Project
:
PLTU Tanjung Pinang 2x 15 MW - Bintan
Area
:
Foundation Beam (axis 2, axis B~D)
Reff. Dwg
:
TLB-CD-FDB-FD-0016
No
GAMBAR SKETSA
Date:
02-Jun-14
L (mm)
PEMOTONGAN
JUMLAH
KG
Pjg Lonjor
(mm)
Jml btg/
Lonjor
Jumlah
Lonjor
ulir
2,960
123
379.37
12000
4.00
30.00
160.00
30.00
5.00
10@250
polos
12,000
10
74.04
12000
1.00
10.00
0.00
10.00
0.00
10@250
polos
8,102
10
49.99
12000
1.00
10.00
3898.00
10.00
24.05
5D25
ulir
12,000
231.18
12000
0.00
5D25
ulir
8,162
157.24
12000
3838
73.94
4D25
ulir
12,000
184.94
12000
0.00
4D25
ulir
8,162
125.79
12000
3838
59.15
6D25
ulir
4,161
96.19
12000
3678
42.51
4D25
ulir
5,400
83.22
12000
1200
9.25
6D25
ulir
12,000
277.42
12000
0.00
6D25
ulir
7,922
183.14
12000
4078
94.28
D16@400
ulir
480
120
90.89
12000
25
0.00
12@100
polos
2,754
168
482.10
12000
42
984
42
43.06
DIA
(mm)
TIPE
D13@140
SISA PEMOTONGAN
L (mm)
JUMLAH
KG
TJBp02
A
B1
80
80
2800
60
11940
B2
60
8042
JL02
C1
11880
120
8042
C2
D1
120
120
11880
D2
120
8042
E1
4161
E2
5400
F1
12000
F2
G
7922
320
80
320 60
997
80
60
997
KET.
320
240 60
997
12@100
polos
2,594
168
454.10
12000
42
1624
42
71.07
60
997
240
10
12
13
16
19
22
25
29
Total
=
=
=
=
=
=
=
=
124.03
936.20
379.37
90.89
1,339.13
2,869.63
kg
kg
kg
kg
kg
kg
kg
kg
kg
2,869.63 kg
Prepared by,
Checked by,
kg
422.32 kg
Approved by,