stora%e area for the
machinery and other parts s'pplied (y the Employer* incl. roads* fences* %ates* li%htin%*
draina%e* sleepers* etc.

To (e meas'red as a 5'mp 2'm.
4$.$B0 /pen 1nfenced Storage 0rea> r"nning and maintenance
This position incl'des costs of r'nnin%* operatin% and maintenance incl'din% s'pply of
electricity* %'ardin%* etc.* for the stora%e mentioned 'nder pos. 42.2@0.

To (e meas'red in >onths.
4$.$C0 /pen 1nfenced Storage 0rea> demolition
This position incl'des costs of demolition and remoal of the stora%e mentioned 'nder
pos. 42.2@0.

4$.300 Cloed Storage 9for ,mplo#er "pplie:> "ppl# and erection
This position incl'des costs of s'pply and erection of a closed stora%e area for machinery
and other parts s'pplied (y the Employer* incl. concrete floors* %ates* li%htin%* draina%e*
f'rnit're* sheles* etc.
To (e meas'red as a 5'mp 2'm.
4$.310 Cloed Storage> r"nning and maintenance
This position incl'des costs of r'nnin%* operation and maintenance incl'din% s'pply of
electricity* %'ardin%* etc.* for the stora%e mentioned 'nder pos. 42."00. This item also
incl'des store personnel for all the stora%e 6 open* coered* closed 6 proided for F52.
To (e meas'red in >onths.
4$.3$0 Cloed Storage> demolition
This position incl'des costs of demolition and remoal of the stora%e mentioned 'nder
pos. 42."00.

To (e meas'red as a 5'mp 2'm.
/ar/www/apps/conersion/tmp/scratch!1/2"1#20$01.doc
Project: FLS Standard 3.000 tpd X3.3 - Page: 13 of 14
Greenfield Cement Plant Verion: !an"ar# $01$
%& Congo &e'.: 0 - %ate: 0$ !an $011
Project (o.: 11-)30)4 C*V*L
4$.330 Cloed Storage for electrical e6"ipment 9for ,mplo#er "pplie:> "ppl# and
erection
This position incl'des costs of modification of the e)istin% store to form a closed stora%e
area for electrical e/'ipment and other parts s'pplied (y the Employer* incl. Concrete
floors* %ates* li%htin%* heatin%* draina%e* f'rnit're* sheles* etc
To (e meas'red as a 5'mp 2'm.
4$.340 Cloed Storage for electrical e6"ipment> r"nning and maintenance
This position incl'des costs of r'nnin%* operation and maintenance incl'din% s'pply of
electricity* %'ardin%* etc.* for the stora%e mentioned 'nder pos. 42.""0.
To (e meas'red in >onths.
4$.3?0: FLS-Cloed Storage for electrical e6"ipment> demolition
This position incl'des costs of demolition and remoal of the stora%e mentioned 'nder
pos. 42.""0.
To (e meas'red as a 5'mp 2'm.
4$.3A0 Co'ered Storage 9for ,mplo#er "pplie:> "ppl# and erection
This position incl'des costs of s'pply and erection of a coered stora%e area for
machinery and other parts s'pplied (y the Employer* incl. roads* fences* %ates* li%htin%*
draina%e* sleepers* etc.
To (e meas'red as a 5'mp 2'm.
4$.3)0 Co'ered Storage> r"nning and maintenance
This position incl'des costs of r'nnin%* operation and maintenance incl'din% s'pply of
electricity* %'ardin%* etc.* for the stora%e mentioned 'nder pos. 42."A0.
To (e meas'red in >onths.
4$.3B0 Co'ered Storage> demolition
This position incl'des costs of demolition and remoal of the stora%e mentioned 'nder
pos. 42."A0.

To (e meas'red as a 5'mp 2'm.
4$.B00 C2ainman
/ar/www/apps/conersion/tmp/scratch!1/2"1#20$01.doc
Project: FLS Standard 3.000 tpd X3.3 - Page: 14 of 14
Greenfield Cement Plant Verion: !an"ar# $01$
%& Congo &e'.: 0 - %ate: 0$ !an $011
Project (o.: 11-)30)4 C*V*L
This position incl'des costs of ma+in% aaila(le* when re/'ired* a chainman incl'din%
helper for assistance to the Employers staff when re/'ired for control of settin% o't*
ta+in% meas'rements etc. The amo'nt is to coer appro)imately twenty fie <2$= B the
informed period.
To (e meas'red in >onths.
/ar/www/apps/conersion/tmp/scratch!1/2"1#20$01.doc